429: 36: 457: 673: 443: 43: 646: 367:
As of November 2016, the projected cost of the project is $ 340 million, to be financed by the World Bank. The three high voltage transmission lines that will evacuate the power generated are projected to cost $ 121 million, financed by the African Development Bank. Construction is planned to begin
285:
design was considered before being abandoned in favor of an 80 MW project with a smaller environmental impact and an estimated cost of US$ 300 million compared to US$ 400 million for the bigger project. The World Bank announced on 6 August 2013 that it had approved loans totaling US$ 340 million
414:
Audits by the Auditor Generals of the three affected countries, carried out in the second half of 2021, have revealed a 22 percent increase in expenditure, up to that point in the work plan, above what was budgeted. At that time work completion was estimated at 81 percent. As of August 2022, an
415:
estimated 95 percent of the work was complete. Completion is anticipated in November 2022, with commercial commissioning in December 2022. Later that month, commercial communication was pushed back to the first quarter of 2023.
347:
In November 2016, two contracts that paved the way for construction of the power station were signed in Kigali, Rwanda. The first contract was between Rusumo Power Company Limited and a consortium of contractors that included a
352:
composed of CGCOC Group Limited and Jiangxi Water & Hydropower Construction Company Limited. This contract provides for the performance of civil works, including supply and installation of hydro-mechanical equipment.
334:
The power generated will be shared equally among the countries of Burundi, Rwanda, and Tanzania. The power will be evacuated from the generation plant via 220 kilovolt transmission lines to transmission stations in:
700: 395:
and Jiangxi Water & Hydropower Construction Company Limited is responsible for the civil works, while ANDRITZ Hydro from Germany and India are responsible for the electro-mechanical works.
277:, is a hydropower plant under construction, with initial planned capacity installation of 80 megawatts (110,000 hp) when completed. The project will involve the construction of a dam, with 339:, Burundi, a distance of 158 kilometres (98 mi); Kigali, Rwanda, a distance of 115 kilometres (71 mi); and, Nyakanazi, Tanzania, a distance of 98 kilometres (61 mi). 620: 1006: 986: 100: 568: 35: 322:, the capital and largest city of Rwanda. Rusumo Falls is approximately 61 kilometres (38 mi), by road, south-east of the provincial headquarters at 917: 408:
As of April 2021, completion was anticipated in 2022, with one of the three power-generating units expected online in the fourth quarter of 2021.
991: 728: 326:, in Ngoma District. The approximate coordinates of the power station are: 02°22'47.0"S, 30°47'09.0"E (Latitude:-2.379722; Longitude:30.785833). 356:
The second contract was signed between Rusumo Power Company Limited and a consortium of companies, including Rusumo Falls Andritz Hydro GmbH of
791: 380:, in Tanzanian territory on 30 March 2017, attended by government officials from the three beneficiary countries; all members of the regional 597: 1011: 225: 888: 1021: 472: 402:(NELSAP-CU), is implementing the project on behalf of the owners. Completion and commercial commissioning were expected in 2020. 955: 306:
and approximately 2 kilometres (1.2 mi) downstream of the tripoint where the two countries share a common border with
674:"Road Distance Between Ngoma District Office, Kibungo, Rwanda And Rusumo Hydroelectric Power Station, Rusumo. Tanzania" 510: 411:
As of June 2021, with 80 percent of the work completed, commercial commissioning was anticipated in December 2021.
1016: 624: 515: 477: 287: 462: 926: 864: 828: 381: 405:
Construction work on this project was estimated at 35% as of February 2019, and 59% as of January 2020.
