28:
80:
76:
72:
53:, was an 18.3 mile (29.5 km) route between the northeast, the downtown core, and the east. The line was mainly built using an existing
38:
27:
57:
65:
17:
42:, commonly referred to as the RT, being prepared for departure on May 9, 1991.
46:
64:
project. A limited amount of the route runs on streets, mainly in downtown
54:
49:
system. The first line, Watt/I-80-Downtown-Meadowview, which opened in
61:
50:
26:
60:, coupled with use of structures of an abandoned
45:The RT operates a 30.3 mile (48.8 km)
8:
7:
39:Sacramento Regional Transit District
24:
1:
73:Bristol Temple Meads station
96:
32:
30:
71:Recently featured:
33:
87:
95:
94:
90:
89:
88:
86:
85:
84:
34:
22:
21:
20:
12:
11:
5:
93:
91:
31:Sacramento LRV
25:
23:
15:
14:
13:
10:
9:
6:
4:
3:
2:
92:
83:
82:
78:
74:
69:
67:
63:
59:
56:
52:
48:
43:
41:
40:
29:
19:
18:Portal:Trains
70:
58:right-of-way
44:
37:
36:LRVs of the
35:
77:Live steam
66:Sacramento
47:light rail
55:railroad
62:freeway
81:Fusee
16:<
51:1987
79:-
75:-
68:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.