28:
517:
505:
483:. With the closure of (formerly West Market as well as Market Square as Market Street ran on southside - now known as The Esplanade) Market Street between King and Front Streets, under City of Toronto By-laws 291-67 and 40-70, the area was converted to pedestrian use only. Additional landscaping features like water fountain (south end at Front Street), rows of trees, flower beds and sculpture (at north end on King Street) have been added. Market Square condominium buildings were constructed along the westerly boundary in the early 1980s.
493:
529:
282:
424:
393:
finds meant that a further in-depth study was required. This study was done after the demolition of the 1968 building, which occurred in 2016. The team led by Peter Popkin, senior archaeologist with Golder
Associates, found various artefacts, including knives, ceramics and butchers’ hooks. An exhibit on the archaeological dig was presented at the Market Gallery in the south building.
1113:
392:
The City commissioned archaeological studies on the site, to determine if there was anything archaeologically significant present on the site, which was first developed in 1804. Artifacts were found by excavating part of the foundation in 2015, including sewer brickworks, foundations and cellars. The
405:
During the construction of the new building, the
Saturday and Sunday North Market vendors are selling from a location (Green P parking lot) one block south on the Esplanade. The vendors vacated the North building in June 2015 to allow for demolition and re-development of a new market structure. The
396:
An award of the contract to build the building was finally made in 2018, but rescinded later in the year when the recommended contractor failed to meet the requirements of the tender. On May 15, 2019, City
Council approved the awarding of a contract for construction to Buttcon Limited / The Atlas
384:
The 1968 building was slated to be demolished late 2010, but City
Council balked at the escalating cost of the project. This led to changes to the design to reduce the cost. The updated design is for a five-story building with a central atrium, connected to St. Lawrence Hall. The ground floor is
240:
in 1803. The first permanent farmers' market building was built on the south side of King Street at Jarvis Street shortly after. It was enclosed in 1820 and replaced by a brick structure in 1831. This new building extended from King to Front and housed an assembly hall on the upper level. City
248:
A new building was built in 1851 abutting the new St. Lawrence Hall on King Street but with its main entrance facing Front Street. This building lasted until 1904 when it was demolished by order of the Market
Commission and replaced by a building designed to match the recently completed South
397:
Corporation Joint
Venture. Construction restarted on July 9, 2019. The market was expected to be completed in summer 2023 but later revised to fall 2024. In July 2024, it was reported that the City was behind on a $ 9.5 million payment for design changes made by a city manager in 2008.
406:
temporary market is located in a single storey pre-fabricated fabric structure on the parking lot south of the South Market
Building at 125 The Esplanade opened on July 11, 2015. The temporary site will be used pending the completion of the permanent structure on Front Street.
385:
4,000 square metres (43,000 sq ft) and the building will also have 4,000 square metres (43,000 sq ft) of office space and 3,000 square metres (32,000 sq ft) of space for courts. In 2013, City
Council approved an overall project budget of
216:, an antique market and Christmas trees daily from mid-Nov. to Dec. 24. The site has been a farmer's market since 1803. Several buildings have been built for the Market North, the most recent in 1968. The new Market North structure is now under construction. The
263:
in protest of the city's decision to close Market Street to vehicular traffic. A Sunday
Variety Market and New Antique Market have replaced it. There is also an outdoor Christmas trees and holiday green market offered daily from mid-November to December 24.
351:
did a review of the Market's operations and determined that the North building would have to be replaced. The City held an architectural competition for a new building to be used for the same purposes as the old one. On June 7, 2010, then-Mayor
380:
and will be a complex of three buildings. The new building includes office space which will be used for municipal courts and a 250-space parking garage underground. The project schedule first envisioned a completion in 2018.
959:
933:
986:
1055:
782:
516:
654:
255:
The
Farmers' Market, the largest in Toronto, is held on Saturdays starting at 5 am. The Sunday Antique Market operated weekly for 31 years until 2022 when the owner relocated it to
804:
528:
245:
along with much of the adjacent area (but not the City Hall.) A remnant of the 1831 building, a stone drainage tunnel, was discovered in the 2015–17 archaeological excavations.
855:
450:
252:
A new one-storey north market building was built in 1968 and was in operation until 2015, when the market moved to a temporary facility at 125 The Esplanade.
80:
504:
1154:
1149:
1011:
492:
569:
237:
1117:
1056:"Temporary North Market - 125 The Esplanade - Temporary North Market - North St. Lawrence Market Redevelopment | City of Toronto"
353:
893:
734:
357:
356:
announced the winners of the design competition for a building to replace the existing North Market. The winning design was by
1159:
27:
760:
242:
73:
680:
566:- former public market prior to 2011 and later as food venue (closed in 2017 and site shuttered by City since 2018)
236:
A market has operated at King St. and Jarvis St. since the area was designated the "Market Block" by Upper Canada
911:
225:
162:
545:
249:
building. A canopy ran over Front Street connecting the north and south markets until it was removed in 1954.
