Knowledge

Pleinfeld station

Source đź“ť

520: 487: 454: 31: 281: 47: 527: 494: 461: 801:
services to and from Gunzenhausen, while track 5 is no longer used for scheduled passenger services. The two island platforms are connected by an underpass to the “home” platform. The platforms are not covered and there is no destination displays. The station also has no barrier-free facilities for
738:
on 5 March 1945. Rail operation with electric rolling stock, however, was maintained. The trains continued under their own momentum and were assisted by a steam locomotive back to the electrified section of track. Following the bombardment of a munitions train, ten freight wagons exploded in April
624:
was proclaimed on 7 October. The Bavarian government confirmed this decision on 21 February 1844. The first land was acquired in the Pleinfeld area on 23 September 1845. A contract was awarded for the production of “objects” for Pleinfeld station on 28 February 1849 and the track plan for the
796:
Pleinfeld station has five tracks on three platforms. Track 1 is the “home” platform (next to the station building), and is no longer used for scheduled passenger services. Regional trains to Nuremberg stop on track 2 and regional trains to Treuchtlingen stop on track 3. Track 4 is used by
1100: 646:
The land required for the construction of the line between Treuchtlingen and Pleinfeld was determined on 19 March 1867 and the acquisition of land for the expansion of the station was approved on 12 September 1868. The line was opened on 2 October 1869.
712:
On 9 April 1904, Pleinfeld petitioned for the building of a marshalling yard, because it wanted to be a node for the operations of local freight traffic following the construction of the Donauwörth–Treuchtlingen line. For operational reasons,
769:
The ticket office was opened only once a month for the sale of monthly passes from 31 May 1982 and it was closed completely in 1986 with the installation of ticket machines. The delivery of wagon-load freight ended in the summer of 1999.
988: 1108: 765:
of class Sp Dr S60 was put into operation on 31 July 1979. This interlocking was remotely controlled from GeorgensgmĂĽnd station from 15 February 1982 and it was controlled from WeiĂźenburg station from 1 June 1987.
1253: 650:
The enlarged station was handed over for operation on 5 June 1873. After the extension of the tracks, there was a new main station building, a freight hall, a watering point, two public toilets,
758:
In 1972, the freight office was closed. In 1975/76 the old station building was closed and the station building and the platform underpass were rebuilt and the station tracks were rebuilt.
639:
and Pleinfeld applied on 7 April 1861 for the establishment of a two-track line from Pleinfeld to WeiĂźenburg. On 17 May 1861, the Directorate General of the Royal Transport Institute (
742:
Operations on the line to Gunzenhausen were restored on 13 June 1945. From 5 November 1957 communications on the line between signalmen changed from telegraph to telephone. The first
724:
Pleinfeld requested electric power for lighting from the railway-owned power company on 7 February 1908. This was followed by an electricity supply contract on 22 March 1910.
1243: 727:
The first sketches for the reconstruction of station emerged in 1911. The railway's management finally agreed on 23 July 1933 to improvements to the station and the line. An
1180: 1203: 190: 158: 146: 84: 654:
I in the old warehouse, roundhouse II (newly constructed), a rail service residential building in the old station building, two signalman's houses,
643:) in Nuremberg, requested the extension of the line so that logs unusually large logs could be loaded. This request was reiterated on 16 July 1866. 1248: 1049: 223: 1143: 1026: 1042: 1238: 236: 519: 153: 788:
The electrification of track 6 (a passing loop) was removed and the track was dismantled during the renewal of overhead lines in 2006.
585: 628:
The opening of the Gunzenhausen–Pleinfeld–Schwabach line took place on 1 October 1849, closing the gap between Munich and Nuremberg.
934: 906: 885: 850: 581: 406: 373: 340: 307: 210: 486: 728: 561: 141: 743: 453: 604:
The law authorising the construction of the Ludwig South-North Railway was adopted on 25 August 1843. The Bavarian King
589: 1210: 858: 731:
of class VES was put into operation on 25 August 1933 and the electrification of the line was completed in 1935.
