Knowledge (XXG)

Rhine-Neckar S-Bahn

Source đź“ť

1803:(Baden-Württemberg local transport company; NVBW) advertised lot 2, network 6b, by Europe-wide tender at the end of September 2015 after several delays. Originally, the tender was scheduled for early 2014. It includes operations on the line to Mainz and amounts to six million train-kilometres annually. The transfer of operations for a term of 15 years would take place at the end of 2020 and the line to Mainz would follow at the end of 2021. As with the tendering of operations of the Stuttgart RE network, this contract was based on an early 2015 law on the contracting of the provision of railway operations in Baden-Württemberg. In December 2016, the contracting authorities decided to postpone the transfer of railway operations until December 2020, as it could already be foreseen—even before the end of negotiations on the contract—that the required new rolling stock would otherwise not be available on time. On 20 June 2017, after none of the unsuccessful bidders had filed a petition for review, DB Regio was awarded the contract. The included lines (S5, S6, S8, S9) will be operated by new 1886: 1530: 1522: 1181: 1923: 1470: 1311: 1161: 40: 1688:. This work was finished in Mannheim-Rheinau at the end of April 2018, except for minor residual work, and the "compact station" was officially opened on 12 July 2019. In contrast, the case for building Neckarau station would be "examined in terms of the costs and benefits of the whole line", so it may not in fact be built. In the meantime, temporary platforms were built on tracks 1 and 2, which were completed in May 2020. 3642: 1169: 1149:
15-minute interval schedule. Ludwigshafen-Rheingönheim and Ludwigshafen-Mundenheim are not usually served by lines S1 and S3. Line S1 usually serves Mannheim Rangierbahnhof and Mannheim-Seckenheim. On Saturday afternoons and Sundays, S2 from Kaiserslautern terminates in Heidelberg and S4 runs only between Germersheim and Mannheim.
1785:
concession. The traffic continues to be operated with Class 425 multiple units upgraded for the purpose. In order to increase seating capacity, the rolling stock fleet is being expanded from 40 to 77 carriages, reaching 64 carriages in 2018 for the time being, achieved by adding six 425.3 sets acquired from
1639:
S-Bahn networks, since December 2020. This line was initially to be referred to as “S 8”. Since there is already a line with this designation at Karlsruhe Hauptbahnhof, it was announced at the beginning of 2020 that the designation “S 9” would be used instead. This means that the entire route between
1767:
and to avoid the problems caused by two trains stopping simultaneously at each end of the same platform track on platform tracks 7, 9 and 10, the new platform F, which faces tracks 11 and 12, was built from September 2014. This was built exclusively for local traffic. The future S-Bahn line S 8
1375:
showed a benefit-cost ratio of 3.7. The district administrator and former director of the Rhine-Neckar Metropolitan Region, Stefan Dallinger, stated that he was not aware of any project with such a good result. The board of the ZRN approved the modernisation in December 2003. The planning agreement
1148:
All lines have a 60-minute basic frequency. As a result of largely overlapping alignments in the core area services run at half-hourly frequency. On the core line between Schifferstadt and Heidelberg four lines run, each at hourly intervals, but due to problems of coordination may not provide a pure
1893:
With the growing network of lines, additional rolling stock was required. Thus, starting in October 2015, 37 additional vehicles were rebuilt for Lot 1 of the Rhine-Neckar S-Bahn in addition to the 40 original S-Bahn trains (425.2), which had previously been mostly used for regional services in the
1775:
Track 12 was already in operation at the end of 2016, while track 11 was completed in August 2017. Since track 12 was already operating while the passenger underpass at the northern end of the platform had not been completed, a temporary solution had to be put in place by July 2017. Access to track
1827:
Due to the high utilisation on the Rhine Valley line on the Bruchsal–Heidelberg section it is planned to extend the platforms from 140 to 210 metres, so that longer trains can run. This is necessary, above all, because it is not possible to increase the capacity of the line due to the joint use of
1754:
The two stations in Mannheim that still need to be upgraded (Mannheim-Waldhof and Mannheim-Käfertal) and the new station in Mannheim-Neuostheim are scheduled to be built between 2021 and 2024. The trains running via Neuostheim and Käfertal have been running under the line name "S 8" since December
1297:
In addition, the further measures at the stations on the Heidelberg–Bruchsal section of the line are still considered to be part of the first expansion stage. At six stations, the platforms were extended to 210 m (230 yd) in order to be able to use S-Bahn trains in triple sets due to the
1784:
Following a call of tenders in December 2013, DB Regio was awarded the contract for lot 1 (S1, S2, S3, S4, S33) with approximately 8 million train-kilometres per year for the period from December 2016 to December 2033. The intervening year due to delays in the tender was covered by a transitional
1691:
Construction work at the Schwetzingen-Hirschacker station began on 29 March 2021 and was completed in time for the timetable change in December 2022. The station has been in operation since then. At the end of July 2021, the new passenger underpass was inserted, which connects platforms 1 and 2.
1937:
The 70-meter-long sets have 200 seats, 26 bicycle parking spaces and free Wi-Fi for passengers. An integrated system to bridge gaps should allow people with reduced mobility to make a stepless entry and exit to 76 cm-high platforms without assistance. The exterior finish of the sets will not be
1905:
The vehicles, which originally had permanently installed steps, received folding steps as part of the rebuild. The seats in second class received new upholstery with leather headrests. In the first class, which consists of 12 seats at the end of car 1, the seats are completely covered with real
1860:
Instead, the operating concept prescribed by the tender stipulates that the main line will be connected from Mainz via Worms and Mannheim to Bensheim, which was implemented in 2018. The Riedbahn line from Gross-Rohrheim, on the other hand, would end at Mannheim Hauptbahnhof, although it has now
1848:
According to the tenders, the originally planned "around the corner" connection of the two branches to Biblis and Bensheim in Mannheim was rejected as well as the connection from Mainz via Mannheim to Eppingen and Aglasterhausen. Previously, considerations of operating this service between
1836:
The Riedbahn, the Main-Neckar Railway and the Mannheim–Heidelberg line are at their capacity limits due to the high level of long-distance passenger, regional passenger and freight traffic. The connections and cycle times of the S-Bahn must therefore be based on the few remaining
1236:
The platforms at Mannheim-Seckenheim, Mannheim-Rangierbahnhof, Ludwigshafen-Mundenheim and Ludwigshafen-Rheingönheim were raised temporarily using wooden planks, since no decision had been made on the final configuration of the track or the future position of the platforms.
1913:
was installed. 19-inch screens have been installed in the vehicles to provide up-to-date travel information and connection options. Surveillance cameras and USB charging points have been installed in all vehicles. All ticket machines have been removed from the vehicles.
1293:
To the extent that they did not already meet this requirement, all stations on the Heidelberg–Karlsruhe route were extended to 140 m (150 yd) of platform length during the first expansion phase in order to enable S-Bahn trains to stop in double sets.
1751:. Completion was planned by the end of 2017. The work in Bobstadt was completed in September 2017; Biblis and Lampertheim have been completely rebuilt since June 2019. GroĂź Rohrheim station was completed in October 2020 and BĂĽrstadt station in July 2021. 1508:
were built. The upgrade of the line began in early July 2010 and lasted 17 months. The cost of the infrastructure work amounted to approximately €31.7 m. All stations were adapted for the disabled and made barrier-free. The only exception was the halt of
1224:
between Mannheim and Ludwigshafen, urgently required to increase capacity, a by-pass of Schifferstadt for long-distance traffic and Ludwigshafen-Mitte S-Bahn station in Berliner Platz. A new S-Bahn workshop was established near Ludwigshafen Hauptbahnhof.
1677:. However, the completion of the lift and the staircase roofing in NeuluĂźheim was delayed until December 2019. Due to the special location and construction of the station, large-scale work could only be carried out with a blockade of the whole station. 1488:
to Bruchsal into the S-Bahn network. This route was added to the S-Bahn network at the 2011/2012 timetable change on 11 December 2011 and is used by an extension of the S 4, but which is designated as the S 33 to avoid confusion with a line of the
1228:
It was considered important to provide a large amount of uniform equipment at the stations. The platforms were raised to 760 mm (30 in) and made accessible by the disabled, partly via elevators. They received new platform equipment, such as
2988: 1768:(Mannheim–Schwetzingen–Waghäusel–Karlsruhe) will use it. It will also be used by RE 1 (Koblenz–Trier–SaarbrĂĽcken–Mannheim) and RE 14 (Mainz–Mannheim). In preparation, the freight train tracks had to be relaid closer to the 1253:. The Speyer route required electrification south of Schifferstadt and modification of three stations. A new station is under construction at Speyer SĂĽd, but its opening has been delayed. A further extension from Germersheim to 1285:. However, it was not finished in time and services commenced in December 2006. Only line S1 runs to Homburg; S2 continues to terminate in Kaiserslautern. The city of Homburg did not participate financially in this extension. 1318:
Shortly after the start of operation, a second stage of expansion was planned for the Rhine-Neckar S-Bahn to integrate previously unserved cities and regions into the S-Bahn network. However, the schedule laid down in the
1902:. In total, 77 vehicles (11x 425.0, 40x 425.2, 6x 425.3 and 20x 425.4) were converted during the first phase. A further 14 vehicles were converted in a second phase to April 2018, being first used on line S 6 to Mainz. 2903: 2527: 1390:
The modernisation of 78 kilometres of line covered 110 km (68 mi) of track and included the installation of about 1180 sets of overhead masts. On 10 October 2009, the overhead line was switched on.
3376: 297:
Services operate on weekdays at intervals of 30 or 60 minutes, except for the S7 and S8, which currently have only a few services. The lines are shared with the other passenger and freight traffic.
3166: 1776:
12 was therefore via track 10a and from there over a bridge to the new platform. However, track 10a had to be blocked for train traffic. Track 10b continued to be used, but only from the south.
