better use of fly-ash. It has entered into a collaboration with the Indo-Norwegian Environment Programme (INEP) and has set up a technology demonstration center called CASHUTEC (Center for Ash Utilization and Environment Conservation) near its plant. CASHUTEC demonstrates different uses for fly ash; mainly its use in the construction sector for making bricks, blocks and mosaic tiles.
337:. Its daily requirement of coal is about 20,000 metric tons, when running at full capacity, which is delivered from Western Coalfields Ltd. and Mahanadi Coalfields Ltd. The coal supplied is sampled using a computerized system and sent to the laboratory for testing. This ensures that the proper grade of coal is used. 381:
elements in the furnaces, but about 2% of fly-ash gets into the atmosphere. The fly-ash is disposed of by converting it into a wet slurry and dumping it into vacant tracts of land (which become what are known as ash-ponds). This is not environment friendly and hence RTPS has come up with ways to make
376:
which can be dangerous to public health. The fly-ash which gets generated during the burning of coal disperses into the air and hence pollutes the atmosphere. This gets deposited on the surrounding land, thereby making the land infertile. The fly-ash may also cause breathing problems for humans. RTPS
355:
The coal is pulverized and fed into furnaces that convert water into steam. This steam runs the turbines to generate electricity. Units 1 to 7, each can produce 5.04 MU of energy per day and Unit 8 can produce 6 MU per day, hence the plant can produce 41.28 MU of energy per day when it is functioning
309:
Units 5 and 6 (each of 210 MW) were installed within three years. Unit 7 (210 MW) which was completed within a record time of 25 months, was installed at the end of the year 2002 The total installed capacity of the power plant is 1,470 MW (7 x 210 MW). As of 2007, Unit 8, with an installed capacity
273:
company was appointed as the consultants for the project. The project involved two stages: Stage I, in which Units 1 and 2 were expected to be installed and Stage II, Units 3 and 4. each unit was expected to have an installed capacity of 210 MW. An area of 300 hectares was allocated for the units.
618:"Guidelines for Hazardous waste, Part I, Recommendations for environmental politics and administration, Introduction of collection and disposal systems under particular consideration of framework conditions in India and Vietnam, Ver 1.0, Oct 2006" 277:
The construction of Unit III was started in 1986 and completed in March 1991 and the Unit IV was started in 1989 and completed in September 1994, thereby completing the Stage II. The total cost of Stage I of the project was
249:(KPCL) and was the first thermal power plant to be set up in the state. The power station was commissioned during various periods from 1985 and it accounts for about 70% of the total electricity generated in 846: 872: 718: 74: 882: 867: 805: 887: 841: 457: 877: 711: 795: 199: 800: 704: 617: 580: 425: 246: 135: 820: 810: 759: 291: 815: 774: 486: 749: 399: 836: 790: 266: 550: 754: 659: 372:
which is let into the ash bund. Though considered safer than fly-ash, bottom ash has also been found to contain
731: 230: 487:"Karnataka Power Corporation Limited, 2 x 210 MW Raichur Thermal Power Plant : Stages – I & II" 262: 114: 287: 269:
was signed between KPCL and the Karnataka State Electricity Board. TCE Consulting Engineers Ltd., a
178: 696: 628: 27: 590: 435: 764: 234: 57: 727: 274:
Unit I of the plant was completed in March 1985, with Unit II following in March 1986.
861: 690: 378: 344: 310:
of 250 MW, is being constructed and is expected to be operational by September 2009.
373: 303: 302:. In 1996, a further expansion of the plant was carried out, with an investment of 283: 279: 497: 377:
has taken steps to ensure that fly-ash gets precipitated out of the air by using
334: 680: 369: 299: 270: 403: 368:
annually which causes environmental problems. 20% of the ash produced is wet
340:
The plant has also started to use washed coal, due to its lower ash content.
89: 76: 735: 684: 585: 525: 430: 250: 238: 61: 37: 558: 184: 208: 365: 295: 494:
Online Webpage of TCE Consulting Engineers Ltd., A TATA Enterprise
242: 226: 150: 700: 664:
Online Edition of The Hindu Business Line, dated 2006-08-04
319:
Stage III (units 5 and 6) costing Rs. 1545 crores in 1999.
316:
Stage II (units 3 and 4) costing Rs. 983 crores in 1994.
313:
Stage I (units 1 and 2) costing Rs. 403 crores in 1986.
