762:
to sag and touch the inside of the cold calandria tube leading to hydrogen enrichment of the cooler areas. This created a series of small cracks which linked up and caused the long rupture. There was some local fuel damage and the reactor was safely shut down by the operators with no increase in radioactive emissions. The eventual resolution was Large Scale Fuel Channel Replacement and all the pressure tubes were replaced in all Pickering A reactors. The new pressure tubes were supported by an improved design of the annulus gas spacer springs. Since then, careful monitoring of the location of the annulus gas spacer rings has been a significant part of routine reactor inspections.
473: 40: 611: 512:
The Pickering A units employ a moderator dump as a shutdown mechanism, a feature not found in Pickering B, which instead uses what is called an over-poisoned reaction guaranteed shutdown.) There are, however, a number of systems and structures in common between the two stations; the most notable of these is the shared vacuum building, a negative pressure containment system. The operation of Pickering A and B was unified in 2010, to reduce costs now that Pickering A Units 2 and 3 are shut down in safe storage.
2912: 3491: 2727: 868: 882: 896: 534:
well as some maintenance. Instead of retrofitting the poison injection found at the other plants, the least cost option was to add more shutdown rods and then split them into separate, independent groups. This was deemed sufficient by the AECB, despite acknowledging that this does not in fact constitute a fully independent fast acting secondary safe shutdown system.
709:
On October 7, 1994, Pickering Unit 7 set the world record for continuous runtime at 894 days, a record that stood for 22 years. It was surpassed by Heysham 2 unit 8 in 2016, a facility located in the UK, owned by EDF. This was subsequently surpassed by OPG's Darlington plant with Unit 1 running 1,106
603:
Numerous changes in executive-level staff and project management strategy were made for the follow-on project to refit Unit 1. The experience with the return to service of Pickering A Unit 1 was significantly different from Unit 4, with a much tighter adherence to schedule and budget. In August 2005,
564:
Mr. Epp and the Pickering A Review Panel released their report in December 2003, which acknowledged the large cost over-runs and delays, attributing blame to bad management. The Epp Review estimated the cost of restarting the remaining three reactors at $ 3 – 4 billion and supported the continuation
807:
on all radio stations, television stations, television providers, and wireless networks in the province of Ontario, containing an advisory of an unspecified "incident" that had been reported and was being addressed at the plant. The alert stated that no immediate action was required for those within
761:
A serious incident occurred on 1 August 1983. Pressure tube G16 in the Pickering A Unit 2 reactor developed a 2 metre long split. The reactor was safely shut down and the damage investigated. The cause was found to be the mis-location of annulus gas spacer springs which allowed the hot pressure tube
769:
In 1995 and 1996, the AECB noted many safety concerns with the plant, and the generating station was shut in 1997 after peer reviews describing poor safety practices at the plant became public. An Independent, Integrated Performance Assessment report noted that Pickering stations A and B were cited
733:
In September 2022, the Province of Ontario announced that it supported an extension of Pickering's operation from 2024 to 2026. Simultaneously, it announced that it had requested OPG to update feasibility studies on the potential refurbishment of the four units of Pickering B. In its announcement,
729:
OPG will begin the longer term decommissioning process if refurbishment is not pursued. The first step in the long-term decommissioning process is to layup the reactors and place them into safe storage. Pickering staff will have future employment opportunities placing the Pickering units in a safe
533:
Often called a refurbishment, the return to service of Pickering A units 1 and 4 did not involve refurbishing the reactor cores, which involves replacing the calandria tubes, pressure tubes, feeders and end fittings. The main scope of work was the upgrading of the secondary safe shutdown system as
511:
The facility was operated as two distinct stations, Pickering A (Units 1 to 4) and Pickering B (Units 5 to 8) until 2011. While primarily administrative in nature, the division was not wholly artificial, as there are some distinct differences in design between the two groups of stations. (Example:
745:
In August 2023, the OPG Board of Directors agreed with and authorized the submission of the feasibility assessment for the refurbishment of the Pickering B plant to the province as well as to proceed with preliminary planning and preparation activities for the project. This feasibility report was
671:
However, the figure presented by the FAO for Unit 1 doesn't align with that provided by Ontario Energy Minister, Dwight Duncan, who indicated that Pickering Unit 1 would cost $ 900 million, putting the completed project much closer to budget. This is supported by OPG stating that the project was
524:
for safety reasons and placed in lay-up. Specific to Pickering A, four years earlier the AECB had required mandatory upgrades to the safe shutdown system be completed by the end of 1997, which differed from that at the other three plants. Pickering A featured a moderator dump as its 2nd shutdown
753:, announced that the Government of Ontario would be investing in the refurbishment of the four Pickering B reactors that date back to the early 1980s. The refurbishment is expected to be complete by the mid 2030s and should extend the life of the plant by at least another 30 years. 765:
On December 10, 1994 there was a loss of coolant accident. It is said to be the most serious accident in Canadian history (June 2001) by The Standing Senate Committee on Energy, the Environment and Natural Resources. The Emergency Core Cooling System was used to prevent a meltdown.
507:
with a total output of 3,114 MW when all units are on line, and two non-operating units with a total output of 1,030 MW currently shut down in safe storage. The facility is connected to the North American power grid via numerous 230 kV and 500 kV transmission lines.
770:
for breaking regulation 15 times and having 13 fires for the year. "Also of concern was the high failure rate of persons being tested for positions as nuclear operators. At Pickering A only 65% of those taking the test passed, while at Pickering B the rate was just 56%."
651:
Ontario Hydro estimated the construction cost for the four Pickering "A" units at $ 508 million in 1965. Actual cost was $ 716 million (in 1973 dollars). Adjusted for inflation, the $ 508 million estimate in 1973 dollars is $ 698 million, a 2.6% overrun.
720:
In January 2016, the Province of Ontario approved plans to pursue continued operation of the Pickering Nuclear Generating Station to 2024. The extension was intended to ensure sufficient base load electricity was available during refurbishment of the
655:
The 1974 estimated cost for the four Pickering "B" units was $ 1.585 billion. Final cost was $ 3.846 billion (1986 dollars). Adjusted for inflation, the $ 1.585 billion estimate in 1986 dollars is $ 4.082 billion, putting Pickering B under budget.
588:
plant. The report recommended proceeding with the restart of Pickering “A” reactors 1, 2, and 3, sequentially. The report argued that the restart of units 2 and 3 would be contingent on whether “OPG will be able to succeed at the Unit 1 project."
610: 525:
system, and this was deemed too slow compared to the poison injection system that later plants used, including Pickering B. Ontario Hydro committed to the refit and restart project, but it underwent long delays and large cost over-runs.
604:
the OPG Board of Directors announced that Units 2 and 3 would not be returned to service due to specific technical and cost risks surrounding the material condition of these two units. Unit 1 was returned to service in November 2005.
851:
kits via its "Prepare to Be Safe" website between January 12 and 13, increasing from its monthly average of 100 to 200, to over 32,000. The website is applicable for those who live within 50 kilometres (31 mi) of the plant; per
1247: 3540: 684:
and some refurbishment waste generated by the plant sits on-site at the Pickering Waste Management Facility. All operational low and intermediate-level waste is transported to OPG's Western Waste Management Facility at the
1771: 2253: 1191: 560:
in October 2003 delayed action on the Epp report. In late 2003, the new government fired the top three executives of OPG for botching the Unit 4 restoration, which was years late and millions of dollars over budget.
