31: 39: 66:. It is a notable facility due to its ability to treat 1 gallon of waste water for 1/3000th of a penny. The process used to treat the waste water has been perfected to treat a large amount of water as inexpensive as possible. This waste water facility is also noted for its high percentage of removal of pollutants while also remaining a primary treatment facility. The solid removal rate is between 88–90% while the 97: 83:
and the Point Loma Wastewater Treatment Plant. The facility was opened in 1963 and began treating 61 million gallons of water per day. In recent years, there have been many changes to legislation regarding the treatment of waste water such as implementing a spill reduction program. In 2013, the plant celebrated its 50th anniversary.
82:
and then on to the ocean. In 1943, the 32nd Street treatment plant was opened, and in 1948, the capacity of this plant was increased to 40 million gallons per day (MGD). A few years later, San Diego Bay was quarantined due to illness and in 1959 the city council approved the metro-sewage system
121:
There are nine major and 84 smaller pump stations in San Diego, these pumps collect water from the surrounding 450 square mile area. The plant treats on average, 145 million gallons per day; however, if needed the plant can process 240 MGD when at maximum capacity. The treated waste
155:
The plant employs two methods to help control the odor that is also produced by all the methane. These two methods are called wet scrubbing, and carbon polishing. The solids that are produced in the digesters is then pushed through the main sludge pumps and is dumped 17.5 miles away in
125:
To begin the treatment of the water, a sample is first taken from the water in order to measure its strength. This is accomplished by measuring the biological oxygen demand of the water. This water is then sent through a series of screens that rake out large solids such as wood and plastic.
136:
After that, an anionic polymer is added which attracts the positively charged solid particles and allows these two substances coagulate and settle out. The fats, oils, and greases are also captured before the water is sent to the
70:(Biological Oxygen Demand) removal rate is kept at 60%. This unique process involves adding Hydrogen Peroxide in order to retrieve and recycle the iron salts that are used in treatment, thus enabling major cost savings. 133:
is added to the water in order to induce a positive chemical charge on the solid particles. Air bubbles are also added to break the surface tension to allow for the inorganic materials settle out.
109: 122:
water is then delivered back into the ocean by an outfall (pipe) that dumps the water 4.5 miles out from the coast. The waste water is gravity-fed throughout the plant.
78:
Prior to the opening of the waste water plant, around 1963, the waste in San Diego was carried through interconnected wooden boxes. These boxes transported the water to the
221: 160:
where it is stored and centrifuged. This final solid product is used in landfills to digest organic material and can help add an extra third of a lifetime to landfills.
285: 265: 260: 290: 144:
The water in the digesters is heated to 98.6 degrees F, in anaerobic conditions. This heating produces about 900 million cubic feet of
177: 108: 96: 280: 270: 148:
each day that is captured to produce energy. This methane production completely powers the plant through the process of
30: 38: 67: 275: 157: 178:"Point Loma Wastewater Treatment Plant | Public Utilities | City of San Diego Official Website" 55: 17: 138: 130: 191: 51: 212:
Huntamer, David. Point Loma Waste Water Treatment Plant. Point Loma: 13 Apr. 2013. Lecture
79: 254: 149: 63: 236: 223: 59: 145: 27:
Wastewater treatment plant in Point Loma, San Diego County, California
42:
A diorama of the grounds of the Point Loma Wastewater Treatment Plant
37: 29: 34:
A view of the digesters at Point Loma Wastewater Treatment Plant
102:A sample of influent (entering) water at the plant 8: 114:Effluent (exiting) water, after treatment 192:"Point Loma Wastewater Treatment Plant" 169: 286:Government buildings completed in 1963 266:Buildings and structures in San Diego 261:Sewage treatment plants in California 48:Point Loma Wastewater Treatment Plant 18:Point loma wastewater treatment plant 7: 25: 291:1963 establishments in California 107: 95: 87:Treatment Process and Disposal 1: 307: 54:facility located on the 281:Government of San Diego 194:. The City of San Diego 237:32.67917°N 117.24694°W 74:History and background 43: 35: 271:Point Loma, San Diego 52:waste water treatment 41: 33: 242:32.67917; -117.24694 56:Point Loma Peninsula 233: /  131:Iron (III) Chloride 44: 36: 16:(Redirected from 298: 248: 247: 245: 244: 243: 238: 234: 231: 230: 229: 226: 213: 210: 204: 203: 201: 199: 188: 182: 181: 174: 111: 99: 21: 306: 305: 301: 300: 299: 297: 296: 295: 251: 250: 241: 239: 235: 232: 227: 224: 222: 220: 219: 217: 216: 211: 207: 197: 195: 190: 189: 185: 176: 175: 171: 166: 119: 118: 117: 116: 115: 112: 104: 103: 100: 89: 80:San Diego River 76: 28: 23: 22: 15: 12: 11: 5: 304: 302: 294: 293: 288: 283: 278: 273: 268: 263: 253: 252: 215: 214: 205: 183: 168: 167: 165: 162: 113: 106: 105: 101: 94: 93: 92: 91: 90: 88: 85: 75: 72: 26: 24: 14: 13: 10: 9: 6: 4: 3: 2: 303: 292: 289: 287: 284: 282: 279: 277: 276:San Diego Bay 274: 272: 269: 267: 264: 262: 259: 258: 256: 249: 246: 209: 206: 193: 187: 184: 179: 173: 170: 163: 161: 159: 153: 151: 150:co-generation 147: 142: 140: 134: 132: 127: 123: 110: 98: 86: 84: 81: 73: 71: 69: 65: 61: 57: 53: 50:is a primary 49: 40: 32: 19: 218: 208: 196:. Retrieved 186: 172: 154: 143: 135: 128: 124: 120: 77: 47: 45: 240: / 228:117°14′49″W 158:Kearny Mesa 255:Categories 225:32°40′45″N 164:References 64:California 139:digesters 60:San Diego 146:methane 129:Next, 198:4 May 200:2013 46:The 68:BOD 58:in 257:: 152:. 141:. 62:, 202:. 180:. 20:)

Index

Point loma wastewater treatment plant


waste water treatment
Point Loma Peninsula
San Diego
California
BOD
San Diego River


Iron (III) Chloride
digesters
methane
co-generation
Kearny Mesa
"Point Loma Wastewater Treatment Plant | Public Utilities | City of San Diego Official Website"
"Point Loma Wastewater Treatment Plant"
32°40′45″N 117°14′49″W / 32.67917°N 117.24694°W / 32.67917; -117.24694
Categories
Sewage treatment plants in California
Buildings and structures in San Diego
Point Loma, San Diego
San Diego Bay
Government of San Diego
Government buildings completed in 1963
1963 establishments in California

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.