847:
Indian states ranking by households having electricity
829: 783: 742: 195: 190: 177: 156: 146: 141: 131: 113: 105: 68: 53: 45: 20: 426:"More locations identified to set up power plants" 322:Stage IV (unit 7) costing Rs. 613 crores in 2002. 36:Location of the Raichur Thermal Power Stationb in 589:. Chennai, India. 12 January 2004. Archived from 325:Stage IV (unit 8) costing Rs. 945 crores in 2010 434:. Chennai, India. 26 March 2007. Archived from 806:Chamundeshwari Electricity Supply Corporation 712: 343:The plant's cooling water is pumped from the 8: 873:Buildings and structures in Raichur district 842:States of India by installed power capacity 364:RTPS generates about 1.5 million tonnes of 719: 705: 697: 233:located at Yadlapur D(Shaktinagar) in the 17: 796:Karnataka Power Transmission Corporation 883:Energy infrastructure completed in 1985 612: 610: 608: 391: 200:Related media on Commons 868:Coal-fired power stations in Karnataka 653: 651: 649: 551:"Raichur Thermal Power Station-Unit 8" 520: 518: 282:4,030,000,000 and of the Stage II was 481: 479: 7: 801:Mangalore Electricity Supply Company 458:"All units of RTPS going full steam" 247:Karnataka Power Corporation Limited 888:20th-century architecture in India 821:Power System Operation Corporation 811:Nuclear Power Corporation of India 14: 760:Kudgi Super Thermal Power Station 333:RTPS uses coal for generation of 878:1985 establishments in Karnataka 683: 464:. Chennai, India. 7 January 2007 298:by Kraftwerk Union AG (KWU) and 292:Bharat Heavy Electricals Limited 142:Thermal power station 26: 526:"Raichur Thermal Power Station" 265:was finalized in 1978 after an 173:7 X 210 MW 1 X 250 MW 816:PowerGrid Corporation of India 775:Yermarus Thermal Power Station 1: 770:Raichur Thermal Power Station 750:Bellary Thermal Power station 261:The project to construct the 219:Raichur Thermal Power Station 21:Raichur Thermal Power Station 581:"Coal sampling computerised" 837:Electricity sector in India 791:Karnataka Power Corporation 904: 755:Kaiga Atomic Power Station 205: 165: 161: 34: 25: 245:. It is operated by the 660:"Cashing in on fly ash" 179:Nameplate capacity 555:Online webpage of KPCL 530:Online webpage of KPCL 351:Electricity production 231:electric power station 170:Units operational 658:Bharathi Ghanashyam. 263:thermal power station 157:Power generation 121:Unit 3 & 4: 1994 90:16.35500°N 77.34194°E 123:Unit 5 & 6: 1999 119:Unit 1 & 2: 1986 115:Commission date 634:on 21 November 2008 593:on 18 February 2004 286:9,830,000,000. The 191:External links 86: /  561:on 1 December 2007 438:on 25 October 2012 400:"Projects of KPCL" 356:at full capacity. 95:16.35500; 77.34194 855: 854: 765:Udupi Power Plant 503:on 1 January 2007 290:were supplied by 216: 215: 147:Primary fuel 895: 721: 714: 707: 698: 693: 688: 687: 675: 674: 672: 670: 655: 644: 643: 641: 639: 633: 627:. Archived from 622: 614: 603: 602: 600: 598: 577: 571: 570: 568: 566: 557:. Archived from 547: 541: 540: 538: 536: 522: 513: 512: 510: 508: 502: 496:. Archived from 491: 483: 474: 473: 471: 469: 454: 448: 447: 445: 443: 422: 416: 415: 413: 411: 402:. Archived from 396: 306:15,450,000,000. 237:of the state of 235:Raichur district 209:edit on Wikidata 101: 100: 98: 97: 96: 91: 87: 84: 83: 82: 79: 58:Raichur district 30: 18: 903: 902: 898: 897: 896: 894: 893: 892: 858: 857: 856: 851: 825: 779: 738: 725: 689: 682: 679: 678: 668: 666: 657: 656: 647: 637: 635: 631: 620: 616: 615: 606: 596: 594: 579: 578: 574: 564: 562: 549: 548: 544: 534: 532: 524: 523: 516: 506: 504: 500: 489: 485: 484: 477: 467: 465: 456: 455: 451: 441: 439: 424: 423: 419: 409: 407: 406:on 12 July 2011 398: 397: 393: 388: 362: 353: 331: 259: 212: 126: 124: 122: 120: 94: 92: 88: 85: 80: 77: 75: 