725:
and the initial Bruce Nuclear refurbishments. By 2016, OPG had begun planning for the end of commercial operations at the generating station, including the potential repurposing of the Pickering site location.
599:
of Canada criticized the 2004 OPG Review Committee report for not attributing any blame to the problems of nuclear technology, noting that there were no energy or environmental experts appointed to the panel.
2311: 1822: 1306: 1217: 1109: 1239: 968: 2224: 1131: 694: 2282: 1779: 1642: 1030: 3535: 734:
the Province stated that continued operation of the station would reduce carbon dioxide emissions by 2.1 megatonnes in 2026, as well as increasing the North American supply of
1750: 1163: 2245: 1430: 1667: 1184: 2338: 1844: 1545: 617: 3550: 3545: 712:- In 2019, Pickering set a site capacity factor record of 87.07%, producing 23.6TWh and putting it roughly on-par with the much newer Darlington and Bruce facilities. 85: 2157: 584:, examine its corporate and management structure, and decide whether the public utility should proceed with refurbishing three more nuclear reactors at the Pickering 1721: 2506: 2128: 2763: 2637: 698: 2099: 1877: 635: 407:
reactors. Since 2003, two of these units have been defuelled and deactivated. The remaining six produce about 16% of Ontario's power and employ 3,000 workers.
1830: 812:
that the alert had been sent in error, and a second emergency alert was issued at around 9:10 a.m. with a similar message cancelling the previous alert.
3436: 369: 2195: 1298: 3515: 1000: 944: 1209: 746:
given to the Minister of Energy in January 2024 but was not released to the public because it could harm the "economic or other interests of Ontario.”
1338: 1906: 2586: 2536: 2424: 2408: 1481: 934: 909: 826: 2046: 488:, with significant completion of Station A scheduled for 1971. In April 1999, Ontario Hydro was split into five component Crown corporations with 3555: 547: 1101: 1520: 939: 480:
The site was once Squires Beach located west of Duffins Creek. The facility was constructed in stages between 1965 and 1986 by the provincial
2398: 2331: 1954: 924: 722: 3494: 2478: 1277: 972: 856:(CNSC) requirements, OPG is required to distribute these pills to all residences within 10 kilometres (6.2 mi) of a nuclear facility. 2216: 1123: 1059: 3333: 2526: 2429: 2274: 2072:"Nuclear power systems : their safety / Lynne C. Myers.: YM32-1/83-14-1999-11E-PDF - Government of Canada Publications - Canada.ca" 1631: 1356: 3441: 2911: 2756: 2678: 2306: 1495: 1022: 853: 778: 359: 1595: 3525: 3061: 2731: 1742: 1155: 2023: 1422: 1659: 472: 2393: 2324: 1928: 929: 686: 664:
According to Ontario's FAO, the cost for refitting and restarting the Pickering A units deviated significantly from projections.
3224: 3149: 3020: 2714: 2658: 2466: 1459: 237: 69: 39: 697:
for the long-term storage of low and intermediate level waste on lands adjacent to the Western Waste Management Facility. The
800: 553:
to study and make recommendations on the problems with the Pickering restart. The review panel was established in May 2003.
2149: 620:
The Pickering Nuclear Generating Station, viewed from the west. All eight reactors are visible, from 2.5km to 3.25km away.
592:
The McGuinty government accepted the OPG Review Committee's recommendation and allowed the refit and restart of reactor 1.
3396: 3328: 3318: 3194: 3094: 2749: 1997: 1713: 3249: 3209: 2786: 2673: 2501: 2363: 2120: 1772:"Ontario Moving Forward with Nuclear Refurbishment at Darlington and Pursuing Continued Operations at Pickering to 2024" 1596:"Appendix 2 - Ontario's Nuclear Generating Facilities: A History and Estimate of Unit Lifetimes and Refurbishment Costs" 815: 481: 520:
On December 31, 1997 the four Pickering A reactors, along with the remaining three units at Bruce A, were shut down by
3530: 3476: 3471: 3189: 3164: 3154: 3130: 3125: 2831: 2620: 2434: 822: 415: 1869: 1929:"Ontario is about to decide whether to overhaul Canada's oldest nuclear power plant. Does it deserve a second life?" 3391: 3109: 3079: 2856: 2368: 2217:"Iodide pills protect you in a nuclear disaster. So, why didn't more people have them before the Pickering scare?" 1793: 1567: 3446: 2935: 2896: 2179: 901: 3421: 3229: 3169: 2826: 2693: 2688: 2642: 2605: 2571: 2516: 2511: 2378: 914: 577: 573: 489: 205: 194: 996: 701:
is currently seeking a site for a potential repository for the used fuel from all Canadian nuclear reactors.
3360: 3350: 3340: 2581: 2358: 2347: 919: 750: 730:
storage state, at the Darlington refurbishment and operations, or at the potential new build at Darlington.
1327: 3520: 3281: 3144: 2927: 2816: 2496: 1898: 1210:"Ontario government supports OPG proposal to operate Pickering nuclear station past planned 2024 closing" 3416: 3184: 3179: 3159: 2039: 1404: 1370: 557: 392: 147: 492:(OPG) taking over all electricity generating stations. OPG continues to operate the Pickering station. 2275:"Over 32,000 potassium iodide pills ordered in 2 days after Pickering nuclear power plant alert error" 3010: 2772: 2021:"Nuclear Threat in the Eastern Mediterranean" David H. Martin, June 2000, Page 10 (or page 17 of 106) 808:
10 kilometres (6.2 mi) of the plant. Approximately 40 minutes later, OPG issued a statement via
739: 403:. It is one of the oldest nuclear power stations in the world and Canada's third-largest, with eight 777:
into Lake Ontario from a failed pump seal. There was negligible risk to the public according to the
668:- Pickering Unit 1 was slated to cost $ 210 million and ultimately ended up costing $ 1.00 billion. 17: 3381: 3214: 3114: 3089: 3042: 2851: 2841: 2806: 2576: 774: 690: 666:- Pickering Unit 4 was slated to cost $ 460 million and ultimately ended up costing $ 1.25 billion. 418:, was installed on the site of the generating station until October 2019, when it was dismantled. 3255: 2866: 2596: 596: 581: 400: 314: 65: 2121:"Ontario government apologizes for alert about Pickering nuclear plant incident sent 'in error'" 2071: 1632:"Nuclear Refurbishment - An Assessment of the Financial Risks of the Nuclear Refurbishment Plan" 1270:"Rod-Based Guaranteed Shutdown States (RBGSS) implementation at Pickering B (IAEA-TECDOC--1650)" 949: 821:
stated that the alert was accidentally issued during a "routine training exercise" by Ontario's
3406: 3286: 2891: 2610: 2531: 2187: 1477: 1269: 1051: 796: 681: 630:
The graph represents the annual electricity generation at the site (A and B combined) in GWh.
1546:"Ontario Supports Plan to Safely Continue Operating the Pickering Nuclear Generating Station" 3355: 3296: 3000: 2995: 2972: 2881: 2821: 2625: 2541: 2246:"Orders for potassium iodide pills surge after false alarm at Pickering nuclear power plant" 1387: 848: 844: 1503: 3386: 3345: 3323: 3204: 3174: 3139: 3099: 2901: 2630: 2615: 2027: 1606: 569: 504: 327: 2020: 1991:"EXAMINATION OF THE PRESSURE TUBE RUPTURE AT PICKERING NGS 'A' UNIT 2, FUEL CHANNEL G16" 3411: 3401: 3199: 2811: 873: 500:
The Pickering station is a large multi-unit nuclear facility, comprising six operating
339: 2040:""Pickering A Shutdown and Rehabilitation: A Brief History" page 4 (or page 11 of 51)" 3509: 3431: 3219: 3104: 3084: 3015: 3005: 2962: 2846: 2801: 2471: 1080: 887: 585: 521: 485: 1452: 1081:"Better Never than Late: The Climate Fall-Out of Ontario's Nuclear Electricity Plan" 3451: 3426: 3291: 3260: 3074: 2876: 2698: 2683: 829: 818: 411: 396: 247: 44:
Unit 4 Facing east with the large vacuum building and water tower in the background
638:
As of the end of 2023, the total lifetime output of the facility was 972,252 GWh.