702: 966:(Sand Railway) with a 600 mm gauge, which brought sand from sand pits to the loading dock at the station. 365: 352: 347: 319: 734:
Towards the end of the Second World War the entire overhead wiring in the station area was destroyed by U.S.
919: 636: 385: 923: 360: 314: 874: 866: 593: 332: 299: 996: 870: 718: 129: 393: 380: 327: 294: 946: 714: 398: 781:
on 9 June 2001, Pleinfeld has only been served to and from Nuremberg by the Nuremberg–Treuchtlingen
605: 1153: 1053: 762: 651: 1139: 1022: 659: 782: 774: 747: 706: 1165: 284: 665:
When planning started in 1875 for new lines in Bavaria, two possible routes, Pleinfeld–
280: 1232: 1187: 1104: 778: 613: 609: 577: 30: 1078: 798: 694: 674: 617: 625:
station was approved by the Royal Railways Commission in Munich on 22 March 1849.
655: 565: 46: 690: 682: 99: 86: 698: 621: 569: 66: 879:
Every 2 hours (some trains on weekends require a change in Treuchtlingen)
735: 721:
were selected for this role. This new line was opened on 1 October 1906.
686: 632: 678: 670: 666: 573: 119: 70: 241: 592:, which reached Pleinfeld in 1849, 20 years before the line from 785:
service, which takes only 33 or 36 minutes to reach Nuremberg.
951:
Hourly from Monday to Friday / every 2 hours on Sat and Sun
709:
both argued that these lines should connect in their town.
588:, which is now a secondary line, was built as part of the 705:
were identified. The municipalities of Pleinfeld and
278: 200: 1254:
Buildings and structures in WeiĂźenburg-Gunzenhausen
750:ran from Pleinfeld to Nördlingen on 20 March 1959. 439: 266: 254: 249: 230: 219: 181: 176: 168: 135: 125: 115: 78: 61: 56: 21: 1019:Eisenbahnatlas Deutschland (German railway atlas) 962:From 1925 to 1964 there was a line known as the 773:Since the inauguration of the line S 3 of the 1021:(2009/2010 ed.). Schweers + Wall. 2009. 810:Platform lengths and heights are as follows: 8: 1138:(in German). FĂĽrstenfeldbruck: Eigenverlag. 1101:"Platform information for Pleinfeld station" 983: 981: 979: 596:, which forms part of the modern main line. 1244:Railway stations in Germany opened in 1849 436: 272: 45: 18: 608:'s decision that the line would run from 288: 275: 834: 826:Track 5: length 303 m, height 38 cm 823:Track 4: length 303 m, height 38 cm 820:Track 3: length 309 m, height 38 cm 817:Track 2: length 309 m, height 38 cm 814:Track 1: length 309 m, height 38 cm 975: 1161: 1151: 7: 991:[Station price list 2024] 584:and has five platform tracks. The 14: 1181:"Track plan of Pleinfeld station" 1134:Verfasser Josef Miehling (2009). 1050:Verkehrsverbund GroĂźraum NĂĽrnberg 526: 493: 460: 1052:. 