Run-of-the-river hydroelectricity

Source đź“ť

147: 1228: 46: 106: 332: 31: 132:, which are at a lower elevation. Projects with pondage, as opposed to those without pondage, can store water for daily load demands. In general, projects divert some or most of a river's flow (up to 95% of mean annual discharge) through a pipe and/or tunnel leading to electricity-generating turbines, then return the water back to the river downstream. 379:
Run-of-the-river projects strongly depend on the consistent flow of water, as they lack reservoirs and depend on the natural flow of rivers. Consequently, these projects are more vulnerable to climate change compared to storage-based projects. Short-term climate anomalies such as the El Niño Southern
280:
to generate the electricity needed by consumers and industry. Moreover, run-of-the-river hydroelectric plants do not have reservoirs, thus eliminating the methane and carbon dioxide emissions caused by the decomposition of organic matter in the reservoir of a conventional hydroelectric dam. That is a
154:
The use of the term "run-of-the-river" for power projects varies around the world. Some may consider a project run-of-the-river if power is produced with no water storage, but limited storage is considered run-of-the-river by others. Developers may mislabel a project run-of-the-river to soothe public
383:
can significantly disrupt the flow and can have a profound impact on the operation of these projects. Thus, incorporating climate change considerations into the initial design and location selection of run-of-the-river projects can help mitigate the vulnerability of these projects to climate-related
289:
Without a reservoir, flooding of the upper part of the river does not take place. As a result, people remain living at or near the river and existing habitats are not flooded. Any pre-existing pattern of flooding will continue unaltered, which presents a flood risk to the facility and downstream
263:
When developed with care to footprint size and location, run-of-the-river hydro projects can create sustainable energy minimizing impacts to the surrounding environment and nearby communities. Run-of-the-river harnesses the natural potential energy of water by eliminating the need to burn coal or
311:
Run-of-the-river power is considered an "unfirm" source of power: a run-of-the-river project has little or no capacity for energy storage and so cannot co-ordinate the output of electricity generation to match consumer demand. It thus generates much more power when seasonal river flows are high
343:
and flow of water. By damming a river, the head is available to generate power at the face of the dam. A dam may create a reservoir hundreds of kilometres long, but in run-of-the-river the head is usually delivered by a canal, pipe or tunnel constructed upstream of the power house. The cost of
224:
The advantages and disadvantages of run-of-river dams depends on the type, the following sections generally refer to Dam-Toe unless otherwise stated. These are listed in order of least impact to most impact, as well as (on average) requisite project size.
352:
Small, well-sited run-of-the-river projects can be developed with minimal environmental impacts. Larger projects have more environmental concerns. For fish-bearing rivers, a ladder may be required, and dissolved gases downstream may affect fish.
175:
A power station utilizing the run of the river flows for generation of power with sufficient pondage for supplying water for meeting diurnal or weekly fluctuations of demand. In such stations, the normal course of the river is not materially
184:
in Quebec is rated at 1,853 MW. Some run-of-the-river projects are downstream of other dams and reservoirs. The reservoir was not built by the project but takes advantage of the water supplied by it. An example would be the 1995 1,436 MW
68:
generation plant whereby little or no water storage is provided. Run-of-the-river power plants may have no water storage at all or a limited amount of storage, in which case the storage reservoir is referred to as
254:
Similar to a regular dam, water is stored from lull periods to be used during peak-times. This allows for the pondage dams to provide for the regulation of daily and/or weekly flows depending on location.
156: 245:
Diversion Weir has very little flow regulation, which is generally used to cover exclusively short-term peak times electricity demand. Diversion Weir is also heavily dependent on the natural river flow.
135:
Run-of-the-river projects are dramatically different in design and appearance from conventional hydroelectric projects. Traditional hydroelectric dams store enormous quantities of water in
393: 751: 364:. As of March 2010, there were 628 applications pending for new water licences solely for power generation, representing more than 750 potential points of river diversion. 951:
Wilderness Committee Comments on the Draft Terms of Reference, Bute Inlet Hydroelectric Private Power Project. Letter to Kathy Eichenberger, Project Assistant Director. P1
1192: 121:
Run-of-the-river, or ROR, hydroelectricity is considered ideal for streams or rivers that can sustain a minimum flow or those regulated by a lake or reservoir upstream.
