221:
because of their need for the Wairakei power station. A report describing this need was not made available to GEL, despite applications and in frustration, GEL applied to declare the ECNZ "anti-competitive" and using their dominant market position to deter advisors, service providers, customers, financiers and investors from dealing with GEL, as well as making baseless statutory applications to hinder GEL's planning applications, and that the ECNZ intended to prevent GEL from supplying power to Electrical Supply Authorities.
167: 644: 299: 285: 313: 208:
and others. In 2007, approval was gained, so with access to more steam (from the whole field, not just that under the McLachlan's land) generation attained 50 MW, full-time; the plot shows that such operation precedes 2007. Ignoring the single value of 56.56 MW (for 10:30pm 22/11/2003, likely a data error), maximum generation plateaued at just under 52 MW over 2012 - 2015, and has fallen since.
250:) for faults that led to the failure of the joint venture (claiming $ 400,000,000), and, denying that the land had been properly sold to Contact as the McLaughlans (the pre-MGL owners) had arranged for the right of first refusal should that land be sold. Multiple entanglements, reaching to the Privy Council ensued. 179:
The station has had an extraordinarily contentious history. In the beginning, Alistair McLachlan and his wife Ava Marie ran a sheep farm for their Waituruturu trust, but also a greenhouse to grow roses and orchids in "artificial monsoon" conditions enabled by geothermal heat: approximately two square
253:
In a deed of settlement in 2006, the McLauchlans abandoned damages proceedings and further arguments over the lease. This however triggered more reverberations in the workings (or not) of the lease but the High Court held that arguments based on an implied term, rectification, mistake, estoppel, and
224:
By 1996 the power station was built. MGL attempted to apply for additional consents allowing the discharge of contaminants to the air, but the Ngati Rauhoto hapu appealed due to inadequate consultation. An application to commence usage was rejected because it was MGL's error in deciding to complete
207:
Initial maximum power levels soon fell from ~43 MW to 30 MW due to a shortage of steam. In 2001 Contact applied for fresh consents (for Wairakei, and Poihipi which it had bought in 2000) which were granted in 2004 but appealed against by the Taupō Council (concerned over land subsidence)
241:
stations, thus reducing their dumping into the Waikato river. MGL objected because this reinjection of low-temperature fluid (much cooler than that already being re-injected) would be detrimental to their Poihipi plant. But in December 1998 Judge Whiting held that Contact's existing (inherited)
220:
and Geotherm Energy Limited (owned by the Waituruturu Trust), challenging ECNZ's entitlement to draw geothermal fluid from the Wairakei field and in 1990 GEL applied to take 44,000 tonnes/day for their new power station, to be named Poihipi, but was granted only 10,000 tonnes/day. ECNZ objected
233:
50,000,000 and could not cover the debenture of $ 80,000,000, thus the call for the appointing of receivers for MGL and PLL, but the McLauchlans obtained an interim injunction against this. Meanwhile, the Electricity Corporation had been dissolved and the Wairakei power plant was now owned by
232:
Immediately after consents were granted, it became clear that the deep liquid steam wells did not provide sufficient fluid. As well, changes to the electricity pricing scheme made it less profitable for Mercury Network to buy power from the station. MGL wrote the value of the plant down to $
191:
55 MW system completed for the Geysers geothermal field in the US by the state of California, but never run. Despite the cost of conversion from the U.S.A standard of 60 cycles/sec. to the N.Z. standard of 50 cycles/sec. the resulting project was much cheaper than using new equipment.
184:) to form a joint venture, Mercury Geotherm Limited, (33% owned by the McLauchlans, or 49% according to the N.Z. Herald, 11 January 2005) and Poihipi Land Limited, wholly owned by MGL. Some land was for the power station, the rest remained as farmland. 199:
Steam supply constraints limited full power to about fourteen hours a day, with only about 3 MW at night. All other geothermal stations are typically run at constant full power. This unusual operating pattern attracted analysis, as in
245:
The McLachlans responded with litigation on two fronts: suing Mercury Energy (by then split, into retail activity still called Mercury Energy but taken over by Mighty River Power, while the line network business became
397: 727: 242:
consents allowed for reinjection at any temperature and consequently, receivers were appointed for MGL and PLL, who decided to sell the Poihipi power plant and the leased land to Contact.
717: 390: 225:
the station before securing all necessary consents, but a priority hearing was allowed. Ngati Rauhoto sought to relitigate the power station consent, but were
271:
In 2004, the McLachlans secured resource consent for a second Poihipi power station just over a kilometre SSE and again encountered objection from Contact.