73: 72: 41: 12: 11: 5: 901: 899: 891: 890: 885: 880: 875: 870: 860: 859: 853: 852: 850: 849: 844: 839: 833: 831: 830:Related topics 827: 826: 824: 823: 818: 813: 808: 803: 798: 793: 787: 785: 781: 780: 778: 777: 772: 767: 762: 757: 752: 746: 744: 743:Power stations 740: 739: 728:Power stations 726: 724: 723: 716: 709: 701: 695: 694: 677: 676: 645: 625:Sacodi Project 604: 572: 542: 514: 475: 449: 417: 390: 389: 387: 384: 361: 358: 352: 349: 330: 327: 258: 255: 214: 213: 206: 203: 202: 197: 193: 192: 188: 187: 181: 175: 174: 171: 167: 166: 163: 162: 159: 158: 154: 153: 148: 144: 143: 139: 138: 133: 129: 128: 117: 111: 110: 107: 103: 102: 70: 66: 65: 55: 51: 50: 47: 43: 42: 35: 32: 31: 23: 22: 13: 10: 9: 6: 4: 3: 2: 900: 889: 886: 884: 881: 879: 876: 874: 871: 869: 866: 865: 863: 848: 845: 843: 840: 838: 835: 834: 832: 828: 822: 819: 817: 814: 812: 809: 807: 804: 802: 799: 797: 794: 792: 789: 788: 786: 784:Organizations 782: 776: 773: 771: 768: 766: 763: 761: 758: 756: 753: 751: 748: 747: 745: 741: 737: 733: 732:organizations 729: 722: 717: 715: 710: 708: 703: 702: 699: 692: 691:Energy portal 686: 681: 665: 661: 654: 652: 650: 646: 630: 626: 619: 613: 611: 609: 605: 592: 588: 587: 582: 576: 573: 560: 556: 552: 546: 543: 531: 527: 521: 519: 515: 499: 495: 488: 482: 480: 476: 463: 459: 453: 450: 437: 433: 432: 427: 421: 418: 405: 401: 395: 392: 385: 383: 380: 379:electrostatic 375: 371: 367: 359: 357: 350: 348: 346: 345:Krishna River 341: 338: 336: 329:Raw materials 328: 326: 323: 320: 317: 314: 311: 307: 305: 301: 297: 293: 289: 285: 281: 275: 272: 268: 264: 257:Establishment 256: 254: 252: 248: 244: 240: 236: 232: 228: 224: 220: 210: 204: 201: 198: 194: 189: 186: 182: 180: 176: 172: 169: 168: 164: 160: 155: 152: 149: 145: 140: 137: 134: 130: 118: 116: 112: 108: 104: 99: 71: 67: 63: 59: 56: 52: 48: 44: 39: 33: 29: 24: 19: 16: 769: 667:. Retrieved 663: 636:. Retrieved 629:the original 624: 595:. Retrieved 591:the original 584: 575: 563:. Retrieved 559:the original 554: 545: 533:. Retrieved 529: 505:. Retrieved 498:the original 493: 466:. Retrieved 461: 452: 440:. Retrieved 436:the original 429: 420: 408:. Retrieved 404:the original 394: 374:heavy metals 363: 354: 342: 339: 332: 324: 321: 318: 315: 312: 308: 276: 260: 222: 218: 217: 127:Unit 8: 2013 125:Unit 7: 2002 15: 468:15 December 335:electricity 132:Operator(s) 109:Operational 93: / 69:Coordinates 862:Categories 669:1 November 638:1 November 597:1 November 565:1 November 535:1 November 507:1 November 442:1 November 410:27 October 386:References 370:bottom ash 300:Mitsubishi 288:generators 271:Tata Group 81:77°20′31″E 78:16°21′18″N 736:Karnataka 586:The Hindu 462:The Hindu 431:The Hindu 251:Karnataka 239:Karnataka 62:Karnataka 38:Karnataka 347:nearby. 296:turbines 294:and the 54:Location 366:fly ash 229:-fired 225:) is a 196:Commons 46:Country 360:Issues 183:1,720 106:Status 632:(PDF) 621:(PDF) 501:(PDF) 490:(PDF) 243:India 207:[ 49:India 730:and 671:2007 640:2007 599:2007 567:2007 537:2007 509:2007 470:2019 444:2007 412:2007 227:coal 223:RTPS 151:Coal 136:KPCL 734:of 304:Rs. 284:Rs. 280:Rs. 267:MOU 864:: 662:. 648:^ 623:. 607:^ 583:. 553:. 528:. 517:^ 492:. 478:^ 460:. 428:. 253:. 241:, 185:MW 60:, 720:e 713:t 706:v 673:. 642:. 601:. 569:. 539:. 511:. 472:. 446:. 414:. 221:( 211:] 64:. 40:.

Index


Karnataka
Raichur district
Karnataka
16°21′18″N 77°20′31″E / 16.35500°N 77.34194°E / 16.35500; 77.34194
Commission date
KPCL
Coal
Nameplate capacity
MW
Related media on Commons
edit on Wikidata
coal
electric power station
Raichur district
Karnataka
India
Karnataka Power Corporation Limited
Karnataka
thermal power station
MOU
Tata Group
Rs.
Rs.
generators
Bharat Heavy Electricals Limited
turbines
Mitsubishi
Rs.
electricity