634: 361: 544: 180:
Many of the larger run-of-the-river projects have been designed to a scale and generating capacity rivaling some traditional hydroelectric dams. For example, the
181: 694: 298:
Due to their low impact, run-of-the-river dams can be implemented in existing irrigation dams with little to no change in the local fluvial ecosystem.
455: 719: 1079: 659: 1161: 574: 683:
Run-of-the-River Hydropower in BC: A Citizen's Guide to Understanding Approvals, Impacts and Sustainability of Independent Power Projects
938:"Green" Hydro Power: Understanding Impacts, Approvals, and Sustainability of Run-of River Independent Power Projects in British Columbia 276:
Like all hydro-electric power, run-of-the-river harnesses the natural potential energy of water by eliminating the need to burn coal or
163:
plants, which can hold enough water to allow generation for up to 24 hours (reservoir capacity / generating capacity ≤ 24 hours), from
618: 509: 485: 968:"The climate change potential effects on the run-of-river plant and the environmental and economic dimensions of sustainability" 1197: 1136:
Freedman, B., 2007, Environmental Science: a Canadian Perspective; 4th edition, Pearson Education Canada, Toronto, pp 226,394.
1007:"Identifying high potential locations for run-of-the-river hydroelectric power plants using GIS and digital elevation models" 186: 827:"Ecological impacts of run-of-river hydropower plants—Current status and future prospects on the brink of energy transition" 966:
Michels-Brito, Adriane; Rodriguez, Daniel Andrés; Cruz Junior, Wellington Luís; Nildo de Souza Vianna, João (2021-09-01).
204:. Like most buoys, it is anchored to the ground, in this case in a river. The energy within the moving water propels a 168: 74: 1301: 201: 196:
There are also small and somewhat-mobile forms of a run-of-the-river power plants. One example is the so-called
1154: 146: 86: 1260: 937: 682: 234: 38: 1039: 825:
Kuriqi, Alban; Pinheiro, AntĂłnio N.; Sordo-Ward, Alvaro; Bejarano, MarĂ­a D.; Garrote, Luis (2021-05-01).
368: 1057: 967: 826: 789: 584: 413: 866: 1147: 124:
A small dam is usually built to create a headpond ensuring that there is enough water entering the
1086: 1275: 1006: 628: 513: 431: 233:
Dam-toe has no flow regulation and utilizes the natural flow of the river to turn the turbines.
208:
and thereby creates electricity. Prototypes by commercial producers are generating power on the
1111: 987: 919: 848: 655: 649: 614: 608: 491: 190: 139:, sometimes flooding large tracts of land. In contrast, run-of-river projects do not have the 73:. A plant without pondage is subject to seasonal river flows, so the plant will operate as an 17: 1236: 1178: 1018: 979: 909: 838: 707: 427: 360:, the mountainous terrain and wealth of big rivers have made it a global testing ground for 357: 316:), and depending on location, much less during drier summer months or frozen winter months. 65: 34: 1245: 1227: 1043: 475: 205: 898:"Run-Of-River Small Hydropower Plants as Hydro-Resilience Assets against Climate Change" 695:
Plutonic Hydro Inc. Bute Inlet Project. Summary of Project Intake and Turbine Parameters
45: 1250: 950: 776: 469: 340: 320: 281:
particular advantage in tropical countries, where methane generation can be a problem.
1295: 1270: 1255: 449: 435: 82: 381: 105: 1265: 523: 441: 209: 110: 268:
to generate the electricity needed by consumers and industry. Advantages include:
777:
Revised Project Description for Bute Inlet Hydroelectric Project Requirements. P1
1280: 1207: 1202: 579: 564: 559: 417: 403: 277: 265: 94: 90: 1022: 983: 843: 30: 1212: 1170: 569: 554: 136: 991: 923: 852: 344:
upstream construction makes a steep drop desirable, such as falls or rapids.
