861:, as part of the project planning referral. EPA reports state, "in Footscray, for the most exposed residents, a vast majority of the population will experience chronic noise-induced sleep disturbance, with very significant proportions highly disturbed... For the most exposed residents in other areas, almost half the community will experience chronic noise-induced sleep disturbance." The reports also raised concerns about the Footscray Park Railway Reserve where, EPA predicted, the public would be exposed to dangerous levels of nitrogen dioxide from increased diesel train traffic. EPA noted that planned risk assessments had not been done by the Department of Transport. Madden had viewed EPA reports in September 2010, but ruled that an Environment Effects Statement (EES) was not required for Section-1 of the RRL project. 351: 591: 375: 363: 399: 582:
Transport, Jim Betts, admitted that the lack of a mature plan, and the urgency of spending the money provided by the federal government as part of its economic stimulus package, meant that there had been a rush to finalise the financial arrangements of the scheme. He commented that "the budget for that project was basically haggled over between the state and the commonwealth one weekend and we end up with a number written on the back of an envelope".
387: 1483:
introduced as a result of RRL meant the crossing gates were down for longer, which heavily increased traffic in the area and drew criticism from residents and lobby groups. However, when the Andrews government revised their 2014 election commitment of removing 50 of the most dangerous and congested level crossings to include a further 25 level crossings at the 2018 state election, all 3 of them got included in the
3846: 3812: 3070: 3700: 3292: 3533: 901: 1429: 1422: 1415: 1367: 1253: 1246: 1141: 1134: 1105: 908: 1063: 1037: 995: 969: 943: 55: 1396: 1374: 1335: 1303: 1284: 1211: 1176: 1112: 1070: 1044: 1002: 976: 950: 244:
The project was managed by the Regional Rail Link Authority, on behalf of the Victorian Government, and, at the time, was the largest transport infrastructure project being undertaken in Australia. Construction commenced in 2009 and was fully completed in June 2015, with the opening of the section of
1490:
In January 2016, V/Line suddenly withdrew half of its V/locity fleet due to wheel wear issues. The lack of rolling stock meant passengers were forced to use buses and the government ended up having to give passengers a whole month of free travel. An independent report done into the wheel wear issues
1475:
Ballarat line passengers have been particularly upset about their services since the full opening of the RRL. Due to a rolling stock shortage, some Ballarat trains had fewer carriages than before, and timekeeping of services worsened, despite the promise of greater reliability after the RRL opened.
581:
announced the project was under review, citing poor planning and a blow-out in costs. After the review, the Baillieu government estimated the price tag for the line to be $ 880 million more than stated by the outgoing Brumby government. In November 2011, the secretary of the Victorian Department of
1501:
He noted that the lack of any formal business case for the project made it extremely difficult to determine just what the benefits of the project were meant to be, and whether or not the RRL had lived up to the expectations set for it when the project was funded in 2009. He also said that planners
1497:
While acknowledging that the project has had significant benefits, some of them unexpected, the Auditor-General slammed the State Government's of the time, the former Victorian Department of Transport and the Regional Rail Link Authority for its mismanagement of the project, particularly in the
564:
representatives. A Government spokeswoman said "every effort" had been made to contact the households affected, but bureaucrats had abandoned their planned visit to deliver the bad news because they did not want to be filmed by the media. The proposals would also have acquired 136 square metres
427:
suburban trains, caused increasing delays on rail services. Late running by V/Line or metropolitan rail services affected the reliability of other trains, and V/Line trains, running express through most suburban stations, limited the frequency, and affected the timekeeping, of stopping suburban
1482:
Despite Allen Garner, former CEO and COO of the Regional Rail Link Authority, saying there were "no new level crossings" along the whole Regional Rail Link route, three were left in place along the former Serviceton line in Deer Park, which Geelong line trains now travel on. The extra services
569:, (Australia's oldest remaining industrial garden) as part of a grade separation along Anderson Road in Sunshine; after community resistance and lobbying by Brimbank City Council, plans were altered to reduce the acquisition of the gardens to approximately 5 square metres (54 sq ft). 816:
However, far from providing a bypass of the suburban network for Geelong line trains, those services have become suburban trains on the Tarneit section of the RRL, being the only ones which can serve those stations. Tarneit station rapidly became the second busiest on the V/Line network after
1491:
found the major cause of the problem was tight curves on the RRL route, particularly on the North Melbourne flyover (NMFO), which was upgraded as part of RRL as a means of allowing V/line trains to travel through North Melbourne on a separate route to Metro trains
2963: 817:
Southern Cross. That has worsened the chronic overcrowding on peak-hour Geelong trains, as well as slowing of journey times. As a result, there have been calls for the other three planned stations on the Tarneit section of the RRL to be constructed.
559:
To accommodate the final route, 26 homes and 84 businesses on Buckley Street, Footscray were acquired. Many residents did not find out their homes were to be acquired until told by journalists, waiting up to 24 hours for official notification from
804:
to Melbourne, solving a lot of the capacity problem, and the conflicts encountered when those services share tracks with metropolitan trains. The link allows more regional and metropolitan trains to run, which, combined with the purchase of new
1502:
had not adequately predicted how many people would use the RRL after its opening, and that the lines designed maximum capacity of 18 trains per-hour would make it difficult to add the number of services which will be required in the future.
2937: 820:
As part of the project, the partially-built platforms 15 and 16 at Southern Cross station were completed, which increased the number of trains the station can handle. However, no platforms were provided for RRL trains at
2959: 241:, was excluded from the project despite being the main connection hub for regional travellers not needing to go all the way to Southern Cross, and now requires regional rail link customers to change at Footscray. 1576: 521:
to widen the existing railway corridor, and local residents launched a campaign against that proposal in May 2010. Other options floated were the sharing of tracks with freight trains in the existing
2482: 2279: 2067: 2933: 1800: 2885: 2696: 2400: 532:
was announced by the state government. Heading away from Melbourne, the pair of Regional Rail Link tracks run south of the current four suburban tracks until after the line has crossed the
2334: 1769: 1472:
Despite the immediate advantage to commuters in the Wyndham Vale and Tarneit areas, there has been some disappointment regarding the irregular spacing of services at these stations.
2854: 2376: 1962: 2160: 1831: 1738: 1931: 3020: 1601: 2823: 2670: 2033: 1676: 522: 2416: 2011: 2098: 2532: 1707: 2452: 813:
passenger capacity on regional services, particularly those from Geelong and Ballarat, and freed up capacity on Melbourne suburban tracks to allow more trains to run.
561: 2562: 771:
stated it would cost closer to $ 5 billion and take two years longer to build. In July 2011 the cost was estimated at $ 5.3 billion with a completion date of 2016.
525:, or the construction of a second rail tunnel under Footscray A preliminary route between Sunshine and Werribee was released for public consultation in June 2009. 3968: 2584: 1573: 2760: 556:
stations. Suburban trains towards Sunshine use the existing tracks except at Footscray, where two new platforms were built north of the four existing platforms.
1900: 2613: 690:
18 July 2011: Sydenham, Ballarat and Bendigo lines re-open after being closed for 2 weeks during the Victorian School Holidays to allow construction of the RRL
2474: 2319: 3948: 2276: 2059: 854: 431:
A separate line for regional trains between Geelong and Melbourne, then called the "Tarneit Link", was included as a possible long-term rail option in the
1792: 544:. At Footscray the line uses the existing platforms 1 and 2 (since renumbered 3 and 4), and then run on resumed land to the south of the suburban line to 3953: 2644: 1494:
In May 2018, the Victorian Auditor-General completed an audit on the Regional Rail Link, titled "Assessing Benefits from the Regional Rail Link Project"
780:
However, the final cost of property acquisitions related to the project will not be fully known until December 2018, so this cost estimate may increase.
