105:, but it is easier with a railbanked line than one that has undergone a "total abandonment," as the federal government guarantees the railroad the full rights to reactivate it. A railbanked line can be reopened within a year's time while an abandoned corridor could take years to be reactivated, if it was even possible. In railbanking, the government helps fund the line's rebuild. In the 25-year period from 1983 to 2008, 14,184 miles (22,827 km) of railroad have been abandoned. Of that, 8,056.5 miles (12,965.7 km), representing 56.8% of the lines abandoned in the past 25 years, were originally negotiated for railbanking agreements.
109:
period. The remaining 43.2% of the lines, representing 6,127.5 miles (9,861.3 km), were lines that railroads never considered trying to have railbanked, and were abandoned in their entirety. In total, 9,105 miles (14,653 km) of the 14,184 miles (22,827 km) abandoned during the 25-year period were not railbanked (64.2%). Some railroads refuse to railbank lines, and instead sell the land in parcels to the surrounding landowners.
25:
202:
railway's route with many different owners, the reopening costs could be considerable. In 2017 the STB ruled that Neosho County in Kansas violated the Trails Act when it foreclosed on and sold three parcels of railbanked land where each spanned the full width of the right-of-way. The county's sales of the parcels were preempted by federal law and were vacated to keep the rail line available for reactivation.
183:
179:, a law was made to remove all unused railroad overpasses. Another example is a natural disaster. If a flood washes away a railbanked railroad bridge, that is beyond the owner's control. The local, state, and Federal governments could give some financial help for the railroad to rebuild any infrastructure that may have been damaged or destroyed during the time that it was unused.
93:
on their condition or any planned interim use of the railbed. Often the rail corridor is put in custody of a state transportation agency, which then seeks a new operator for possible rehabilitation or reactivation. This helps ensure the possibility of future restored rail service when new economic conditions may warrant resuming operation.
119:
The land over which railways pass may have many owners—private, rail operator, or governmental—and, depending on the terms under which it was originally acquired, the type of operating rights may also vary. Without railbanking, on closure, some parts of a railway's route might otherwise revert to the
92:
for possible future use. Railbanking leaves the railroad, railbed, bridges or bridge corridor, and other infrastructure intact. This relieves the railroad's operator from the responsibility of maintenance, and from taxation. Existing rails may or may not be maintained intact on the railbed, depending
205:
By designating the route as railbanked, these complications are avoided and the costs of maintaining a right-of-way are removed from the railway operator. In the United States, land transferred to rail banks is held by local, state or federal governments and many railbanked rail corridors have been
123:
Approximately 85% of the railroad rights-of-way in the United States were acquired by easement from the then-abutting property owners. Normally, when the use for an easement is abandoned, the easement is extinguished and the land is not burdened by this adverse use. In 1983, Congress passed what is
108:
Twenty-one percent of those railbanking agreements failed; that is, they were ultimately abandoned. Of those 8,056.5 miles (12,965.7 km) originally negotiated, 5,079 miles (8,174 km) actually reached a railbanking agreement, representing 35.8% of the lines abandoned during the 25-year
222:
cuts in the 1960s and while several of these routes have subsequently been reopened, none were formally treated as land banks in the US manner. The
Beeching closures were driven by the government's desire to reduce expenditure on railways, and so most lines were offered for sale to the highest
116:(STB). Some of these reactivated corridors had only short sections reactivated, while others had the entire corridor reactivated. Railbanked corridors are usually utilized as multi-use recreational trails for cyclists, walkers, joggers, snowmobiling, cross country skiing, and horseback riding.
201:
A single section of a route changed in this way could have serious consequences for the viability of a restoration of a service, with the costs of repurchasing the land or right-of-way or of restoring the site to its former condition outweighing the economic benefit. Over the full length of a
124:
now known as the federal Rails-To-Trails law codified as 16 U.S.C. 1247(d). The federal law took the property rights of property owners throughout the United States for rail trails. Several property owners sued the government as the law took property without compensation. In 1990, the
171:
is one of the only states where railbanked corridors have a reasonable chance of reactivation (should there be a need to), where elsewhere local opposition from trail users and property abutters would be able to directly influence a municipally-owned right-of-way.
120:
former owner. The owner could reuse them for any purpose, or modify the ground conditions, potentially prejudicing the line's future reuse if required. However, the landowner must agree to keep the infrastructure such as bridges and tunnels intact.