1185:"Pickering-Ajax-Whitby Sub-region Integrated Regional Resource Plan - Appendices" 3276: 3244: 3037: 3025: 2945: 2871: 2861: 2791: 2663: 2150:"Pickering Nuclear Generating Station emergency alert issued in error, OPG says" 1480:(Report). The Ontario Power Generation Review Committee. p. 47 – via 804: 790: 543: 1990: 1972: 3239: 3234: 3047: 3030: 2886: 863: 2191: 1955:"Doug Ford government to announce plans to refurbish Pickering nuclear plant" 1870:"Ontario plans to extend life of Pickering nuclear plant, eyes refurbishment" 100: 87: 2955: 2950: 2836: 2796: 969:"Preliminary Decommissioning Plan - Pickering Generating Stations A & B" 881: 837: 735: 2070:
Government of Canada, Public Services and Procurement Canada (2002-07-01).
2316: 843:
The false alarm also prompted renewed interest in preparedness for actual
556:
Unit 4 was refitted and then restarted in Sept. 2003. The election of the
3069: 1743:"Darlington's Unit 1 heads into planned outage after record-breaking run" 550: 320: 378: 2990: 2980: 2741: 1973:"Pickering nuclear plant expected to be fully refurbished by mid-2030s" 1801: 833: 825:. The incident prompted criticism from government officials, including 809: 73: 2985: 2668: 2096:"Pickering Nuclear plant reports water leak, CBC News, March 16 2011" 2095: 2546: 1240:"The Use of Rod-Based Guaranteed Shutdown State in CANDU Reactors" 501: 471: 404: 296: 997:"Our story > Pickering Nuclear celebrates record-setting year" 2940: 2551: 1714:"New Record: Nuclear Power Plant Online for 940 Continuous Days" 1357:"Ontario to spend nearly $ 1 billion to restart nuclear reactor" 1023:"Future of Pickering nuclear plant a hot topic in Durham Region" 476:
Site of the Pickering Nuclear Station during construction, 1965.
3541:
Buildings and structures in the Regional Municipality of Durham
2745: 2320: 2180:"Ontario Warned of a Nuclear 'Emergency,' Then Said Never Mind" 572:
appointed Epp to the Ontario Power Generation Review headed by
2521: 1052:"Removal of Pickering wind turbine – Sept. 30 to Nov. 8, 2019" 633: 1660:"Ontario government gives thumbs up to Pickering A1 restart" 1208:
McClearn, Matthew; Baum, Kathryn Blaze (16 January 2020).
1124:"A look at the long, complicated history of Ontario hydro" 773:
On March 14, 2011, there was a leak of 73 cubic metres of
1688: 1521:"OPG Moves to Planning Phase of Darlington Refurbishment" 1496:"Manley Expected to Support Pickering Nuclear Boondoggle" 1102:"it seems like only yesterday this was a farmer's field" 693:. OPG has proposed the construction and operation of a 1405:"Canada's Nuclear Reactors: How much safety is enough?" 1371:"Canada's Nuclear Reactors: How much safety is enough?" 3460: 3370: 3307: 3269: 3123: 3060: 2971: 2926: 2919: 2779: 2707: 2651: 2595: 2564: 2487: 2459: 2452: 2417: 2386: 2377: 1899:"OPG REPORTS 2023 SECOND QUARTER FINANCIAL RESULTS" 365: 355: 350: 338: 326: 313: 264: 253: 243: 233: 225: 220: 212: 201: 190: 180: 170: 146: 124: 116: 79: 61: 53: 32: 1639:FAO - Financial Accountability Office of Ontario 1476:Manley, J.; Epp, J.; Godsoe, P.C. (2004-03-15). 1478:Transforming Ontario's Power Generation Company 1515: 1513: 441:PICKERING A 3 (Safe Shutdown state, defuelled) 438:PICKERING A 2 (Safe Shutdown state, defuelled) 2757: 2332: 749:On January 30, 2024, the Minister of Energy, 8: 1388:"CANDU Fundamentals - Reactivity mechanisms" 1150: 1148: 3536:Nuclear power stations using CANDU reactors 1548:. Government of Ontario. September 29, 2022 426:The reactors can be classified as follows: 2923: 2764: 2750: 2742: 2456: 2383: 2339: 2325: 2317: 1453:"Report Of The Pickering "A" Review Panel" 945:Nine Mile Point Nuclear Generating Station 29: 1274:International Atomic Energy Agency (IAEA) 991: 989: 935:Point Lepreau Nuclear Generating Station 910:List of largest power stations in Canada 3551:Energy infrastructure completed in 1983 3546:Energy infrastructure completed in 1971 1568:"A Journalist's guide to Nuclear Power" 960: 847:: OPG reported a surge in the sales of 370:Related media on Commons 1927:McClearn, Matthew (January 21, 2024). 1328:"EB-2013-0321 - Decision with Reasons" 1299:"Pickering Nuclear Generating Station" 1156:"Pickering Nuclear Generating Station" 940:Fitzpatrick Nuclear Generating Station 795:On January 12, 2020 at 7:24 a.m. 2638:Nuclear Waste Management Organization 2285:from the original on January 16, 2020 925:Darlington Nuclear Generating Station 723:Darlington Nuclear Generating Station 699:Nuclear Waste Management Organization 7: 1220:from the original on 18 January 2020 389:Pickering Nuclear Generating Station 33:Pickering Nuclear Generating Station 18:Pickering nuclear generating station 3442:Renewable energy commercialization 2679:Canadian Nuclear Safety Commission 1953:Crawley, Mike (January 30, 2024). 1303:Canadian Nuclear Safety Commission 1244:Canadian Nuclear Safety Commission 915:List of nuclear reactors in Canada 854:Canadian Nuclear Safety Commission 779:Canadian Nuclear Safety Commission 25: 3516:Nuclear power stations in Ontario 1794:"Ontario's Long-Term Energy Plan" 1664:Nuclear Engineering International 832:, Pickering mayor Dave Ryan, and 672:completed on time and on budget. 3490: 3489: 2910: 2726: 2725: 1648:from the original on 2021-01-26. 1465:from the original on 2020-06-09. 