2877: 2350: 2295: 2264: 3963: 3719: 2911: 2307: 317: 3013: 2506: 2692: 2397: 1479:
Following the opening of the Regional Rail Link, V/Line trains on the Ballarat line failed to meet punctuality targets for 14 consecutive months.
2331: 1761: 777:
Before the project opened in June 2015, the PTV promotional pamphlet for the regional rail link stating a cost of $ 3.9 billion for the project.
739:
19 April 2015: originally scheduled opening of the new route and stations at Tarneit and Wyndham Vale, but delayed due to a lack of V/Line trains
419:, and subsequent growth in passengers and services, there was an increase in congestion in the Melbourne suburban area, where trains operated by 28: 2729: 2252: 3271: 3900: 2846: 2368: 1954: 837:
precincts. No reason was given for that decision, and after the RRL opened, passengers wanting to get to North Melbourne had to alight at
2152: 2129: 857:(EPA) which criticised the methodology and results contained in assessments submitted by the RRL team to former state planning minister, 774:
In the 2015/16 State Budget the final cost of the project was given as $ 3.65 billion, down from the previous estimate of $ 4.1 billion.
3682: 3006: 2792: 1083: 801: 721: 545: 379: 277: 194: 1823: 1730: 3517: 3276: 3110: 2787: 1923: 537: 1593: 3677: 2815: 2666: 1668: 2236: 1986: 1874: 1855: 708: 549: 2003: 3627: 2090: 1645: 822: 238: 2524: 3905: 1699: 1484: 921: 842: 701: 694: 594: 553: 507: 476: 367: 300: 265: 226: 190: 3586: 2444: 3958: 3304: 2554: 1623: 2847:"Reasons for Decision Under Environmental Effects Act 1978 : Regional Rail Link 1 – Moonee Ponds Creek to Deer Park" 2182: 1511: 1345: 882: 789: 747: 403: 330: 222: 174: 3258: 3082: 2752: 1382: 797: 281: 198: 189:, thereby increasing rail capacity and reliability. The project involved the building of an extra pair of tracks from 182: 2988: 2609: 1892: 3120: 1521: 416: 350: 3671: 3649: 3596: 3217: 3170: 3041: 1224: 1015: 838: 730: 715: 566: 541: 529: 448: 355: 307: 293: 230: 202: 3606: 3551: 3427: 3150: 3145: 3125: 3100: 830: 514: 472: 337: 210: 2636: 590: 764:
In May 2010, the estimated cost was $ 4.3 billion, and economic benefits were estimated to be $ 6.2 billion.
687:
2 July 2011: Construction begins, with the shifting of existing railway tracks between Sunshine and Tottenham
3771: 3642: 3637: 3632: 3484: 3422: 3417: 3412: 3407: 3402: 3397: 3392: 3387: 3382: 3377: 3372: 3367: 3362: 3352: 3347: 3342: 3337: 3332: 3245: 3105: 1438: 1313: 1161: 1120: 834: 743: 391: 326: 218: 206: 128: 3910: 3815: 3766: 3500: 3494: 3489: 3479: 3474: 3469: 3464: 3459: 3327: 3322: 3317: 3312: 3186: 3115: 3029: 2907: 2209: 1549: 1189: 673:
West Werribee Junction / Geelong Line interchange (approximately 1.5 km): Leighton Contractors &
617: 424: 186: 169:) was a project to build a 47.5-kilometre (29.5 mi) length of railway through the western suburbs of 143: 133: 78: 2503: 513:
Several route options were investigated. One proposal involved the acquisition of up to 49 properties in
270:
a new twin track rail bridge and a new bridge deck (total 2 bridges) over Dudley Street in West Melbourne
3165: 3140: 3130: 3095: 3073: 1527: 1261: 506:
In May 2009 the project reached full funding, gaining the required allocation of $ 3.2 billion from the
246: 214: 39: 374: 3864: 3849: 3703: 3160: 3155: 3090: 3048: 1157: 1153: 1149: 793: 667: 653: 649: 178: 726:
16 July 2014: commissioning of the new dedicated V/line tracks between South Kensington and Sunshine
3601: 3581: 3135: 2721: 1269: 1265: 518: 170: 362: 3571: 3561: 3536: 3295: 3265: 707:
22 December 2013: platforms 15/16 at Southern Cross and approximately 5 kilometres of track from
624: 602: 492: 336:
new rail bridge over the existing broad gauge and standard gauge tracks at the junction with the
35: 825:, which had been a major interchange point for regional passengers using northern suburban and 601:
Construction commenced in August 2009. The works were divided into seven packages - an overall
398: 3795: 3611: 3576: 3223: 3207: 2121: 768: 578: 536:, where a new bridge was built. After crossing the river, the line passes over the top of the 533: 287: 2782: 428:
trains. After major disruptions each operator might blame the other for causing the problem.
3591: 3357: 662:
Deer Park West to West Werribee Junction (25.5 km as a design and construct contract):
234: 3756: 2510: 2404: 2338: 2283: 2240: 1990: 1878: 1859: 1580: 540:
bound suburban tracks on a flyover, and then runs between each pair of suburban tracks to
468: 432: 229:
and Sunshine stations were rebuilt. Additional platforms were built at Southern Cross and
2667:"Bombardier Awarded Contract for a Further 32 DMU Cars for V/Line Passenger in Australia" 386: 3761: 3751: 3202: 2430: 2233: 1983: 1872:
Regional Rail Work to Start this Year after $ 4 Billion Project Secures Federal Funding
1871: 1852: 657: 645: 3845: 3942: 3880: 3830: 3556: 3212: 858: 829:
trains, as well as the recently introduced Route 401 bus from North Melbourne to the
806: 440: 3811: 3069: 1653: 3699: 3291: 3251: 674: 663: 491:, from suburban rail movements, the proposed route was from Southern Cross through 17: 2428:"Ballarat services now stopping at new, dedicated platforms at Sunshine station" 3532: 3443: 2998: 610: 2783:"Users ask the government how much slower the new rail link to Geelong will be" 1631: 475:
of December 2008. With a revised aim of separating all regional trains between
2993: 2504:
Geelong and Warrnambool trains to run via Regional Rail Link from 21 June 2015
2445:"First RRL test train was an N class light engine for signal sighting trials" 27:
For the new rail corridor constructed by the Regional Rail Link project, see
3240: 826: 810: 636: 68: 1524:- a prior project aimed at improving regional rail services across Victoria 54: 868: 623:
Southern Cross station to Maribyrnong River (4.75 km): consortium of
3654: 628: 500: 484: 452: 439:
report. Costed at around $ 500 million, the link was also recommended in
1530:- a subsequent program to upgrade regional railway lines across Victoria 261:
Section 1 (existing rail corridor between Southern Cross and Deer Park)
2034:"Footscray residents slam plans to acquire homes for transport upgrade" 496: 488: 480: 322:
grade-separated double-track rail corridor with no new level crossings
3735: 3566: 2060:"Rail demolition: Footscray residents fume over notification blunder" 1515: 736:
6 October 2014: first test train operated on the new line via Tarneit
420: 138: 2475:"Andrews government delays Regional Rail Link opening by two months" 318:
Section 2 (new rail corridor between Deer Park and west of Werribee)
2585:"Relief from commuter crush years away despite billions in budget" 632: 597:
platforms 15 & 16 northern concourse entrance in December 2013
589: 397: 385: 373: 361: 349: 447:
study, released in April 2008. By November 2008 the link between
233:
stations, and two level crossings near Sunshine were replaced by
3055: 2878:"Ballarat train commuters suffer after Regional Rail Link opens" 3002: 644:
West Footscray to Deer Park West (13.4 km): consortium of
415:
Following the rail infrastructure improvements provided by the
2332:
Full steam ahead on the Regional Rail Link Premier of Victoria
510:, adding to funds to be provided by the Victorian Government. 2234:
Construction Starts on the $ 4.3 Billion Regional Rail Link
641:
Maribyrnong River to West Footscray station (2.35 km):
616:
Southern Cross station platforms 15 & 16: (overseen by
312:
removal of two level crossings at Anderson Road in Sunshine
2994:
YouTube video overview of works Public Transport Victoria
853:
Controversy emerged with the release of reports from the
605:
and control systems contract, and six sections of track:
2610:"Assessing Benefits from the Regional Rail Link Project" 1574:
Australia's largest public transport project leaps ahead
2369:"Commuters face snarls as $ 5.3bn rail project digs in" 1596:. Department of Environment, Land, Water and Planning. 147:
Train travellers on Geelong, Bendigo and Ballarat lines
3929:*Only including services within metropolitan Melbourne 273:
upgrades to the North Melbourne rail-over-rail flyover
1700:"Geelong, V/Line Connex rail delays after fuel spill" 1667:
Jason Dowling & Natalie Puchalski (6 June 2009).