1 January 2019. Archived from 1043:"Tarifzonenplan: VGN-Gesamtraum" 928:Every 2 hours, hourly on Sunday 900:Hourly service in Mon-Fri peaks 560:is at a railway junction on the 525: 518: 492: 485: 459: 452: 279: 29: 1136:Chronik des Bahnhofes Pleinfeld 729:electro-mechanical interlocking 1249:1849 establishments in Bavaria 1204:"History of Pleinfeld station" 744:battery electric multiple unit 586:Gunzenhausen–Pleinfeld railway 1: 1079:"List of German signal boxes" 641:Königlichen Verkehrsanstalten 631:The councils of the towns of 1239:Railway stations in Bavaria 1209:(in German). Archived from 1270: 1081:(in German). stellwerke.de 590:Ludwig South-North Railway 562:Nuremberg–Augsburg railway 16:Railway station in Germany 1202:Stephanie Thoma-Kellner. 989:"Stationspreisliste 2024" 703:Neumarkt in der Oberpfalz 446: 435: 431: 427: 423: 271: 262: 209: 199: 189: 44: 39: 763:track plan interlocking 572:in the German state of 997:DB Station&Service 777:between Nuremberg and 754:Decline of the station 658:, a weighbridge and a 576:. It is classified by 130:DB Station&Service 100:49.10611°N 10.97722°E 237:stationsdatenbank.de 154:Nördlingen–Pleinfeld 1216:on 22 November 2014 509:Show map of Germany 506:Location in Germany 476:Show map of Bavaria 473:Location in Bavaria 96: /  57:General information 1164:has generic name ( 1059:on 20 October 2019 918:– Treuchtlingen – 582:category 4 station 542:Show map of Europe 539:Location in Europe 289:Following station 276:Preceding station 142:Nuremberg–Augsburg 105:49.10611; 10.97722 40:Separation station 1145:978-3-922404-43-9 1028:978-3-89494-139-0 955: 954: 558:Pleinfeld station 555: 554: 551: 550: 419: 418: 177:Other information 162: 150: 1261: 1225: 1223: 1221: 1215: 1208: 1198: 1196: 1194: 1185: 1169: 1163: 1159: 1157: 1149: 1121: 1120: 1118: 1116: 1107:. Archived from 1097: 1091: 1090: 1088: 1086: 1075: 1069: 1068: 1066: 1064: 1058: 1047: 1039: 1033: 1032: 1015: 1009: 1008: 1006: 1004: 994: 985: 939: 937: 911: 909: 897:– Treuchtlingen 890: 888: 855: 853: 835: 783:Regional-Express 775:Nuremberg S-Bahn 543: 529: 528: 522: 510: 496: 495: 489: 477: 463: 462: 456: 437: 283: 273: 202: 156: 144: 111: 110: 108: 107: 106: 101: 97: 94: 93: 92: 89: 49: 33: 19: 1269: 1268: 1264: 1263: 1262: 1260: 1259: 1258: 1229: 1228: 1219: 1217: 1213: 1206: 1201: 1192: 1190: 1183: 1179: 1176: 1160: 1150: 1146: 1133: 1130: 1125: 1124: 1114: 1112: 1111:on 4 March 2016 1099: 1098: 1094: 1084: 1082: 1077: 1076: 1072: 1062: 1060: 1056: 1045: 1041: 1040: 1036: 1029: 1017: 1016: 1012: 1002: 1000: 999:. 24 April 2023 992: 987: 986: 977: 972: 960: 935: 933: 907: 905: 886: 884: 851: 849: 833: 808: 794: 756: 602: 547: 546: 545: 544: 541: 540: 537: 536: 535: 534: 530: 513: 512: 511: 508: 507: 504: 503: 502: 501: 497: 480: 479: 478: 475: 474: 471: 470: 469: 468: 464: 442: 401: 388: 368: 355: 335: 322: 302: 285:DB Regio Bayern 104: 102: 98: 95: 90: 87: 85: 83: 82: 73: 65:Bahnhofstr. 