549: 481: 399: 140: 78: 807: 167:
plants, which hold far more than 24 hours of generation without pumps. The
331: 517: 129: 125: 914: 897: 367:
In undeveloped areas, new access roads and transmission lines can cause
319:
Depending on location and type, the plant will most likely have a lower
41:, USA, is a major run-of-the-river station without a sizeable reservoir. 527: 313: 70: 499: 495: 463: 459: 445: 421: 407: 213: 654:(Rev. 2nd ed.). New Delhi: New Age International. p. 288. 531: 503: 330: 145: 114: 104: 44: 29: 157:
European Network of Transmission System Operators for Electricity
1080:"Nathpa - Jhakri Hydroelectric Project, Himachal Pradesh, India" 1143: 189:. Previous upstream dams and reservoirs were part of the 1980s 1187: 1036: 1139: 790:"Hydroelectric generating stations - Hydro-Québec Production" 49:
A small and floating run-of-the-river power plant in Austria.
607:
Dwivedi, A.K. Raja, Amit Prakash Srivastava, Manish (2006).
1059:
Hydroelectric Generating Stations (as of December 31, 2010)
155:
perception about its environmental or social effects. The
757:. Kalpavriksh, Aaranyak and ActionAid India. pp. 4–5 394:
List of run-of-the-river hydroelectric power stations
1005:
Zaidi, Arjumand Z.; Khan, Majid (20 November 2016).
323:
than from a dam, and will thus generate less power.
1235: 1177: 1193:List of conventional hydroelectric power stations 651:Hydrology : principles, analysis, and design 613:. New Delhi: New Age International. p. 354. 371:, allowing the introduction of invasive species. 339:The potential power at a site is a result of the 171:describes run-of-the-river hydroelectricity as: 545:Environmental impact of electricity generation 1155: 8: 1085:. Geological Survey of India. Archived from 633:: CS1 maint: multiple names: authors list ( 182:Beauharnois Hydroelectric Generating Station 150:Saint Marys Falls – run of the river (1902) 1162: 1148: 1140: 472:, Oregon/Washington, United States 1878 MW 143:and so cause fewer environmental impacts. 913: 896:Skoulikaris, Charalampos (January 2021). 842: 602: 600: 1011:Renewable and Sustainable Energy Reviews 972:Renewable and Sustainable Energy Reviews 831:Renewable and Sustainable Energy Reviews 745: 743: 335:Rapids can provide enough hydraulic head 272:Cleaner power and fewer greenhouse gases 141:disadvantages associated with reservoirs 681:Douglas T, Broomhall P, Orr C. (2007). 596: 456:Beauharnois Hydroelectric Power Station 161:run-of-the-river and pondage hydropower 626: 961: 959: 891: 889: 887: 820: 818: 816: 810:. German. Retrieved 30 November 2019. 677: 675: 673: 671: 362:10–50 MW run-of-river technology 7: 575:Gravitation water vortex power plant 237:is heavily dependent on river flow. 720:"Hydro modelling description (PDF)" 550:Environmental impacts of reservoirs 750:Partha J. Das, Neeraj Vagholikar. 