Knowledge (XXG)

Remuera railway station

Source šŸ“

1475: 466: 47: 1320: 1223: 1130: 1532: 1593: 447:
overbridge. The station was opened in 1873 and is one of the oldest remaining island platform stations in New Zealand. It includes a weatherboard and tile station building, typical of those designed by
569:. All Southern Line services stop at Remuera. Since 26 August 2018, Onehunga Line services stop only in the evenings. The typical weekday off-peak timetable in trains per hour (tph) is: 1598: 1080: 519:
built a large cargo depot, which closed in 1980s. During the same decade, the station was closed to all traffic, except for passengers and traffic to the private Alltrans sidings.
1603: 1569: 921: 837: 1516: 77: 512:
The current Remuera station was rebuilt and opened in November 1907 for Ā£1,149 and a toilet block was added shortly after for Ā£80, but was demolished in 1982.
528: 1608: 1073: 1562: 1406: 1066: 473:
Remuera station was first built in 1873 as a stop on the Auckland-Onehunga railway. By 1903, Remuera station was at its maximum capacity and
527:
Between 2013 and 2014, Remuera station was electrified and the platforms were modified towards the southern end of the station to allow the
1555: 914: 830: 1588: 954: 858: 739: 493: 326: 293: 1509: 474: 1207: 974: 878: 596: 485: 1202: 1424: 907: 823: 1032: 1502: 1438: 1039: 979: 441: 1323: 1226: 1133: 1089: 944: 535: 331: 35: 1412: 516: 616: 1268: 989: 984: 1304: 1014: 969: 964: 883: 873: 868: 765: 501: 497: 346: 313: 1444: 1374: 1299: 1165: 1046: 1019: 1009: 1004: 931: 888: 586: 562: 429: 351: 339: 318: 128: 727: 1369: 1170: 1155: 994: 949: 645: 543: 531:
to operate. Currently, both platforms at Remuera station are open to all passengers, but remains unstaffed.
1418: 1400: 1025: 999: 489: 1241: 1338: 1263: 1108: 791: 703: 542:. Remuera station has remained open for Stage 3 of the Rail Network Rebuild, despite stations beyond 481: 380: 1474: 1353: 151: 515:
The station saw a steady decline in freight and passengers and became unstaffed in 1942. In 1970,
1273: 1101: 798: 558: 275: 117: 38: 465: 1186: 554: 281: 1539: 1486: 1394: 1251: 668: 46: 1482: 437: 899: 815: 1149: 539: 1582: 1348: 1343: 1283: 1278: 1246: 1160: 847: 591: 566: 534:
From 16 January 2023 to 19 March 2023, Remuera station closed to all traffic and had
433: 303: 132: 1432: 1319: 1129: 449: 1222: 1115: 477: 425: 1058: 92: 79: 546:
on the Southern Line being closed for refurbishment until March/April 2024.