3711: 2992: 2867: 1220:
Beginning in 2001, the lines and stations were prepared for S-Bahn operations. €260 million was invested for construction and €190 million for vehicles. An extra bridge was built over the
2615: 3478: 3317: 3144: 3096: 2837: 3518: 2951: 3188: 2907: 1885: 2719: 2815: 1607:, have been served by the S-Bahn since December 2018. This required the line to be upgraded and electrified. Since then, it has been served by trains operating as line 2538: 1938:
Deutsche Bahn red, but light gray with dark grey sections in the door areas and a large S-Bahn logo. The yellow doors should stand out from the dark grey background.
1657:
The stations on the southern section between Graben-Neudorf and Karlsruhe were upgraded starting in 2011 and 2014 respectively. In the northern part of the line, the
3704: 1529: 3380: 2693: 1335:, between 2008 and 2010, was rejected again in 2006. The reasons for this were the reduction of funds made available under the federal Rail Regionalisation Act ( 2425: 2320: 1576:, and work at another ten stations was completed by June 2016. Mettenheim station was completed in September 2013. The planned establishment of stations in 1005: 941: 3697: 3266: 1842: 1348: 431: 347: 2767: 1541:
was integrated into the route of the new line S 6 at the minor timetable change on 10 June 2018. Early operations of S-Bahn trains using adapted
4490: 3511: 3291: 2878: 3214: 3070: 1323:(implementation program for the 2010 Rhine-Neckar clock-face timetable), which provided for further expansion to Homburg, Bruchsal, Karlsruhe, 4362: 2619: 2502:"Elektrifizierung und Ausbau der Nahverkehrsinfrastruktur im Elsenz- und Schwarzbachtal – Unterzeichnung des Bau- und Finanzierungsvertrages" 2400: 1009: 937: 1347:
paper" as well as the need to finance infrastructure measures required for capacity increases in the north of the region, in particular the
3401: 1379:
The project was to cost €81.5 million, of which €66.9 m was for eligible building costs, of which the federal government paid 60% and the
1496:
This required considerable modernisation and electrification between Graben-Neudorf and Germersheim. In addition, the three new stops of
1274: 391: 4475: 4375: 4020: 2845: 1747:
and providied €8.2 m, while the federal government provided €11 m. Construction began on 7 July 2016 with a groundbreaking ceremony at
539: 3504: 1561: 1173: 1013: 933: 742: 689: 403: 4040: 3427: 1426:
for scheduling reasons until December 2016 and only hourly after that. Line S 51 was opened in June 2010; this branches off in
949: 789: 738: 685: 511: 439: 355: 251: 2958: 2473: 1793:
from December 2017 and an improved service to Homburg from 2019. A quarter of the trains would be occupied by train attendants; in
1708:
was also integrated into the network of the Rhine Neckar S-Bahn as line S 9. The line was originally planned to run only as far as
1552:
In addition to the conversion of existing stations to make them compatible with S-Bahn operations, the new stations were opened in
1431: 905: 4485: 1569: 648: 230:
The S-Bahn is about 437 km (272 mi) long and is one of the largest S-Bahn networks in Germany. The core area is in the
160: 3192: 1411: 851: 2745: 2375: 1368: 1701: 1680:
Two compact stations were built in Mannheim-Rheinau and Mannheim-Neckarau, which allow a quick and barrier-free change to the
1538: 1073: 977: 4236: 4226: 2563: 1681: 1458: 1407: 835: 4283: 4246: 3240: 1665:
stations already had the required platform lengths and heights, so only lifts had to be retrofitted. Work in Hockenheim and
785: 719: 1819:
The second stage of construction includes further projects that should have been implemented gradually by the end of 2017.
1152:
Although the lines run from 05:00 until 01:30, regular interval operations usually run only between about 08:00 and 21:00.
4125: 4120: 4030: 3018: 2589: 2501: 2296: 1988: 4465: 3840: 3800: 3556: 2663: 1910: 1744: 1717: 572: 3292:"Drehscheibe Online Foren :: 02 - Allgemeines Forum :: Re: Anzahl der umgebauten 425 bei S-Bahn RheinNeckar?" 4214: 420: 343: 332: 1565: 892: 1245:
The first stage was completed at the end of 2006 with the extension from Homburg to Kaiserslautern and the Mannheim-
4470: 4404: 4370: 4110: 3295: 3119:"Deutschland-Stuttgart: Öffentlicher Schienentransport/öffentliche Schienenbeförderung: document 2015/S 189-343041" 1878:
was used from the start of the Rhine-Neckar S-Bahn in 2002. These sets have a toilet and fewer entrance doors than
1721: 1521: 1180: 2436: 1359:
In November 2000, the Verkehrsforum 2000 proposed an extension to Eppingen for the first time. In August 2002, a "
4115: 1360: 754: 701: 633: 625: 523: 617: 4380: 3790: 3586: 2321:"Homburg jetzt auch auf Schienen: Ein Zug der S-Bahn RheinNeckar trägt seit gestern den Namen "Homburg (Saar)"" 1640:
Karlsruhe and Biblis will have a uniform line number (like RB 2 before it). New S-Bahn stations were opened in
1299: 1057: 953: 601: 1713: 1208:. Following European-wide advertising for tenders, operation for 12 years from 2002 until 2015 was awarded to 487: 3946: 1882:
sets. They have a floor height of 780 mm. Their folding steps allow a level crossing from the platform.
4310: 3926: 1854: 1395: 884: 869: 827: 816: 750: 697: 621: 519: 451: 447: 424: 375: 367: 363: 259: 155: 2793: 1188:
On 14 December 2003, the Rhine-Neckar area became the last large densely populated area in Germany with an
1094: 4495: 4409: 4095: 1947: 1899: 1650: 1485: 1474: 1435: 1364: 1254: 1246: 1101: 1090: 877: 609: 568: 479: 283: 267: 219: 4299: 3689: 3365:, Bahnhöfe A – Z: Das große Archiv der deutschen Bahnhöfe 5 Erich Preuß (in German), GeraMond Verlag GmbH 3339: 1545:
stock were implemented on the Mainz–Worms–Frankenthal–Ludwigshafen am Rhein–Mannheim(–Weinheim–Bensheim)
1121: 1061: 4480: 4430: 4414: 4241: 4172: 4045: 4011: 2067: 1850: 1764: 1727:
At the end of January 2016, the state of Hesse concluded an implementation and financial agreement with
1632: 1403: 1399: 1117: 1046: 1028: 994: 945: 847: 746: 734: 693: 681: 605: 515: 507: 443: 435: 399: 359: 351: 255: 247: 189: 4221: 3976: 1728: 1658: 1549:
route from the beginning of 2006. Line S 6 replaced the previous Regionalbahn RB 44 service.
1105: 888: 1469: 4347: 4145: 3656: 3218: 3074: 1794: 1769: 1685: 1666: 1380: 1278: 1205: 1197: 1113: 395: 379: 235: 204: 200: 1648:
in 2021 and Schwetzingen Nord station is expected to be opened by the end of 2025, but the proposed
4278: 4262: 4167: 4135: 4024: 3981: 3961: 3956: 3891: 3780: 3661: 3581: 3118: 1636: 1490: 1450: 1446: 1442: 1310: 1282: 1250: 1024: 973: 730: 723: 677: 666: 561: 503: 499: 491: 336: 271: 263: 243: 2929: 2349: 1922: 1807:
rolling stock. A corresponding contract for 57 three-part sets was signed between DB Regio AG and
4390: 4341: 4325: 4320: 4273: 4231: 4192: 4182: 4070: 3921: 3916: 3906: 1934:
sets were ordered in August 2017. These will be used from December 2020 on the new S-Bahn lines.
1662: 1427: 1109: 961: 957: 926: 873: 831: 287: 3073:(Press release) (in German). Verkehrsverbund Rhein-Neckar GmbH. 12 December 2013. Archived from 1344: 1160: 2642:"S-Bahn Rhein-Neckar: Infrastrukturminister Lewentz besucht die S-Bahn-Baustelle in Mettenheim" 262:
section. Beyond this main line, the S-Bahn operates over six lines with terminuses in Homburg,
4315: 4268: 4090: 4080: 4055: 4006: 3951: 3911: 3825: 3815: 3748: 3621: 3611: 3591: 3423: 3052: 2301: 2232: 1577: 1573: 1262: 1193: 231: 177: 4352: 4305: 4293: 4209: 4204: 4162: 4156: 4085: 4065: 4060: 3991: 3966: 3941: 3931: 3896: 3873: 3835: 3805: 3785: 3721: 3641: 3631: 3601: 2247: 2082: 2007: 1841:
on the routes, especially since the longed-for relief that would be provided by the planned
1731:
under which the state of Hesse invested €5 million in the upgrade of five Hessian stations,
1705: 1669:
was completed in March and July 2018 respectively. The platforms were rebuilt in Wiesental,
1481: 1415: 1376:
was signed on 13 May 2004 and the construction and financing contract on 20 September 2007.
1372: 1258: 998: 922: 820: 758: 670: 629: 584: 557: 527: 495: 455: 371: 291: 279: 275: 215:. S-Bahn trains operate about 7.5 million kilometres per year, with 113 stations served by 4288: 4251: 4187: 4100: 4075: 4050: 4016: 4000: 3936: 3765: 3566: 2989:"Die modernisierte S-Bahn RheinNeckar verkehrt ab 11. Dezember gemäß neuem S-Bahn-Vertrag" 39: 1828:
the Rhine Valley Railway by local passenger, long-distance passenger and freight trains.