2814:
Deborah Gough & Melissa Fyfe (6 February 2011).
2277:
New contract moves Regional Rail Link into high gear
1955:"New train line and ring road routes to be unveiled" 1824:"Planned $ 1.5bn rail link will free up bottlenecks" 3893: 3873: 3857: 3843: 3823: 3809: 3782: 3744: 3728: 3712: 3697: 3663: 3620: 3544: 3530: 3510: 3452: 3436: 3303: 3289: 3233: 3195: 3179: 3081: 3067: 2604: 2602: 2600: 2598: 151: 124: 116: 108: 100: 92: 84: 74: 64: 2934:"Solution needed to curb traffic woes at crossing" 2153:"Fears review of rail link scandal may be tainted" 276:new pair of tracks from Southern Cross station to 1924:"Rail plan with at least one obstacle: Footscray" 1731:"Melbourne train commuters warned of more delays" 237:. The most used station before its construction, 173:, the main aim of which was to separate regional 2851:Department of Planning and Community Development 1853:Regional Rail Link to Streamline Train Services 1760:Royce Millar & Clay Lucas (29 March 2008). 565:(1,460 sq ft) of the heritage listed 463:The project was expanded and re-branded as the 2693:"Coalition Orders 40 New Carriages for V/Line" 1669:"Regional rail travel booming, despite delays" 742:21 June 2015: completion including opening of 306:improvements to the entrance and forecourt at 3014: 2816:"Residents face lost sleep over rail project" 2695:. Department of Transport. 26 November 2012. 1984:Proposed Route of Regional Rail Link Revealed 1797:East West Links Needs Assessment final report 714:20 January 2014: new platforms 1/2 opened at 264:two new platforms (platforms 15 & 16) at 257:The Regional Rail Link project consisted of: 8: 2398:Regional Rail Link works to kick off in July 2363: 2361: 2359: 855:Victorian Environmental Protection Authority 47: 720:28 April 2014: new platforms 3/4 opened at 3854: 3844: 3820: 3810: 3709: 3698: 3541: 3531: 3300: 3290: 3078: 3068: 3021: 3007: 2999: 2525:"Cost won't put a stop to freeway: Brumby" 2183:"Brumby rapt at $ 3bn boost for rail link" 890: 46: 2004:"Houses to go for new regional rail link" 693:Early 2013: fitout of platforms 15/16 at 59:Route of the Regional Rail Link in orange 2845:Minister for Planning (7 October 2010). 2091:"Residents not told their homes will go" 1518:separating suburban and freight services 2960:"V/Line woes continue with poor report" 2716: 2714: 1540: 2732:from the original on 16 September 2018 800:lines use the Regional Rail Link from 609:signalling and control: consortium of 528:In July 2010, the final route through 29:Deer Park - West Werribee railway line 3969:5 ft 3 in gauge railways in Australia 3272:List of railway stations in Melbourne 2966:from the original on 12 February 2016 2888:from the original on 10 December 2017 2857:from the original on 28 February 2011 2699:from the original on 28 December 2012 2555:"Rail link delay as bill nears $ 5bn" 2485:from the original on 20 February 2015 2163:from the original on 14 February 2011 455:was estimated to cost $ 1.5 billion. 249:junction to Deer Park West junction. 7: 2795:from the original on 1 February 2014 2763:from the original on 5 November 2012 2753:"$ 4.3b link won't cut travel times" 1772:from the original on 3 November 2012 1741:from the original on 15 January 2009 1679:from the original on 16 January 2011 1604:from the original on 4 February 2022 1583:Premier of Victoria 21 December 2011 155:Fair-go for Footscray Rail Residents 2914:from the original on 13 August 2016 2151:Gough, Deborah (13 February 2011). 1862:Premier of Victoria 8 December 2008 1487:and were removed in 2022 and 2023. 729:16 July 2014: new platforms 3/4 at 201:, and a new double-track line from 3949:Rail transport in Victoria (state) 2826:from the original on 12 March 2011 2788:Public Transport Users Association 2320:Deer Park - West Werribee Junction 2243:Premier of Victoria 27 August 2009 845:stations and catch another train. 25: 3954:Railway lines in Victoria (state) 2940:from the original on 29 June 2019 2876:Schetzer, Alana (8 August 2015). 2673:from the original on 12 June 2013 2616:from the original on 22 July 2018 2565:from the original on 6 April 2011 2455:from the original on 5 March 2016 2208:Jason Murphy (16 November 2011). 2120:Laura Wakely (14 February 2012). 2101:from the original on 15 July 2010 2070:from the original on 16 July 2010 2014:from the original on 15 July 2010 1965:from the original on 18 June 2009 1803:from the original on 25 June 2009 1710:from the original on 27 June 2009 3964:2015 establishments in Australia 3926:denotes services yet to commence 2647:from the original on 20 May 2009 2535:from the original on 23 May 2010 2379:from the original on 6 July 2011 1993:Premier of Victoria 17 June 2009 1834:from the original on 19 May 2009 1550:"Regional rail link to go ahead" 1427: 1420: 1413: 1394: 1372: 1365: 1333: 1301: 1282: 1251: 1244: 1209: 1174: 1139: 1132: 1110: 1103: 1068: 1061: 1042: 1035: 1000: 993: 974: 967: 948: 941: 906: 899: 809:, has helped provide additional 437:Meeting Our Transport Challenges 53: 3628:List of bus routes in Melbourne 2722:"Express call for Tarneit West" 2481:. Melbourne. 20 February 2015. 2407:Premier of Victoria 17 May 2011 2286:Premier of Victoria 12 May 2012 2132:from the original on 5 May 2016 1934:from the original on 9 May 2010 1903:from the original on 5 May 2023 1893:"Tough decisions necessary: PM" 1881:Premier of Victoria 14 May 2009 577:In February 2011, the incoming 445:East-West Link Needs Assessment 3906:Level Crossing Removal Project 1822:Clay Lucas (3 November 2008). 