1433:from the original on 9 June 2020 1344:from the original on 2020-12-16. 1197:from the original on 2019-02-24. 1112:from the original on 2020-03-21. 930:Bruce Nuclear Generating Station 894: 880: 866: 609: 221:Nuclear power station 38: 2715:Anti-nuclear movement in Canada 2659:Atomic Energy of Canada Limited 2256:from the original on 2020-01-15 2227:from the original on 2020-01-20 2198:from the original on 2020-01-12 2160:from the original on 2020-01-12 2131:from the original on 2020-01-12 2102:from the original on 2012-04-30 2052:from the original on 2019-02-03 2003:from the original on 2013-10-05 1909:from the original on 2023-08-20 1880:from the original on 2023-01-02 1753:from the original on 2022-01-13 1724:from the original on 2021-10-09 1670:from the original on 2020-09-05 1423:"OPG cancels Pickering repairs" 1309:from the original on 2021-11-18 1280:from the original on 2020-06-09 1250:from the original on 2021-11-20 1166:from the original on 2021-04-23 1134:from the original on 2020-11-12 1062:from the original on 2020-06-09 1033:from the original on 2016-08-16 1003:from the original on 2020-06-09 791:Alert Ready § False alarms 3556:1971 establishments in Ontario 1421:Luciw, Roma (12 August 2005). 1106:Canadian Champion (Milton, ON) 576:to examine the future role of 395:located on the north shore of 186:$ 3.84 billion CAD (B station) 1: 3437:Renewable Energy Certificates 3397:Cost of electricity by source 3319:Arc-fault circuit interrupter 3195:High-voltage shore connection 1868:Jones, Allison (2022-09-29). 184:$ 716 million CAD (A station) 27:Nuclear power plant in Canada 3452:Spark/Dark/Quark/Bark spread 3250:Transmission system operator 3210:Mains electricity by country 2787:Automatic generation control 2674:Canadian Nuclear Association 2364:Electricity sector in Canada 1778:. 2016-01-11. Archived from 1712:Larson, Aaron (2016-09-21). 1502:. 2004-03-17. Archived from 3477:List of electricity sectors 3472:Electric energy consumption 3190:High-voltage direct current 3165:Electric power transmission 3155:Electric power distribution 2832:Energy return on investment 2621:McArthur River uranium mine 2435:Nuclear Power Demonstration 2312:Google maps satellite image 1798:Canada's Ministry of Energy 1021:Shah, Maryam (2013-06-22). 823:emergency operations centre 785:2020 nuclear incident alert 416:OPG 7 commemorative turbine 340:Annual net output 3572: 3392:Carbon offsets and credits 3110:Three-phase electric power 2369:Nuclear industry in Canada 2178:Austen, Ian (2020-01-12). 1689:"Deep Geologic Repository" 788: 166:Unit 8: February 28, 1986 3485: 3447:Renewable Energy Payments 2936:Fossil fuel power station 2908: 2723: 2587:Plasma Physics Laboratory 2354: 1603:www.pembinafoundation.org 1355:CBC News (July 7, 2004). 1108:. 1967-04-05. p. 5. 902:Nuclear technology portal 375: 306:Units decommissioned 273: 269: 154:Unit 2: December 30, 1971 142:Unit 8: September 1, 1976 130:Unit 2: September 1, 1966 49: 37: 3526:Ontario Power Generation 3230:Single-wire earth return 3170:Electrical busbar system 2827:Energy demand management 2694:Ontario Power Generation 2689:Natural Resources Canada 2643:Deep Geologic Repository 2606:Uranium mining in Canada 2572:Chalk River Laboratories 2307:Ontario Power Generation 1827:Ontario Power Generation 695:deep geologic repository 580:(OPG) in the province's 578:Ontario Power Generation 490:Ontario Power Generation 292:Make and model 206:Ontario Power Generation 195:Ontario Power Generation 162:Unit 6: February 1, 1984 136:Unit 5: November 1, 1974 132:Unit 3: December 1, 1967 3361:Residual-current device 3351:Power system protection 3341:Generator interlock kit 2582:Whiteshell Laboratories 2359:Energy policy of Canada 2348:Nuclear power in Canada 1823:"Repurposing Pickering" 920:Nuclear power in Canada 595:The anti-nuclear group 548:federal energy Minister 346:972,252 GW·h (lifetime) 315:Nameplate capacity 283:2 × 516 MWe (NET B 6–8) 281:2 × 515 MWe (NET A 1–4) 164:Unit 7: January 1, 1985 138:Unit 6: October 1, 1975 125:Construction began 3145:Distributed generation 2817:Electric power quality 2490:and prototype reactors 2488:Research, experimental 477: 278:Units operational 181:Construction cost 171:Decommission date 3417:Fossil fuel phase-out 3185:Electricity retailing 3180:Electrical substation 3160:Electric power system 1500:Sierra Club of Canada 558:Ontario Liberal Party 475: 393:nuclear power station 287:1 x 530 MWe (NET B 5) 285:1 × 522 MWe (NET B 7) 265:Power generation 254:Thermal capacity 234:Reactor supplier 152:Unit 1: July 29, 1971 140:Unit 7: March 1, 1976 101:43.81167°N 79.06583°W 2773:Electricity delivery 2460:Power plant reactors 2281:. January 14, 2020. 1335:Ontario Energy Board 422:Reactor codification 328:Capacity factor 160:Unit 5: May 10, 1983 158:Unit 4 June 17, 1973 156:Unit 3: June 1, 1972 148:Commission date 128:Unit 1: June 1, 1966 3382:Availability factor 3334:Sulfur hexafluoride 3215:Overhead power line 3115:Virtual power plant 3090:Induction generator 3043:Sustainable biofuel 2852:Home energy storage 2842:Grid energy storage 2807:Droop speed control 2577:McMaster University 2252:. 14 January 2020. 2223:. 20 January 2020. 1305:. 3 February 2014. 999:. OPG. 2020-01-30. 