1531: 623: 444: 421: 112: 417: 65: 1594:
Heritage New Zealand Category 1 historic places in the Auckland Region
1256: 538:
to allow Stage 1 of the Rail Network Rebuild to allow the opening of
464: 1062: 903: 819: 669:"Names & Opening & Closing Dates of Railway Stations" 480:
acknowledged that better capacity was needed on the line. A
1538:
This article about a railway station in New Zealand is a
1543: 1490: 274: 1387: 1362: 1331: 1317: 1292: 1234: 1220: 1195: 1179: 1141: 1127: 488:. The Auckland-Onehunga line was later extended to 395: 387: 378: 262: 246: 237: 229: 221: 213: 208: 200: 195: 187: 179: 171: 163: 158: 147: 139: 124: 108: 71: 61: 56: 23: 698: 696: 694: 692: 440:which is accessed by a ramp from the Market Road 469:Aerial view of the Remuera Railway Station, 1964 1599:Railway stations in New Zealand opened in 1873 1563: 1510: 1074: 915: 831: 8: 1604:Auckland Region building and structure stubs 1485:-related building or structure article is a 51:Looking northwest prior to electrification. 1570: 1556: 1517: 1503: 1328: 1318: 1231: 1221: 1138: 1128: 1081: 1067: 1059: 922: 908: 900: 838: 824: 816: 492:. New island platforms were also built at 268: 45: 20: 287: 271: 608: 381:Heritage New Zealand ā€“ Category 1 1407:Auckland Regional Transport Authority 766:"Stage 3 of the Rail Network Rebuild" 648:. Greater Auckland. 11 September 2019 394: 386: 377: 7: 1528: 1526: 1471: 1469: 561:, operates suburban services on the 436:(off-peak only), and consists of an 416:is a station serving the suburb of 1542:. You can help Knowledge (XXG) by 1489:. You can help Knowledge (XXG) by 676:Rail Heritage Trust of New Zealand 14: 1609:New Zealand railway station stubs 1208:List of Auckland railway stations 704:"Remuera Railway Station History" 597:List of Auckland railway stations 1530: 1473: 1458:denotes services yet to commence 740:"About the Rail Network Rebuild" 191:Step-free ramp from Market Road 16:Railway station in New Zealand 1: 1269:Pavlovich Transport Solutions 728:Rail Heritage Trust - Remuera 646:"2019 Rail Station Boardings" 617:"Auckland Electrifcation Map" 1090:Public transport in Auckland 135:(evenings and weekends only) 1625: 1589:Rail transport in Auckland 1525: 1468: 1453: 1096: 940: 854: 407: 403: 374: 370: 366: 362: 267: 258: 254: 242: 44: 34: 1425:City Centreā€“Māngere Line 1375:List of Auckland ferries 1264:Howick and Eastern Buses 930:Railway stations on the 846:Railway stations on the 708:Remuera Heritage Society 1413:Avondaleā€“Southdown Line 1370:Auckland Ferry Terminal 667:Scoble, Juliet (2010). 573:3 tph to Waitematā 414:Remuera railway station 470: 428:. It is served by the 1401:Auckland Airport Line 576:3 tph to Puhinui 536:rail-bus replacements 475:Minister for Railways 468: 115:(track and platforms) 523:Post Electrification 93:36.8817Ā°S 174.7850Ā°E 1354:SeaLink New Zealand 1284:Waiheke Bus Company 1279:Tranzurban Auckland 250:416 passengers/day 89: /  57:General information 1274:Ritchies Transport 1102:Auckland Transport 799:Auckland Transport 770:Auckland Transport 744:Auckland Transport 559:Auckland Transport 471: 396:Reference no. 288:Following station 276:Auckland Transport 272:Preceding station 180:Bicycle facilities 118:Auckland Transport 98:-36.8817; 174.7850 36:Auckland Transport 1551: 1550: 1498: 1497: 1463: 1462: 1383: 1382: 1313: 1312: 1216: 1215: 1187:Auckland One Rail 1056: 1055: 897: 896: 772:. 