7, 52: 35: 34: 27: 26: 17: 12: 11: 5: 1267: 1265: 1257: 1256: 1251: 1246: 1241: 1231: 1230: 1227: 1226: 1214:(PDF; 8.36 MB) 1199: 1175: 1174:External links 1172: 1171: 1170: 1144: 1129: 1126: 1123: 1122: 1092: 1070: 1034: 1027: 1010: 974: 973: 971: 968: 959: 956: 953: 952: 949: 940: 930: 929: 926: 912: 902: 901: 898: 891: 881: 880: 877: 856: 846: 845: 842: 839: 832: 829: 828: 827: 824: 821: 818: 815: 807: 804: 802:the disabled. 793: 792:Infrastructure 790: 755: 752: 689:and Pleinfeld– 601: 598: 553: 552: 549: 548: 538: 532: 531: 524: 523: 517: 516: 515: 514: 505: 499: 498: 491: 490: 484: 483: 482: 481: 472: 466: 465: 458: 457: 451: 450: 449: 448: 447: 444: 443: 440: 433: 432: 429: 428: 425: 424: 421: 420: 417: 416: 411: 409: 404: 402: 396: 390: 389: 383: 378: 376: 371: 369: 363: 357: 356: 350: 345: 343: 338: 336: 330: 324: 323: 317: 312: 310: 305: 303: 297: 291: 290: 287: 277: 269: 268: 264: 263: 260: 259: 258:1 October 1849 256: 252: 251: 247: 246: 245: 244: 242:www.bahnhof.de 239: 232: 228: 227: 221: 217: 216: 213: 207: 206: 203: 197: 196: 193: 187: 186: 183: 179: 178: 174: 173: 170: 166: 165: 164: 163: 151: 137: 133: 132: 127: 123: 122: 117: 113: 112: 80: 76: 75: 63: 59: 58: 54: 53: 50: 42: 41: 37: 36: 28: 24: 23: 22: 15: 13: 10: 9: 6: 4: 3: 2: 1266: 1255: 1252: 1250: 1247: 1245: 1242: 1240: 1237: 1236: 1234: 1212: 1205: 1200: 1189: 1188:Deutsche Bahn 1186:(in German). 1182: 1178: 1177: 1173: 1167: 1162:|author= 1155: 1147: 1141: 1137: 1132: 1131: 1127: 1110: 1106: 1105:Deutsche Bahn 1103:(in German). 1102: 1096: 1093: 1080: 1074: 1071: 1055: 1051: 1044: 1038: 1035: 1030: 1024: 1020: 1014: 1011: 998: 995:(in German). 990: 984: 982: 980: 976: 969: 967: 965: 957: 950: 948: 944: 941: 938: 932: 931: 927: 925: 921: 917: 914:Nuremberg – 913: 910: 904: 903: 899: 896: 892: 889: 883: 882: 878: 876: 872: 868: 867:Treuchtlingen 864: 860: 857: 854: 848: 847: 843: 840: 837: 836: 830: 825: 822: 819: 816: 813: 812: 811: 806:Platform data 805: 803: 800: 791: 789: 786: 784: 780: 776: 771: 767: 764: 759: 753: 751: 749: 748:class ETA 150 745: 740: 737: 732: 730: 725: 722: 720: 716: 710: 708: 707:GeorgensgmĂĽnd 704: 700: 696: 692: 688: 684: 680: 676: 672: 668: 663: 661: 657: 653: 648: 644: 642: 638: 634: 629: 626: 623: 619: 615: 611: 607: 599: 597: 595: 594:Treuchtlingen 591: 587: 583: 579: 578:Deutsche Bahn 575: 571: 567: 563: 559: 521: 488: 455: 445: 438: 434: 430: 426: 422: 415: 412: 410: 408: 405: 403: 400: 395: 392: 391: 387: 382: 379: 377: 375: 372: 370: 367: 362: 359: 358: 354: 349: 348:GeorgensgmĂĽnd 346: 344: 342: 339: 337: 334: 333:Treuchtlingen 329: 326: 325: 321: 316: 313: 311: 309: 306: 304: 301: 296: 293: 292: 286: 282: 274: 270: 265: 261: 257: 253: 248: 243: 240: 238: 235: 234: 233: 229: 226:: 661 and 662 225: 222: 218: 214: 212: 208: 204: 198: 194: 192: 188: 184: 180: 175: 171: 167: 160: 155: 152: 148: 143: 140: 139: 138: 134: 131: 128: 124: 121: 118: 114: 109: 81: 77: 72: 68: 64: 60: 55: 48: 43: 38: 32: 20: 1218:. Retrieved 