629:
563:
373:
831:
376:(also known as the Pompidou Centre). The proposed new building was four stories tall and would feature an
377:
256:
281:
1033:
1087:
1076:
260:
468:
1098:
217:
361:
213:
557:
480:
221:
560:- not a traditional market but rather a multicultural neighbourhood and former Jewish enclave
551:
1124:
867:
614:
589:
738:
348:
365:
423:
1143:
987:"City on the hook for another $ 9.5 million to finish St. Lawrence market building"
1129:
389:. After the temporary site was built in 2015, the 1968 North building was closed.
368:
of the Rogers Stirk Harbour + Partners architectural firm is also responsible for
486:
The park will remain after the demolition and after the new structure is built.
761:"St. Lawrence Market North Preparing For Temporary Move | Urban Toronto"
572:- former market and since re-developed into city park and mixed used building
522:
View of interior of 1850 St. Lawrence Market building as it appeared in 1891.
95:
82:
681:"A beloved Toronto antique market is getting a revival with a vintage twist"
534:
View of St. Lawrence Market North building and Market Lane Park from north.
241:
Council met in this assembly hall from 1834 to 1845. It was damaged in the
1112:
655:"Sunday Antique Market at St. Lawrence says goodbye after three decades"
1130:
Official new St. Lawrence Market North building design competition page
894:"North St. Lawrence Market Redevelopment Project: phases and timelines"
209:
205:
58:
1134:
630:"Displaying St. Lawrence Market's 1831 drain could cost city $ 2M"
369:
1135:
St. Lawrence Market neighbourhood BIA (Business Improvement Area)
705:
479:
is located on the west side of the North Market Building and
1099:
St. Lawrence Market North Building, Design Competition Brief
832:"Redevelopment of St. Lawrence Market North – Status Update"
615:"North St. Lawrence Market Redevelopment – City of Toronto"
912:"North St. Lawrence Market artifacts reveal clean vendors"
32:
Construction for St. Lawrence Market North in May, 2022
212:, Canada. It hosts a variety of markets, including a
1012:"Temporary St. Lawrence North Market location open"
464:
456:
446:
438:
430:
416:
336:
328:
320:
312:
304:
296:
291:
274:
190:
182:
174:
169:
161:(current temporary site was used as parking lot by
155:
137:
119:
111:
72:
64:
54:
46:
41:
20:
1125:History of the St. Lawrence Market North building
469:Parks, Forestry and Recreation - Market Lane Park
718:The History of the St. Lawrence Market Buildings
548:- the public market associated with Market North
257:Small Arms Munitions Building (Arsenal Lands)
8:
826:
824:
822:
729:
727:
609:
607:
413:
286:View of temporary site of farmer's market.
271:
17:
837:(pdf). City of Toronto. December 17, 2015
805:"North St. Lawrence Market Redevelopment"
275:St. Lawrence Market North Temporary Site
581:
488:
332:on completion of the new North Building
1014:. Daily Commercial News. July 17, 2015
554:- culture venue linked to Market North
510:1851 building, as it looked circa 1890
910:Hanagan, Dennis (November 22, 2016).
905:
903:
115:None - vendors relocated to temp site
7:
940:. City of Toronto. November 17, 2017
807:. City of Toronto. November 17, 2017
455:
985:Habibinia, Mahdis (July 12, 2024).
628:Rieti, John (September 20, 2017).
570:St. Andrew's Market and Playground
498:Sketch of 1831 building circa 1888
14:
874:. Rogers Stirk Harbour + Partners
759:Cale Vanderveen (April 2, 2015).
720:. Toronto: City of Toronto. 2013.
220:combines the North building, the
1111:
1088:City of Toronto By-Law 1970-0040
1077:City of Toronto By-Law 1967-0291
590:"Opps! This link appears broken"
527:
515:
503:
491:
429:
422:
280:
238:Lieutenant-Governor Peter Hunter
26:
1034:"Read More St. Lawrence Market"
445:
358:Rogers Stirk Harbour + Partners
327:
186:10,000 square feet (930 m)
136:
118:
1155:Municipal buildings in Toronto
1058:. .toronto.ca. October 1, 2009
1:
434:129 King Street East, Toronto
1150:Farmers' markets in Ontario
125:; 56 years ago
1176:
868:"St Lawrence Market North"
706:https://sundayvariety.com/
300:pre-fabricated fabric tent
143:; 8 years ago
1118:St. Lawrence Market North
421:
341:
279:
226:St. Lawrence Market South
202:St. Lawrence Market North
195:
163:Toronto Parking Authority
37:
25:
21:St. Lawrence Market North
546:St Lawrence Market South
360:in a joint venture with
347:In the early 2000s, the
374:Centre Georges Pompidou
1036:. Stlawrencemarket.com
783:"Competition Schedule"
592:. Stlawrencemarket.com
204:is a public market in
1160:Courthouses in Canada
1120:at Wikimedia Commons
259:at Lakeshore Park in
96:43.64972°N 79.37194°W
564:St. Patrick's Market
313:Construction started
261:Mississauga, Ontario
50:92 Front Street East
966:. November 17, 2017
292:General information
218:St. Lawrence Market
101:43.64972; -79.37194
92: /
42:General information
896:. City of Toronto.