128:
ruled that the property owners were entitled to compensation for the land taken for these rail trails. In 1996, the plaintiff was awarded $ 1.5 million as compensation for the land taken for a trail through his property (see
532:
156:
293:
Testimony presented to the
Surface Transportation Board July 8, 2009, on the 25th anniversary of Section 8(d) of the National Trails Systems Act, which created the federal railbanking program
147:
policy has been to acquire abandoned rail lines for preservation. This has contributed to the majority of railroad mileage in
Connecticut being publicly owned, between the state and
380:"Railbanking is the essential legal tool for preserving abandoned railroad rights of way for Trails and Greenways, planning, railtrail corridor study, recreation path system, l"
276:
175:
Often, most of or all infrastructure is removed regardless to future use. Laws have been passed to remove infrastructure, in some cases. For example, in the
Commonwealth of
596:
564:
317:
35:
223:
bidder, a process which frequently led to great fragmentation in the ownership of former UK railway lines and reuse of the land for entirely different purposes. The
521:
493:
167:). A provision of this transfer is that CDOT is allowed to retake ownership of a right-of-way when needed for transportation purposes. Because of this,
155:
that shows future potential for transportation, when the property becomes available. CDOT has subsequently transferred 60 miles of right-of-way to the
144:
379:
280:
304:
69:
101:
In places with many environmental laws and other governmental regulations as the United States, it is very difficult to restore an
589:
557:
321:
152:
89:
354:
164:
113:
125:
51:
482:
130:
405:
112:
Since railbanking began in 1983, less than twenty railbanked corridors have been approved for reactivation by the
427:
590:
Sunflower Rails-Trails
Conservancy, Inc. - Petition for Declaratory Order - Sale of Railbanked Right-of-Way
558:
Sunflower Rails-Trails
Conservancy, Inc. - Petition for Declaratory Order - Sale of Railbanked Right-of-Way
627:
383:
305:
https://scholarship.law.tamu.edu/cgi/viewcontent.cgi?article=1035&context=student-scholarship
231:
is possibly the most extreme example, but commercial and residential developments are common.
102:
163:, and CDEEP itself has independently obtained another 50 miles (22 of which are used for the
187:
47:
318:"Surface Transportation Board hearing on rail banking abandoned railroad trail corridors"
224:
215:
195:
86:
621:
143:
has taken a proactive approach to preserving railway rights-of-way. Since the 1970s,
228:
219:
176:
563:(Report). Surface Transportation Board Decision Document 45420. 23 February 2017.
343:
182:
595:(Report). Surface Transportation Board Decision Document 46055. 17 October 2017.
168:
160:
140:
240:
277:"Review of federal railbanking: successes, statistics, and landowner impacts"
406:"Rails-to-Trails Conservancy:: What We Do:: Trail Advocacy:: Railbanking"
191:
456:
435:
148:
218:, thousands of miles (kilometers) of railway were closed under the
181:
18:
157:
Connecticut
Department of Energy and Environmental Protection
483:"2013 Connecticut Rail Transportation Ownership and Service"
151:. Today, this policy continues; the State will purchase any
43:
428:"National Association of Reversionary Property Owners"
16:
Preserving railroad corridors for possible future use
382:. Americantrails.org. 17 March 2007. Archived from
32:The examples and perspective in this article
8:
531:. Connecticut Department of Transportation.
516:
514:
492:. Connecticut Department of Transportation.
70:Learn how and when to remove this message
270:
268:
266:
264:
262:
260:
258:
256:
145:Connecticut Department of Transportation
522:"Connecticut State Rail Plan 2012-2016"
252:
7:
320:. Americantrails.org. Archived from
316:the Surface Transportation Board.
14:
279:. American trails. Archived from
275:Fowler, Marianne (July 8, 2009).
23:
602:from the original on 2022-10-09
570:from the original on 2022-10-09
538:from the original on 2022-10-09
499:from the original on 2022-10-09
360:from the original on 2022-10-09
227:on the former Oxford–Cambridge
186:This causeway once carried the
85:is the practice of preserving
1:
114:Surface Transportation Board
126:United States Supreme Court
46:, discuss the issue on the
644:
134:, 100 F3d 1525, Fed. Cir.
344:"Story of Railbanking"
198:
210:In the United Kingdom
185:
463:. Supreme.justia.com
97:In the United States
52:create a new article
44:improve this article
34:may not represent a
408:. Railstotrails.org
386:on 24 December 2010
432:Home.earthlink.net
206:reused as trails.
199:
194:'s largest lake,
190:over portions of
132:Preseault v. U.S.
80:
79:
72:
54:, as appropriate.