3147:(Press release) (in German). Ministerium fĂĽr Verkehr Baden-WĂĽrttemberg. 21 December 2016 1449:. Since December 2014, with the integration of the eastern Elsenz Valley Railway in the 1261:
was opened in December 2011 and an extension of line S5 of the Karlsruhe Stadtbahn from
4335: 4256: 4150: 4140: 4105: 3901: 3863: 3830: 3810: 3775: 3770: 3753: 3626: 3606: 3576: 3571: 3561: 3320:(Press release) (in German). Ministerium fĂĽr Verkehr Baden-WĂĽrttemberg. 6 February 2017 2142: 1895: 1879: 1875: 1748: 1740: 1709: 1584: SĂĽd was abandoned as the responsible municipalities were unwilling to fund them. 1581: 1542: 1332: 1125: 1050: 239: 216: 147: 1743:
and GroĂź Rohrheim. In addition, affected municipalities participated through the
4459: 4198: 4177: 4130: 4035: 3868: 3858: 3795: 3759: 3743: 3738: 3677: 3596: 3551: 3546: 3447: 3191:(Press release) (in German). DMM Der Mobilitätsmanager. 8 August 2017. Archived from 2217: 1931: 1804: 99: 3167:"DB Regio AG erbringt künftig die Verkehrsleistungen der S-Bahn Rhein-Neckar, Los 2" 2868:"RB Mitte: S-Bahn-Ausbau auf der Riedbahn gestartet – Spatenstich am Bahnhof Biblis" 1560:
SĂĽd at the timetable change on 14 June 2015. Construction began in 2012 and 2013 at
4330: 2641: 2435:(in German) (2009 Jubilee booklet). VRN GmbH, URN GmbH. 20 May 2009. Archived from 1889:
Redesigned Rhine-Neckar S-Bahn class 425 set in Heidelberg-Schlierbach/Ziegelhausen
1620: 1546: 1230: 17: 2567: 2401:"Niederschrift ĂĽber die 110. Sitzung der Verbandsversammlung am 19. Dezember 2019" 1670: 1628: 1533:
Dienheimer station on 2 July 2015, shortly after its commissioning on 14 June 2015
3244: 2664:"Zu teuer: Haltepunkte für S-Bahn und Regionalbahn in Worms werden nicht gebaut" 2187: 2037: 1736: 1732: 1557: 1340: 1031:, Neu-Edingen/Mannheim–Friedrichsfeld–Schwetzingen railway, Main-Neckar Railway 119: 2593: 2505: 2991:(Press release) (in German). Deutsche Bahn AG. 9 December 2016. Archived from 2906:(Press release) (in German). Deutsche Bahn AG. 26 January 2016. Archived from 2671: 2376:"Niederschrift über die 109. Sitzung der Verbandsversammlung am 27. Juni 2019" 2202: 2112: 2022: 1838: 1674: 1624: 1314:
Original network plan for the 2010 Rhine-Neckar clock-face timetable from 2004
185: 3056: 2305: 3883: 3215:"Neuer Bauzeitenplan fĂĽr zweite Baustufe der S-Bahn RheinNeckar vorgestellt" 2262: 1454: 1328: 3243:(in German). Rhein-Neckar-Zeitung im Web. 26 September 2008. Archived from 1906:
leather. Poles were used to protect the windows in the multipurpose areas.
1635:) has been operated as the S 9 line, connecting the Rhine Neckar and 3971: 3340:"Neues Design fĂĽr das neue S-Bahnfahrzeug Siemens Mireo ab Dezember 2020" 2474:"No. 5: RĂĽckblick auf 150 Jahre Bahnstandort Meckesheim: 11: Chronologie" 2157: 2127: 2052: 2003: 1786: 1553: 1387:). The remaining costs were assumed by the municipalities and districts. 1324: 1209: 208: 181: 2816:"Hp Schwetzingen-Hirschacker: Einschub der PersonenunterfĂĽhrung erfolgt" 1857:
as an express line without intervening stops had already been rejected.
3529: 3318:"S-Bahn Rhein-Neckar (Netz 6b) soll an die DB Regio AG vergeben werden" 2172: 1973: 1808: 1192:
system—planning had lasted decades and involved the cooperation of the
1164:
Line S1 S-Bahn train in the former Mannheim Rangierbahnhof station
4399: 3850: 3730: 3145:"Inbetriebnahme der S-Bahn Rhein Neckar Los 2 um ein Jahr verschoben" 3097:"Inbetriebnahme der S-Bahn Rhein Neckar Los 2 um ein Jahr verschoben" 2504:(Press release) (in German). VRN GmbH. 1 October 2007. Archived from 2472:
HeĂź, JĂĽrgen; Hoffmann, Herbert; Luksch, Siegbert (20 November 2013).
2097: 1189: 238:, it touches the Saarland and it has three stations in Hesse between 196: 27:
Backbone of the urban rail transport network of the Rhine Neckar Area
3443: 1168: 1654:
station is not currently considered compatible with the timetable.
1480:
The second stage of expansion also included the integration of the
1418:. Trains only occasionally stopped at the two Heidelberg halts of 3496: 1921: 1884: 1528: 1520: 1468: 1309: 1221: 1201: 1179: 1167: 1159: 212: 199:
operates over 437 km (272 mi) of route in the states of
2433:
Hinundweg – das Kundenmagazin des Verkehrsverbundes Rhein-Neckar
1790: 1716:
was able to have it extended with the fare boundary between the
1592: 713:
Wörth–Schifferstadt, Mannheim–Saarbrücken, Rhine Valley Railway
3693: 3500: 3217:(Press release) (in German). VRN. 22 March 2012. Archived from 3071:"Ausschreibungsverfahren fĂĽr die S-Bahn Rhein-Neckar gestartet" 2616:"S-Bahn Rhein-Neckar: Ausbau zwischen Bruchsal und Germersheim" 2537:(in German) (3). DB Netz AG: 6. September 2008. Archived from 770:
BASF works railway, Mannheim–Saarbrücken, Schifferstadt–Wörth
176:
forms the backbone of the urban rail transport network of the
2904:"Finanzierungsvertrag für fünf südhessische S-Bahn Stationen" 2528:"Elektrifiziertes Netz in Baden-Württemberg legt kräftig zu" 1894:
Rhine-Neckar area. But rolling stock was also acquired from
1281:
was carried out as an urgent project in preparation for the
1619:
The line running to the east of the Rhine on the Mannheim–
3379:(in German). Deutsche Bahn AG. 2017-03-13. Archived from 3342:(Press release) (in German). Verkehrsverbund Rhein Neckar 2618:(in German). Eurailpress. 14 January 2010. Archived from 1861:
operates between Gross-Rohrheim, Mannheim and Karlsruhe.
2406:(in German). Verkehrsverbund Rhein-Neckar GmbH, Mannheim 2381:(in German). Verkehrsverbund Rhein-Neckar GmbH, Mannheim 1525:
Construction of Dienheimer station in the summer of 2014
1441:
In Eppingen there is connection to line S 4 of the
1394:
Since December 2009, the new line S 5 has operated from
2983: 2981: 2979: 1797:
this applies to all trains after 7 PM and half before.
1789:. The package also includes push-pull trains to run to 2720:"Barrierefreie Haltestelle nach neun Monaten eröffnet" 1517:
Mainz–Worms–Frankenthal–Ludwigshafen am Rhein–Mannheim
1383:
paid 20% under the Municipal Transport Financing Act (
1298:
expected traffic volume. On 15 December 2019, the new