685:Streets of Toronto
362:Adamson Associates
1116:Media related to
960:"Progress Update"
934:"Progress Update"
785:. City of Toronto
763:. Urbantoronto.ca
558:Kensington Market
481:St. Lawrence Hall
474:
473:
345:
344:
308:125 The Esplanade
222:St. Lawrence Hall
199:
198:
170:Technical details
1167:
1115:
1101:
1096:
1090:
1085:
1079:
1074:
1068:
1067:
1065:
1063:
1052:
1046:
1045:
1043:
1041:
1030:
1024:
1023:
1021:
1019:
1008:
1002:
1001:
999:
997:
982:
976:
975:
973:
971:
956:
950:
949:
947:
945:
930:
924:
923:
921:
919:
914:. TheBulletin.ca
907:
898:
897:
890:
884:
883:
881:
879:
864:
858:
853:
847:
846:
844:
842:
836:
828:
817:
816:
814:
812:
801:
795:
794:
792:
790:
779:
773:
772:
770:
768:
756:
750:
749:
747:
745:
735:"Winning Design"
731:
722:
721:
714:
708:
703:
697:
696:
694:
692:
677:
671:
670:
668:
666:
651:
645:
644:
642:
640:
625:
619:
618:
611:
602:
601:
599:
597:
586:
552:St Lawrence Hall
531:
519:
507:
495:
477:Market Lane Park
447:Operated by
426:
417:Market Lane Park
414:
410:Market Lane Park
388:
387:CA$ 91.5 million
284:
272:
159:City of Toronto
151:
149:
144:
133:
131:
126:
107:
106:
104:
103:
102:
97:
93:
90:
89:
88:
85:
30:
18:
1175:
1174:
1170:
1169:
1168:
1166:
1165:
1164:
1140:
1139:
1109:
1104:
1097:
1093:
1086:
1082:
1075:
1071:
1061:
1059:
1054:
1053:
1049:
1039:
1037:
1032:
1031:
1027:
1017:
1015:
1010:
1009:
1005:
995:
993:
984:
983:
979:
969:
967:
964:City of Toronto
958:
957:
953:
943:
941:
932:
931:
927:
917:
915:
909:
908:
901:
892:
891:
887:
877:
875:
866:
865:
861:
854:
850:
840:
838:
834:
830:
829:
820:
810:
808:
803:
802:
798:
788:
786:
781:
780:
776:
766:
764:
758:
757:
753:
743:
741:
739:City of Toronto
733:
732:
725:
716:
715:
711:
704:
700:
690:
688:
679:
678:
674:
664:
662:
653:
652:
648:
638:
636:
627:
626:
622:
613:
612:
605:
595:
593:
588:
587:
583:
579:
542:
535:
532:
523:
520:
511:
508:
499:
496:
412:
403:
386:
349:City of Toronto
287:
270:
243:1849 great fire
234:
214:farmers' market
160:
147:
145:
142:
129:
127:
124:
112:Current tenants
100:
98:
94:
91:
86:
83:
81:
79:
78:
33:
12:
11:
5:
1173:
1171:
1163:
1162:
1157:
1152:
1142:
1141:
1138:
1137:
1132:
1127:
1108:
1107:External links
1105:
1103:
1102:
1091:
1080:
1069:
1047:
1025:
1003:
977:
951:
925:
899:
885:
859:
848:
818:
796:
774:
751:
723:
709:
698:
687:. June 7, 2023
672:
661:. May 29, 2022
646:
620:
603:
580:
578:
575:
574:
573:
567:
561:
555:
549:
541:
538:
537:
536:
533:
526:
524:
521:
514:
512:
509:
502:
500:
497:
490:
472:
471:
466:
462:
461:
458:
454:
453:
448:
444:
443:
440:
436:
435:
432:
428:
427:
419:
418:
411:
408:
402:
401:Temporary site
399:
366:Richard Rogers
343:
342:
339:
338:
334:
333:
330:
326:
325:
322:
318:
317:
314:
310:
309:
306:
302:
301:
298:
294:
293:
289:
288:
285:
277:
276:
269:
266:
233:
230:
197:
196:
193:
192:
188:
187:
184:
180:
179:
176:
172:
171:
167:
166:
157:
153:
152:
139:
135:
134:
121:
117:
116:
113:
109:
108:
76:
70:
69:
66:
62:
61:
56:
52:
51:
48:
44:
43:
39:
38:
35:
34:
31:
23:
22:
13:
10:
9:
6:
4:
3:
2:
1172:
1161:
1158:
1156:
1153:
1151:
1148:
1147:
1145:
1136:
1133:
1131:
1128:
1126:
1123:
1122:
1121:
1119:
1114:
1106:
1100:
1095:
1092:
1089:
1084:
1081:
1078:
1073:
1070:
1057:
1051:
1048:
1035:
1029:
1026:
1013:
1007:
1004:
992:
988:
981:
978:
965:
961:
955:
952:
939:
935:
929:
926:
913:
906:
904:
900:
895:
889:
886:
873:
872:www.rsh-p.com
869:
863:
860:
857:
856:National Post
852:
849:
833:
827:
825:
823:
819:
806:
800:
797:
784:
778:
775:
762:
755:
752:
740:
736:
730:
728:
724:
719:
713:
710:
707:
702:
699:
686:
682:
676:
673:
660:
656:
650:
647:
635:
631:
624:
621:
616:
610:
608:
604:
591:
585:
582:
576:
571:
568:
565:
562:
559:
556:
553:
550:
547:
544:
543:
539:
530:
525:
518:
513:
506:
501:
494:
489:
487:
484:
482:
478:
470:
467:
463:
459:
452:
451:Toronto Parks
449:
441:
437:
433:
425:
420:
415:
409:
407:
400:
398:
394:
390:
382:
379:
375:
371:
367:
363:
359:
355:
350:
340:
335:
331:
324:July 11, 2015
323:
319:
315:
311:
307:
303:
299:
295:
290:
283:
278:
273:
267:
265:
262:
258:
253:
250:
246:
244:
239:
231:
229:
227:
223:
219:
215:
211:
207:
203:
194:
189:
185:
181:
177:
173:
168:
164:
158:
154:
140:
122:
114:
110:
105:
77:
75:
71:
67:
63:
60:
57:
53:
49:
45:
40:
36:
29:
24:
19:
16:
1110:
1094:
1083:
1072:
1060:. Retrieved
1050:
1038:. Retrieved
1028:
1016:. Retrieved
1006:
994:. Retrieved
991:Toronto Star
990:
980:
968:. Retrieved
963:
954:
942:. Retrieved
937:
928:
916:. Retrieved
888:
876:. Retrieved
871:
862:
851:
839:. Retrieved
809:. Retrieved
799:
787:. Retrieved
777:
765:. Retrieved
754:
742:. Retrieved
717:
712:
701:
689:. Retrieved
684:
675:
663:. Retrieved
659:Toronto Star
658:
649:
637:. Retrieved
633:
623:
594:. Retrieved
584:
485:
476:
475:
404:
395:
391:
383:
354:David Miller
346:
268:New building
254:
251:
247:
235:
201:
200:
55:Town or city
15:
944:January 24,
918:January 24,
878:January 24,
321:Inaugurated
175:Floor count
99: /
74:Coordinates
1144:Categories
938:toronto.ca
577:References
337:References
329:Demolished
228:building.
191:References
183:Floor area
138:Demolished
87:79°22′19″W
84:43°38′59″N
691:March 24,
665:March 24,
639:April 30,
316:late 2014
120:Completed
1062:June 24,
1040:June 24,
1018:June 24,
996:July 12,
970:March 7,
841:June 13,
789:June 24,
767:June 24,
744:June 24,
634:CBC News
596:June 24,
540:See also
431:Location
224:and the
811:May 14,
465:Website
439:Created
305:Address
232:History
210:Ontario
206:Toronto
146: (
128: (
65:Country
59:Toronto
47:Address
457:Status
378:arcade
68:Canada
835:(PDF)
370:Paris
156:Owner
1064:2016
1042:2016
1020:2016
998:2024
972:2023
946:2019
920:2019
880:2019
843:2016
813:2019
791:2016
769:2016
746:2016
693:2024
667:2024
641:2019
598:2016
460:Open
442:1967
297:Type
148:2016
141:2016
130:1968
123:1968
1146::
989:.
962:.
936:.
902:^
870:.
821:^
737:.
726:^
683:.
657:.
632:.
606:^
372:'
364:.
208:,
1066:.
1044:.
1022:.
1000:.
974:.
948:.
922:.
882:.
845:.
815:.
793:.
771:.
748:.
695:.
669:.
643:.
617:.
600:.
178:1
165:)
150:)
132:)
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.