399: 258: 767: 544: 242: 762: 647:"Road Distance Between Kigali, Rwanda And Rusumo Hydroelectric Power Station, Rusumo, Tanzania" 539: 893: 220: 135: 960: 922: 729:"Rusumo Falls: Water for Power Generation And Multipurpose Use, Burundi, Rwanda, Tanzania" 482: 266: 88: 315: 1000: 857: 853:"East Africa: 80-Megawatt Rusumo Power Plant to Begin Electricity Supply in December" 821: 434: 349: 232: 448: 311: 299: 278: 192: 84: 852: 816: 705: 678: 651: 621:"AfDB Board Commits US$ 113 Million to Regional Rusumo Falls Hydropower Project" 456: 392: 572: 424: 598:"Rwanda's 80 Megawatt Rusumo Falls Hydropower Project Receives $ 113 Million" 286:
towards the US$ 468.60 million needed for the project. In November 2013, the
115: 102: 442: 282: 987:
Construction of Rusumo Falls Hydroelectric Project to start 30 March 2017
388:(RPCL), a special purpose vehicle company, owned by the three countries. 303: 318:, approximately 164.5 kilometres (102.2 mi), by road, southeast of 391:
Two contractors were selected for the project. A Joint Venture between
357: 323: 307: 290:
approved a loan of US$ 113 million towards completion of the project.
364:, to carry out electrical and mechanicalworks for power generation. 336: 319: 74: 918:"Joint Tanzania, Burundi and Rwanda power project nears completion" 817:"Rwanda: Rusumo Power Plant Could Start Operations By End of 2021" 377: 361: 792:"Rusumo hydroelectric power project in Tanzania now 59% complete" 511:"Rwanda, Tanzania, Burundi start construction of Rusumo Dam" 42: 281:
design. A more expensive 90 megawatts (120,000 hp)
701:"Location of Rusumo Hydropower Station At Google Maps" 569:"World Bank Approves Rusumo Falls Hydropower Plant" 241: 231: 219: 211: 203: 198: 188: 183: 173: 165: 157: 149: 141: 131: 94: 80: 70: 60: 24: 763:"Rusumo power project construction a step closer" 400:Nile Equatorial Lakes Subsidiary Action Program 8: 16:Dam in Rusumo Falls, Kirehe District, Rwanda 889:"Rusumo power project delayed by two years" 21: 761:Mushimiyimana, Diane (11 November 2016). 591: 589: 376:The ground-breaking ceremony was held at 916:The Citizen, Tanzania (22 August 2022). 956:"Rusumo power 'to reach grid by March'" 851:Jean De Dieu Nsabimana (13 June 2021). 756: 754: 752: 494: 1007:Hydroelectric power stations in Rwanda 887:Johnson Kanamugire (12 October 2021). 263:Urugomero rw'amashanyarazi rwa Rusumo 64:Urugomero rw'amashanyarazi rwa Rusumo 50:Map of Rwanda showing the location of 7: 540:"Rusumo Hydropower To Generate 80MW" 504: 502: 500: 498: 19:Dam in Rusumo Falls, Kirehe District 815:Michel Nkurunziza (19 April 2021). 271:Centrale hydroélectrique de Rusumo 255:Rusumo Hydroelectric Power Station 66:Centrale hydroélectrique de Rusumo 25:Rusumo Hydroelectric Power Station 14: 727:Mbesherubusa, Déogratias (2008). 509:The Independent (30 March 2017). 360:and Andritz Hydro PVT Limited of 992:Overview of Rusumo Power Project 473:List of power stations in Rwanda 455: 441: 427: 384:. The power station is owned by 41: 34: 538:Musoni, Edwin (12 March 2012). 790:Ilolo, Patricia (2020-01-13). 596:Hydroword (27 November 2013). 1: 954:Ange Iliza (28 August 2022). 398:The Coordination Unit of the 302:, along Rwanda's border with 567:World Bank (6 August 2013). 