1211:the original 1191:. Retrieved 1135: 1113:. Retrieved 1109:the original 1095: 1083:. Retrieved 1073: 1061:. Retrieved 1054:the original 1037: 1018: 1013: 1001:. Retrieved 963: 961: 958:Sand Railway 947:Gunzenhausen 942: 915: 894: 893:Nuremberg – 862: 838:Train class 809: 799:Regionalbahn 795: 787: 772: 768: 760: 757: 741: 733: 726: 723: 715:Gunzenhausen 711: 695:Hilpoltstein 675:Thalmaessing 664: 656:water cranes 649: 645: 640: 630: 627: 618:Gunzenhausen 603: 557: 556: 413: 399:Gunzenhausen 366:NĂĽrnberg Hbf 353:NĂĽrnberg Hbf 320:NĂĽrnberg Hbf 300:Augsburg Hbf 182:Station code 1003:29 November 566:market town 386:MĂĽnchen Hbf 361:MĂĽhlstetten 315:MĂĽhlstetten 126:Operated by 103: / 79:Coordinates 1233:Categories 1128:References 1063:21 October 920:Ingolstadt 871:Donauwörth 844:Frequency 719:Donauwörth 691:Schwandorf 683:Beilngries 652:roundhouse 637:WeiĂźenburg 614:Nördlingen 610:Donauwörth 191:DS100 code 91:10°58′38″E 1154:cite book 943:Pleinfeld 916:Pleinfeld 895:Pleinfeld 863:Pleinfeld 859:Nuremberg 699:Freystadt 660:turntable 622:Nuremberg 570:Pleinfeld 533:Pleinfeld 500:Pleinfeld 467:Pleinfeld 220:Fare zone 169:Platforms 88:49°6′22″N 67:Pleinfeld 25:Pleinfeld 1220:14 April 1193:14 April 1115:14 April 1085:14 April 964:Sandbahn 875:Augsburg 831:Services 736:strafing 687:Dietfurt 633:Ellingen 606:Ludwig I 441:Location 414:Terminus 397:towards 394:Ramsberg 384:towards 381:Ellingen 364:towards 351:towards 331:towards 328:Ellingen 318:towards 298:towards 295:Ellingen 267:Services 211:Category 116:Owned by 62:Location 679:Greding 671:Heideck 667:Kelheim 600:History 574:Bavaria 564:in the 250:History 231:Website 205:8004835 159:KBS 912 147:KBS 910 136:Line(s) 120:DB Netz 74:Germany 71:Bavaria 1142:  1025:  924:Munich 841:Route 761:A new 739:1945. 255:Opened 1207:(PDF) 1184:(PDF) 1057:(PDF) 1046:(PDF) 993:(PDF) 970:Notes 936:RB 62 908:RB 16 887:RE 60 852:RB 16 580:as a 407:RB 62 374:RB 16 341:RE 60 308:RE 16 1222:2013 1195:2013 1166:help 1140:ISBN 1117:2013 1087:2012 1065:2019 1023:ISBN 1005:2023 779:Roth 717:and 701:and 693:via 685:and 669:via 616:and 612:via 201:IBNR 195:NPLF 185:4960 51:2009 746:of 620:to 568:of 224:VGN 1235:: 1158:: 1156:}} 1152:{{ 1048:. 978:^ 945:– 922:– 873:– 869:– 865:– 861:– 697:, 681:, 677:, 673:, 662:. 635:, 69:, 1224:. 1197:. 1168:) 1148:. 1119:. 1089:. 1067:. 1031:. 1007:. 215:4 172:5 161:) 157:( 149:) 145:(

Index

Deutsche Bahn

Pleinfeld
Bavaria
49°6′22″N 10°58′38″E / 49.10611°N 10.97722°E / 49.10611; 10.97722
DB Netz
DB Station&Service
Nuremberg–Augsburg
KBS 910
Nördlingen–Pleinfeld
KBS 912
DS100 code
Category
VGN
stationsdatenbank.de
www.bahnhof.de

DB Regio Bayern
Ellingen
Augsburg Hbf
RE 16
MĂĽhlstetten
NĂĽrnberg Hbf
Ellingen
Treuchtlingen
RE 60
GeorgensgmĂĽnd
NĂĽrnberg Hbf
MĂĽhlstetten
NĂĽrnberg Hbf

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