318:
304:
290:
260:-generators. After power production, the water is sent to the lower reservoir. During periods of low energy demand, the same pump-generators pump water from the lower reservoir back to the upper where it becomes stored energy. Power generation occurs when energy demand is high. The upper reservoir, formed by an
272:. Both the upper and lower reservoirs have an active (or usable) storage capacity of 6,000,000 cubic metres (4,900 acre⋅ft). The difference in elevation between both the upper and lower affords a
500:
515:
432:
338:
252:
of 1,000 megawatts (1,300,000 hp). Construction began in 1979, it was finished in 1990 and the generators commissioned in 1991. In 2004, the plant was renamed after
495:
406:
58:
510:
440:
366:
256:. Power is generated by releasing water from the upper Cesima reservoir down to the power plant which contains four reversible 250 MW
490:
380:
410:
333:
323:
505:
462:
257:
193:
269:
238:
249:
200:
253:
273:
261:
242:
230:
210:
179:
358:
484:
265:
245:
309:
295:
264:, is located at an elevation of 643 metres (2,110 ft) in the municipality of
384:
317:
285:
234:
46:
73:
60:
303:
436:
125:
407:"The hydropower plant will be named after Domenico Cimarosa"
409:(in Italian). Il Denar o. 13 May 2004. Archived from
501:
Pumped-storage hydroelectric power stations in Italy
516:
Buildings and structures in the
Province of Caserta
339:
List of pumped-storage hydroelectric power stations
209:
199:
188:
178:
173:
165:
157:
152:
144:
136:
131:
121:
113:
105:
97:
89:
52:
42:
34:
26:
21:
8:
18:
496:Energy infrastructure completed in 1991
350:
463:"Hydroelectric Enel Preston (Caserta)"
227:Domenico Cimarosa Hydroelectric Plant
169:6,000,000 m (4,900 acre⋅ft)
148:6,000,000 m (4,900 acre⋅ft)
30:Domenico Cimarosa Hydroelectric Plant
7:
383:(in Italian). Trevi. Archived from
367:United States Department of Energy
192:4 x 250 MW (340,000 hp)
14:
205:1,000 MW (1,300,000 hp)
316:
302:
288:
433:"Domenico Cimarosa, Presenzano"
276:of 495 metres (1,624 ft).
223:Presenzano Hydroelectric Plant
215:1,276 GWh (4,590 TJ)
22:Presenzano Hydroelectric Plant
1:
363:www.energystorageexchange.org
511:1991 establishments in Italy
465:(in Italian). Campania Tour
532:
225:, officially known as the
184:495 m (1,624 ft)
359:"Energy Storage Exchange"
334:Hydroelectricity in Italy
324:Renewable energy portal
229:, is located along the
201:Installed capacity
98:Construction began
491:Dams completed in 1990
211:Annual generation
114:Construction cost
74:41.38139°N 14.09028°E
258:Francis pump-turbine
194:Francis pump-turbine
387:on 3 September 2014
270:Province of Isernia
241:, Italy. Using the
239:Province of Caserta
166:Total capacity
145:Total capacity
70: /
250:installed capacity
248:method, it has an
117:1,000 billion lire
79:41.38139; 14.09028
381:"ENEL Presenanzo"
254:Domenico Cimarosa
219:
218:
106:Opening date
16:Dam in Presenzano
523:
475:
474:
472:
470:
459:
453:
452:
450:
448:
439:. Archived from
429:
423:
422:
420:
418:
403:
397:
396:
394:
392:
377:
371:
370:
355:
326:
321:
320:
312:
307:
306:
298:
293:
292:
291:
161:Presenzano Lower
85:
84:
82:
81:
80:
75:
71:
68:
67:
66:
63:
19:
531:
530:
526:
525:
524:
522:
521:
520:
481:
480:
479:
478:
468:
466:
461:
460:
456:
446:
444:
443:on 13 June 2012
431:
430:
426:
416:
414:
405:
404:
400:
390:
388:
379:
378:
374:
357:
356:
352:
347:
330:
329:
322:
315:
308:
301:
294:
289:
287:
282:
189:Pump-generators
153:Lower reservoir
132:Upper reservoir
78:
76:
72:
69:
64:
61:
59:
57:
56:
17:
12:
11:
5:
529:
527:
519:
518:
513:
508:
503:
498:
493:
483:
482:
477:
476:
454:
435:(in Italian).
424:
413:on 8 July 2012
398:
372:
349:
348:
346:
343:
342:
341:
336:
328:
327:
313:
299:
284:
283:
281:
278:
274:hydraulic head
262:embankment dam
243:pumped-storage
231:Volturno River
217:
216:
213:
207:
206:
203:
197:
196:
190:
186:
185:
182:
180:Hydraulic head
176:
175:
171:
170:
167:
163:
162:
159:
155:
154:
150:
149:
146:
142:
141:
138:
134:
133:
129:
128:
123:
119:
118:
115:
111:
110:
107:
103:
102:
99:
95:
94:
91:
87:
86:
54:
50:
49:
44:
40:
39:
36:
32:
31:
28:
24:
23:
15:
13:
10:
9:
6:
4:
3:
2:
528:
517:
514:
512:
509:
507:
506:Dams in Italy
504:
502:
499:
497:
494:
492:
489:
488:
486:
464:
458:
455:
442:
438:
434:
428:
425:
412:
408:
402:
399:
386:
382:
376:
373:
368:
364:
360:
354:
351:
344:
340:
337:
335:
332:
331:
325:
319:
314:
311:
305:
300:
297:
286:
279:
277:
275:
271:
267:
266:Sesto Campano
263:
259:
255:
251:
247:
246:hydroelectric
244:
240:
236:
232:
228:
224:
214:
212:
208:
204:
202:
198:
195:
191:
187:
183:
181:
177:
174:Power Station
172:
168:
164:
160:
156:
151:
147:
143:
139:
135:
130:
127:
124:
120:
116:
112:
108:
104:
100:
96:
92:
88:
83:
55:
51:
48:
45:
41:
37:
33:
29:
27:Official name
25:
20:
467:. Retrieved
457:
445:. Retrieved
441:the original
427:
415:. Retrieved
411:the original
401:
389:. Retrieved
385:the original
375:
362:
353:
310:Water portal
296:Italy portal
226:
222:
220:
93:Operational
77: /
53:Coordinates
485:Categories
469:27 January
447:27 January
417:27 January
391:27 January
345:References
235:Presenzano
62:41°22′53″N
47:Presenzano
65:14°5′25″E
280:See also
122:Owner(s)
43:Location
268:in the
158:Creates
137:Creates
35:Country
140:Cesima
90:Status
38:Italy
471:2012
449:2012
437:ENEL
419:2012
393:2012
221:The
126:ENEL
109:1991
101:1979
233:in
487::
365:.
361:.
237:,
473:.
451:.
421:.
395:.
369:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.