635:
612:
611:
609:
607:
601:
594:
586:
580:
579:
577:
575:
569:
562:
554:
548:
547:
545:
543:
537:
526:
518:
509:
508:
506:
504:
498:
487:
479:
473:
472:
470:
468:
459:Preseault v. ICC
453:
447:
446:
444:
443:
434:. Archived from
424:
418:
417:
415:
413:
402:
396:
395:
393:
391:
376:
370:
369:
367:
365:
359:
348:
340:
334:
333:
331:
329:
324:on 26 April 2011
313:
307:
302:
296:
295:
290:
288:
272:
188:Rutland Railroad
75:
68:
64:
61:
55:
27:
26:
19:
643:
642:
638:
637:
636:
634:
633:
632:
618:
617:
616:
615:
605:
603:
599:
592:
588:
587:
583:
573:
571:
567:
560:
556:
555:
551:
541:
539:
535:
524:
520:
519:
512:
502:
500:
496:
485:
481:
480:
476:
466:
464:
455:
454:
450:
441:
439:
426:
425:
421:
411:
409:
404:
403:
399:
389:
387:
378:
377:
373:
363:
361:
357:
346:
342:
341:
337:
327:
325:
315:
314:
310:
303:
299:
286:
284:
274:
273:
254:
249:
237:
212:
165:Valley Railroad
99:
76:
65:
59:
56:
41:
28:
24:
17:
12:
11:
5:
641:
639:
631:
630:
620:
619:
614:
613:
581:
549:
510:
474:
448:
419:
397:
371:
335:
308:
297:
251:
250:
248:
245:
244:
243:
236:
233:
225:Ryle Telescope
216:United Kingdom
211:
208:
196:Lake Champlain
103:abandoned line
98:
95:
78:
77:
38:of the subject
36:worldwide view
31:
29:
22:
15:
13:
10:
9:
6:
4:
3:
2:
640:
629:
628:Railway Lands
626:
625:
623:
598:
591:
585:
582:
566:
559:
553:
550:
534:
530:
523:
517:
515:
511:
495:
491:
484:
478:
475:
462:
460:
452:
449:
438:on 2016-07-05
437:
433:
429:
423:
420:
407:
401:
398:
385:
381:
375:
372:
356:
352:
345:
339:
336:
323:
319:
312:
309:
306:
301:
298:
294:
283:on 2011-12-24
282:
278:
271:
269:
267:
265:
263:
261:
259:
257:
253:
246:
242:
239:
238:
234:
232:
230:
226:
221:
217:
209:
207:
203:
197:
193:
189:
184:
180:
178:
173:
170:
166:
162:
158:
154:
150:
146:
142:
139:The state of
137:
135:
133:
127:
121:
117:
115:
110:
106:
104:
96:
94:
91:
88:
84:
74:
71:
63:
53:
49:
45:
39:
37:
30:
21:
20:
604:. Retrieved
584:
572:. Retrieved
552:
542:30 September
540:. Retrieved
528:
503:30 September
501:. Retrieved
489:
477:
465:. Retrieved
458:
451:
440:. Retrieved
436:the original
431:
422:
410:. Retrieved
400:
388:. Retrieved
384:the original
374:
362:. Retrieved
350:
338:
326:. Retrieved
322:the original
311:
300:
292:
285:. Retrieved
281:the original
229:Varsity Line
220:Beeching Axe
213:
204:
200:
177:Pennsylvania
174:
153:right-of-way
138:
131:
122:
118:
111:
107:
100:
82:
81:
66:
57:
33:
351:Atfiles.org
169:Connecticut
161:rail trails
159:for use in
141:Connecticut
83:Railbanking
467:31 January
442:2016-08-18
412:31 January
390:31 January
364:31 January
328:31 January
287:31 January
247:References
241:Rail trail
60:April 2021
90:corridors
48:talk page
622:Category
597:Archived
565:Archived
533:Archived
494:Archived
355:Archived
235:See also
42:You may
606:13 July
574:13 July
214:In the
192:Vermont
529:ct.gov
490:ct.gov
149:Amtrak
600:(PDF)
593:(PDF)
568:(PDF)
561:(PDF)
536:(PDF)
525:(PDF)
497:(PDF)
486:(PDF)
358:(PDF)
347:(PDF)
50:, or
608:2020
576:2020
544:2014
505:2014
469:2011
414:2011
392:2011
366:2011
330:2011
289:2011
87:rail
136:).
624::
527:.
513:^
488:.
430:.
353:.
349:.
291:.
255:^
610:.
578:.
546:.
507:.
471:.
461:"
457:"
445:.
416:.
394:.
368:.
332:.
73:)
67:(
62:)
58:(
40:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.