383: 53: 187:
The original design involved two 23 MW refurbished Elliot turbine-generators but late in the design these were abandoned in favour of a newer
180:
kilometres of their land overlaid the Wairakei geothermal field. Their Waituruturu trust joined with Mercury Network (wholly owned subsidiary of
353: 217: 328: 265: 257:
Thus, the "right of first refusal" did not in fact protect the McLauchlans, and, Contact retains a competitive advantage. Details in
333: 159:
The plant produces around 350 GWh pa, utilising geothermal steam from the Wairakei field, and is operated as part of the
237:, who had applied for consent to reinject used fluid as part of their new low-temperature plant to be added to the main 487: 254:
relief against forfeiture were rejected, and that the lease was void for having an uncertain term of application.
492: 229:
as having already accepted the use of geothermal fluid. Costs of $ 700,000 were awarded against Ngati Rauhoto.
590: 545: 318: 268:
merely states "The Poihipi Road power station was commissioned in 1997 and was bought by Contact in 2000."
686: 664: 658: 565: 555: 550: 522: 507: 406: 238: 160: 629: 585: 580: 575: 570: 560: 540: 517: 512: 93: 202:
Optimised Numerical Modelling of Production from the Poihipi Dry Steam Zone: Wairakei Geothermal System
266:
https://web.archive.org/web/20141225112813/http://www.contactenergy.co.nz/aboutus/shared/powerstations
166: 497: 464: 459: 453: 434: 357: 482: 290: 118: 375: 722: 643: 608: 532: 474: 145: 696: 624: 691: 681: 304: 247: 234: 181: 149: 106: 711: 188: 194:
Utilisation of Second-Hand Plant to Reduce Capital Investment and Project Lead Times
298: 445: 312: 153: 600: 280: 68: 55: 226: 41: 130: 410: 165: 426: 379: 356:. New Zealand Geothermal Association. Archived from 674: 651: 617: 599: 531: 473: 444: 425: 418: 117: 112: 102: 92: 84: 47: 37: 29: 20: 170:Electricity Generation at Poihipi, New Zealand. 152:. It is located on Poihipi Road near Taupō in 728:Buildings and structures in the Taupō District 391: 8: 422: 398: 384: 376: 17: 718:Geothermal power stations in New Zealand 345: 216:Litigation started in 1989 between the 218:Electricity Corporation of New Zealand 354:"Geothermal Fields: Wairakei-Tauhara" 329:List of power stations in New Zealand 7: 196:, Minoru Frederiksens et al., 2000) 148:power station owned and operated by 204:by Sadiq J. Zarrouk et al., 2006. 14: 334:Electricity sector in New Zealand 642: 311: 297: 283: 1: 744: 161:Wairakei geothermal system 640: 261:, Simon Schofield, 2014. 127: 25: 419:Operating power stations 652:Decommissioned stations 319:Renewable energy portal 119:Nameplate capacity 407:Electricity generation 235:Contact Energy Limited 171: 69:38.63028°S 176.04167°E 169: 142:Poihipi Power Station 113:Power generation 21:Poihipi Power Station 465:Te Rapa cogeneration 94:Commission date 74:-38.63028; 176.04167 65: /  291:New Zealand portal 259:Climate Change Law 172: 705: 704: 638: 637: 138: 137: 735: 646: 423: 400: 393: 386: 377: 370: 369: 367: 365: 350: 321: 316: 315: 307: 302: 301: 293: 288: 287: 286: 131:edit on Wikidata 80: 79: 77: 76: 75: 70: 66: 63: 62: 61: 58: 18: 743: 742: 738: 737: 736: 734: 733: 732: 708: 707: 706: 701: 697:Meridian Energy 670: 647: 634: 625:Hauauru ma raki 613: 595: 527: 469: 440: 414: 404: 374: 373: 363: 361: 352: 351: 347: 342: 325: 324: 317: 310: 303: 296: 289: 284: 282: 277: 214: 177: 134: 73: 71: 67: 64: 59: 56: 54: 52: 51: 12: 11: 5: 741: 739: 731: 730: 725: 720: 710: 709: 703: 702: 700: 699: 694: 692:Mercury Energy 689: 