1793:"Fact sheet - Recommendations" 1729:Mex Cooper (14 January 2009). 1485:Level Crossing Removal Project 900: 467:when announced as part of the 213:, near the site of the former 185:services from the electrified 1: 3030:Public transport in Melbourne 2822:. The Sunday Age. Melbourne. 2635:Lucas, Clay (21 March 2009). 2451:. Melbourne. 6 October 2014. 1428: 1421: 1414: 1366: 1252: 1245: 1140: 1133: 1104: 907: 217:. New stations were built at 2751:Lucas, Clay (15 June 2010). 2058:Robyn Grace (13 July 2010). 1791:Rod Eddington (March 2008). 1762:"West may get new rail line" 1548:Peter Begg (26 April 2011). 1512:Southern Sydney Freight Line 1062: 1036: 994: 968: 942: 788:All passenger trains on the 3587:McKenzie's Tourist Services 2561:. Melbourne. 5 April 2011. 2523:Lucas, Clay (22 May 2010). 2214:Australian Financial Review 2089:Clay Lucas (13 July 2010). 2010:. Melbourne. 12 July 2010. 1953:Clay Lucas (16 June 2009). 1395: 1373: 1334: 1302: 1283: 1210: 1175: 1111: 1069: 1043: 1001: 975: 949: 767:In April 2011 the incoming 406:before opening in June 2015 394:before opening in June 2015 187:Melbourne suburban services 3985: 2989:Project page (August 2015) 2375:. Melbourne. 4 July 2011. 1891:Mex Cooper (18 May 2009). 1698:Mex Cooper (11 May 2009). 1522:Regional Fast Rail project 573:Baillieu government review 417:Regional Fast Rail project 33: 26: 3919: 3597:Ryan Brothers Bus Service 3042:Public Transport Victoria 3036: 2637:"Melbourne's Big Squeeze" 1922:Clay Lucas (7 May 2010). 1436: 1407: 1403: 1388: 1381: 1359: 1327: 1295: 1291: 1276: 1260: 1238: 1203: 1168: 1148: 1126: 1119: 1097: 1055: 1051: 1029: 987: 983: 961: 957: 935: 893: 700:14 October 2013: Rebuilt 567:HV McKay Memorial Gardens 286:new rail bridge over the 52: 3607:Transit Systems Victoria 3552:Broadmeadows Bus Service 2591:. Melbourne. 5 May 2015. 2296:City - Maribyrnong River 2210:"Vic project railroaded" 1799:. transport.vic.gov.au. 1121:Standard Gauge to Albury 473:Victorian Transport Plan 34:Not to be confused with 3901:Department of Transport 3720:Deer Park–West Werribee 3683:Doncaster Park and Ride 3246:Flinders Street Viaduct 1514:– a similar project in 823:North Melbourne station 562:Department of Transport 296:including new platforms 205:, which joins with the 136:(minor funding partner) 131:(major funding partner) 129:Government of Australia 3911:Rail Projects Victoria 3865:Melbourne City Express 3259:Melbourne Airport Rail 2351:West Werribee Junction 1598:Environment assessment 618:Metro Trains Melbourne 598: 595:Southern Cross station 425:Metro Trains Melbourne 407: 395: 383: 371: 368:West Footscray station 359: 266:Southern Cross station 191:Southern Cross station 144:Metro Trains Melbourne 134:Government of Victoria 79:Government of Victoria 3678:Bulleen Park and Ride 3111:Flemington Racecourse 2509:29 March 2015 at the 2403:20 April 2013 at the 2337:20 April 2013 at the 2308:Footscray - Deer Park 2282:20 April 2013 at the 1579:20 April 2013 at the 1528:Regional Rail Revival 613:& Manidis Roberts 593: 523:Bunbury Street tunnel 401: 389: 377: 365: 353: 303:and Sunshine stations 215:Manor railway station 40:Regional Rail Revival 3959:V/Line rail services 2962:. 11 February 2016. 2449:Wongm's Rail Gallery 2239:9 April 2013 at the 1989:9 April 2013 at the 1877:9 April 2013 at the 1858:9 April 2013 at the 1594:"Regional Rail Link" 668:Leighton Contractors 654:Sinclair Knight Merz 650:Parsons Brinckerhoff 404:Wyndham Vale station 3602:Sunbury Bus Service 3582:Martyrs Bus Service 3518:Proposed extensions 3277:Proposed extensions 2417:Platforms 15 and 16 849:Noise and pollution 769:Baillieu government 579:Baillieu government 508:2009 Federal budget 423:shared tracks with 171:Melbourne, Victoria 49: 3790:Regional Rail Link 3572:Kastoria Bus Lines 3562:Cranbourne Transit 3266:Suburban Rail Loop 2936:. 23 August 2015. 2908:"Past performance" 2419:Regional Rail Link 2353:Regional Rail Link 2322:Regional Rail Link 2310:Regional Rail Link 2298:Regional Rail Link 2267:Regional Rail Link 2255:Regional Rail Link 1650:Regional Rail Link 1628:Regional Rail Link 1624:"Project overview" 1554:Geelong Advertiser 874:Regional Rail Link 603:railway signalling 599: 465:Regional Rail Link 408: 396: 384: 372: 360: 292:major upgrades to 280:, parallel to the 197:, parallel to the 163:Regional Rail Link 48:Regional Rail Link 36:Regional Fast Rail 18:Regional Rail Link 3936: 3935: 3889: 3888: 3839: 3838: 3805: 3804: 3796:Western Rail Plan 3693: 3692: 3612:Ventura Bus Lines 3577:Kinetic Melbourne 3526: 3525: 3285: 3284: 2434:June 2014 page 21 1498:planning stages. 