775:demineralized water 691:Kincardine, Ontario 529:Safety System Refit 351:External links 344:23,600 GW·h (2019) 244:Cooling source 134:Unit 4: May 1, 1968 106:43.81167; -79.06583 97: /  3531:Pickering, Ontario 3256:Transmission tower 2867:Nameplate capacity 2565:Research locations 2184:The New York Times 2076:publications.gc.ca 2026:2014-10-13 at the 1845:"Ontario Newsroom" 1427:The Globe and Mail 1268:Urjan, R. (2010). 1214:The Globe and Mail 687:Bruce nuclear site 660:Safety Refit Costs 647:Construction Costs 582:electricity market 568:The government of 478: 401:Pickering, Ontario 3503: 3502: 3407:Environmental tax 3287:Cascading failure 3056: 3055: 2892:Utility frequency 2739: 2738: 2611:McClean Lake mine 2560: 2559: 2448: 2447: 2440:Pickering (A2/A3) 1506:on 16 April 2004. 1458:. December 2003. 1088:Greenpeace Canada 845:nuclear accidents 816:Solicitor General 710:consecutive days. 682:used nuclear fuel 626:Electrical Output 538:Return to service 482:Crown corporation 410:A single 1.8 MWe 386: 385: 360:Pickering Nuclear 332:73.85% (lifetime) 226:Reactor type 16:(Redirected from 3563: 3493: 3492: 3402:Energy subsidies 3356:Protective relay 3297:Rolling blackout 2924: 2914: 2882:Power-flow study 2822:Electrical fault 2766: 2759: 2752: 2743: 2729: 2728: 2708:Public discourse 2626:Rabbit Lake mine 2457: 2384: 2341: 2334: 2327: 2318: 2295: 2294: 2292: 2290: 2271: 2265: 2264: 2262: 2261: 2242: 2236: 2235: 2233: 2232: 2213: 2207: 2206: 2204: 2203: 2175: 2169: 2168: 2166: 2165: 2146: 2140: 2139: 2137: 2136: 2117: 2111: 2110: 2108: 2107: 2092: 2086: 2085: 2083: 2082: 2067: 2061: 2060: 2058: 2057: 2051: 2044: 2036: 2030: 2018: 2012: 2011: 2009: 2008: 2002: 1995: 1987: 1981: 1980: 1969: 1963: 1962: 1950: 1944: 1943: 1941: 1939: 1924: 1918: 1917: 1915: 1914: 1895: 1889: 1888: 1886: 1885: 1865: 1859: 1858: 1856: 1855: 1841: 1835: 1834: 1829:. Archived from 1819: 1813: 1812: 1810: 1809: 1800:. Archived from 1790: 1784: 1783: 1768: 1762: 1761: 1759: 1758: 1739: 1733: 1732: 1730: 1729: 1709: 1703: 1702: 1700: 1699: 1685: 1679: 1678: 1676: 1675: 1656: 1650: 1649: 1647: 1636: 1628: 1622: 1621: 1619: 1617: 1611: 1605:. Archived from 1600: 1592: 1586: 1585: 1583: 1581: 1572: 1564: 1558: 1557: 1555: 1553: 1542: 1536: 1535: 1533: 1532: 1517: 1508: 1507: 1492: 1486: 1485: 1473: 1467: 1466: 1464: 1457: 1449: 1443: 1442: 1440: 1438: 1418: 1412: 1411: 1409: 1401: 1395: 1394: 1392: 1384: 1378: 1377: 1375: 1367: 1361: 1360: 1352: 1346: 1345: 1343: 1332: 1324: 1318: 1317: 1315: 1314: 1295: 1289: 1288: 1286: 1285: 1265: 1259: 1258: 1256: 1255: 1236: 1230: 1229: 1227: 1225: 1205: 1199: 1198: 1196: 1189: 1181: 1175: 1174: 1172: 1171: 1152: 1143: 1142: 1140: 1139: 1120: 1114: 1113: 1098: 1092: 1091: 1085: 1077: 1071: 1070: 1068: 1067: 1048: 1042: 1041: 1039: 1038: 1018: 1012: 1011: 1009: 1008: 993: 984: 983: 981: 980: 971:. Archived from 965: 904: 899: 898: 897: 890: 885: 884: 876: 871: 870: 869: 849:potassium iodide 613: 565:of the project. 516:Partial shutdown 505:nuclear reactors 379:edit on Wikidata 257:6 × 1744 MW 176:31 Oct 2008 (A3) 174:28 May 2007 (A2) 112: 111: 109: 108: 107: 102: 98: 95: 94: 93: 90: 42: 30: 21: 3571: 3570: 3566: 3565: 3564: 3562: 3561: 3560: 3506: 3505: 3504: 3499: 3481: 3465: 3463: 3456: 3387:Capacity factor 3375: 3373: 3366: 3346:Numerical relay 3324:Circuit breaker 3312: 3310: 3303: 3265: 3205:Load management 3175:Electrical grid 3140:Demand response 3133: 3128: 3119: 3100:Microgeneration 3052: 2967: 2915: 2906: 2902:Vehicle-to-grid 2775: 2770: 2740: 2735: 2719: 2703: 2647: 2631:Cigar Lake mine 2616:Cluff Lake mine 2591: 2556: 2489: 2483: 2444: 2413: 2373: 2350: 2345: 2303: 2298: 2288: 2286: 2273: 2272: 2268: 2259: 2257: 2244: 2243: 2239: 2230: 2228: 2215: 2214: 2210: 2201: 2199: 2177: 2176: 2172: 2163: 2161: 2148: 2147: 2143: 2134: 2132: 2119: 2118: 2114: 2105: 2103: 2094: 2093: 2089: 2080: 2078: 2069: 2068: 2064: 2055: 2053: 2049: 2042: 2038: 2037: 2033: 2028:Wayback Machine 2019: 2015: 2006: 2004: 2000: 1993: 1989: 1988: 1984: 1971: 1970: 1966: 1952: 1951: 1947: 1937: 1935: 1926: 1925: 1921: 1912: 1910: 1897: 1896: 1892: 1883: 1881: 1867: 1866: 1862: 1853: 1851: 1849:news.ontario.ca 1843: 1842: 1838: 1821: 1820: 1816: 1807: 1805: 1792: 1791: 1787: 1776:news.ontario.ca 1770: 1769: 1765: 1756: 1754: 1741: 1740: 1736: 1727: 1725: 1711: 1710: 1706: 1697: 1695: 1687: 1686: 1682: 1673: 1671: 1658: 1657: 1653: 1645: 1634: 1630: 1629: 1625: 1615: 1613: 1612:on 4 April 2017 1609: 1598: 1594: 1593: 1589: 1579: 1577: 1570: 1566: 1565: 1561: 1551: 1549: 1544: 1543: 1539: 1530: 1528: 1519: 1518: 1511: 1494: 1493: 1489: 1475: 1474: 1470: 1462: 1455: 1451: 1450: 1446: 1436: 1434: 1420: 1419: 1415: 1410:. June 7, 2001. 1407: 1403: 1402: 1398: 1390: 1386: 1385: 1381: 1376:. June 7, 2001. 1373: 1369: 1368: 1364: 1354: 1353: 1349: 1341: 1330: 1326: 1325: 1321: 1312: 1310: 1297: 1296: 1292: 1283: 1281: 1267: 1266: 1262: 1253: 1251: 1238: 1237: 1233: 1223: 1221: 1207: 1206: 1202: 1194: 1187: 1183: 1182: 1178: 1169: 1167: 1154: 1153: 1146: 1137: 1135: 1122: 1121: 1117: 1100: 1099: 1095: 1090:. October 2008. 