25: 1218:Run-of-the-river hydroelectricity 62:run-of-the-river hydroelectricity 1226: 1056:Hydro-QuĂ©bec Production (2012), 510:Ghazi-Barotha Hydropower Project 486:Democratic Republic of the Congo 109:Mankala Power Station along the 1198:Pumped-storage hydroelectricity 708:Hydromax Energy Limited website 187:La Grande-1 generating station 18:Run-of-the-river hydroelectric 1: 87:dispatchable electrical power 54:Run-of-river hydroelectricity 1116:, Power Technology, Nov 2021 697:. Knight Piesold Consulting. 375:Vulnerable to climate change 212:river in Germany and on the 693:Knight Piesold Consulting. 492:Satluj Jal Vidyut Nigam Ltd 81:, which regulate water for 27:Hydroelectric power station 1318: 1023:10.1016/j.rser.2018.02.025 984:10.1016/j.rser.2021.111238 844:10.1016/j.rser.2021.110833 808:Strom aus Bojen serienreif 391: 169:Bureau of Indian Standards 77:. Conventional hydro uses 75:intermittent energy source 1224: 752:"Damming Northeast India" 706:Hydromax Energy Limited. 294:Low-Impact Implementation 202:hydroelectric power plant 648:Raghunath, H.M. (2009). 953:. Wilderness Committee. 775:Plutonic Power (2008). 610:Power Plant Engineering 128:pipes that lead to the 89:, and the provision of 1261:Gorlov helical turbine 1035:IPPwatch.com website. 949:Wilderness Committee. 336: 235:Electricity generation 178: 151: 118: 50: 42: 39:Bridgeport, Washington 867:"Reservoir Emissions" 369:habitat fragmentation 348:Environmental impacts 334: 327:Availability of sites 173: 149: 108: 48: 33: 936:Douglas, T. (2007). 871:International Rivers 585:Marine current power 165:reservoir hydropower 915:10.3390/su132414001 794:www.hydroquebec.com 200:, a small floating 1276:Cross-flow turbine 1042:2011-01-13 at the 940:. Watershed Watch. 514:Khyber Pakhtunkhwa 380:Oscillation (ENSO) 337: 216:river in Austria. 152: 119: 51: 43: 1289: 1288: 1092:on 2 October 2011 779:. Plutonic Power. 661:978-81-224-1825-5 414:Santo AntĂ´nio Dam 191:James Bay Project 16:(Redirected from 1309: 1302:Hydroelectricity 1237:Hydroelectricity 1230: 1179:Hydroelectricity 1164: 1157: 1150: 1141: 1124: 1123: 1122: 1121: 1108: 1102: 1101: 1099: 1097: 1091: 1084: 1076: 1070: 1069: 1068: 1067: 1053: 1047: 1033: 1027: 1026: 1002: 996: 995: 963: 954: 947: 941: 934: 928: 927: 917: 893: 882: 881: 879: 877: 863: 857: 856: 846: 822: 811: 804: 798: 797: 786: 780: 773: 767: 766: 764: 762: 756: 747: 738: 737: 735: 733: 724: 716: 710: 704: 698: 691: 685: 679: 666: 665: 645: 639: 638: 632: 624: 604: 478:, Brazil 1820 MW 428:Chief Joseph Dam 358:British Columbia 198:electricity buoy 35:Chief Joseph Dam 21: 1317: 1316: 1312: 1311: 1310: 1308: 1307: 1306: 1292: 1291: 1290: 1285: 1246:Francis turbine 1231: 1222: 1173: 1168: 1133: 1128: 1127: 1119: 1117: 1113:Gezhouba, China 1110: 1109: 1105: 1095: 1093: 1089: 1082: 1078: 1077: 1073: 1065: 1063: 1055: 1054: 1050: 1044:Wayback Machine 1034: 1030: 1004: 1003: 999: 965: 964: 957: 948: 944: 935: 931: 895: 894: 885: 875: 873: 865: 864: 860: 824: 823: 814: 805: 801: 788: 787: 783: 774: 770: 760: 758: 754: 749: 748: 