1465: 1464: 1461: 1460: 760:Cost and benefits 542:Footscray station 534:Maribyrnong River 469:Brumby Government 433:Bracks government 356:Footscray station 354:New platforms at 308:Tottenham station 294:Footscray station 288:Maribyrnong River 235:grade separations 159: 158: 16:(Redirected from 3976: 3855: 3848: 3821: 3814: 3710: 3702: 3592:Panorama Coaches 3542: 3535: 3301: 3294: 3079: 3072: 3023: 3016: 3009: 3000: 2976: 2975: 2973: 2971: 2956: 2950: 2949: 2947: 2945: 2930: 2924: 2923: 2921: 2919: 2904: 2898: 2897: 2895: 2893: 2873: 2867: 2866: 2864: 2862: 2842: 2836: 2835: 2833: 2831: 2811: 2805: 2804: 2802: 2800: 2779: 2773: 2772: 2770: 2768: 2748: 2742: 2741: 2739: 2737: 2718: 2709: 2708: 2706: 2704: 2689: 2683: 2682: 2680: 2678: 2663: 2657: 2656: 2654: 2652: 2632: 2626: 2625: 2623: 2621: 2606: 2593: 2592: 2581: 2575: 2574: 2572: 2570: 2551: 2545: 2544: 2542: 2540: 2520: 2514: 2501: 2495: 2494: 2492: 2490: 2471: 2465: 2464: 2462: 2460: 2441: 2435: 2426: 2420: 2414: 2408: 2395: 2389: 2388: 2386: 2384: 2365: 2354: 2348: 2342: 2329: 2323: 2317: 2311: 2305: 2299: 2293: 2287: 2274: 2268: 2262: 2256: 2250: 2244: 2231: 2225: 2224: 2222: 2220: 2205: 2199: 2198: 2196: 2194: 2179: 2173: 2172: 2170: 2168: 2148: 2142: 2141: 2139: 2137: 2122:"No Opportunity" 2117: 2111: 2110: 2108: 2106: 2086: 2080: 2079: 2077: 2075: 2055: 2049: 2048: 2046: 2044: 2030: 2024: 2023: 2021: 2019: 2000: 1994: 1981: 1975: 1974: 1972: 1970: 1950: 1944: 1943: 1941: 1939: 1919: 1913: 1912: 1910: 1908: 1888: 1882: 1869: 1863: 1850: 1844: 1843: 1841: 1839: 1819: 1813: 1812: 1810: 1808: 1788: 1782: 1781: 1779: 1777: 1757: 1751: 1750: 1748: 1746: 1726: 1720: 1719: 1717: 1715: 1695: 1689: 1688: 1686: 1684: 1664: 1658: 1657: 1656:on 16 July 2014. 1652:. Archived from 1642: 1636: 1635: 1634:on 29 July 2014. 1630:. Archived from 1620: 1614: 1613: 1611: 1609: 1590: 1584: 1571: 1565: 1564: 1562: 1560: 1545: 1431: 1430: 1424: 1423: 1417: 1416: 1398: 1397: 1376: 1375: 1369: 1368: 1337: 1336: 1305: 1304: 1286: 1285: 1255: 1254: 1248: 1247: 1213: 1212: 1178: 1177: 1143: 1142: 1136: 1135: 1114: 1113: 1107: 1106: 1072: 1071: 1065: 1064: 1046: 1045: 1039: 1038: 1004: 1003: 997: 996: 978: 977: 971: 970: 952: 951: 945: 944: 910: 909: 903: 902: 891: 869: 709:South Kensington 631:, Coleman Rail, 550:Middle Footscray 380:Sunshine station 338:Warrnambool line 207:Warrnambool line 57: 50: 21: 3984: 3983: 3979: 3978: 3977: 3975: 3974: 3973: 3939: 3938: 3937: 3932: 3915: 3885: 3869: 3835: 3801: 3778: 3772:N type carriage 3767:H type carriage 3740: 3724: 3689: 3659: 3616: 3522: 3506: 3448: 3432: 3281: 3229: 3191: 3175: 3063: 3032: 3027: 2985: 2980: 2979: 2969: 2967: 2958: 2957: 2953: 2943: 2941: 2932: 2931: 2927: 2917: 2915: 2906: 2905: 2901: 2891: 2889: 2875: 2874: 2870: 2860: 2858: 2844: 2843: 2839: 2829: 2827: 2813: 2812: 2808: 2798: 2796: 2781: 2780: 2776: 2766: 2764: 2750: 2749: 2745: 2735: 2733: 2720: 2719: 2712: 2702: 2700: 2691: 2690: 2686: 2676: 2674: 2665: 2664: 2660: 2650: 2648: 2634: 2633: 2629: 2619: 2617: 2608: 2607: 2596: 2583: 2582: 2578: 2568: 2566: 2553: 2552: 2548: 2538: 2536: 2522: 2521: 2517: 2511:Wayback Machine 2502: 2498: 2488: 2486: 2473: 2472: 2468: 2458: 2456: 2443: 2442: 2438: 2427: 2423: 2415: 2411: 2405:Wayback Machine 2396: 2392: 2382: 2380: 2367: 2366: 2357: 2349: 2345: 2339:Wayback Machine 2330: 2326: 2318: 2314: 2306: 2302: 2294: 2290: 2284:Wayback Machine 2275: 2271: 2263: 2259: 2251: 2247: 2241:Wayback Machine 2232: 2228: 2218: 2216: 2207: 2206: 2202: 2192: 2190: 2181: 2180: 2176: 2166: 2164: 2150: 2149: 2145: 2135: 2133: 2119: 2118: 2114: 2104: 2102: 2088: 2087: 2083: 2073: 2071: 2057: 2056: 2052: 2042: 2040: 2032: 2031: 2027: 2017: 2015: 2002: 2001: 1997: 1991:Wayback Machine 1982: 1978: 1968: 1966: 1952: 1951: 1947: 1937: 1935: 1921: 1920: 1916: 1906: 1904: 1890: 1889: 1885: 1879:Wayback Machine 1870: 1866: 1860:Wayback Machine 1851: 1847: 1837: 1835: 1821: 1820: 1816: 1806: 1804: 1790: 1789: 1785: 1775: 1773: 1759: 1758: 1754: 1744: 1742: 1728: 1727: 1723: 1713: 1711: 1697: 1696: 1692: 1682: 1680: 1666: 1665: 1661: 1646:"Overview maps" 1644: 1643: 1639: 1622: 1621: 1617: 1607: 1605: 1592: 1591: 1587: 1581:Wayback Machine 1572: 1568: 1558: 1556: 1547: 1546: 1542: 1537: 1508: 1470: 1432: 1425: 1418: 1399: 1377: 1370: 1355: 1338: 1323: 1306: 1287: 1256: 1249: 1234: 1219: 1214: 1199: 1184: 1179: 1144: 1137: 1115: 1108: 1093: 1078: 1073: 1066: 1047: 1040: 1025: 1010: 1005: 998: 979: 972: 953: 946: 931: 916: 911: 904: 885: 876: 875: 867: 851: 786: 762: 757: 684: 588: 575: 461: 459:Official status 413: 392:Tarneit station 348: 255: 239:North Melbourne 175:V/Line Ballarat 146: 142: 137: 132: 117:Completion date 60: 43: 32: 23: 22: 15: 12: 11: 5: 3982: 3980: 3972: 3971: 3966: 3961: 3956: 3951: 3941: 3940: 3934: 3933: 3931: 3930: 3927: 3920: 3917: 3916: 3914: 3913: 3908: 3903: 3897: 3895: 3891: 3890: 3887: 3886: 3884: 3883: 3877: 3875: 3871: 3870: 3868: 3867: 3861: 3859: 3852: 3841: 3840: 3837: 3836: 3834: 3833: 3827: 3825: 3818: 3807: 3806: 3803: 3802: 3800: 3799: 3792: 3786: 3784: 3783:Infrastructure 3780: 3779: 3777: 3776: 3775: 3774: 3769: 3759: 3754: 3748: 3746: 3742: 3741: 3739: 3738: 3732: 3730: 3726: 3725: 3723: 3722: 3716: 3714: 3707: 3704:Regional train 3695: 3694: 3691: 3690: 3688: 3687: 3686: 3685: 3680: 3672:Eastern Busway 3667: 3665: 3664:Infrastructure 3661: 3660: 3658: 3657: 3652: 3647: 3646: 3645: 3640: 3635: 3624: 3622: 3618: 3617: 3615: 3614: 3609: 3604: 3599: 3594: 3589: 3584: 3579: 3574: 3569: 3564: 3559: 3554: 3548: 3546: 3539: 3528: 3527: 3524: 3523: 3521: 3520: 3514: 3512: 3508: 3507: 3505: 3504: 3497: 3492: 3487: 3482: 3477: 3472: 3467: 3462: 3456: 3454: 3450: 3449: 3447: 3446: 3440: 3438: 3434: 3433: 3431: 3430: 3425: 3420: 3415: 3410: 3405: 3400: 3395: 3390: 3385: 3380: 3375: 3370: 3365: 3360: 3355: 3350: 3345: 3340: 3335: 3330: 3325: 3320: 3315: 3309: 3307: 3298: 3287: 3286: 3283: 3282: 3280: 3279: 3274: 3269: 3262: 3255: 3248: 3243: 3237: 3235: 3234:Infrastructure 3231: 3230: 3228: 3227: 3224:X'Trapolis 2.0 3220: 3215: 3210: 3208:X'Trapolis 100 3205: 3199: 3197: 3193: 3192: 3190: 3189: 3183: 3181: 3177: 3176: 3174: 3173: 3168: 3163: 3158: 3153: 3148: 3143: 3138: 3133: 3128: 3123: 3118: 3113: 3108: 3103: 3098: 3093: 3087: 3085: 3076: 3065: 3064: 3062: 3061: 3060: 3059: 3045: 3037: 3034: 3033: 3028: 3026: 3025: 3018: 3011: 3003: 2997: 2996: 2991: 2984: 2983:External links 2981: 2978: 2977: 2951: 2925: 2899: 2868: 2837: 2806: 2774: 2743: 2728:. 