386:Rusumo Power Company Limited 298:The power station is on the 247:80 MW (110,000 hp) 207:1,325 m (4,347 ft) 178:Rusumo Power Company Limited 1038: 796:Construction Review Online 310:. The project is sited at 619:AfDB (27 November 2013). 29: 1012:Eastern Province, Rwanda 625:African Development Bank 516:The Independent (Uganda) 478:Eastern Province, Rwanda 288:African Development Bank 1022:Dams under construction 463:Renewable energy portal 243:Installed capacity 150:Construction began 927:The Citizen (Tanzania) 865:The New Times (Rwanda) 829:The New Times (Rwanda) 382:East African Community 270: 262: 166:Construction cost 273:), also known as the 204:Normal elevation 330:Other considerations 275:Rusumo Power Station 212:Commission date 116:2.37972°S 30.78583°E 343:Recent developments 314:, near the town of 112: /  768:New Times (Rwanda) 571:. Washington, DC: 545:New Times (Rwanda) 145:Under construction 121:-2.37972; 30.78583 368:in January 2017. 251: 250: 184:Dam and spillways 158:Opening date 1029: 974: 973: 971: 969: 964:. Nairobi, Kenya 951: 945: 944: 942: 940: 935:. Nairobi, Kenya 930: 913: 907: 906: 904: 902: 897:. Nairobi, Kenya 894:The East African 884: 878: 877: 875: 873: 861: 848: 842: 841: 839: 837: 825: 812: 806: 805: 803: 802: 787: 781: 780: 778: 776: 758: 747: 746: 744: 742: 733: 724: 718: 717: 715: 713: 697: 691: 690: 688: 686: 670: 664: 663: 661: 659: 643: 637: 636: 634: 632: 616: 610: 609: 607: 605: 600:. Hydroworld.com 593: 584: 583: 581: 579: 564: 558: 557: 555: 553: 535: 529: 528: 526: 524: 506: 465: 460: 459: 451: 446: 445: 437: 432: 431: 430: 226:Run-of-the-river 127: 126: 124: 123: 122: 117: 113: 110: 109: 108: 105: 45: 44: 38: 22: 1037: 1036: 1032: 1031: 1030: 1028: 1027: 1026: 1017:Kirehe District 997: 996: 983: 978: 977: 967: 965: 961:The EastAfrican 953: 952: 948: 938: 936: 933:The EastAfrican 923:The EastAfrican 920: 915: 914: 910: 900: 898: 886: 885: 881: 871: 869: 855: 850: 849: 845: 835: 833: 819: 814: 813: 809: 800: 798: 789: 788: 784: 774: 772: 760: 759: 750: 740: 738: 731: 726: 725: 721: 711: 709: 699: 698: 694: 684: 682: 672: 671: 667: 657: 655: 645: 644: 640: 630: 628: 618: 617: 613: 603: 601: 595: 594: 587: 577: 575: 566: 565: 561: 551: 549: 537: 536: 532: 522: 520: 508: 507: 496: 491: 483:Kirehe District 469: 468: 461: 454: 447: 440: 433: 428: 426: 421: 374: 345: 332: 296: 215:2023 (expected) 169:US$ 468 million 120: 118: 114: 111: 106: 103: 101: 99: 98: 89:Kirehe District 65: 56: 55: 54: 53: 51: 48: 47: 46: 20: 17: 12: 11: 5: 1035: 1033: 1025: 1024: 1019: 1014: 1009: 999: 998: 995: 994: 989: 982: 981:External links 979: 976: 975: 946: 908: 879: 843: 807: 782: 748: 719: 692: 665: 638: 611: 585: 559: 530: 493: 492: 490: 487: 486: 485: 480: 475: 467: 466: 452: 438: 423: 422: 420: 417: 373: 370: 344: 341: 331: 328: 295: 292: 249: 248: 245: 239: 238: 235: 229: 228: 223: 217: 216: 213: 209: 208: 205: 201: 200: 196: 195: 190: 186: 185: 181: 180: 175: 171: 170: 167: 163: 162: 159: 155: 154: 151: 147: 146: 143: 139: 138: 133: 129: 128: 96: 92: 91: 82: 78: 77: 72: 68: 67: 62: 58: 57: 49: 40: 39: 33: 32: 31: 30: 27: 26: 18: 15: 13: 10: 9: 6: 4: 3: 2: 1034: 1023: 1020: 1018: 1015: 1013: 1010: 1008: 1005: 1004: 1002: 993: 990: 988: 985: 984: 980: 963: 962: 957: 950: 947: 934: 928: 924: 919: 912: 909: 896: 895: 890: 883: 880: 867: 866: 859: 858:AllAfrica.com 