Knowledge

Portal:Trains/Featured picture/Week 51, 2005

Source 📝

28: 80: 76: 72: 53:, was an 18.3 mile (29.5 km) route between the northeast, the downtown core, and the east. The line was mainly built using an existing 38: 27: 57: 65: 17: 42:, commonly referred to as the RT, being prepared for departure on May 9, 1991. 46: 64:
project. A limited amount of the route runs on streets, mainly in downtown
54: 49:
system. The first line, Watt/I-80-Downtown-Meadowview, which opened in
61: 50: 26: 60:, coupled with use of structures of an abandoned 45:The RT operates a 30.3 mile (48.8 km) 8: 7: 39:Sacramento Regional Transit District 24: 1: 73:Bristol Temple Meads station 96: 32: 30: 71:Recently featured: 33: 87: 95: 94: 90: 89: 88: 86: 85: 84: 34: 22: 21: 20: 12: 11: 5: 93: 91: 31:Sacramento LRV 25: 23: 15: 14: 13: 10: 9: 6: 4: 3: 2: 92: 83: 82: 78: 74: 69: 67: 63: 59: 56: 52: 48: 43: 41: 40: 29: 19: 18:Portal:Trains 70: 58:right-of-way 44: 37: 36:LRVs of the 35: 77:Live steam 66:Sacramento 47:light rail 55:railroad 62:freeway 81:Fusee 16:< 51:1987 79:- 75:- 68:.

Index

Portal:Trains
Sacramento LRV
Sacramento Regional Transit District
light rail
1987
railroad
right-of-way
freeway
Sacramento
Bristol Temple Meads station
Live steam
Fusee

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.