1 May 2018. 2710: 2684: 2669:. Bombardier. 2658: 2627: 2594: 2576: 2546: 2515: 2496: 2466: 2436: 2431:Railway Digest 2421: 2409: 2390: 2355: 2343: 2324: 2312: 2300: 2288: 2269: 2265:Southern Cross 2257: 2245: 2226: 2200: 2174: 2143: 2126:Star Community 2112: 2081: 2050: 2025: 1995: 1976: 1945: 1914: 1883: 1864: 1845: 1814: 1783: 1752: 1721: 1690: 1659: 1637: 1615: 1585: 1566: 1539: 1538: 1536: 1533: 1532: 1531: 1525: 1519: 1507: 1504: 1469: 1466: 1463: 1462: 1459: 1458: 1456: 1454: 1452: 1450: 1448: 1446: 1443: 1442: 1435: 1433: 1426: 1419: 1412: 1410: 1408: 1405: 1404: 1402: 1400: 1393: 1391: 1389: 1386: 1385: 1380: 1378: 1371: 1364: 1362: 1360: 1357: 1356: 1353: 1351: 1341: 1339: 1332: 1330: 1328: 1325: 1324: 1321: 1319: 1309: 1307: 1300: 1298: 1296: 1293: 1292: 1290: 1288: 1281: 1279: 1277: 1274: 1273: 1259: 1257: 1250: 1243: 1241: 1239: 1236: 1235: 1232: 1230: 1220: 1217: 1215: 1208: 1206: 1204: 1201: 1200: 1197: 1195: 1185: 1182: 1180: 1173: 1171: 1169: 1166: 1165: 1147: 1145: 1138: 1131: 1129: 1127: 1124: 1123: 1118: 1116: 1109: 1102: 1100: 1098: 1095: 1094: 1092:Zone 1 & 2 1091: 1089: 1079: 1076: 1074: 1067: 1060: 1058: 1056: 1053: 1052: 1050: 1048: 1041: 1034: 1032: 1030: 1027: 1026: 1023: 1021: 1011: 1008: 1006: 999: 992: 990: 988: 985: 984: 982: 980: 973: 966: 964: 962: 959: 958: 956: 954: 947: 940: 938: 936: 933: 932: 929: 927: 922:Southern Cross 917: 914: 912: 905: 898: 896: 894: 887: 886: 881: 878: 877: 873: 872: 866: 863: 850: 847: 843:Southern Cross 785: 782: 761: 758: 756: 753: 752: 751: 740: 737: 734: 727: 724: 718: 712: 705: 704:Station opened 702:West Footscray 698: 695:Southern Cross 691: 688: 683: 680: 679: 678: 677:joint venture. 671: 660: 646:Balfour Beatty 642: 639: 621: 614: 587: 584: 574: 571: 554:West Footscray 477:Southern Cross 460: 457: 412: 409: 347: 344: 343: 342: 341: 340: 334: 323: 315: 314: 313: 310: 304: 301:West Footscray 299:rebuilding of 297: 290: 284: 274: 271: 268: 254: 251: 227:West Footscray 157: 156: 153: 149: 148: 126: 122: 121: 118: 114: 113: 110: 106: 105: 104:$ 3.65 billion 102: 98: 97: 94: 90: 89: 86: 82: 81: 76: 72: 71: 66: 62: 61: 58: 24: 14: 13: 10: 9: 6: 4: 3: 2: 3981: 3970: 3967: 3965: 3962: 3960: 3957: 3955: 3952: 3950: 3947: 3946: 3944: 3928: 3925: 3922: 3921: 3918: 3912: 3909: 3907: 3904: 3902: 3899: 3898: 3896: 3892: 3882: 3881:Kinetic Group 3879: 3878: 3876: 3872: 3866: 3863: 3862: 3860: 3856: 3853: 3851: 3847: 3842: 3832: 3831:Westgate Punt 3829: 3828: 3826: 3822: 3819: 3817: 3813: 3808: 3798: 3797: 3793: 3791: 3788: 3787: 3785: 3781: 3773: 3770: 3768: 3765: 3764: 3763: 3760: 3758: 3755: 3753: 3750: 3749: 3747: 3745:Rolling stock 3743: 3737: 3734: 3733: 3731: 3727: 3721: 3718: 3717: 3715: 3711: 3708: 3705: 3701: 3696: 3684: 3681: 3679: 3676: 3675: 3674: 3673: 3669: 3668: 3666: 3662: 3656: 3653: 3651: 3650:Night Network 3648: 3644: 3641: 3639: 3636: 3634: 3631: 3630: 3629: 3626: 3625: 3623: 3619: 3613: 3610: 3608: 3605: 3603: 3600: 3598: 3595: 3593: 3590: 3588: 3585: 3583: 3580: 3578: 3575: 3573: 3570: 3568: 3565: 3563: 3560: 3558: 3557:CDC Melbourne 3555: 3553: 3550: 3549: 3547: 3543: 3540: 3538: 3534: 3529: 3519: 3516: 3515: 3513: 3509: 3503: 3502: 3498: 3496: 3493: 3491: 3488: 3486: 3483: 3481: 3478: 3476: 3473: 3471: 3468: 3466: 3463: 3461: 3458: 3457: 3455: 3453:Rolling stock 3451: 3445: 3442: 3441: 3439: 3435: 3429: 3426: 3424: 3421: 3419: 3416: 3414: 3411: 3409: 3406: 3404: 3401: 3399: 3396: 3394: 3391: 3389: 3386: 3384: 3381: 3379: 3376: 3374: 3371: 3369: 3366: 3364: 3361: 3359: 3356: 3354: 3351: 3349: 3346: 3344: 3341: 3339: 3336: 3334: 3331: 3329: 3326: 3324: 3321: 3319: 3316: 3314: 3311: 3310: 3308: 3306: 3302: 3299: 3297: 3293: 3288: 3278: 3275: 3273: 3270: 3268: 3267: 3263: 3261: 3260: 3256: 3254: 3253: 3249: 3247: 3244: 3242: 3239: 3238: 3236: 3232: 3226: 3225: 3221: 3219: 3216: 3214: 3213:Siemens Nexas 3211: 3209: 3206: 3204: 3201: 3200: 3198: 3196:Rolling stock 3194: 3188: 3185: 3184: 3182: 3178: 3172: 3169: 3167: 3164: 3162: 3159: 3157: 3154: 3152: 3149: 3147: 3144: 3142: 3139: 3137: 3134: 3132: 3129: 3127: 3124: 3122: 3121:Glen Waverley 3119: 3117: 3114: 3112: 3109: 3107: 3104: 3102: 3099: 3097: 3094: 3092: 3089: 3088: 3086: 3084: 3080: 3077: 3075: 3071: 3066: 3058: 3057: 3053: 3052: 3051: 3050: 3046: 3044: 3043: 3039: 3038: 3035: 3031: 3024: 3019: 3017: 3012: 3010: 3005: 3004: 3001: 2995: 2992: 2990: 2987: 2986: 2982: 2965: 2961: 2955: 2952: 2939: 2935: 2929: 2926: 2913: 2909: 2903: 2900: 2887: 2883: 2879: 2872: 2869: 2856: 2852: 2848: 2841: 2838: 2825: 2821: 2817: 2810: 2807: 2794: 2790: 2789: 2784: 2778: 2775: 2762: 2758: 2754: 2747: 2744: 2731: 2727: 2723: 2717: 2715: 2711: 2698: 2694: 2688: 2685: 2672: 2668: 2662: 2659: 2646: 2642: 2638: 2631: 2628: 2615: 2611: 2605: 2603: 2601: 2599: 2595: 2590: 2586: 2580: 2577: 2564: 2560: 2556: 2550: 2547: 2534: 2531:. Melbourne. 