741: 731: 729: 722: 718: 717: 713: 705: 701: 692: 688: 680: 669: 662: 647: 646: 642: 625: 621: 606: 605: 598: 593: 541: 534:, China 2715 MW 476:Teles Pires Dam 396: 390: 377: 350: 329: 309: 304: 296: 287: 274: 261: 252: 243: 231: 222: 206:power generator 103: 28: 23: 22: 15: 12: 11: 5: 1315: 1313: 1305: 1304: 1294: 1293: 1287: 1286: 1284: 1283: 1278: 1273: 1268: 1263: 1258: 1253: 1251:Kaplan turbine 1248: 1242: 1240: 1233: 1232: 1225: 1223: 1221: 1220: 1215: 1210: 1205: 1200: 1195: 1190: 1184: 1182: 1175: 1174: 1169: 1167: 1166: 1159: 1152: 1144: 1138: 1137: 1132: 1129: 1126: 1125: 1103: 1071: 1062:, Hydro-QuĂ©bec 1048: 1028: 997: 955: 942: 929: 902:Sustainability 883: 858: 812: 799: 781: 768: 739: 711: 699: 686: 667: 660: 640: 619: 595: 594: 592: 589: 588: 587: 582: 577: 572: 567: 562: 557: 552: 547: 540: 537: 536: 535: 521: 507: 489: 479: 473: 470:The Dalles Dam 467: 453: 439: 425: 411: 392:Main article: 389: 388:Major examples 386: 376: 373: 349: 346: 328: 325: 308: 307:"Unfirm" power 305: 303: 300: 295: 292: 286: 283: 273: 270: 260: 257: 251: 248: 242: 241:Diversion Weir 239: 230: 227: 221: 218: 159:distinguishes 102: 99: 26: 24: 14: 13: 10: 9: 6: 4: 3: 2: 1314: 1303: 1300: 1299: 1297: 1282: 1279: 1277: 1274: 1272: 1271:Turgo turbine 1269: 1267: 1264: 1262: 1259: 1257: 1256:Tyson turbine 1254: 1252: 1249: 1247: 1244: 1243: 1241: 1238: 1234: 1229: 1219: 1216: 1214: 1211: 1209: 1206: 1204: 1201: 1199: 1196: 1194: 1191: 1189: 1186: 1185: 1183: 1180: 1176: 1172: 1165: 1160: 1158: 1153: 1151: 1146: 1145: 1142: 1135: 1134: 1130: 1115: 1114: 1107: 1104: 1088: 1081: 1075: 1072: 1061: 1060: 1052: 1049: 1045: 1041: 1038: 1032: 1029: 1024: 1020: 1016: 1012: 1008: 1001: 998: 993: 989: 985: 981: 977: 973: 969: 962: 960: 956: 952: 946: 943: 939: 933: 930: 925: 921: 916: 911: 908:(24): 14001. 907: 903: 899: 892: 890: 888: 884: 872: 868: 862: 859: 854: 850: 845: 840: 836: 832: 828: 821: 819: 817: 813: 809: 803: 800: 795: 791: 785: 782: 778: 772: 769: 753: 746: 744: 740: 728: 727:www.entsoe.eu 721: 715: 712: 709: 703: 700: 696: 690: 687: 684: 678: 676: 674: 672: 668: 663: 657: 653: 652: 644: 641: 636: 630: 622: 620:81-224-1831-7 616: 612: 611: 603: 601: 597: 590: 586: 583: 581: 578: 576: 573: 571: 568: 566: 563: 561: 558: 556: 553: 551: 548: 546: 543: 542: 538: 533: 529: 525: 522: 519: 515: 511: 508: 505: 501: 497: 493: 490: 487: 483: 480: 477: 474: 471: 468: 465: 461: 457: 454: 451: 450:United States 448:/Washington, 447: 443: 440: 437: 436:United States 433: 429: 426: 423: 419: 415: 412: 409: 405: 401: 398: 397: 395: 387: 385: 384:disruptions. 