1083: 1079: 1078: 1074: 1065: 1063: 1050: 1049: 1045: 1036: 1034: 1020: 1019: 1015: 1006: 1004: 995: 994: 987: 978: 976: 967: 966: 962: 958: 950:Frenchman's Bay 900: 895: 893: 886: 879: 872: 867: 865: 862: 803:was issued via 801:emergency alert 793: 787: 759: 740:medical isotope 718: 711: 707: 678: 667: 665: 662: 649: 644: 636: 634: 628: 623: 622: 621: 619: 614: 570:Dalton McGuinty 540: 531: 518: 498: 470: 424: 382: 345: 333: 309:2 × 515 MW 300: 286: 284: 282: 260: 185: 175: 165: 163: 161: 159: 157: 155: 153: 141: 139: 137: 135: 133: 131: 129: 105: 103: 99: 96: 91: 88: 86: 84: 83: 45: 28: 23: 22: 15: 12: 11: 5: 3569: 3567: 3559: 3558: 3553: 3548: 3543: 3538: 3533: 3528: 3523: 3518: 3508: 3507: 3501: 3500: 3498: 3497: 3486: 3483: 3482: 3480: 3479: 3474: 3468: 3466: 3462:Statistics and 3461: 3458: 3457: 3455: 3454: 3449: 3444: 3439: 3434: 3429: 3424: 3419: 3414: 3412:Feed-in tariff 3409: 3404: 3399: 3394: 3389: 3384: 3378: 3376: 3371: 3368: 3367: 3365: 3364: 3358: 3353: 3348: 3343: 3338: 3337: 3336: 3331: 3321: 3315: 3313: 3308: 3305: 3304: 3302: 3301: 3300: 3299: 3289: 3284: 3279: 3273: 3271: 3267: 3266: 3264: 3263: 3258: 3253: 3247: 3242: 3237: 3232: 3227: 3222: 3217: 3212: 3207: 3202: 3200:Interconnector 3197: 3192: 3187: 3182: 3177: 3172: 3167: 3162: 3157: 3152: 3150:Dynamic demand 3147: 3142: 3136: 3134: 3124: 3121: 3120: 3118: 3117: 3112: 3107: 3102: 3097: 3092: 3087: 3082: 3080:Combined cycle 3077: 3072: 3066: 3064: 3058: 3057: 3054: 3053: 3051: 3050: 3045: 3040: 3035: 3034: 3033: 3028: 3023: 3018: 3013: 3003: 2998: 2993: 2988: 2983: 2977: 2975: 2969: 2968: 2966: 2965: 2960: 2959: 2958: 2953: 2948: 2943: 2932: 2930: 2921: 2917: 2916: 2909: 2907: 2905: 2904: 2899: 2894: 2889: 2884: 2879: 2874: 2869: 2864: 2859: 2857:Load-following 2854: 2849: 2844: 2839: 2834: 2829: 2824: 2819: 2814: 2812:Electric power 2809: 2804: 2799: 2794: 2789: 2783: 2781: 2777: 2776: 2771: 2769: 2768: 2761: 2754: 2746: 2737: 2736: 2724: 2721: 2720: 2718: 2717: 2711: 2709: 2705: 2704: 2702: 2701: 2696: 2691: 2686: 2681: 2676: 2671: 2666: 2661: 2655: 2653: 2649: 2648: 2646: 2645: 2640: 2635: 2634: 2633: 2628: 2623: 2618: 2613: 2602: 2600: 2593: 2592: 2590: 2589: 2584: 2579: 2574: 2568: 2566: 2562: 2561: 2558: 2557: 2555: 2554: 2549: 2544: 2539: 2534: 2529: 2524: 2519: 2514: 2509: 2504: 2499: 2497:Advanced CANDU 2493: 2491: 2485: 2484: 2482: 2481: 2476: 2475: 2474: 2463: 2461: 2454: 2450: 2449: 2446: 2445: 2443: 2442: 2437: 2432: 2427: 2421: 2419: 2415: 2414: 2412: 2411: 2406: 2401: 2396: 2390: 2388: 2381: 2375: 2374: 2372: 2371: 2366: 2361: 2355: 2352: 2351: 2346: 2344: 2343: 2336: 2329: 2321: 2315: 2314: 2309: 2302: 2301:External links 2299: 2297: 2296: 2266: 2237: 2208: 2170: 2141: 2127:. 2020-01-12. 2112: 2087: 2062: 2031: 2013: 1982: 1964: 1945: 1933:Globe and Mail 1919: 1905:. 2023-08-11. 1890: 1860: 1836: 1833:on 2016-07-18. 1814: 1785: 1782:on 2016-04-14. 1763: 1749:. 2021-02-05. 1734: 1704: 1680: 1666:. 2004-07-26. 1651: 1623: 1587: 1559: 1537: 1509: 1487: 1468: 1444: 1413: 1396: 1379: 1362: 1347: 1337:. 2014-11-20. 1319: 1290: 1260: 1246:. 2016-04-08. 1231: 1200: 1190:. 2016-06-30. 1176: 1144: 1130:. 2017-03-09. 1128:YorkRegion.com 1115: 1093: 1072: 1058:. 2019-09-27. 1043: 1013: 985: 959: 957: 954: 953: 952: 947: 942: 937: 932: 927: 922: 917: 912: 906: 905: 891: 877: 874:Ontario portal 861: 858: 789:Main article: 786: 783: 758: 755: 717: 714: 706: 703: 677: 674: 661: 658: 648: 645: 643: 640: 632: 627: 624: 616: 615: 608: 607: 606: 539: 536: 530: 527: 517: 514: 497: 494: 469: 466: 465: 464: 461: 458: 455: 446: 445: 442: 439: 436: 423: 420: 391:is a Canadian 384: 383: 376: 373: 372: 367: 363: 362: 357: 353: 352: 348: 347: 342: 336: 335: 330: 324: 323: 317: 311: 310: 307: 303: 302: 301:4 × CANDU 500B 293: 289: 288: 279: 275: 274: 271: 270: 267: 266: 262: 261: 258: 255: 251: 250: 245: 241: 240: 235: 231: 230: 227: 223: 222: 218: 217: 214: 210: 209: 203: 199: 198: 192: 188: 187: 182: 178: 177: 172: 168: 167: 150: 144: 143: 126: 122: 121: 118: 114: 113: 81: 77: 76: 63: 59: 58: 55: 51: 50: 47: 46: 43: 35: 34: 26: 24: 14: 13: 10: 9: 6: 4: 3: 2: 3568: 3557: 3554: 3552: 3549: 3547: 3544: 3542: 3539: 3537: 3534: 3532: 3529: 3527: 3524: 3522: 3521:Ontario Hydro 3519: 3517: 3514: 3513: 3511: 3496: 3488: 3487: 3484: 3478: 3475: 3473: 3470: 3469: 3467: 3459: 3453: 3450: 3448: 3445: 3443: 3440: 3438: 3435: 3433: 3432:Pigouvian tax 3430: 3428: 3425: 3423: 3420: 3418: 3415: 3413: 3410: 3408: 3405: 3403: 3400: 3398: 3395: 3393: 3390: 3388: 3385: 3383: 3380: 3379: 3377: 3369: 3362: 3359: 3357: 3354: 3352: 3349: 3347: 3344: 3342: 3339: 3335: 3332: 3330: 3329:Earth-leakage 3327: 3326: 3325: 3322: 3320: 3317: 3316: 3314: 3306: 3298: 3295: 3294: 3293: 3290: 3288: 3285: 3283: 3280: 3278: 3275: 3274: 3272: 3270:Failure modes 3268: 3262: 3259: 3257: 3254: 3251: 3248: 3246: 3243: 3241: 3238: 3236: 3233: 3231: 3228: 3226: 3223: 3221: 3220:Power station 3218: 3216: 3213: 3211: 3208: 3206: 3203: 3201: 3198: 3196: 3193: 3191: 3188: 3186: 3183: 3181: 3178: 3176: 3173: 3171: 3168: 3166: 3163: 3161: 3158: 3156: 3153: 3151: 3148: 3146: 3143: 3141: 3138: 3137: 3135: 3132: 3127: 3122: 3116: 3113: 3111: 3108: 3106: 3105:Rankine cycle 3103: 3101: 3098: 3096: 3093: 3091: 3088: 3086: 3085:Cooling tower 3083: 3081: 3078: 3076: 3073: 3071: 3068: 3067: 3065: 3063: 3059: 3049: 3046: 3044: 3041: 3039: 3036: 3032: 3029: 3027: 3024: 3022: 3019: 3017: 3014: 3012: 3009: 3008: 3007: 3004: 3002: 2999: 