2530: 2526: 2519: 2516: 2512: 2508: 2505: 2500: 2497: 2484: 2480: 2476: 2470: 2467: 2454: 2450: 2446: 2440: 2437: 2433: 2432: 2425: 2422: 2418: 2413: 2410: 2406: 2402: 2399: 2394: 2391: 2378: 2374: 2370: 2364: 2362: 2360: 2356: 2352: 2347: 2344: 2340: 2336: 2333: 2328: 2325: 2321: 2316: 2313: 2309: 2304: 2301: 2297: 2292: 2289: 2285: 2281: 2278: 2273: 2270: 2266: 2261: 2258: 2254: 2249: 2246: 2242: 2238: 2235: 2230: 2227: 2215: 2211: 2204: 2201: 2189:. 13 May 2009 2188: 2184: 2178: 2175: 2162: 2159:. Melbourne. 2158: 2154: 2147: 2144: 2131: 2127: 2123: 2116: 2113: 2100: 2097:. Melbourne. 2096: 2092: 2085: 2082: 2069: 2066:. Melbourne. 2065: 2061: 2054: 2051: 2039: 2035: 2029: 2026: 2013: 2009: 2005: 1999: 1996: 1992: 1988: 1985: 1980: 1977: 1964: 1961:. Melbourne. 1960: 1956: 1949: 1946: 1933: 1930:. Melbourne. 1929: 1925: 1918: 1915: 1902: 1899:. Melbourne. 1898: 1894: 1887: 1884: 1880: 1876: 1873: 1868: 1865: 1861: 1857: 1854: 1849: 1846: 1833: 1830:. Melbourne. 1829: 1825: 1818: 1815: 1802: 1798: 1794: 1787: 1784: 1771: 1768:. Melbourne. 1767: 1763: 1756: 1753: 1740: 1736: 1732: 1725: 1722: 1709: 1706:. Melbourne. 1705: 1701: 1694: 1691: 1678: 1674: 1670: 1663: 1660: 1655: 1651: 1647: 1641: 1638: 1633: 1629: 1625: 1619: 1616: 1603: 1599: 1595: 1589: 1586: 1582: 1578: 1575: 1570: 1567: 1555: 1551: 1544: 1541: 1534: 1529: 1526: 1523: 1520: 1517: 1513: 1510: 1509: 1505: 1503: 1499: 1495: 1492: 1488: 1486: 1480: 1477: 1473: 1467: 1457: 1455: 1453: 1451: 1449: 1447: 1445: 1444: 1440: 1434: 1411: 1409: 1406: 1401: 1392: 1390: 1387: 1384: 1379: 1363: 1361: 1358: 1352: 1349: 1348: 1347: 1342: 1340: 1331: 1329: 1326: 1320: 1317: 1316: 1315: 1310: 1308: 1299: 1297: 1294: 1289: 1280: 1278: 1275: 1271: 1267: 1263: 1258: 1242: 1240: 1237: 1231: 1228: 1227: 1226: 1221: 1218:20.82 km 1216: 1207: 1205: 1202: 1196: 1193: 1192: 1191: 1186: 1183:15.02 km 1181: 1172: 1170: 1167: 1163: 1159: 1155: 1151: 1146: 1130: 1128: 1125: 1122: 1117: 1101: 1099: 1096: 1090: 1087: 1086: 1085: 1080: 1075: 1059: 1057: 1054: 1049: 1033: 1031: 1028: 1022: 1019: 1018: 1017: 1012: 1007: 991: 989: 986: 981: 965: 963: 960: 955: 939: 937: 934: 928: 925: 924: 923: 918: 913: 897: 895: 892: 889: 888: 884: 880: 879: 871: 870: 864: 862: 860: 859:Justin Madden 856: 848: 846: 844: 840: 836: 832: 828: 824: 818: 814: 812: 808: 807:rolling stock 803: 799: 795: 791: 783: 781: 778: 775: 772: 770: 765: 759: 754: 749: 745: 741: 738: 735: 732: 728: 725: 723: 719: 717: 713: 710: 706: 703: 699: 696: 692: 689: 686: 685: 681: 676: 672: 670:joint venture 669: 665: 661: 659: 655: 651: 647: 643: 640: 638: 634: 630: 626: 622: 619: 615: 612: 608: 607: 606: 604: 596: 592: 585: 583: 580: 572: 570: 568: 563: 557: 555: 551: 547: 543: 539: 535: 531: 526: 524: 520: 516: 515:Railway Place 511: 509: 504: 502: 501:West Werribee 498: 494: 490: 486: 482: 478: 474: 470: 466: 458: 456: 454: 453:West Werribee 450: 446: 442: 441:Rod Eddington 438: 434: 429: 426: 422: 418: 410: 405: 400: 393: 388: 381: 376: 369: 364: 357: 352: 345: 339: 335: 332: 328: 324: 321: 320: 319: 316: 311: 309: 305: 302: 298: 295: 291: 289: 285: 283: 279: 275: 272: 269: 267: 263: 262: 260: 259: 258: 252: 250: 248: 242: 240: 236: 232: 228: 224: 220: 216: 212: 208: 204: 200: 196: 192: 188: 184: 180: 176: 172: 168: 164: 154: 150: 145: 140: 135: 130: 127: 123: 119: 115: 111: 107: 103: 101:Cost estimate 99: 95: 91: 87: 83: 80: 77: 73: 70: 67: 63: 56: 51: 45: 41: 37: 30: 19: 3923: 3794: 3789: 3670: 3499: 3264: 3257: 3252:Metro Tunnel 3250: 3222: 3187:Metro Trains 3171:Williamstown 3054: 3047: 3040: 2968:. Retrieved 2954: 2942:. Retrieved 2928: 2916:. Retrieved 2902: 2890:. Retrieved 2881: 2871: 2859:. Retrieved 2850: 2840: 2828:. Retrieved 2819: 2809: 2797:. Retrieved 2786: 2777: 2765:. Retrieved 2756: 2746: 2736:16 September 2734:. Retrieved 2725: 2701:. Retrieved 2687: 2675:. Retrieved 2661: 2649:. Retrieved 2640: 2630: 2618:. Retrieved 2588: 2579: 2567:. Retrieved 2558: 2549: 2537:. Retrieved 2528: 2518: 2499: 2487:. Retrieved 2478: 2469: 2457:. Retrieved 2448: 2439: 2429: 2424: 2412: 2393: 2381:. Retrieved 2372: 2346: 2327: 2315: 2303: 2291: 2272: 2260: 2253:Rail Systems 2248: 2229: 2217:. Retrieved 2213: 2203: 2191:. Retrieved 2186: 2177: 2165:. Retrieved 2156: 2146: 2134:. Retrieved 2125: 2115: 2103:. Retrieved 2094: 2084: 2072:. Retrieved 2063: 2053: 2041:. Retrieved 2037: 2028: 2016:. Retrieved 2007: 1998: 1979: 1967:. Retrieved 1958: 1948: 1936:. Retrieved 1927: 1917: 1905:. Retrieved 1896: 1886: 1867: 1848: 1836:. Retrieved 1827: 1817: 1805:. Retrieved 1796: 1786: 1774:. Retrieved 1765: 1755: 1743:. Retrieved 1734: 1724: 1712:. Retrieved 1703: 1693: 1681:. Retrieved 1672: 1662: 1654:the original 1649: 1640: 1632:the original 1627: 1618: 1606:. Retrieved 1597: 1588: 1569: 1557:. Retrieved 1553: 1543: 1500: 1496: 1493: 1489: 1481: 1478: 1474: 1471: 1439:Geelong line 1383:Western line 1346:Wyndham Vale 1344: 1343: 1312: 1311: 1223: 1222: 1188: 1187: 1082: 1081: 1077:13.5 km 1014: 1013: 920: 919: 852: 819: 815: 787: 779: 776: 773: 766: 763: 748:Wyndham Vale 664:Baulderstone 625:John Holland 600: 586:Construction 576: 558: 527: 512: 505: 464: 462: 444: 436: 430: 414: 331:Wyndham Vale 282:Western line 256: 243: 223:Wyndham Vale 199:Western line 166: 162: 160: 125:Stakeholders 44: 3444:Yarra Trams 3151:Stony Point 3146:Sandringham 3126:Hurstbridge 3101:Craigieburn 2726:Star Weekly 2703:16 December 2677:16 December 2341:8 June 2012 2167:12 February 1009:6.1 km 382:in May 2014 370:in May 2014 358:in May 2014 245:track from 3943:Categories 3106:Cranbourne 2799:25 January 2038:Herald Sun 1608:4 February 1535:References 835:university 675:Downer EDI 411:Background 253:Components 141:(operator) 109:Start date 3545:Operators 3241:City Loop 3116:Frankston 3049:Ticketing 2892:26 August 2193:25 August 1468:Criticism 1225:Deer Park 1158:Swan Hill 1016:Footscray 839:Footscray 827:City Loop 811:peak hour 750:stations. 