382: 374: 372: 370: 365: 363: 359: 354: 347: 345: 342: 333: 326: 324: 322: 321:head of water 317: 315: 306: 302:Disadvantages 301: 299: 293: 291: 285:Less flooding 284: 282: 279: 271: 269: 267: 258: 256: 249: 247: 240: 238: 236: 228: 226: 219: 217: 215: 211: 207: 203: 199: 194: 192: 188: 183: 177: 172: 170: 166: 162: 158: 148: 144: 142: 138: 133: 131: 127: 122: 116: 112: 107: 100: 98: 96: 92: 88: 84: 83:flood control 80: 76: 72: 67: 66:hydroelectric 64:is a type of 63: 59: 55: 47: 40: 36: 32: 19: 1266:Pelton wheel 1217: 1118:, retrieved 1112: 1106: 1094:. Retrieved 1087:the original 1074: 1064:, retrieved 1058: 1051: 1037:IPPwatch.com 1031: 1014: 1010: 1000: 975: 971: 945: 932: 905: 901: 874:. Retrieved 870: 861: 834: 830: 802: 793: 784: 771: 759:. Retrieved 730:. Retrieved 726: 714: 702: 689: 650: 643: 609: 524:Gezhouba Dam 496:Satluj River 442:John Day Dam 378: 366: 355: 351: 338: 318: 310: 297: 288: 275: 262: 253: 244: 232: 223: 210:Middle Rhine 197: 195: 179: 174: 164: 160: 153: 134: 123: 120: 61: 57: 53: 52: 1281:Water wheel 1208:Micro hydro 1203:Small hydro 1017:: 106–116. 580:Tidal power 565:Micro hydro 560:Small hydro 278:natural gas 266:natural gas 220:Major types 95:agriculture 91:fresh water 1213:Pico hydro 1181:generation 1171:Hydropower 1131:References 1120:2022-09-12 1066:2011-05-17 978:: 111238. 876:8 February 837:: 110833. 806:ORF News. 570:Pico hydro 555:Hydropower 432:Washington 259:Advantages 137:reservoirs 111:Kymi River 79:reservoirs 1239:equipment 992:1364-0321 924:2071-1050 853:1364-0321 732:10 August 629:cite book 506:, 1500 MW 482:Inga Dams 466:, 1903 MW 400:Jirau Dam 117:, Finland 1296:Category 1096:7 August 1040:Archived 539:See also 518:Pakistan 418:RondĂ´nia 404:RondĂ´nia 312:(spring 176:altered. 130:turbines 126:penstock 761:11 July 528:Yichang 520:1450 MW 488:1775 MW 452:2160 MW 438:2620 MW 424:3580 MW 410:3750 MW 314:freshet 290:areas. 250:Pondage 229:Dam-Toe 101:Concept 71:pondage 990:  922:  851:  658:  617:  500:Shimla 464:Canada 460:Quebec 446:Oregon 422:Brazil 408:Brazil 214:Danube 1090:(PDF) 1083:(PDF) 755:(PDF) 723:(PDF) 591:Notes 532:Hubei 504:India 115:Iitti 60:) or 37:near 1098:2011 988:ISSN 920:ISSN 878:2017 849:ISSN 763:2011 734:2020 656:ISBN 635:link 615:ISBN 341:head 93:for 1188:Dam 1019:doi 980:doi 976:147 910:doi 839:doi 835:142 356:In 113:in 58:ROR 1298:: 1015:89 1013:. 1009:. 986:. 974:. 970:. 958:^ 918:. 906:13 904:. 900:. 886:^ 869:. 847:. 833:. 829:. 815:^ 792:. 742:^ 725:. 670:^ 631:}} 627:{{ 599:^ 530:, 526:, 516:, 512:, 502:, 498:, 494:, 484:, 462:, 458:, 444:, 434:, 430:, 420:, 416:, 406:, 402:, 193:. 97:. 85:, 1163:e 1156:t 1149:v 1100:. 1046:. 1025:. 1021:: 994:. 982:: 926:. 912:: 880:. 855:. 841:: 796:. 765:. 736:. 664:. 637:) 623:. 56:( 20:)

Index

Run-of-the-river hydroelectric

Chief Joseph Dam
Bridgeport, Washington

hydroelectric
pondage
intermittent energy source
reservoirs
flood control
dispatchable electrical power
fresh water
agriculture

Kymi River
Iitti
penstock
turbines
reservoirs
disadvantages associated with reservoirs

European Network of Transmission System Operators for Electricity
Bureau of Indian Standards
Beauharnois Hydroelectric Generating Station
La Grande-1 generating station
James Bay Project
hydroelectric power plant
power generator
Middle Rhine
Danube