3462: 3012: 3010: 2467: 2465: 2463: 2461: 2459: 2457: 4423: 4389: 4361: 3990: 3882: 3849: 3729: 3670: 3649: 3539: 3402:"Karlsruhe: S-Bahn Karlsruhe: Modernisiert getauft" 246:. Four of the seven lines run together on the core 154: 118: 110: 105: 95: 87: 79: 71: 63: 51: 46: 32: 2590:"S-Bahn Rhein-Neckar – Netz wird weiter ausgebaut" 2566:(in German). AVG. 15 December 2014. Archived from 234:of Rhineland-Palatinate and Baden-WĂĽrttemberg. At 2877:(in German) (17): 15. August 2016. Archived from 1513:, which had no ramps and lifts for part of 2012. 1363:" for the electrification of all three routes to 1184:Construction between Kaiserslautern and Homburg 3377:"S-Bahn-Zug auf den Namen "Karlsruhe" getauft" 2356:(in German). DB Station&Service AG, Berlin 1615:Mannheim–Schwetzingen–Graben-Neudorf–Karlsruhe 904:Neckar Valley Railway, Elsenz Valley Railway, 3705: 3512: 2496: 2494: 542:, Mannheim–SaarbrĂĽcken, Rhine Valley Railway 8: 3241:"Der "Renner" S-Bahn sorgt fĂĽr Kontroversen" 2952:"Hauptbahnhof Mannheim – Neubau Bahnsteig F" 2670:(in German). 22 October 2011. Archived from 1874:Rolling stock based on the second series of 1321:Realisierungsprogramm Rhein-Neckar-Takt 2010 1265:to Germersheim was opened in December 2010. 55: 3267:"S-Bahn RheinNeckar Los 1 ab Dezember 2016" 2698:Schwetzinger Zeitung / Hockenheimer Zeitung 2344: 2342: 3712: 3698: 3690: 3519: 3505: 3497: 3189:"S-Bahn RheinNeckar erhält neue Fahrzeuge" 1952: 1451:northern branch of the Heilbronn Stadtbahn 1137:Rhine Railway, Mannheim–Frankfurt railway 299: 38: 3169:(Press release) (in German). 20 June 2017 2844:(in German). 20 June 2012. Archived from 2694:"Bahn vertröstet um weitere zwölf Monate" 2294:"S-Bahn Rhein-Neckar nimmt Betrieb auf". 1801:Nahverkehrsgesellschaft Baden-WĂĽrttemberg 1745:Zweckverband Verkehrsverbund Rhein-Neckar 655: 3463:"Verkehrsverbunds Rhein-Neckar website" 2930:"Streckenkarte - ausbau-rheinneckar.de" 2286: 1954: 1926:DB Class 463 Siemens Mireo in Waghäusel 1823:Development of the Rhine Valley Railway 1588:Ludwigshafen Hbf–Ludwigshafen BASF Nord 301: 2768:"S-Bahn-Ausbau "hakt" an zwei Stellen" 1465:Extension from Germersheim to Bruchsal 1453:, there has also been a connection to 29: 3049:Eisenbahn Magazin. Modellbahn Magazin 2957:(in German). DB Netze. Archived from 2564:"AVG fährt nach Mosbach und Sinsheim" 1843:Frankfurt–Mannheim high-speed railway 1763:In order to increase the capacity at 1631:–Graben-Neudorf–Karlsruhe route (the 1595:in Ludwigshafen and its three stops, 1349:Frankfurt–Mannheim high-speed railway 7: 1870:Class 425 "Rhine-Neckar S-Bahn" sets 1339:) in accordance with the so-called " 2746:"Einweihung Kompaktbahnhof Rheinau" 1385:Gemeindeverkehrsfinanzierungsgesetz 2748:(in German). ausbau-rheinneckar.de 2319:Schäfer, Ralph (4 November 2016). 1759:Mannheim Hauptbahnhof – platform F 1355:Heidelberg–Eppingen/Aglasterhausen 25: 3479:"Line map of Rhine-Neckar S-Bahn" 3019:"Zukunft der S-Bahn Rhein-Neckar" 2644:(in German). newstix. 2 July 2013 3640: 2838:"S-Bahn fährt bis GroĂź-Rohrheim" 2592:(in German). VRN. Archived from 3724:networks and systems in Germany 3017:Löwe, Michael (February 2015). 2300:(in German) (12): 586 f. 2003. 4491:2003 establishments in Germany 3422:. Ludwigshafen am Rhein 2004, 3125:(in German). 30 September 2015 3026:ProBahn Hessen Fahrgastzeitung 2354:Ausbau der S-Bahn Rhein-Neckar 1724:(RMV) moved to GroĂź-Rohrheim. 786:Ludwigshafen (Rhein) BASF Nord 720:Ludwigshafen (Rhein) BASF Nord 432:Neustadt (WeinstraĂźe) Hbf 348:Neustadt (WeinstraĂźe) Hbf 1: 3444:"Rhine-Neckar S-Bahn website" 3272:(in German). DB Regio SĂĽdwest 2297:Eisenbahn-Revue International 1845:has receded into the future. 1696:Mannheim–Biblis–GroĂź-Rohrheim 1302:was also put into operation. 512:Ludwigshafen (Rhein) Hbf 440:Ludwigshafen (Rhein) Hbf 356:Ludwigshafen (Rhein) Hbf 1911:passenger information system 1718:Verkehrsverbund Rhein-Neckar 1432:Meckesheim–Neckarelz railway 1369:Bad Friedrichshall-Jagstfeld 1275:Mannheim–Kaiserslautern line 1081: 1079: 1037: 1035: 985: 983: 913: 911: 859: 857: 807: 805: 776: 774: 657: 592: 590: 548: 546: 470: 468: 411: 409: 323: 321: 3294:(in German). Archived from 3099:(Press release) (in German) 3051:(in German) (3): 19. 2015. 2266: 2251: 2236: 2221: 2206: 2191: 2176: 2161: 2146: 2131: 2116: 2101: 2086: 2071: 2056: 2041: 2026: 2011: 1992: 1977: 1832:Planned operational concept 1412:Steinsfurt–Eppingen railway 1269:Extension to Homburg (Saar) 207:, and in small sections in 161:15 kV  16.7 Hz AC 4512: 4476:Rail transport in Mannheim 4405:Dresden Suspension Railway 4012:Bad Schandau-Kirnitzschtal 2932:(in German). Deutsche Bahn 2818:(in German). Deutsche Bahn 2796:(in German). Deutsche Bahn 2726:(in German). 25 April 2018 1989:Neustadt an der WeinstraĂźe 1722:Rhein-Main-Verkehrsverbund 1539:Mainz–Ludwigshafen railway 1381:state of Baden-WĂĽrttemberg 1289:Heidelberg–Karlsruhe route 1216:First stage of development 1074:Mannheim–Frankfurt railway 1006:Neu-Edingen/Friedrichsfeld 942:Neu-Edingen/Friedrichsfeld 743:Ludwigshafen (Rhein) Mitte 690:Ludwigshafen (Rhein) Mitte 180:, including the cities of 4439: 3638: 1942:List of names of railcars 1930:For Lot 2, 57 three-part 1918:Class 463 – Siemens Mireo 1700:On the Hessian side, the 1306:Second stage of expansion 390: 114:437 km (272 mi) 37: 4041:Brandenburg an der Havel 3482:(PDF, about 150 kB) 3420:... an einem Strang 3123:Tenders Electronic Daily 3028:(in German) (107): 31–32 1950:have city sponsorships: 1420:Schlierbach/Ziegelhausen 1300:Stettfeld-Weiher station 1241:Extension to Germersheim 976:, Rhine Valley Railway, 950:Ludwigshafen (Rhein) Hbf 790:Ludwigshafen (Rhein) Hbf 739:Ludwigshafen (Rhein) Hbf 686:Ludwigshafen (Rhein) Hbf 4486:Transport in Heidelberg 1948:electric multiple units 1855:Heidelberg Hauptbahnhof 1566:Ludwigshafen-Oggersheim 1562:Mainz Römisches Theater 1498:Germersheim Mitte/Rhein 1434:and runs every hour to 1361:standardised assessment 1337:Regionalisierungsgesetz 893:Neckarbischofsheim Nord 651:, Rhine Valley Railway 333:Homburg (Saar) Hbf 220:electric multiple units 4446:Former tramway network 1927: 1900:North Rhine-Westphalia 1890: 1729:DB Station&Service 1534: 1526: 1477: 1475:Graben-Neudorf station 1315: 1185: 1177: 1165: 1010:Weinheim (Bergstr) Hbf 938:Weinheim (Bergstr) Hbf 482:<> Karlsruhe Hbf 56: 4443:Former S-Bahn network 4431:Bad Schandau Elevator 4415:Wuppertal Schwebebahn 4021:Schöneiche-RĂĽdersdorf 3363:Sinsheim (Elsenz) Hbf 3361:Garrelt Rippelmeier, 3047:"eisenbahn-magazin". 2426:"Keine ruhige Minute" 2350:"Heidelberg–Bruchsal" 2068:Ludwigshafen am Rhein 1925: 1888: 1851:Mannheim Hauptbahnhof 1780:Operations since 2016 1765:Mannheim Hauptbahnhof 1714:BergstraĂźe (district) 1704:between Mannheim and 1532: 1524: 1506:Bruchsal Sportzentrum 1484:from Germersheim via 1472: 1410:or every hour on the 1404:Elsenz Valley Railway 1400:Neckar Valley Railway 1313: 1183: 1171: 1163: 848:Elsenz Valley Railway 404:Neckarelz–Osterburken 400:Neckar Valley Railway 4391:Suspension monorails 2884:on 13 September 2016 1795:Rhineland-Palatinate 1206:Rhineland-Palatinate 1014:Heppenheim (Bergstr) 934:Heppenheim (Bergstr) 906:Meckesheim–Neckarelz 425:Mosbach (Baden) 396:Rhine Valley Railway 392:Mannheim–SaarbrĂĽcken 376:Mosbach (Baden) 201:Rhineland-Palatinate 174:(S-Bahn RheinNeckar) 4466:Rhine-Neckar S-Bahn 4410:DĂĽsseldorf SkyTrain 4376:Esslingen am Neckar 3077:on 16 December 2013 2995:on 14 December 2016 2508:on 23 November 2007 2325:SaarbrĂĽcker Zeitung 1909:In addition, a new 1491:Karlsruhe Stadtbahn 1447:Heilbronn Stadtbahn 1443:Karlsruhe Stadtbahn 1283:2006 FIFA World Cup 1273:The upgrade of