731:Footscray 716:Footscray 697:completed 530:Footscray 519:Footscray 449:Deer Park 231:Footscray 203:Deer Park 152:Opponents 120:June 2015 112:July 2009 88:Completed 69:Melbourne 3874:Operator 3757:Sprinter 3729:Operator 3655:SmartBus 3621:Services 3437:Operator 3180:Operator 3166:Werribee 3141:Pakenham 3131:Lilydale 3096:Belgrave 2964:Archived 2938:Archived 2918:9 August 2912:Archived 2886:Archived 2855:Archived 2853:. DPCD. 2824:Archived 2793:Archived 2761:Archived 2730:Archived 2697:Archived 2671:Archived 2645:Archived 2614:Archived 2563:Archived 2533:Archived 2507:Archived 2483:Archived 2453:Archived 2401:Archived 2377:Archived 2335:Archived 2280:Archived 2237:Archived 2161:Archived 2136:27 April 2130:Archived 2099:Archived 2068:Archived 2012:Archived 1987:Archived 1963:Archived 1932:Archived 1901:Archived 1875:Archived 1856:Archived 1832:Archived 1801:Archived 1770:Archived 1739:Archived 1708:Archived 1677:Archived 1602:Archived 1577:Archived 1506:See also 1262:Ballarat 1084:Sunshine 831:hospital 802:Sunshine 790:Ballarat 722:Sunshine 682:Timeline 629:Abigroup 546:Sunshine 493:Sunshine 485:Ballarat 435:'s 2006 402:The new 390:The new 378:Rebuilt 366:Rebuilt 333:stations 278:Sunshine 225:, while 211:Werribee 209:west of 195:Sunshine 75:Proposer 65:Location 3924:Italics 3858:Service 3824:Service 3816:Ferries 3762:N class 3752:VLocity 3161:Upfield 3156:Sunbury 3091:Alamein 2970:29 June 2944:29 June 2882:The Age 2861:3 March 2830:3 March 2820:The Age 2757:The Age 2641:The Age 2620:22 July 2589:The Age 2569:4 April 2559:The Age 2529:The Age 2479:The Age 2373:The Age 2219:24 July 2187:The Age 2157:The Age 2105:16 July 2095:The Age 2074:16 July 2064:The Age 2043:16 July 2018:16 July 2008:The Age 1969:19 June 1959:The Age 1928:The Age 1907:19 June 1897:The Age 1838:19 June 1828:The Age 1807:19 June 1776:19 June 1766:The Age 1745:19 June 1735:The Age 1714:19 June 1704:The Age 1683:19 June 1673:The Age 1314:Tarneit 1154:Bendigo 1150:Sunbury 798:Geelong 794:Bendigo 755:Impacts 744:Tarneit 548:, past 538:Newport 497:Tarneit 489:Bendigo 481:Geelong 346:History 327:Tarneit 219:Tarneit 183:Geelong 179:Bendigo 96:Railway 3850:SkyBus 3736:V/Line 3567:Dysons 3305:Routes 3203:Comeng 3136:Mernda 2767:6 July 2651:15 May 2539:22 May 2513:V/Line 2383:6 July 1516:Sydney 1354:Zone 2 1350:(WVL) 1322:Zone 2 1318:(TNT) 1272:lines 1270:Melton 1266:Ararat 1233:Zone 2 1229:(DEK) 1198:Zone 2 1194:(APR) 1190:Ardeer 1164:lines 1162:Echuca 1088:(SUN) 1024:Zone 1 1020:(FSY) 930:Zone 1 926:(SSS) 883:Legend 784:Legacy 733:opened 711:opened 666:& 658:Thiess 656:& 635:& 487:, and 421:V/Line 139:V/Line 85:Status 3894:Other 3713:Lines 3511:Lists 3083:Lines 3074:Train 2489:5 May 2459:5 May 1938:7 May 1559:6 May 865:Lines 633:AECOM 247:Manor 3296:Tram 3218:HCMT 3056:Myki 2972:2019 2946:2019 2920:2016 2894:2015 2863:2011 2832:2011 2801:2014 2769:2017 2738:2018 2705:2012 2679:2012 2653:2009 2622:2018 2571:2011 2541:2010 2491:2015 2461:2015 2385:2011 2221:2012 2195:2015 2169:2011 2138:2015 2107:2010 2076:2010 2045:2010 2020:2010 1971:2009 1940:2010 1909:2009 1840:2009 1809:2009 1778:2009 1747:2009 1716:2009 1685:2009 1610:2022 1561:2012 915:0 km 833:and 796:and 746:and 552:and 495:and 479:and 451:and 329:and 325:new 221:and 181:and 161:The 93:Type 3643:901 3638:601 3633:202 3537:Bus 3428:109 841:or 637:GHD 611:UGL 499:to 471:'s 443:'s 193:to 167:RRL 38:or 3945:: 3485:C2 3423:96 3418:86 3413:82 3408:78 3403:75 3398:72 3393:70 3388:67 3383:64 3378:59 3373:58 3368:57 3363:48 3358:35 3353:30 3348:19 3343:16 3338:12 3333:11 2910:. 2884:. 2880:. 2849:. 2818:. 2791:. 2785:. 2759:. 2755:. 2724:. 2713:^ 2643:. 2639:. 2612:. 2597:^ 2587:. 2557:. 2527:. 2477:. 2447:. 2371:. 2358:^ 2212:. 2185:. 2155:. 2128:. 2124:. 2093:. 2062:. 2036:. 2006:. 1957:. 1926:. 1895:. 1826:. 1795:. 1764:. 1737:. 1733:. 1702:. 1675:. 1671:. 1648:. 1626:. 1600:. 1552:. 1441:→ 1437:← 792:, 652:, 648:, 627:, 517:, 503:. 483:, 177:, 3706:* 3501:G 3495:E 3490:D 3480:C 3475:B 3470:A 3465:Z 3460:W 3328:6 3323:5 3318:3 3313:1 3022:e 3015:t 3008:v 2974:. 2948:. 2922:. 2896:. 2865:. 2834:. 2803:. 2771:. 2740:. 2707:. 2681:. 2655:. 2624:. 2573:. 2543:. 2493:. 2463:. 2387:. 2223:. 2197:. 2171:. 2140:. 2109:. 2078:. 2047:. 2022:. 1973:. 1942:. 1911:. 1842:. 1811:. 1780:. 1749:. 1718:. 1687:. 1612:. 1563:. 1268:/ 1264:/ 1160:/ 1156:/ 1152:/ 620:) 165:( 42:. 31:. 20:)

Index

Regional Rail Link
Deer Park - West Werribee railway line
Regional Fast Rail
Regional Rail Revival

Melbourne
Government of Victoria
Government of Australia
Government of Victoria
V/Line
Metro Trains Melbourne
Melbourne, Victoria
V/Line Ballarat
Bendigo
Geelong
Melbourne suburban services
Southern Cross station
Sunshine
Western line
Deer Park
Warrnambool line
Werribee
Manor railway station
Tarneit
Wyndham Vale
West Footscray
Footscray
grade separations
North Melbourne
Manor

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.