19: 106:
to resolve the matter. Subsequently, MSRDC and MahaMetro agreed to integrate the two structures. The last 200 metres (660 ft) of the second bridge would be built by the latter with two levels with the metro at the upper level before proceeding towards the railway station.
90:. As per the plan, the old bridge would be demolished once the parallel bridge was open to traffic following which a second three-lane bridge would be built, bringing the total number of lanes to six. However, a dispute arose between MSRDC and the 151: 70:
were informed by the British contractors that the bridge had lasted its guaranteed service life and hence be kept out of bounds for heavy vehicles. Subsequently, the
71: 125: 176: 91: 229: 349: 305: 203: 354: 280: 98:. MahaMetro sought permission to build the metro between the two bridges but the MSRDC refused. In 2016, the Nagpur bench of the 63: 55: 35: 254: 82:
The MSRDC began work in 2006 by building a three-lane cable-stayed bridge parallel to the old bridge. The bridge was built by
344: 67: 87: 59: 83: 103: 99: 18: 54:
in 1927 to connect what was then Old Nagpur and New Nagpur that lay across the tracks of the
34:, India. The 606.74 metres (1,990.6 ft) long bridge crosses the railway tracks north of 177:"Ram Jhula Phase-II: Demolition of old bridge at Nagpur rly station hits many hurdles" 338: 95: 74:(MSRDC) was handed over the responsibility to demolish and reconstruct the bridge. 39: 51: 320: 307: 31: 281:"Nagpur Metro's Viaduct to be Integrated with Ram Jhula's 2nd Phase" 17: 152:"Ram Jhula-II likely to be ready by Mar, project cost doubles" 30:
consists of two parallel cable-stayed railway over-bridges in
42:
runs along the centre of the bridge on the eastern side.
94:(MahaMetro) over the alignment of the Blue Line of the 126:"Ramjhula ROB phase two to open for public in January" 255:"HC urges CM to resolve dead-lock over Ram Jhula" 72:Maharashtra State Road Development Corporation 8: 92:Maharashtra Metro Rail Corporation Limited 230:"Old Santra Market ROB dismantling soon" 116: 228:Chakraborty, Proshun (18 April 2015). 202:Pinjarkar, Vijay (25 November 2010). 50:A bridge was originally built by the 7: 150:Anparthy, Anjaya (5 January 2018). 14: 204:"Ram Jhula fate hangs in balance" 102:asked Maharashtra Chief Minister 124:Roy, Ashish (28 November 2018). 56:Great Indian Peninsular Railway 36:Nagpur Junction railway station 1: 350:Cable-stayed bridges in India 68:Nagpur Municipal Corporation 371: 64:South East Central Railway 355:Railway bridges in India 88:Shapoorji Pallonji Group 58:(GIPR, the precursor to 38:. The Blue Line of the 86:, a subsidiary of the 23: 21: 345:Transport in Nagpur 321:21.1535°N 79.0894°E 317: /  22:राम झूला पुल नागपुर 285:The Metro Rail Guy 24: 104:Devendra Fadnavis 100:Bombay High Court 362: 332: 331: 329: 328: 327: 326:21.1535; 79.0894 322: 318: 315: 314: 313: 310: 297: 296: 294: 292: 277: 271: 270: 268: 266: 261:. 9 January 2016 251: 245: 244: 242: 240: 225: 219: 218: 216: 214: 199: 193: 192: 190: 188: 183:. 9 October 2015 173: 167: 166: 164: 162: 147: 141: 140: 138: 136: 121: 370: 369: 365: 364: 363: 361: 360: 359: 335: 334: 325: 323: 319: 316: 311: 308: 306: 304: 303: 301: 300: 290: 288: 287:. 19 March 2016 279: 278: 274: 264: 262: 253: 252: 248: 238: 236: 227: 226: 222: 212: 210: 201: 200: 196: 186: 184: 175: 174: 170: 160: 158: 149: 148: 144: 134: 132: 123: 122: 118: 113: 80: 60:Central Railway 48: 12: 11: 5: 368: 366: 358: 357: 352: 347: 337: 336: 299: 298: 272: 246: 234:Times of India 220: 208:Times of India 194: 168: 156:Times of India 142: 130:Times of India 115: 114: 112: 109: 79: 78:Reconstruction 76: 47: 44: 13: 10: 9: 6: 4: 3: 2: 367: 356: 353: 351: 348: 346: 343: 342: 340: 333: 330: 286: 282: 276: 273: 260: 256: 250: 247: 235: 231: 224: 221: 209: 205: 198: 195: 182: 178: 172: 169: 157: 153: 146: 143: 131: 127: 120: 117: 110: 108: 105: 101: 97: 93: 89: 85: 77: 75: 73: 69: 65: 61: 57: 53: 45: 43: 41: 37: 33: 29: 20: 16: 302: 289:. Retrieved 284: 275: 263:. Retrieved 259:The Hitavada 258: 249: 237:. Retrieved 233: 223: 211:. Retrieved 207: 197: 185:. Retrieved 181:Nagpur Today 180: 171: 159:. Retrieved 155: 145: 133:. Retrieved 129: 119: 96:Nagpur Metro 81: 49: 40:Nagpur Metro 27: 25: 15: 324: / 339:Categories 312:79°05′22″E 309:21°09′13″N 111:References 291:2 January 265:2 January 239:2 January 213:2 January 187:1 January 161:1 January 135:1 January 28:Ram Jhula 52:British 46:History 84:Afcons 62:. The 32:Nagpur 293:2019 267:2019 241:2019 215:2019 189:2019 163:2019 137:2019 66:and 26:The 341:: 283:. 257:. 232:. 206:. 179:. 154:. 128:. 295:. 269:. 243:. 217:. 191:. 165:. 139:.

Index


Nagpur
Nagpur Junction railway station
Nagpur Metro
British
Great Indian Peninsular Railway
Central Railway
South East Central Railway
Nagpur Municipal Corporation
Maharashtra State Road Development Corporation
Afcons
Shapoorji Pallonji Group
Maharashtra Metro Rail Corporation Limited
Nagpur Metro
Bombay High Court
Devendra Fadnavis
"Ramjhula ROB phase two to open for public in January"
"Ram Jhula-II likely to be ready by Mar, project cost doubles"
"Ram Jhula Phase-II: Demolition of old bridge at Nagpur rly station hits many hurdles"
"Ram Jhula fate hangs in balance"
"Old Santra Market ROB dismantling soon"
"HC urges CM to resolve dead-lock over Ram Jhula"
"Nagpur Metro's Viaduct to be Integrated with Ram Jhula's 2nd Phase"
21°09′13″N 79°05′22″E / 21.1535°N 79.0894°E / 21.1535; 79.0894
Categories
Transport in Nagpur
Cable-stayed bridges in India
Railway bridges in India

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.