the 1025:Main-Neckar Railway 974:Main-Neckar Railway 852:Steinsfurt–Eppingen 801:BASF works railway 540:Schifferstadt–Wörth 171:Rhine-Neckar S-Bahn 33:Rhine-Neckar S-Bahn 18:Rhein-Neckar S-Bahn 3418:Werner Schreiner: 3298:on 23 October 2018 2848:on 5 December 2013 2622:on 15 January 2010 2083:Eberbach am Neckar 1928: 1891: 1651:Graben-Neudorf SĂĽd 1535: 1527: 1511:Bruchsal Am Mantel 1502:Bruchsal Am Mantel 1478: 1316: 1186: 1178: 1174:Ludwigshafen-Mitte 1166: 978:Mainz–Ludwigshafen 620:- Mannheim Hbf (- 618:Mannheim-Luzenberg 421:Kaiserslautern Hbf 344:Kaiserslautern Hbf 100:S-Bahn RheinNeckar 80:Number of stations 57:S-Bahn RheinNeckar 4471:S-Bahn in Germany 4453: 4452: 4111:Frankfurt am Main 3791:Mitteldeutschland 3687: 3686: 3587:Mitteldeutschland 2964:on 16 August 2017 2772:Mannheimer Morgen 2724:Mannheimer Morgen 2674:on 5 October 2013 2273: 2272: 2158:Sinsheim (Elsenz) 1684:and buses of the 1646:Schwetzingen Nord 1198:Baden-WĂĽrttemberg 1144:Operating pattern 1141: 1140: 1128: 1064: 1058:Mannheim-Käfertal 1016: 964: 895: 838: 836:Sinsheim (Elsenz) 761: 755:Wiesloch-Walldorf 704: 702:Wiesloch-Walldorf 637: 634:Karlsruhe-Durlach 626:Wiesloch-Walldorf 575: 530: 524:Wiesloch-Walldorf 458: 382: 205:Baden-WĂĽrttemberg 178:Rhine Neckar Area 167: 166: 16:(Redirected from 4503: 4217: 4116:Frankfurt (Oder) 3722:public transport 3714: 3707: 3700: 3691: 3644: 3532: 3521: 3514: 3507: 3498: 3493: 3491: 3489: 3483: 3474: 3472: 3470: 3458: 3456: 3454: 3432: 3406: 3405: 3398: 3392: 3391: 3389: 3388: 3373: 3367: 3366: 3358: 3352: 3351: 3349: 3347: 3336: 3330: 3329: 3327: 3325: 3314: 3308: 3307: 3305: 3303: 3288: 3282: 3281: 3279: 3277: 3271: 3263: 3257: 3256: 3254: 3252: 3237: 3231: 3230: 3228: 3226: 3211: 3205: 3204: 3202: 3200: 3195:on 8 August 2017 3185: 3179: 3178: 3176: 3174: 3163: 3157: 3156: 3154: 3152: 3141: 3135: 3134: 3132: 3130: 3115: 3109: 3108: 3106: 3104: 3093: 3087: 3086: 3084: 3082: 3067: 3061: 3060: 3044: 3038: 3037: 3035: 3033: 3023: 3014: 3005: 3004: 3002: 3000: 2985: 2974: 2973: 2971: 2969: 2963: 2956: 2948: 2942: 2941: 2939: 2937: 2926: 2920: 2919: 2917: 2915: 2910:on 15 April 2016 2900: 2894: 2893: 2891: 2889: 2883: 2875:StationsAnzeiger 2872: 2864: 2858: 2857: 2855: 2853: 2834: 2828: 2827: 2825: 2823: 2812: 2806: 2805: 2803: 2801: 2790: 2784: 2783: 2781: 2779: 2764: 2758: 2757: 2755: 2753: 2742: 2736: 2735: 2733: 2731: 2716: 2710: 2709: 2707: 2705: 2690: 2684: 2683: 2681: 2679: 2660: 2654: 2653: 2651: 2649: 2638: 2632: 2631: 2629: 2627: 2612: 2606: 2605: 2603: 2601: 2586: 2580: 2579: 2577: 2575: 2560: 2554: 2553: 2551: 2549: 2544:on 20 March 2017 2543: 2532: 2524: 2518: 2517: 2515: 2513: 2498: 2489: 2488: 2486: 2484: 2478: 2469: 2452: 2451: 2449: 2447: 2441: 2430: 2422: 2416: 2415: 2413: 2411: 2405: 2397: 2391: 2390: 2388: 2386: 2380: 2372: 2366: 2365: 2363: 2361: 2346: 2337: 2336: 2334: 2332: 2316: 2310: 2309: 2291: 2222:14 November 2016 2207:30 November 2013 2072:13 December 2008 2057:13 December 2008 1978:27 November 2006 1953: 1815:Further planning 1811:in August 2017. 1482:Bruhrain Railway 1099: 1086: 1084: 1055: 1042: 1040: 1003: 990: 988: 931: 918: 916: 882: 864: 862: 825: 812: 810: 781: 779: 728: 675: 662: 660: 615: 602:Mannheim-Waldhof 597: 595: 585:Bruhrain Railway 566: 553: 551: 485: 475: 473: 429: 416: 414: 341: 328: 326: 300: 150: 144: 142: 141: 137: 134: 126: 59: 42: 30: 21: 4511: 4510: 4506: 4505: 4504: 4502: 4501: 4500: 4456: 4455: 4454: 4449: 4435: 4419: 4385: 4357: 4213: 3986: 3878: 3845: 3725: 3718: 3688: 3683: 3666: 3645: 3636: 3535: 3530: 3525: 3487: 3485: 3481: 3477: 3468: 3466: 3461: 3452: 3450: 3442: 3439: 3430: 3415: 3410: 3409: 3400: 3399: 3395: 3386: 3384: 3375: 3374: 3370: 3360: 3359: 3355: 3345: 3343: 3338: 3337: 3333: 3323: 3321: 3316: 3315: 3311: 3301: 3299: 3290: 3289: 3285: 3275: 3273: 3269: 3265: 3264: 3260: 3250: 3248: 3247:on 16 July 2009 3239: 3238: 3234: 3224: 3222: 3213: 3212: 3208: 3198: 3196: 3187: 3186: 3182: 3172: 3170: 3165: 3164: 3160: 3150: 3148: 3143: 3142: 3138: 3128: 3126: 3117: 3116: 3112: 3102: 3100: 3095: 3094: 3090: 3080: 3078: 3069: 3068: 3064: 3046: 3045: 3041: 3031: 3029: 3021: 3016: 3015: 3008: 2998: 2996: 2987: 2986: 2977: 2967: 2965: 2961: 2954: 2950: 2949: 2945: 2935: 2933: 2928: 2927: 2923: 2913: 2911: 2902: 2901: 2897: 2887: 2885: 2881: 2870: 2866: 2865: 2861: 2851: 2849: 2836: 2835: 2831: 2821: 2819: 2814: 2813: 2809: 2799: 2797: 2794:"Streckenkarte" 2792: 2791: 2787: 2777: 2775: 2766: 2765: 2761: 2751: 2749: 2744: 2743: 2739: 2729: 2727: 2718: 2717: 2713: 2703: 2701: 2692: 2691: 2687: 2677: 2675: 2668:Wormser Zeitung 2662: 2661: 2657: 2647: 2645: 2640: 2639: 2635: 2625: 2623: 2614: 2613: 2609: 2599: 2597: 2596:on 10 July 2010 2588: 2587: 2583: 2573: 2571: 2570:on 11 June 2016 2562: 2561: 2557: 2547: 2545: 2541: 2535:NetzNachrichten 2530: 2526: 2525: 2521: 2511: 2509: 2500: 2499: 2492: 2482: 2480: 2476: 2471: 2470: 2455: 2445: 2443: 2439: 2428: 2424: 2423: 2419: 2409: 2407: 2403: 2399: 2398: 2394: 2384: 2382: 2378: 2374: 2373: 2369: 2359: 2357: 2348: 2347: 2340: 2330: 2328: 2318: 2317: 2313: 2293: 2292: 2288: 2283: 2278: 2252:1 December 2016 2237:3 November 2016 2192:13 October 2013 2132:16 October 2010 2087:18 October 2009 1944: 1920: 1872: 1867: 1834: 1825: 1817: 1782: 1761: 1698: 1617: 1590: 1519: 1467: 1357: 1308: 1291: 1271: 1243: 1218: 1158: 1146: 1098: 1082: 1080: 1054: 1038: 1036: 1002: 986: 984: 954:Frankenthal Hbf 930: 914: 912: 887:– Meckesheim – 881: 860: 858: 824: 808: 806: 777: 775: 727: 674: 658: 656: 641: 614: 593: 591: 565: 549: 547: 484: 471: 469: 428: 412: 410: 340: 324: 322: 304: 228: 156:Electrification 146: 139: 135: 132: 130: 129:4 ft  128: 124: 88:Daily ridership 72:Number of lines 28: 23: 22: 15: 12: 11: 5: 4509: 4507: 4499: 4498: 4493: 4488: 4483: 4478: 4473: 4468: 4458: 4457: 4451: 4450: 4448: 4447: 4444: 4440: 4437: 4436: 4434: 4433: 4427: 4425: 4421: 4420: 4418: 4417: 4412: 4407: 4402: 4395: 4393: 4387: 4386: 4384: 4383: 4378: 4373: 4367: 4365: 4359: 4358: 4356: 4355: 4350: 4345: 4338: 4333: 4328: 4323: 4318: 4313: 4308: 4303: 4296: 4291: 4286: 4281: 4276: 4271: 4266: 4259: 4254: 4249: 4244: 4239: 4234: 4229: 4224: 4219: 4207: 4202: 4195: 4190: 4185: 4180: 4175: 4170: 4165: 4160: 4153: 4148: 4143: 4138: 4133: 4128: 4123: 4118: 4113: 4108: 4103: 4098: 4093: 4088: 4083: 4078: 4073: 4068: 4063: 4058: 4053: 4048: 4043: 4038: 4033: 4028: 4014: 4009: 4004: 3996: 3994: 3988: 3987: 3985: 3984: 3979: 3974: 3969: 3964: 3959: 3954: 3949: 3944: 3939: 3934: 3929: 3924: 3919: 3914: 3909: 3904: 3899: 3894: 3888: 3886: 3880: 3879: 3877: 3876: 3871: 3866: 3861: 3855: 3853: 3847: 3846: 3844: 3843: 3838: 3833: 3828: 3823: 3818: 3813: 3808: 3803: 3798: 3793: 3788: 3783: 3778: 3773: 3768: 3763: 3756: 3751: 3746: 3741: 3735: 3733: 3727: 3726: 3719: 3717: 3716: 3709: 3702: 3694: 3685: 3684: 3682: 3681: 3674: 3672: 3668: 3667: 3665: 3664: 