687:Genesis Energy 684: 682:Contact Energy 678: 676: 672: 671: 669: 668: 662: 655: 653: 649: 648: 641: 639: 636: 635: 633: 632: 627: 621: 619: 615: 614: 612: 611: 605: 603: 597: 596: 594: 593: 588: 583: 578: 573: 568: 563: 558: 553: 548: 543: 537: 535: 529: 528: 526: 525: 520: 515: 510: 505: 500: 495: 490: 485: 479: 477: 471: 470: 468: 467: 462: 457: 450: 448: 442: 441: 439: 438: 431: 429: 420: 416: 415: 405: 403: 402: 395: 388: 380: 372: 371: 360:on 2 June 2010 344: 343: 341: 338: 337: 336: 331: 323: 322: 308: 305:Geology portal 294: 279: 278: 276: 273: 213: 210: 182:Mercury Energy 176: 173: 150:Contact Energy 136: 135: 128: 125: 124: 121: 115: 114: 110: 109: 107:Contact Energy 104: 100: 99: 96: 90: 89: 86: 82: 81: 49: 45: 44: 39: 35: 34: 31: 27: 26: 23: 22: 13: 10: 9: 6: 4: 3: 2: 740: 729: 726: 724: 721: 719: 716: 715: 713: 698: 695: 693: 690: 688: 685: 683: 680: 679: 677: 673: 666: 663: 660: 657: 656: 654: 650: 645: 631: 628: 626: 623: 622: 620: 616: 610: 607: 606: 604: 602: 598: 592: 589: 587: 584: 582: 579: 577: 574: 572: 569: 567: 564: 562: 559: 557: 554: 552: 549: 547: 544: 542: 539: 538: 536: 534: 533:Hydroelectric 530: 524: 521: 519: 516: 514: 511: 509: 506: 504: 501: 499: 496: 494: 491: 489: 488:Nga Awa Purua 486: 484: 481: 480: 478: 476: 472: 466: 463: 461: 458: 455: 452: 451: 449: 447: 443: 436: 433: 432: 430: 428: 424: 421: 417: 412: 408: 401: 396: 394: 389: 387: 382: 381: 378: 359: 355: 349: 346: 339: 335: 332: 330: 327: 326: 320: 314: 309: 306: 300: 295: 292: 281: 274: 272: 269: 267: 264:The web page 262: 260: 255: 251: 249: 243: 240: 236: 230: 228: 222: 219: 211: 209: 205: 203: 197: 195: 190: 189:Fuji Electric 185: 183: 174: 168: 164: 162: 157: 155: 151: 147: 143: 132: 126: 122: 120: 116: 111: 108: 105: 101: 97: 95: 91: 87: 83: 78: 50: 46: 43: 40: 36: 32: 28: 24: 19: 16: 502: 362:. Retrieved 358:the original 348: 270: 263: 258: 256: 252: 244: 231: 223: 215: 206: 201: 198: 193: 186: 178: 158: 141: 139: 15: 493:Ngatamariki 175:Development 154:New Zealand 88:Operational 72: / 48:Coordinates 33:New Zealand 712:Categories 475:Geothermal 460:Huntly 5-6 456:(co-fires) 454:Huntly 1-4 437:(co-fires) 435:Huntly 1-4 340:References 212:Litigation 146:geothermal 60:176°2′30″E 57:38°37′49″S 675:Companies 591:Whakamaru 546:Aratiatia 665:Meremere 659:Horahora 618:Proposed 566:Maraetai 556:Karapiro 551:Atiamuri 523:Wairakei 508:Rotokawa 364:13 March 275:See also 227:estopped 103:Owner(s) 38:Location 661:(hydro) 630:Tauhara 586:Waipapa 581:Tokaanu 576:Rangipo 571:Ohakuri 561:Mangaio 541:Arapuni 518:Te Mihi 513:Te Huka 503:Poihipi 411:Waikato 409:in the 239:Wairaki 30:Country 667:(coal) 609:Te Uku 498:Ohaaki 413:Region 248:Vector 85:Status 723:Taupō 483:Mokai 144:is a 129:[ 123:55 MW 42:Taupō 601:Wind 427:Coal 366:2011 140:The 98:1996 446:Gas 714:: 163:. 156:. 399:e 392:t 385:v 368:. 192:( 133:]

Index

Taupō
38°37′49″S 176°2′30″E / 38.63028°S 176.04167°E / -38.63028; 176.04167
Commission date
Contact Energy
Nameplate capacity
edit on Wikidata
geothermal
Contact Energy
New Zealand
Wairakei geothermal system

Mercury Energy
Fuji Electric
Electricity Corporation of New Zealand
estopped
Contact Energy Limited
Wairaki
Vector
https://web.archive.org/web/20141225112813/http://www.contactenergy.co.nz/aboutus/shared/powerstations
New Zealand portal
icon
Geology portal
icon
Renewable energy portal
List of power stations in New Zealand
Electricity sector in New Zealand
"Geothermal Fields: Wairakei-Tauhara"
the original
v
t

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