2997: 2994: 2992: 2989: 2987: 2984: 2982: 2979: 2978: 2976: 2974: 2970: 2964: 2961: 2957: 2954: 2952: 2949: 2947: 2944: 2942: 2939: 2938: 2937: 2934: 2933: 2931: 2929: 2928:Non-renewable 2925: 2922: 2918: 2913: 2903: 2900: 2898: 2895: 2893: 2890: 2888: 2885: 2883: 2880: 2878: 2875: 2873: 2870: 2868: 2865: 2863: 2860: 2858: 2855: 2853: 2850: 2848: 2847:Grid strength 2845: 2843: 2840: 2838: 2835: 2833: 2830: 2828: 2825: 2823: 2820: 2818: 2815: 2813: 2810: 2808: 2805: 2803: 2802:Demand factor 2800: 2798: 2795: 2793: 2790: 2788: 2785: 2784: 2782: 2778: 2774: 2767: 2762: 2760: 2755: 2753: 2748: 2747: 2744: 2734: 2733: 2722: 2716: 2713: 2712: 2710: 2706: 2700: 2697: 2695: 2692: 2690: 2687: 2685: 2682: 2680: 2677: 2675: 2672: 2670: 2667: 2665: 2662: 2660: 2657: 2656: 2654: 2652:Organizations 2650: 2644: 2641: 2639: 2636: 2632: 2629: 2627: 2624: 2622: 2619: 2617: 2614: 2612: 2609: 2608: 2607: 2604: 2603: 2601: 2598: 2594: 2588: 2585: 2583: 2580: 2578: 2575: 2573: 2570: 2569: 2567: 2563: 2553: 2550: 2548: 2545: 2543: 2540: 2538: 2535: 2533: 2530: 2528: 2525: 2523: 2520: 2518: 2515: 2513: 2510: 2508: 2505: 2503: 2500: 2498: 2495: 2494: 2492: 2486: 2480: 2477: 2473: 2472:CANDU reactor 2470: 2469: 2468: 2465: 2464: 2462: 2458: 2455: 2453:Reactor types 2451: 2441: 2438: 2436: 2433: 2431: 2428: 2426: 2425:Douglas Point 2423: 2422: 2420: 2416: 2410: 2409:Point Lepreau 2407: 2405: 2402: 2400: 2397: 2395: 2392: 2391: 2389: 2385: 2382: 2380: 2376: 2370: 2367: 2365: 2362: 2360: 2357: 2356: 2353: 2349: 2342: 2337: 2335: 2330: 2328: 2323: 2322: 2319: 2313: 2310: 2308: 2305: 2304: 2300: 2284: 2280: 2276: 2270: 2267: 2255: 2251: 2247: 2241: 2238: 2226: 2222: 2218: 2212: 2209: 2197: 2193: 2189: 2185: 2181: 2174: 2171: 2159: 2155: 2151: 2145: 2142: 2130: 2126: 2122: 2116: 2113: 2101: 2097: 2091: 2088: 2077: 2073: 2066: 2063: 2048: 2041: 2035: 2032: 2029: 2025: 2022: 2017: 2014: 1999: 1992: 1986: 1983: 1979:. 2024-01-30. 1978: 1974: 1968: 1965: 1960: 1956: 1949: 1946: 1934: 1930: 1923: 1920: 1908: 1904: 1900: 1894: 1891: 1879: 1875: 1871: 1864: 1861: 1850: 1846: 1840: 1837: 1832: 1828: 1824: 1818: 1815: 1804:on 2016-07-09 1803: 1799: 1795: 1789: 1786: 1781: 1777: 1773: 1767: 1764: 1752: 1748: 1744: 1738: 1735: 1723: 1719: 1718:PowerMagazine 1715: 1708: 1705: 1694: 1690: 1684: 1681: 1669: 1665: 1661: 1655: 1652: 1644: 1641:. Fall 2017. 1640: 1633: 1627: 1624: 1608: 1604: 1597: 1591: 1588: 1576: 1575:inis.iaea.org 1569: 1563: 1560: 1547: 1541: 1538: 1526: 1525:Cision Canada 1522: 1516: 1514: 1510: 1505: 1501: 1497: 1491: 1488: 1483: 1479: 1472: 1469: 1461: 1454: 1448: 1445: 1432: 1428: 1424: 1417: 1414: 1406: 1400: 1397: 1389: 1383: 1380: 1372: 1366: 1363: 1358: 1351: 1348: 1340: 1336: 1329: 1323: 1320: 1308: 1304: 1300: 1294: 1291: 1279: 1275: 1271: 1264: 1261: 1249: 1245: 1241: 1235: 1232: 1219: 1215: 1211: 1204: 1201: 1193: 1186: 1180: 1177: 1165: 1161: 1157: 1151: 1149: 1145: 1133: 1129: 1125: 1119: 1116: 1111: 1107: 1103: 1097: 1094: 1089: 1082: 1076: 1073: 1061: 1057: 1053: 1047: 1044: 1032: 1028: 1024: 1017: 1014: 1002: 998: 992: 990: 986: 975:on 2020-03-12 974: 970: 964: 961: 955: 951: 948: 946: 943: 941: 938: 936: 933: 931: 928: 926: 923: 921: 918: 916: 913: 911: 908: 907: 903: 892: 889: 888:Energy portal 883: 878: 875: 864: 859: 857: 855: 850: 846: 841: 839: 835: 831: 828: 824: 820: 817: 813: 811: 806: 802: 798: 792: 784: 782: 780: 776: 771: 767: 763: 756: 754: 752: 747: 743: 741: 737: 731: 727: 724: 715: 713: 704: 702: 700: 696: 692: 688: 683: 675: 673: 669: 659: 657: 653: 646: 641: 639: 631: 625: 618: 612: 605: 601: 598: 593: 590: 587: 586:nuclear power 583: 579: 575: 571: 566: 562: 559: 554: 552: 549: 546:asked former 545: 537: 535: 528: 526: 523: 522:Ontario Hydro 515: 513: 509: 506: 503: 495: 493: 491: 487: 486:Ontario Hydro 483: 474: 467: 463:PICKERING B 8 462: 460:PICKERING B 7 459: 457:PICKERING B 6 456: 454:PICKERING B 5 453: 452: 451: 450: 444:PICKERING A 4 443: 440: 437: 435:PICKERING A 1 434: 433: 432: 431: 427: 421: 419: 417: 413: 408: 406: 402: 398: 394: 390: 380: 374: 371: 368: 364: 361: 358: 354: 349: 343: 341: 337: 334:87.07% (2019) 331: 329: 325: 322: 318: 316: 312: 308: 305: 304: 298: 294: 291: 290: 280: 277: 276: 272: 268: 263: 256: 252: 249: 246: 242: 239: 236: 232: 228: 224: 219: 215: 211: 207: 204: 200: 196: 193: 189: 183: 179: 173: 169: 151: 149: 145: 127: 123: 119: 115: 110: 82: 78: 75: 71: 70:Durham Region 67: 64: 60: 56: 52: 48: 41: 36: 31: 19: 3427:Net metering 3374:and policies 3292:Power outage 3261:Utility pole 3225:Pumped hydro 3131:distribution 3126:Transmission 3075:Cogeneration 2877:Power factor 2730: 2699:Orano Canada 2684:Candu Energy 2439: 2403: 2379:Power plants 2287:. Retrieved 2278: 2269: 2258:. Retrieved 2250:Toronto Star 2249: 2240: 2229:. Retrieved 2221:Toronto Star 2220: 2211: 2200:. Retrieved 2183: 2173: 2162:. Retrieved 2153: 2144: 2133:. Retrieved 2124: 2115: 2104:. Retrieved 2090: 2079:. Retrieved 2075: 2065: 2054:. Retrieved 2034: 2016: 2005:. Retrieved 1985: 1976: 1967: 1958: 1948: 1936:. Retrieved 1932: 1922: 1911:. Retrieved 1902: 1893: 1882:. Retrieved 1873: 1863: 1852:. Retrieved 1848: 1839: 1831:the original 1826: 1817: 1806:. Retrieved 1802:the original 1797: 1788: 1780:the original 1775: 1766: 1755:. Retrieved 1746: 1737: 1726:. Retrieved 1717: 1707: 1696:. Retrieved 1692: 1683: 1672:. Retrieved 1663: 1654: 1638: 1626: 1614:. Retrieved 1607:the original 1602: 1590: 1578:. Retrieved 1574: 1562: 1550:. Retrieved 1540: 1529:. Retrieved 1527:. 