3659: 3653: 3651: 3647: 3646: 3639: 3637: 3635: 3634: 3629: 3624: 3619: 3614: 3609: 3604: 3599: 3594: 3589: 3584: 3579: 3574: 3569: 3564: 3559: 3554: 3549: 3543: 3541: 3537: 3536: 3526: 3524: 3523: 3516: 3509: 3501: 3495: 3494: 3475: 3459: 3438: 3437:External links 3435: 3434: 3433: 3414: 3411: 3408: 3407: 3393: 3368: 3353: 3331: 3309: 3283: 3258: 3232: 3206: 3180: 3158: 3136: 3110: 3088: 3062: 3039: 3006: 2975: 2943: 2921: 2895: 2859: 2829: 2807: 2785: 2759: 2737: 2711: 2685: 2655: 2633: 2607: 2581: 2555: 2519: 2490: 2453: 2442:on 29 May 2012 2417: 2392: 2367: 2338: 2311: 2285: 2284: 2282: 2279: 2277: 2274: 2271: 2270: 2268: 2265: 2260: 2256: 2255: 2253: 2250: 2245: 2241: 2240: 2238: 2235: 2233:Homburg (Saar) 2230: 2226: 2225: 2223: 2220: 2215: 2211: 2210: 2208: 2205: 2200: 2196: 2195: 2193: 2190: 2185: 2181: 2180: 2178: 2175: 2170: 2166: 2165: 2163: 2162:9 October 2011 2160: 2155: 2151: 2150: 2148: 2145: 2143:Kaiserslautern 2140: 2136: 2135: 2133: 2130: 2125: 2121: 2120: 2118: 2115: 2110: 2106: 2105: 2103: 2100: 2095: 2091: 2090: 2088: 2085: 2080: 2076: 2075: 2073: 2070: 2065: 2061: 2060: 2058: 2055: 2050: 2046: 2045: 2043: 2042:27 August 2008 2040: 2035: 2031: 2030: 2028: 2025: 2020: 2016: 2015: 2013: 2010: 2001: 1997: 1996: 1994: 1991: 1986: 1982: 1981: 1979: 1976: 1971: 1967: 1966: 1963: 1960: 1957: 1946:The following 1943: 1940: 1919: 1916: 1871: 1868: 1866: 1863: 1833: 1830: 1824: 1821: 1816: 1813: 1781: 1778: 1760: 1757: 1749:Biblis station 1720:(VRN) and the 1697: 1694: 1616: 1613: 1589: 1586: 1518: 1515: 1486:Graben-Neudorf 1466: 1463: 1436:Aglasterhausen 1396:Heidelberg Hbf 1365:Aglasterhausen 1356: 1353: 1307: 1304: 1290: 1287: 1270: 1267: 1263:Wörth am Rhein 1255:Graben-Neudorf 1242: 1239: 1217: 1214: 1176:S-Bahn station 1157: 1154: 1145: 1142: 1139: 1138: 1135: 1132: 1129: 1102:Graben-Neudorf 1087: 1077: 1076: 1071: 1068: 1065: 1043: 1033: 1032: 1022: 1019: 1017: 991: 981: 980: 971: 968: 965: 919: 909: 908: 902: 899: 896: 878:Aglasterhausen 870:Heidelberg Hbf 865: 855: 854: 845: 842: 839: 817:Heidelberg Hbf 813: 803: 802: 799: 796: 793: 782: 772: 771: 768: 765: 762: 751:Heidelberg Hbf 715: 714: 711: 708: 705: 698:Heidelberg Hbf 663: 653: 652: 646: 643: 638: 622:Heidelberg Hbf 598: 588: 587: 582: 579: 576: 569:Graben-Neudorf 554: 544: 543: 537: 534: 531: 520:Heidelberg Hbf 476: 466: 465: 462: 459: 448:Heidelberg Hbf 417: 407: 406: 389: 386: 383: 364:Heidelberg Hbf 329: 319: 318: 317:Railway lines 315: 312: 309: 306: 284:Aglasterhausen 240:Neckarsteinach 236:Homburg (Saar) 227: 224: 165: 164: 158: 152: 151: 148:standard gauge 122: 116: 115: 112: 108: 107: 103: 102: 97: 93: 92: 89: 85: 84: 81: 77: 76: 73: 69: 68: 65: 61: 60: 53: 49: 48: 44: 43: 35: 34: 26: 24: 14: 13: 10: 9: 6: 4: 3: 2: 4508: 4497: 4496:Deutsche Bahn 4494: 4492: 4489: 4487: 4484: 4482: 4479: 4477: 4474: 4472: 4469: 4467: 4464: 4463: 4461: 4445: 4442: 4441: 4438: 4432: 4429: 4428: 4426: 4422: 4416: 4413: 4411: 4408: 4406: 4403: 4401: 4397: 4396: 4394: 4392: 4388: 4382: 4379: 4377: 4374: 4372: 4369: 4368: 4366: 4364: 4360: 4354: 4351: 4349: 4346: 4344: 4343: 4339: 4337: 4336:Weil am Rhein 4334: 4332: 4329: 4327: 4324: 4322: 4319: 4317: 4314: 4312: 4309: 4307: 4304: 4302: 4301: 4297: 4295: 4292: 4290: 4287: 4285: 4282: 4280: 4277: 4275: 4272: 4270: 4267: 4265: 4264: 4260: 4258: 4255: 4253: 4250: 4248: 4245: 4243: 4240: 4238: 4235: 4233: 4230: 4228: 4225: 4223: 4220: 4216: 4211: 4208: 4206: 4203: 4201: 4200: 4196: 4194: 4191: 4189: 4186: 4184: 4181: 4179: 4176: 4174: 4171: 4169: 4166: 4164: 4161: 4159: 4158: 4154: 4152: 4149: 4147: 4144: 4142: 4139: 4137: 4134: 4132: 4129: 4127: 4126:Gelsenkirchen 4124: 4122: 4119: 4117: 4114: 4112: 4109: 4107: 4104: 4102: 4099: 4097: 4094: 4092: 4089: 4087: 4084: 4082: 4079: 4077: 4074: 4072: 4069: 4067: 4064: 4062: 4059: 4057: 4054: 4052: 4049: 4047: 4044: 4042: 4039: 4037: 4034: 4032: 4029: 4026: 4022: 4018: 4015: 4013: 4010: 4008: 4005: 4003: 4002: 3998: 3997: 3995: 3993: 3989: 3983: 3980: 3978: 3975: 3973: 3970: 3968: 3965: 3963: 3960: 3958: 3955: 3953: 3950: 3948: 3947:Gelsenkirchen 3945: 3943: 3940: 3938: 3935: 3933: 3930: 3928: 3925: 3923: 3920: 3918: 3915: 3913: 3910: 3908: 3905: 3903: 3900: 3898: 3895: 3893: 3890: 3889: 3887: 3885: 3881: 3875: 3872: 3870: 3867: 3865: 3862: 3860: 3857: 3856: 3854: 3852: 3848: 3842: 3839: 3837: 3834: 3832: 3829: 3827: 3824: 3822: 3819: 3817: 3814: 3812: 3809: 3807: 3804: 3802: 3799: 3797: 3794: 3792: 3789: 3787: 3784: 3782: 3779: 3777: 3774: 3772: 3769: 3767: 3764: 3762: 3761: 3757: 3755: 3752: 3750: 3747: 3745: 3742: 3740: 3737: 3736: 3734: 3732: 3728: 3723: 3715: 3710: 3708: 3703: 3701: 3696: 3695: 3692: 3679: 3676: 3675: 3673: 3669: 3663: 3660: 3658: 3655: 3654: 3652: 3648: 3643: 3633: 3630: 3628: 3625: 3623: 3620: 3618: 3615: 3613: 3610: 3608: 3605: 3603: 3600: 3598: 3595: 3593: 3590: 3588: 3585: 3583: 3580: 3578: 3575: 3573: 3570: 3568: 3565: 3563: 3560: 3558: 3555: 3553: 3550: 3548: 3545: 3544: 3542: 3538: 3534: 3533: 3522: 3517: 3515: 3510: 3508: 3503: 3502: 3499: 3480: 3476: 3464: 3460: 3449: 3448:Deutsche Bahn 3446:(in German). 3445: 3441: 3440: 3436: 3429: 3428:3-934845-17-7 3425: 3421: 3417: 3416: 3412: 3403: 3397: 3394: 3383:on 2017-03-20 3382: 3378: 3372: 3369: 3364: 3357: 3354: 3341: 3335: 3332: 3319: 3313: 3310: 3297: 3293: 3287: 3284: 3268: 3262: 3259: 3246: 3242: 3236: 3233: 3221:on 5 May 2012 3220: 3216: 3210: 3207: 3194: 3190: 3184: 3181: 3168: 3162: 3159: 3146: 3140: 3137: 3124: 3120: 3114: 3111: 3098: 3092: 3089: 3076: 3072: 3066: 3063: 3058: 3054: 3050: 3043: 3040: 3027: 3020: 3013: 3011: 3007: 2994: 2990: 2984: 2982: 2980: 2976: 2960: 2953: 2947: 2944: 2931: 2925: 2922: 2909: 2905: 2899: 2896: 2880: 2876: 2869: 2863: 2860: 2847: 2843: 2839: 2833: 2830: 2817: 2811: 2808: 2795: 2789: 2786: 2773: 2769: 2763: 2760: 2747: 2741: 2738: 2725: 2721: 2715: 2712: 2699: 2695: 2689: 2686: 2673: 2669: 2665: 2659: 2656: 2643: 2637: 2634: 2621: 2617: 2611: 2608: 2595: 2591: 2585: 2582: 2569: 2565: 2559: 2556: 2540: 2536: 2529: 2523: 2520: 2507: 2503: 2497: 2495: 2491: 2475: 2468: 2466: 2464: 2462: 2460: 2458: 2454: 2438: 2434: 2427: 2421: 2418: 2402: 2396: 2393: 2377: 2371: 2368: 2355: 2351: 2345: 2343: 2339: 2326: 2322: 2315: 2312: 2307: 2303: 2299: 2298: 2290: 2287: 2280: 2275: 2269: 2267:13 March 2017 2264: 2261: 2258: 2257: 2254: 2249: 2248:Bad Schönborn 2246: 2243: 2242: 2239: 2234: 2231: 2228: 2227: 2224: 2219: 2218:Schifferstadt 2216: 2213: 2212: 2209: 2204: 2201: 2198: 2197: 2194: 2189: 2186: 2183: 2182: 2179: 2174: 2171: 2168: 2167: 2164: 2159: 2156: 2153: 2152: 2149: 2147:19 March 2011 2144: 2141: 2138: 2137: 2134: 2129: 2126: 2123: 2122: 2119: 2114: 2111: 2108: 2107: 2104: 2102:27 March 2010 2099: 2096: 2093: 2092: 2089: 2084: 2081: 2078: 2077: 2074: 2069: 2066: 2063: 2062: 2059: 2054: 2051: 2048: 2047: 2044: 2039: 2036: 2033: 2032: 2029: 2024: 2021: 2018: 