335: 307: 40: 321: 289:-generators. Water from the power station is discharged into the lower reservoir. During periods of lower power demand such as at night, water is pumped with the same turbines back up to the upper reservoir for use in peak hours. The difference in elevation between the two reservoirs affords a 280:
which forms the lower reservoir. The Cerro Pelado dam is 104 m (341 ft) high and 410.5 metres (1,347 ft) long while the Arroyo Corto is 50 metres (160 ft) tall and 1,500 metres (4,900 ft) in length. Water from the upper reservoir is sent to the
450: 445: 455: 435: 264:. The complex consists of two dams and a power station in the Cerro Pelado Valley. Aside from power generation, the complex also serves to control floods and provide 74: 465: 460: 350: 370: 430: 257: 62: 293:
of 185 metres (607 ft). Construction on the complex began in 1976 and the generators were commissioned in 1986.
440: 285:
during periods of high power demand. The power station contains four 187.5 megawatts (251,400 hp) reversible
282: 340: 253: 58: 402: 220: 17: 312: 286: 265: 377: 290: 246: 230: 193: 424: 269: 249: 203: 39: 326: 213: 334: 302: 89: 76: 320: 261: 209: 446:
Pumped-storage hydroelectric power stations in Argentina
451:
Buildings and structures in Córdoba Province, Argentina
229: 219: 202: 192: 187: 179: 171: 166: 158: 150: 145: 137: 129: 121: 113: 105: 68: 54: 46: 32: 27:Dam in Calamuchita Department, Córdoba Province 8: 38: 29: 456:Hydroelectric power stations in Argentina 276:which forms the upper reservoir and the 436:Energy infrastructure completed in 1986 362: 183:1,600,000 m (1,300 acre⋅ft) 162:3,675,000 m (2,979 acre⋅ft) 7: 351:List of power stations in Argentina 25: 466:1986 establishments in Argentina 333: 319: 305: 243:Río Grande Hydroelectric Complex 141:Provincial Power Company Córdoba 33:Río Grande Hydroelectric Complex 18:Rio Grande Hydroelectric Complex 225:750 MW (1,010,000 hp) 1: 371:"Hydroelectric power plants" 235:977 GWh (3,520 TJ) 482: 461:Underground power stations 376:. Panedile. Archived from 283:underground power station 90:32.2217528°S 64.6365222°W 37: 198:185 m (607 ft) 95:-32.2217528; -64.6365222 341:Renewable energy portal 221:Installed capacity 114:Construction began 431:Dams completed in 1986 268:. The two dams on the 254:Calamuchita Department 231:Annual generation 175:Arroyo Corto Reservoir 154:Cerro Pelado Reservoir 130:Construction cost 59:Calamuchita Department 252:power station in the 403:"Historical Review" 180:Total capacity 159:Total capacity 86: /  405:(in Spanish). EPEC 441:Dams in Argentina 239: 238: 122:Opening date 16:(Redirected from 473: 415: 414: 412: 410: 399: 393: 392: 390: 388: 383:on 29 April 2014 382: 375: 367: 343: 338: 337: 329: 324: 323: 315: 313:Argentina portal 310: 309: 308: 278:Arroyo Corto Dam 274:Cerro Pelado Dam 258:Córdoba Province 101: 100: 98: 97: 96: 91: 87: 84: 83: 82: 79: 63:Córdoba Province 42: 30: 21: 481: 480: 476: 475: 474: 472: 471: 470: 421: 420: 419: 418: 408: 406: 401: 400: 396: 386: 384: 380: 373: 369: 368: 364: 359: 347: 346: 339: 332: 325: 318: 311: 306: 304: 299: 287:Francis turbine 266:municipal water 167:Lower reservoir 146:Upper reservoir 133:US$ 315 million 94: 92: 88: 85: 80: 77: 75: 73: 72: 28: 23: 22: 15: 12: 11: 5: 479: 477: 469: 468: 463: 458: 453: 448: 443: 438: 433: 423: 422: 417: 416: 394: 361: 360: 358: 355: 354: 353: 345: 344: 330: 316: 301: 300: 298: 295: 291:hydraulic head 247:pumped-storage 237: 236: 233: 227: 226: 223: 217: 216: 206: 200: 199: 196: 194:Hydraulic head 190: 189: 185: 184: 181: 177: 176: 173: 169: 168: 164: 163: 160: 156: 155: 152: 148: 147: 143: 142: 139: 135: 134: 131: 127: 126: 123: 119: 118: 115: 111: 110: 107: 103: 102: 70: 66: 65: 56: 52: 51: 48: 44: 43: 35: 34: 26: 24: 14: 13: 10: 9: 6: 4: 3: 2: 478: 467: 464: 462: 459: 457: 454: 452: 449: 447: 444: 442: 439: 437: 434: 432: 429: 428: 426: 404: 398: 395: 379: 372: 366: 363: 356: 352: 349: 348: 342: 336: 331: 328: 322: 317: 314: 303: 296: 294: 292: 288: 284: 279: 275: 271: 270:Tercero River 267: 263: 259: 255: 251: 250:hydroelectric 248: 244: 234: 232: 228: 224: 222: 218: 215: 211: 207: 205: 201: 197: 195: 191: 188:Power Station 186: 182: 178: 174: 170: 165: 161: 157: 153: 149: 144: 140: 136: 132: 128: 124: 120: 116: 112: 108: 104: 99: 81:64°38′11.48″W 78:32°13′18.31″S 71: 67: 64: 60: 57: 53: 49: 45: 41: 36: 31: 19: 407:. Retrieved 397: 385:. Retrieved 378:the original 365: 327:Water portal 277: 273: 242: 240: 214:Francis-type 212:reversible 109:Operational 93: / 69:Coordinates 425:Categories 357:References 208:4 x 187.5 262:Argentina 50:Argentina 409:28 April 387:28 April 297:See also 272:are the 204:Turbines 138:Owner(s) 55:Location 172:Creates 151:Creates 47:Country 106:Status 381:(PDF) 374:(PDF) 245:is a 411:2014 389:2014 241:The 125:1986 117:1976 256:of 427:: 260:, 210:MW 61:, 413:. 391:. 20:)

Index

Rio Grande Hydroelectric Complex

Calamuchita Department
Córdoba Province
32°13′18.31″S 64°38′11.48″W / 32.2217528°S 64.6365222°W / -32.2217528; -64.6365222
Hydraulic head
Turbines
MW
Francis-type
Installed capacity
Annual generation
pumped-storage
hydroelectric
Calamuchita Department
Córdoba Province
Argentina
municipal water
Tercero River
underground power station
Francis turbine
hydraulic head
Argentina portal
icon
Water portal
icon
Renewable energy portal
List of power stations in Argentina
"Hydroelectric power plants"
the original
"Historical Review"

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.