8 February 2024 746:. 14 January 2024 555:Auckland One Rail 482:double track line 411: 410: 358: 357: 285: 282:Auckland One Rail 196:Other information 1616: 1572: 1565: 1558: 1534: 1527: 1519: 1512: 1505: 1477: 1470: 1439:North Shore Line 1395:Auckland Airport 1329: 1322: 1242:Bayes Coachlines 1232: 1225: 1139: 1132: 1083: 1076: 1069: 1060: 934: 924: 917: 910: 901: 840: 833: 826: 817: 810: 809: 807: 805: 796: 788: 782: 781: 779: 777: 762: 756: 755: 753: 751: 736: 730: 725: 719: 718: 716: 714: 700: 687: 686: 684: 682: 673: 664: 658: 657: 655: 653: 642: 636: 635: 633: 631: 621: 613: 486:Penrose Junction 461:Original Station 279: 269: 104: 103: 101: 100: 99: 94: 90: 87: 86: 85: 82: 49: 21: 1624: 1623: 1619: 1618: 1617: 1615: 1614: 1613: 1579: 1578: 1577: 1576: 1524: 1523: 1483:Auckland Region 1466: 1464: 1459: 1449: 1379: 1358: 1339:Belaire Ferries 1309: 1305:Northern Busway 1288: 1212: 1203:Electrification 1191: 1175: 1123: 1092: 1087: 1057: 1052: 936: 932: 928: 898: 893: 850: 844: 814: 813: 803: 801: 794: 792:"Southern Line" 790: 789: 785: 775: 773: 764: 763: 759: 749: 747: 738: 737: 733: 726: 722: 712: 710: 702: 701: 690: 680: 678: 671: 666: 665: 661: 651: 649: 644: 643: 639: 629: 627: 626:. 28 April 2014 619: 615: 614: 610: 605: 583: 557:, on behalf of 552: 525: 510: 508:Rebuilt station 478:Sir Joseph Ward 463: 458: 438:island platform 383: 354: 334: 321: 308: 307:(evenings only) 298: 278: 164:Platform levels 143:Island platform 131: 116: 97: 95: 91: 88: 83: 80: 78: 76: 75: 52: 30: 29: 28: 17: 12: 11: 5: 1622: 1620: 1612: 1611: 1606: 1601: 1596: 1591: 1581: 1580: 1575: 1574: 1567: 1560: 1552: 1549: 1548: 1535: 1522: 1521: 1514: 1507: 1499: 1496: 1495: 1478: 1461: 1460: 1454: 1451: 1450: 1448: 1447: 1442: 1435: 1430: 1429: 1428: 1416: 1409: 1404: 1397: 1391: 1389: 1385: 1384: 1381: 1380: 1378: 1377: 1372: 1366: 1364: 1363:Infrastructure 1360: 1359: 1357: 1356: 1351: 1346: 1341: 1335: 1333: 1326: 1315: 1314: 1311: 1310: 1308: 1307: 1302: 1300:Eastern Busway 1296: 1294: 1293:Infrastructure 1290: 1289: 1287: 1286: 1281: 1276: 1271: 1266: 1261: 1260: 1259: 1254: 1244: 1238: 1236: 1229: 1218: 1217: 1214: 1213: 1211: 1210: 1205: 1199: 1197: 1196:Infrastructure 1193: 1192: 1190: 1189: 1183: 1181: 1177: 1176: 1174: 1173: 1168: 1163: 1158: 1153: 1150:City Rail Link 1145: 1143: 1136: 1125: 1124: 1122: 1121: 1120: 1119: 1105: 1097: 1094: 1093: 1088: 1086: 1085: 1078: 1071: 1063: 1054: 1053: 1051: 1050: 1043: 1036: 1029: 1022: 1017: 1012: 1007: 1002: 997: 992: 987: 982: 977: 972: 967: 962: 957: 952: 947: 941: 938: 937: 929: 927: 926: 919: 912: 904: 895: 894: 892: 891: 886: 881: 876: 871: 866: 861: 855: 852: 851: 845: 843: 842: 835: 828: 820: 812: 811: 783: 757: 731: 720: 688: 659: 637: 607: 606: 604: 601: 600: 599: 594: 