2017: 2014: 2009: 2005: 2002: 1999: 1998: 1995: 1993:21 March 2007 1990: 1987: 1984: 1983: 1980: 1975: 1972: 1969: 1968: 1964: 1961: 1958: 1955: 1951: 1949: 1941: 1939: 1935: 1933: 1932:Siemens Mireo 1924: 1917: 1915: 1912: 1907: 1903: 1901: 1897: 1887: 1883: 1881: 1877: 1869: 1865:Rolling stock 1864: 1862: 1858: 1856: 1852: 1846: 1844: 1840: 1831: 1829: 1822: 1820: 1814: 1812: 1810: 1806: 1805:Siemens Mireo 1802: 1798: 1796: 1792: 1788: 1779: 1777: 1773: 1771: 1766: 1758: 1756: 1752: 1750: 1746: 1742: 1738: 1734: 1730: 1725: 1723: 1719: 1715: 1711: 1707: 1706:GroĂź-Rohrheim 1703: 1695: 1693: 1689: 1687: 1683: 1678: 1676: 1672: 1668: 1664: 1660: 1655: 1653: 1652: 1647: 1643: 1638: 1634: 1633:Rhine Railway 1630: 1626: 1622: 1614: 1612: 1610: 1606: 1602: 1598: 1594: 1587: 1585: 1583: 1579: 1575: 1571: 1567: 1563: 1559: 1555: 1550: 1548: 1544: 1540: 1531: 1523: 1516: 1514: 1512: 1507: 1503: 1499: 1494: 1492: 1487: 1483: 1476: 1473:S 33 in 1471: 1464: 1462: 1460: 1456: 1452: 1448: 1444: 1439: 1437: 1433: 1429: 1425: 1421: 1417: 1413: 1409: 1405: 1401: 1397: 1392: 1388: 1386: 1382: 1377: 1374: 1370: 1366: 1362: 1354: 1352: 1350: 1346: 1342: 1338: 1334: 1330: 1326: 1322: 1312: 1305: 1303: 1301: 1295: 1288: 1286: 1284: 1280: 1276: 1268: 1266: 1264: 1260: 1256: 1252: 1248: 1240: 1238: 1234: 1233:and seating. 1232: 1231:waiting rooms 1226: 1223: 1215: 1213: 1211: 1207: 1203: 1199: 1195: 1191: 1182: 1175: 1170: 1162: 1155: 1153: 1150: 1143: 1136: 1133: 1130: 1127: 1123: 1119: 1115: 1111: 1107: 1103: 1097: 1096: 1095:GroĂź-Rohrheim 1092: 1091:Karlsruhe Hbf 1088: 1085: 1078: 1075: 1072: 1069: 1066: 1063: 1059: 1053: 1052: 1048: 1044: 1041: 1034: 1030: 1029:Rhine Railway 1026: 1023: 1020: 1018: 1015: 1011: 1007: 1001: 1000: 996: 992: 989: 982: 979: 975: 972: 969: 966: 963: 959: 955: 951: 947: 943: 939: 935: 929: 928: 924: 920: 917: 910: 907: 903: 900: 897: 894: 890: 886: 880: 879: 875: 871: 866: 863: 856: 853: 849: 846: 843: 840: 837: 833: 829: 823: 822: 818: 814: 811: 804: 800: 797: 794: 792: 791: 787: 783: 780: 773: 769: 766: 763: 760: 756: 752: 748: 744: 740: 736: 735:Schifferstadt 732: 726: 725: 721: 717: 716: 712: 709: 706: 703: 699: 695: 691: 687: 683: 682:Schifferstadt 679: 673: 672: 668: 664: 661: 654: 650: 647: 644: 642:(79 km) 639: 635: 631: 627: 623: 619: 613: 611: 610:Karlsruhe Hbf 607: 603: 599: 596: 589: 586: 583: 580: 577: 574: 570: 564: 563: 559: 555: 552: 545: 541: 538: 535: 532: 529: 525: 521: 517: 513: 509: 508:Schifferstadt 505: 501: 497: 493: 489: 488:Wörth (Rhein) 483: 481: 480:Karlsruhe Hbf 477: 474: 467: 463: 460: 457: 453: 449: 445: 441: 437: 436:Schifferstadt 433: 427: 426: 422: 418: 415: 408: 405: 401: 397: 393: 387: 384: 381: 377: 373: 369: 365: 361: 357: 353: 352:Schifferstadt 349: 345: 339: 338: 334: 330: 327: 320: 316: 313: 310: 307: 302: 298: 295: 293: 289: 285: 281: 277: 273: 269: 265: 261: 257: 253: 249: 248:Schifferstadt 245: 241: 237: 233: 225: 223: 221: 218: 214: 210: 206: 202: 198: 193: 191: 187: 183: 179: 175: 172: 162: 159: 157: 153: 149: 125:1,435 mm 123: 121: 117: 113: 111:System length 109: 104: 101: 98: 94: 90: 86: 82: 78: 74: 70: 67:Commuter rail 66: 62: 58: 54: 50: 45: 41: 36: 31: 19: 4481:Ludwigshafen 4363:Trolleybuses 4340: 4298: 4261: 4227:Ludwigshafen 4197: 4155: 4046:Braunschweig 3999: 3821:Rhine-Neckar 3820: 3758: 3617:Rhine-Neckar 3616: 3557:Danube-Iller 3540:In operation 3528: 3486:. Retrieved 3467:. Retrieved 3451:. Retrieved 3419: 3396: 3385:. Retrieved 3381:the original 3371: 3362: 3356: 3344:. Retrieved 3334: 3322:. Retrieved 3312: 3300:. Retrieved 3296:the original 3286: 3274:. Retrieved 3261: 3249:. Retrieved 3245:the original 3235: 3223:. Retrieved 3219:the original 3209: 3197:. Retrieved 3193:the original 3183: 3171:. Retrieved 3161: 3149:. Retrieved 3139: 3127:. Retrieved 3122: 3113: 3101:. Retrieved 3091: 3079:. Retrieved 3075:the original 3065: 3048: 3042: 3030:. Retrieved 3025: 2997:. Retrieved 2993:the original 2966:. Retrieved 2959:the original 2946: 2934:. Retrieved 2924: 2912:. Retrieved 2908:the original 2898: 2886:. Retrieved 2879:the original 2874: 2862: 2850:. Retrieved 2846:the original 2841: 2832: 2820:. Retrieved 2810: 2798:. Retrieved 2788: 2776:. Retrieved 2771: 2762: 2750:. Retrieved 2740: 2728:. Retrieved 2723: 2714: 2702:. Retrieved 2697: 2688: 2676:. Retrieved 2672:the original 2667: 2658: 2646:. Retrieved 2636: 2624:. Retrieved 2620:the original 2610: 2598:. Retrieved 2594:the original 2584: 2572:. Retrieved 2568:the original 2558: 2546:. Retrieved 2539:the original 2534: 2522: 2510:. Retrieved 2506:the original 2481:. Retrieved 2444:. Retrieved 2437:the original 2432: 2420: 2408:. Retrieved 2395: 2383:. Retrieved 2370: 2358:. Retrieved 2353: 2329:. Retrieved 2324: 2314: 2295: 2289: 2177:21 July 2012 2012:24 June 2007 1945: 1936: 1929: 1908: 1904: 1892: 1873: 1859: 1847: 1835: 1826: 1818: 1800: 1799: 1783: 1774: 1762: 1753: 1739:, Bobstadt, 1726: 1699: 1690: 1679: 1667:Schwetzingen 1656: 1649: 1645: 1641: 1621:Schwetzingen 1618: 1608: 1604: 1600: 1596: 1591: 1551: 1547:Regionalbahn 1536: 1510: 1505: 1501: 1497: 1495: 1479: 1440: 1423: 1419: 1393: 1389: 1384: 1378: 1358: 1336: 1320: 1317: 1296: 1292: 1272: 1244: 1235: 1227: 1219: 1187: 1151: 1147: 1118:Mannheim Hbf 1114:Schwetzingen 1089: 1047:Mannheim Hbf 1045: 995:Mannheim Hbf 993: 967:108 km 946:Mannheim Hbf 921: 885:NeckargemĂĽnd 867: 828:NeckargemĂĽnd 815: 784: 747:Mannheim Hbf 718: 694:Mannheim Hbf 665: 645:3 (20) 606:Mannheim Hbf 600: 573:Philippsburg 556: 533:104 km 516:Mannheim Hbf 478: 461:133 km 452:NeckargemĂĽnd 444:Mannheim Hbf 419: 385:202 km 368:NeckargemĂĽnd 360:Mannheim Hbf 331: 296: 252:Ludwigshafen 229: 194: 190:Ludwigshafen 173: 170: 168: 64:Transit type 4311:SaarbrĂĽcken 4146:Halberstadt 4025:Woltersdorf 4019:(Suburban: 3972:SaarbrĂĽcken 3680:(1976–1995) 3484:(in German) 3465:(in German) 3431:(in German) 2842:Echo online 2774:(in German) 2700:(in German) 2479:(in German) 2327:(in German) 2188:Osterburken 2117:12 May 2010 2038:Germersheim 2027:7 June 2008 1962:Named since 1839:train paths 1733:Lampertheim 1642:Hirschacker 1558:Frankenthal 1251:Germersheim 1122:Lampertheim 1062:Lampertheim 898:39 km 841:43 km 764:38 km 724:Germersheim 707:83 km 667:Germersheim 578:32 km 562:Germersheim 500:Germersheim 492:Rheinzabern 337:Osterburken 272:Germersheim 264:Osterburken 120:Track gauge 52:Native name 4460:Categories 4371:Eberswalde 4321:Strausberg 4300:Regensburg 4284:Oberhausen 4279:Nordhausen 4168:Heidelberg 4096:DĂĽsseldorf 3927:DĂĽsseldorf 3826:Rhine-Ruhr 3816:Rhine-Main 3622:Rhine-Ruhr 3612:Rhine-Main 3592:Mittelelbe 3469:16 January 3453:16 January 3387:2017-03-19 2626:16 January 2600:16 January 2276:References 2203:Meckesheim 2113:Heidelberg 1712:, but the 1675:Oftersheim 1663:Hockenheim 1659:NeuluĂźheim 1625:Hockenheim 1601:BASF Mitte 1570:Mettenheim 1428:Meckesheim 1424:Orthopädie 