2010-02-16 1524: 1504:the original 1499: 1490: 1471: 1447: 1435:. Retrieved 1426: 1416: 1399: 1382: 1365: 1350: 1334: 1322: 1311:. Retrieved 1302: 1293: 1282:. Retrieved 1273: 1263: 1252:. Retrieved 1243: 1234: 1222:. Retrieved 1213: 1203: 1179: 1168:. Retrieved 1159: 1136:. Retrieved 1127: 1118: 1105: 1096: 1087: 1075: 1064:. Retrieved 1055: 1046: 1035:. Retrieved 1026: 1016: 1005:. Retrieved 977:. Retrieved 973:the original 963: 842: 830:Peter Tabuns 819:Sylvia Jones 814: 794: 772: 768: 764: 760: 748: 744: 732: 728: 719: 708: 679: 670: 663: 654: 650: 637: 629: 602: 594: 591: 567: 563: 555: 541: 532: 519: 510: 499: 479: 468:Construction 448: 447: 429: 428: 425: 414:, named the 412:wind turbine 409: 397:Lake Ontario 388: 387: 248:Lake Ontario 3422:Load factor 3277:Black start 3245:Transformer 2946:Natural gas 2897:Variability 2872:Peak demand 2862:Merit order 2792:Backfeeding 2664:Bruce Power 2289:January 20, 2154:Global News 1938:January 30, 1027:Toronto Sun 805:Alert Ready 597:Sierra Club 574:John Manley 544:Mike Harris 449:PICKERING B 430:PICKERING A 202:Operator(s) 120:Operational 104: / 80:Coordinates 3510:Categories 3464:production 3309:Protective 3240:Super grid 3235:Smart grid 3062:Generation 2996:Geothermal 2887:Repowering 2597:Fuel cycle 2399:Darlington 2260:2020-01-21 2231:2020-01-21 2202:2020-01-12 2164:2020-01-12 2135:2020-01-12 2106:2012-04-25 2081:2024-01-31 2056:2019-02-03 2007:2013-07-21 1913:2023-08-20 1884:2023-05-01 1854:2023-05-02 1808:2016-06-28 1757:2022-01-13 1728:2021-11-29 1698:2011-04-11 1674:2022-06-08 1531:2022-06-08 1313:2021-11-29 1284:2021-11-29 1254:2021-11-29 1170:2021-11-29 1138:2020-05-13 1066:2021-11-29 1037:2014-07-02 1007:2021-11-29 979:2020-09-09 956:References 751:Todd Smith 92:79°03′57″W 89:43°48′42″N 3372:Economics 3095:Micro CHP 2973:Renewable 2956:Petroleum 2951:Oil shale 2837:Grid code 2797:Base load 2599:locations 2404:Pickering 2192:0362-4331 1552:April 24, 838:John Tory 757:Incidents 736:cobalt-60 496:Operation 229:CANDU-500 213:Employees 66:Pickering 3495:Category 3282:Brownout 3070:AC power 2780:Concepts 2732:Category 2542:SLOWPOKE 2430:Gentilly 2283:Archived 2279:CBC News 2254:Archived 2225:Archived 2196:Archived 2158:Archived 2129:Archived 2125:CBC News 2100:Archived 2047:Archived 2024:Archived 1998:Archived 1977:CBC News 1959:CBC News 1907:Archived 1878:Archived 1874:CBC News 1751:Archived 1722:Archived 1668:Archived 1643:Archived 1616:19 April 1460:Archived 1431:Archived 1339:Archived 1307:Archived 1278:Archived 1248:Archived 1218:Archived 1192:Archived 1164:Archived 1132:Archived 1110:Archived 1060:Archived 1031:Archived 1001:Archived 860:See also 551:Jake Epp 542:Premier 191:Owner(s) 62:Location 3311:devices 3021:Thermal 3016:Osmotic 3011:Current 2991:Biomass 2981:Biofuel 2963:Nuclear 2920:Sources 834:Toronto 810:Twitter 705:Records 366:Commons 356:Website 74:Ontario 54:Country 3006:Marine 2986:Biogas 2669:Cameco 2537:STOR-M 2418:Closed 2387:Active 2190:  1437:13 May 1224:13 May 836:mayor 716:Future 117:Status 57:Canada 3363:(GFI) 3252:(TSO) 3038:Solar 3026:Tidal 3001:Hydro 2547:ZED-2 2507:MAPLE 2479:SGHWR 2394:Bruce 2050:(PDF) 2043:(PDF) 2001:(PDF) 1994:(PDF) 1646:(PDF) 1635:(PDF) 1610:(PDF) 1599:(PDF) 1580:3 May 1571:(PDF) 1463:(PDF) 1456:(PDF) 1408:(PDF) 1391:(PDF) 1374:(PDF) 1342:(PDF) 1331:(PDF) 1195:(PDF) 1188:(PDF) 1084:(PDF) 799:, an 689:near 676:Waste 642:Costs 502:CANDU 405:CANDU 377:[ 319:3114 297:CANDU 216:3000+ 208:(OPG) 197:(OPG) 3129:and 3048:Wind 3031:Wave 2941:Coal 2552:ZEEP 2502:IMSR 2467:PHWR 2291:2020 2188:ISSN 1940:2024 1618:2022 1582:2023 1554:2024 1482:INIS 1439:2020 1226:2020 738:, a 680:The 299:500A 295:2 × 238:AECL 2532:PTR 2527:NRU 2522:NRX 2517:MTF 2512:MNR 1903:OPG 1747:OPG 1693:OPG 1160:OPG 1056:OPG 827:MPP 399:in 3512:: 2277:. 2248:. 2219:. 2194:. 2186:. 2182:. 2156:. 2152:. 2123:. 2098:. 2074:. 2045:. 1996:. 1975:. 1957:. 1931:. 1901:. 1876:. 1872:. 1847:. 1825:. 1796:. 1774:. 1745:. 1720:. 1716:. 1691:. 1662:. 1637:. 1601:. 1573:. 1523:. 1512:^ 1498:. 1429:. 1425:. 1333:. 1301:. 1276:. 1272:. 1242:. 1216:. 1212:. 1162:. 1158:. 1147:^ 1126:. 1104:. 1086:. 1054:. 1029:. 1025:. 988:^ 840:. 797:ET 781:. 742:. 484:, 321:MW 259:th 72:, 68:, 2765:e 2758:t 2751:v 2340:e 2333:t 2326:v 2293:. 2263:. 2234:. 2205:. 2167:. 2138:. 2109:. 2084:. 2059:. 2010:. 1961:. 1942:. 1916:. 1887:. 1857:. 1811:. 1760:. 1731:. 1701:. 1677:. 1620:. 1584:. 1556:. 1534:. 1484:. 1441:. 1393:. 1359:. 1316:. 1287:. 1257:. 1228:. 1173:. 1141:. 1069:. 1040:. 1010:. 982:. 381:] 20:)

Index

Pickering nuclear generating station

Pickering
Durham Region
Ontario
43°48′42″N 79°03′57″W / 43.81167°N 79.06583°W / 43.81167; -79.06583
Commission date
Ontario Power Generation
Ontario Power Generation
AECL
Lake Ontario
CANDU
Nameplate capacity
MW
Capacity factor
Annual net output
Pickering Nuclear
Related media on Commons
edit on Wikidata
nuclear power station
Lake Ontario
Pickering, Ontario
CANDU
wind turbine
OPG 7 commemorative turbine

Crown corporation
Ontario Hydro
Ontario Power Generation
CANDU