589: 582: 579: 578: 577: 574: 551: 548: 540:City Rail Link 524: 521: 509: 506: 462: 459: 457: 454: 409: 408: 405: 404: 401: 400: 397: 393: 392: 389: 385: 384: 379: 376: 375: 372: 371: 368: 367: 364: 363: 360: 359: 356: 355: 349: 344: 342: 337: 335: 329: 323: 322: 316: 311: 309: 306: 301: 299: 296: 290: 289: 286: 273: 265: 264: 260: 259: 256: 255: 252: 251: 248: 244: 243: 240: 239: 235: 234: 231: 227: 226: 223: 219: 218: 215: 211: 210: 206: 205: 202: 198: 197: 193: 192: 189: 185: 184: 181: 177: 176: 173: 169: 168: 165: 161: 160: 156: 155: 149: 145: 144: 141: 137: 136: 126: 122: 121: 110: 106: 105: 73: 69: 68: 63: 59: 58: 54: 53: 50: 42: 41: 32: 31: 26: 25: 24: 15: 13: 10: 9: 6: 4: 3: 2: 1621: 1610: 1607: 1605: 1602: 1600: 1597: 1595: 1592: 1590: 1587: 1586: 1584: 1573: 1568: 1566: 1561: 1559: 1554: 1553: 1547: 1545: 1541: 1536: 1533: 1529: 1520: 1515: 1513: 1508: 1506: 1501: 1500: 1494: 1492: 1488: 1484: 1479: 1476: 1472: 1467: 1457: 1452: 1446: 1443: 1441: 1440: 1436: 1434: 1431: 1427: 1426: 1422: 1421: 1420: 1417: 1415: 1414: 1410: 1408: 1405: 1403: 1402: 1398: 1396: 1393: 1392: 1390: 1386: 1376: 1373: 1371: 1368: 1367: 1365: 1361: 1355: 1352: 1350: 1347: 1345: 1344:Explore Group 1342: 1340: 1337: 1336: 1334: 1330: 1327: 1325: 1321: 1316: 1306: 1303: 1301: 1298: 1297: 1295: 1291: 1285: 1282: 1280: 1277: 1275: 1272: 1270: 1267: 1265: 1262: 1258: 1255: 1253: 1250: 1249: 1248: 1247:Kinetic Group 1245: 1243: 1240: 1239: 1237: 1233: 1230: 1228: 1224: 1219: 1209: 1206: 1204: 1201: 1200: 1198: 1194: 1188: 1185: 1184: 1182: 1178: 1172: 1169: 1167: 1166:Southern Line 1164: 1162: 1161:Onehunga Line 1159: 1157: 1154: 1152: 1151: 1147: 1146: 1144: 1140: 1137: 1135: 1131: 1126: 1118: 1117: 1113: 1112: 1111: 1110: 1106: 1104: 1103: 1099: 1098: 1095: 1091: 1084: 1079: 1077: 1072: 1070: 1065: 1064: 1061: 1049: 1048: 1044: 1042: 1041: 1037: 1035: 1034: 1030: 1028: 1027: 1023: 1021: 1018: 1016: 1013: 1011: 1008: 1006: 1003: 1001: 998: 996: 993: 991: 988: 986: 983: 981: 978: 976: 973: 971: 968: 966: 963: 961: 958: 956: 953: 951: 948: 946: 943: 942: 939: 935: 933:Southern Line 925: 920: 918: 913: 911: 906: 905: 902: 890: 887: 885: 882: 880: 877: 875: 872: 870: 867: 865: 862: 860: 857: 856: 853: 849: 848:Onehunga Line 841: 836: 834: 829: 827: 822: 821: 818: 800: 793: 787: 784: 771: 767: 761: 758: 745: 741: 735: 732: 729: 724: 721: 709: 705: 699: 697: 695: 693: 689: 677: 670: 663: 660: 647: 641: 638: 625: 618: 612: 609: 602: 598: 595: 593: 592:Onehunga Line 590: 588: 587:Southern Line 585: 584: 580: 575: 572: 571: 570: 568: 567:Onehunga Line 564: 563:Southern Line 560: 556: 549: 547: 545: 541: 537: 532: 530: 522: 520: 518: 513: 507: 505: 504:and Penrose. 