1345:SteinbrĂĽck 1110:Hockenheim 874:Meckesheim 832:Meckesheim 795:5 km 731:Speyer Hbf 678:Speyer Hbf 504:Speyer Hbf 260:Heidelberg 244:Hirschhorn 186:Heidelberg 4398:Dortmund 4342:Wuppertal 4326:Stuttgart 4274:Nuremberg 4242:Merseburg 4232:Magdeburg 4183:Karlsruhe 4173:Heilbronn 4071:Darmstadt 3982:Stuttgart 3962:Karlsruhe 3957:Heilbronn 3942:Frankfurt 3892:Bielefeld 3884:Stadtbahn 3874:Nuremberg 3836:Stuttgart 3811:Offenburg 3806:Nuremberg 3786:Magdeburg 3781:Karlsruhe 3632:Stuttgart 3602:Nuremberg 3582:Karlsruhe 3488:9 October 3346:8 October 3324:8 October 3302:8 October 3276:8 October 3251:7 October 3225:7 October 3199:6 October 3173:6 October 3151:6 October 3129:6 October 3103:5 October 3081:5 October 3057:0342-1902 3032:5 October 2999:5 October 2968:5 October 2914:7 October 2888:7 October 2852:7 October 2778:7 October 2752:7 October 2730:7 October 2704:7 October 2678:5 October 2648:5 October 2574:3 October 2548:3 October 2512:3 October 2483:3 October 2446:3 October 2410:24 August 2385:24 August 2360:24 August 2331:3 October 2306:1421-2811 2263:Karlsruhe 2259:425 220-1 2244:425 219-2 2229:425 218-5 2214:425 217-7 2199:425 216-9 2184:425 215-1 2169:425 214-4 2154:425 213-6 2139:425 212-8 2124:425 211-0 2109:425 210-2 2094:425 209-4 2079:425 208-6 2064:425 207-8 2049:425 206-0 2034:425 205-2 2019:425 204-5 2000:425 203-7 1985:425 202-9 1970:425 201-1 1880:class 423 1876:class 425 1671:Waghäusel 1637:Karlsruhe 1629:Waghäusel 1609:S 44 1597:BASF Nord 1574:Bodenheim 1543:class 425 1455:Heilbronn 1430:over the 1329:Darmstadt 1249:route to 1106:Waghäusel 962:Mainz Hbf 958:Worms Hbf 927:Mainz Hbf 889:Waibstadt 640:7 km 268:Karlsruhe 217:class 425 106:Technical 4381:Solingen 4348:WĂĽrzburg 4316:Schwerin 4269:Naumburg 4237:Mannheim 4121:Freiburg 4091:Duisburg 4056:Chemnitz 4007:Augsburg 3922:Duisburg 3917:Dortmund 3907:Chemnitz 3766:Freiburg 3657:Augsburg 3567:Freiburg 3531:S-Bahnen 2936:28 March 2822:28 March 2800:28 March 2128:Bruchsal 2053:Mannheim 2008:Walldorf 2004:Wiesloch 1787:Hannover 1737:BĂĽrstadt 1702:Riedbahn 1605:BASF SĂĽd 1554:Dienheim 1459:Sinsheim 1445:and the 1416:Eppingen 1408:Sinsheim 1402:and the 1373:Eppingen 1325:Eppingen 1259:Bruchsal 1210:DB Regio 999:Bensheim 923:Bensheim 821:Eppingen 759:Bruchsal 671:Bruchsal 649:Riedbahn 630:Bruchsal 558:Bruchsal 528:Bruchsal 496:Bellheim 456:Eberbach 372:Eberbach 314:Stations 292:Bensheim 280:Eppingen 276:Bruchsal 256:Mannheim 209:Saarland 182:Mannheim 163:overhead 143: in 47:Overview 4353:Zwickau 4306:Rostock 4294:Potsdam 4263:MĂĽnster 4247:MĂĽlheim 4222:Lößnitz 4215:History 4210:Leipzig 4205:Krefeld 4163:Hanover 4157:Hamburg 4136:Görlitz 4086:Dresden 4066:Cottbus 4061:Cologne 3977:MĂĽlheim 3952:Hanover 3912:Cologne 3864:Hamburg 3831:Rostock 3801:Neu-Ulm 3776:Hanover 3771:Hamburg 3754:Dresden 3749:Cologne 3671:Defunct 3650:Planned 3627:Rostock 3607:Ortenau 3577:Hanover 3572:Hamburg 3562:Dresden 3527:German 3413:Sources 2173:Seckach 2023:HaĂźloch 1974:Mosbach 1896:Hanover 1809:Siemens 1772:first. 1593:BASF SE 1578:Roxheim 1398:on the 1279:Homburg 1156:History 380:Seckach 226:Network 138:⁄ 96:Website 4400:H-Bahn 4289:Plauen 4252:Munich 4188:Kassel 4101:Erfurt 4081:Döbeln 4076:Dessau 4051:Bremen 4031:Bochum 4017:Berlin 4001:Aachen 3967:Kassel 3932:Erfurt 3897:Bochum 3869:Munich 3859:Berlin 3851:U-Bahn 3796:Munich 3760:Erfurt 3744:Bremen 3739:Berlin 3731:S-Bahn 3720:Urban 3678:Erfurt 3662:LĂĽbeck 3597:Munich 3552:Bremen 3547:Berlin 3426:  3055:  2304:  2098:Speyer 1755:2022. 1741:Biblis 1710:Biblis 1247:Speyer 1194:states 1190:S-Bahn 1131:89 km 1126:Biblis 1067:28 km 1051:Biblis 901:14/16 311:Length 305:number 232:states 197:S-Bahn 91:75,000 4424:Other 4257:Mainz 4151:Halle 4141:Gotha 4106:Essen 3992:Trams 3937:Essen 3270:(PDF) 3022:(PDF) 2962:(PDF) 2955:(PDF) 2882:(PDF) 2871:(PDF) 2542:(PDF) 2531:(PDF) 2477:(PDF) 2440:(PDF) 2429:(PDF) 2404:(PDF) 2379:(PDF) 2281:Notes 1965:Note 1682:trams 1582:Worms 1333:Worms 1222:Rhine 1202:Hesse 308:Route 288:Mainz 213:Hesse 4199:Kiel 4193:Kehl 4178:Jena 4131:Gera 4036:Bonn 3902:Bonn 3490:2019 3471:2011 3455:2011 3424:ISBN 3348:2019 3326:2019 3304:2019 3278:2019 3253:2019 3227:2019 3201:2019 3175:2019 3153:2019 3131:2019 3105:2019 3083:2019 3053:ISSN 3034:2019 3001:2019 2970:2019 2938:2024 2916:2019 2890:2019 2854:2019 2824:2024 2802:2024 2780:2019 2754:2019 2732:2019 2706:2019 2680:2019 2650:2019 2628:2011 2602:2011 2576:2019 2550:2019 2514:2019 2485:2019 2448:2019 2412:2024 2387:2024 2362:2024 2333:2019 2302:ISSN 1959:Name 1898:and 1853:and 1791:BASF 1770:B 36 1673:and 1661:and 1644:and 1603:and 1580:and 1572:and 1556:and 1537:The 1504:and 1422:and 1371:and 1341:Koch 1331:and 1204:and 1172:The 1100:via 1056:via 1004:via 932:via 883:via 826:via 729:via 676:via 616:via 567:via 486:via 430:via 342:via 303:Line 290:and 242:and 211:and 203:and 195:The 188:and 169:The 4331:Ulm 4023:· 3841:Ulm 1956:EMU 1686:RNV 1457:in 1414:to 1406:to 1277:to 1257:to 1196:of 1134:23 970:31 872:–) 861:S51 844:19 778:S44 767:15 710:27 608:(– 594:S39 581:11 550:S33 536:29 464:39 388:54 83:120 4462:: 3121:. 3024:. 3009:^ 2978:^ 2873:. 2840:. 2770:. 2722:. 2696:. 2666:. 2533:. 2493:^ 2456:^ 2431:. 2352:. 2341:^ 2323:. 1735:, 1611:. 1599:, 1568:, 1564:, 1500:, 1493:. 1461:. 1438:. 1367:, 1351:. 1327:, 1212:. 1200:, 1124:– 1120:– 1116:– 1112:– 1108:– 1104:– 1093:– 1083:S9 1070:7 1060:– 1049:– 1039:S8 1027:, 1021:6 1012:– 1008:– 997:– 987:S7 960:– 956:– 952:– 948:– 944:– 940:– 936:– 925:– 915:S6 891:– 876:– 850:, 834:– 830:– 819:– 809:S5 798:4 788:– 757:– 753:- 749:- 745:- 741:- 737:- 733:- 722:– 700:- 696:- 692:- 688:- 684:- 680:- 669:– 659:S4 632:- 628:- 624:- 604:– 571:– 560:– 526:– 522:– 518:– 514:– 510:– 506:– 502:– 498:– 494:– 490:– 472:S3 454:– 450:– 446:– 442:– 438:– 434:– 423:– 413:S2 402:, 398:, 394:, 378:- 374:– 370:– 366:– 362:– 358:– 354:– 350:– 346:– 335:– 325:S1 294:. 286:, 282:, 278:, 274:, 270:, 266:, 222:. 192:. 184:, 145:) 75:13 4218:) 4212:( 4027:) 3713:e 3706:t 3699:v 3520:e 3513:t 3506:v 3492:. 3473:. 3457:. 3404:. 3390:. 3350:. 3328:. 3306:. 3280:. 3255:. 3229:. 3203:. 3177:. 3155:. 3133:. 3107:. 3085:. 3059:. 3036:. 3003:. 2972:. 2940:. 2918:. 2892:. 2856:. 2826:. 2804:. 2782:. 2756:. 2734:. 2708:. 2682:. 2652:. 2630:. 2604:. 2578:. 2552:. 2516:. 2487:. 2450:. 2414:. 2389:. 2364:. 2335:. 2308:. 2006:- 1627:– 1623:– 1343:- 868:( 636:) 612:) 258:– 254:– 250:– 140:2 136:1 133:+ 131:8 127:( 20:)

Index

Rhein-Neckar S-Bahn

S-Bahn RheinNeckar
Track gauge
standard gauge
Electrification
15 kV  16.7 Hz AC
Rhine Neckar Area
Mannheim
Heidelberg
Ludwigshafen
S-Bahn
Rhineland-Palatinate
Baden-WĂĽrttemberg
Saarland
Hesse
class 425
electric multiple units
states
Homburg (Saar)
Neckarsteinach
Hirschhorn
Schifferstadt
Ludwigshafen
Mannheim
Heidelberg
Osterburken
Karlsruhe
Germersheim
Bruchsal

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