854: 847: 844: 831: 830: 823: 822:AllAfrica.com 818: 811: 808: 797: 793: 786: 783: 770: 769: 764: 757: 755: 753: 749: 737: 730: 723: 720: 708: 707: 702: 696: 693: 681: 680: 675: 669: 666: 654: 653: 648: 642: 639: 626: 622: 615: 612: 599: 592: 590: 586: 574: 570: 563: 560: 547: 546: 541: 534: 531: 518: 517: 512: 505: 503: 501: 499: 495: 488: 484: 481: 479: 476: 474: 471: 470: 464: 458: 453: 450: 444: 439: 436: 435:Africa portal 425: 418: 416: 412: 409: 406: 403: 401: 396: 394: 389: 387: 383: 379: 371: 369: 365: 363: 359: 354: 351: 350:joint venture 342: 340: 338: 329: 327: 325: 321: 317: 313: 309: 305: 301: 293: 291: 289: 284: 280: 276: 272: 268: 264: 260: 256: 246: 244: 240: 236: 234: 230: 227: 224: 222: 218: 214: 210: 206: 202: 197: 194: 191: 187: 182: 179: 176: 172: 168: 164: 160: 156: 152: 148: 144: 140: 137: 134: 130: 125: 97: 93: 90: 86: 83: 79: 76: 73: 69: 63: 61:Official name 59: 37: 28: 23: 966:. Retrieved 959: 949: 937:. Retrieved 932: 911: 899:. Retrieved 892: 882: 870:. Retrieved 863: 846: 834:. Retrieved 827: 810: 799:. Retrieved 795: 785: 773:. Retrieved 766: 739:. Retrieved 736:icafrica.org 735: 722: 710:. Retrieved 704: 695: 683:. Retrieved 677: 668: 656:. Retrieved 650: 641: 629:. Retrieved 614: 602:. Retrieved 576:. Retrieved 562: 550:. Retrieved 543: 533: 521:. Retrieved 514: 449:Water portal 413: 410: 407: 404: 397: 390: 385: 375: 372:Construction 366: 355: 346: 333: 312:Rusumo Falls 300:Kagera River 297: 279:run of river 274: 254: 252: 193:Kagera River 177: 85:Rusumo Falls 52:Rusumo Falls 775:15 November 741:18 February 706:Google Maps 679:Google Maps 652:Google Maps 631:18 February 604:18 February 578:18 February 393:CGCOC Group 259:Kinyarwanda 174:Operator(s) 161:2023 (est.) 119: / 95:Coordinates 1001:Categories 901:12 October 801:2020-04-08 573:World Bank 489:References 107:30°47′09″E 104:02°22′47″S 968:29 August 939:25 August 519:. Kampala 283:reservoir 199:Reservoir 925:Quoting 868:. Kigali 836:22 April 832:. Kigali 771:. Kigali 548:. Kigali 419:See also 304:Tanzania 294:Location 233:Turbines 189:Impounds 81:Location 872:16 June 712:16 June 703:(Map). 685:16 June 676:(Map). 658:16 June 649:(Map). 552:8 April 358:Germany 324:Kibungo 308:Burundi 132:Purpose 71:Country 627:(AfDB) 523:21 May 337:Gitega 320:Kigali 316:Rusumo 267:French 142:Status 75:Rwanda 856:(via 820:(via 732:(PDF) 378:Ngara 362:India 136:Power 970:2022 941:2022 903:2021 874:2021 838:2021 777:2016 743:2015 714:2021 687:2021 660:2021 633:2015 606:2015 580:2015 554:2016 525:2018 253:The 221:Type 153:2017 1003:: 958:. 931:. 891:. 862:. 826:. 794:. 765:. 751:^ 734:. 623:. 588:^ 542:. 513:. 497:^ 269:: 265:, 261:: 87:, 972:. 943:. 929:) 921:( 905:. 876:. 860:) 840:. 824:) 804:. 779:. 745:. 716:. 689:. 662:. 635:. 608:. 582:. 556:. 527:. 257:( 237:3

Index

Rusumo Hydroelectric Power Station is located in Rwanda
Rwanda
Rusumo Falls
Kirehe District
02°22′47″S 30°47′09″E / 2.37972°S 30.78583°E / -2.37972; 30.78583
Power
Kagera River
Type
Run-of-the-river
Turbines
Installed capacity
Kinyarwanda
French
run of river
reservoir
African Development Bank
Kagera River
Tanzania
Burundi
Rusumo Falls
Rusumo
Kigali
Kibungo
Gitega
joint venture
Germany
India
Ngara
East African Community
CGCOC Group

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.