503: 499: 495: 491: 487: 484:was built to 483: 479: 476: 467: 460: 455: 453: 451: 446: 443: 439: 435: 434:Onehunga Line 431: 430:Southern Line 427: 423: 419: 415: 406: 402: 398: 390: 382: 373: 369: 365: 361: 353: 348: 345: 343: 341: 340:Southern Line 338: 336: 333: 328: 325: 324: 320: 315: 312: 310: 305: 304:Onehunga Line 302: 300: 295: 292: 291: 283: 277: 270: 266: 261: 257: 253: 249: 245: 241: 236: 233:25 kV AC 232: 228: 224: 220: 216: 212: 207: 203: 199: 194: 190: 186: 182: 178: 174: 170: 166: 162: 157: 153: 150: 146: 142: 138: 134: 133:Onehunga Line 130: 129:Southern Line 127: 123: 119: 114: 111: 107: 102: 74: 70: 67: 64: 60: 55: 48: 43: 40: 37: 33: 22: 19: 1544:expanding it 1537: 1491:expanding it 1480: 1465: 1455: 1445:Trolleybuses 1437: 1423: 1411: 1399: 1171:Western Line 1156:Eastern Line 1148: 1114: 1107: 1100: 1045: 1038: 1031: 1024: 959: 863: 802:. Retrieved 786: 774:. Retrieved 769: 760: 748:. Retrieved 743: 734: 723: 711:. Retrieved 707: 679:. Retrieved 675: 662: 650:. Retrieved 640: 628:. Retrieved 611: 553: 533: 529:AM Class EMU 526: 514: 511: 472: 450:George Troup 413: 412: 159:Construction 18: 1116:AT HOP card 776:18 February 750:18 February 713:10 February 426:New Zealand 230:Electrified 120:(buildings) 96: / 72:Coordinates 1583:Categories 1419:Light rail 1349:Fullers360 990:Papatoetoe 985:Middlemore 681:10 October 603:References 391:3-Mar-1995 388:Designated 238:Passengers 188:Accessible 84:174Ā°47.1ā€²E 39:Urban rail 1332:Operators 1235:Operators 1109:Ticketing 1015:Takaanini 970:Ellerslie 965:Greenlane 955:Newmarket 945:Waitematā 884:Te Papapa 874:Ellerslie 869:Greenlane 859:Newmarket 502:Ellerslie 498:Greenlane 494:Newmarket 347:Greenlane 332:Waitematā 327:Newmarket 314:Greenlane 294:Newmarket 201:Fare zone 140:Platforms 81:36Ā°52.9ā€²S 1180:Operator 1047:Pukekohe 1033:Ngākōroa 1020:Papakura 1010:Te Mahia 1005:Manurewa 889:Onehunga 804:19 March 624:KiwiRail 581:See also 550:Services 517:Alltrans 490:Hamilton 445:motorway 432:and the 422:Auckland 352:Pukekohe 350:towards 330:towards 319:Onehunga 317:towards 297:Terminus 263:Services 152:Mainline 113:KiwiRail 109:Owned by 62:Location 1456:Italics 1040:Paerātā 995:Puhinui 980:Ōtāhuhu 975:Penrose 960:Remuera 950:Parnell 879:Penrose 864:Remuera 630:11 July 544:Puhinui 456:History 418:Remuera 222:Rebuilt 209:History 204:Isthmus 172:Parking 125:Line(s) 66:Remuera 27:Remuera 1257:NZ Bus 1252:Go Bus 214:Opened 148:Tracks 1481:This 1388:Other 1324:Ferry 1142:Lines 1134:Train 1026:Drury 1000:Homai 795:(PDF) 672:(PDF) 652:4 May 620:(PDF) 1540:stub 1487:stub 1433:MAXX 806:2023 778:2024 752:2024 715:2024 683:2019 654:2024 632:2014 565:and 247:2018 225:1907 217:1873 1227:Bus 442:SH1 420:in 399:634 183:Yes 154:(2) 1585:: 797:. 768:. 742:. 706:. 691:^ 674:. 622:. 500:, 496:, 452:. 424:, 175:No 1571:e 1564:t 1557:v 1546:. 1518:e 1511:t 1504:v 1493:. 1082:e 1075:t 1068:v 923:e 916:t 909:v 839:e 832:t 825:v 808:. 780:. 754:. 717:. 685:. 656:. 634:. 284:) 280:( 167:1

Index

Auckland Transport
Urban rail

Remuera
36Ā°52.9ā€²S 174Ā°47.1ā€²E / 36.8817Ā°S 174.7850Ā°E / -36.8817; 174.7850
KiwiRail
Auckland Transport
Southern Line
Onehunga Line
Mainline
Auckland Transport
Auckland One Rail
Newmarket
Onehunga Line
Greenlane
Onehunga
Newmarket
Waitematā
Southern Line
Greenlane
Pukekohe
Heritage New Zealand ā€“ Category 1
Remuera
Auckland
New Zealand
Southern Line
Onehunga Line
island platform
SH1
motorway

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

ā†‘