3S turbines have a capacity of 3.57 MW, with a hub height of 110 metres, tip height of 180 metres, and rotor diameter of 140 metres. The farm is projected to generate 1900 GWh of energy annually, at a corresponding capacity factor of about 40.9%. It will power approximately 425,000 homes annually.
330:. The forecast cost is A$ 900 million (US$ 750 million) In December 2009, the original plan for 242 turbines, the plan was changed to only have 157 turbines. The Victorian minister of planning approved the 157 turbines, in October 2010. 284:. In October 2022 the project completed its hold point tests, and was approved by the Australian Energy Market Operator and Network Services Provider to generate up to its maximum capacity of 511MW into the National Electricity Market. 846: 679: 353:
The wind farm registered its first grid output in July 2021. In June 2022, the wind farm reached an output of 508.4MW, or 99.49% of its maximum registered output of 511 MW.
336:
Construction commenced in May 2018 on a design that has 149 wind turbines. The final turbine installation occurred in December 2020 and operations began in July 2021. The
968: 709: 774: 1457: 1613: 1589: 1608: 1399: 755: 1078: 1125: 985: 961: 61: 723: 1168: 1087: 954: 1527: 1246: 1208: 801: 112: 333:
In 2013 Origin contemplated selling the project before production would have begun, but decided to continue the project.
1582: 308: 653: 1221: 1437: 1432: 1284: 1269: 1138: 1334: 1618: 1023: 304: 871: 1349: 1575: 1389: 1329: 1314: 1264: 1183: 1110: 977: 633: 623: 1480: 1470: 1465: 1364: 1339: 1198: 1193: 1173: 1143: 1033: 1289: 1274: 1412: 1344: 1226: 1216: 1163: 1158: 1095: 1427: 1324: 680:"Origin adds 530 MW of renewable energy to its portfolio; Sets new benchmark for renewable PPA pricing" 1500: 1475: 1299: 1294: 1279: 1259: 1115: 1063: 1028: 281: 1490: 1485: 1422: 1379: 1319: 1236: 1231: 1153: 1105: 1053: 1018: 1008: 1003: 603: 117: 1442: 1354: 1188: 1178: 1068: 1048: 924: 896: 323: 296: 203: 133: 122: 30: 1521: 1417: 1309: 1148: 1133: 1100: 1058: 1043: 1038: 1013: 998: 327: 1559: 1447: 1407: 1384: 1374: 1254: 595: 1369: 1304: 993: 216: 318:
The facility consists of 149 approved wind turbines at a site approximately 35km west of
609: 229: 825: 1602: 686: 342: 292: 617: 585: 76: 63: 1555: 251: 145: 1547: 1516: 941: 740: 946: 267: 910: 337: 319: 209: 195: 576:
Note: Asterisk indicates power output was limited during the month.
288: 345:
has a power purchase agreement to buy all electricity until 2030.
950: 847:"Application to amend the Wind Energy Facility Planning Permit" 654:"NPIM acquires stake in Australia's Stockyard Hill Wind Farm" 710:"Stockyard Hill wind farm to go ahead, Origin Energy says" 897:"SCADAVALUE:DISPATCH (STOCKYD1: 511 MW of Wind in VIC1)" 1563: 925:"eljmkt nemlog - Stockyard Hill Wind Farm (STOCKYD1)" 911:"eljmkt nemlog - Stockyard Hill Wind Farm (STOCKYD1)" 872:"Stockyard Hill Wind Farm a step closer to operation" 1456: 1398: 1245: 1207: 1124: 1086: 984: 246: 241: 228: 215: 202: 170: 162: 154: 144: 139: 129: 108: 100: 92: 55: 41: 23: 295:. In May 2017, Origin sold the development to 1583: 962: 8: 735: 733: 1590: 1576: 969: 955: 947: 724:"Origin shelves wind farm, pending review" 357:Stockyard Hill Wind Farm Generation (MWh) 20: 355: 645: 726:. Climate Spectator. 21 February 2014. 7: 1544: 1542: 796: 794: 769: 767: 765: 708:McLennan, Chris (21 February 2014). 113:Palisade Investment Partners Limited 1562:. You can help Knowledge (XXG) by 1169:Port Augusta Renewable Energy Park 14: 287:The development was initiated by 1614:Proposed wind farms in Australia 1546: 1515: 1077: 876:Energy Source & Distribution 756:"Origin drops sale of Stockyard" 754:Paton, James (15 January 2013). 616: 602: 588: 29: 16:Wind farm in Victoria, Australia 1528:List of wind farms in Australia 1609:Wind farms in Victoria (state) 826:"3S PMDD – Goldwind Australia" 1: 309:Renewable Energy Certificates 870:Howl, Nadia (25 July 2021). 307:to buy the electricity and 230:Annual net output 1635: 1541: 741:"Stockyard Hill Wind Farm" 280:is a wind farm project in 1509: 1075: 264: 179: 175: 37: 28: 658:www.power-technology.com 305:power purchase agreement 278:Stockyard Hill Wind Farm 192:Make and model 24:Stockyard Hill Wind Farm 978:Wind farms in Australia 634:Wind power in Australia 624:Renewable energy portal 204:Nameplate capacity 101:Construction began 942:Stockyard Hill website 254:.stockyardhillwindfarm 184:Units operational 77:37.53583°S 143.25139°E 1554:This article about a 1522:Wind power portal 171:Power generation 282:Victoria (Australia) 217:Capacity factor 82:-37.53583; 143.25139 1486:Kennedy Energy Park 1458:Proposed wind farms 358: 289:Windpower Australia 242:External links 163:Rotor diameter 73: /  356: 297:Goldwind Australia 134:Goldwind Australia 123:Goldwind Australia 1571: 1570: 1536: 1535: 1400:Western Australia 1222:Granville Harbour 685:(Press release). 660:. 14 January 2020 574: 573: 275: 274: 237: 224: 1626: 1592: 1585: 1578: 1550: 1543: 1520: 1519: 1335:Mount Gellibrand 1310:Lal Lal (Yendon) 1081: 971: 964: 957: 948: 929: 928: 921: 915: 914: 907: 901: 900: 893: 887: 886: 884: 882: 867: 861: 860: 858: 856: 851: 843: 837: 836: 834: 832: 822: 816: 815: 813: 811: 806: 798: 789: 788: 786: 784: 779: 771: 760: 759: 751: 745: 744: 737: 728: 727: 720: 714: 713: 705: 699: 698: 696: 694: 684: 676: 670: 669: 667: 665: 650: 626: 621: 620: 612: 607: 606: 598: 596:Australia portal 593: 592: 591: 359: 314: 302: 268:edit on Wikidata 260: 257: 255: 253: 235: 222: 88: 87: 85: 84: 83: 78: 74: 71: 70: 69: 66: 33: 21: 1634: 1633: 1629: 1628: 1627: 1625: 1624: 1623: 1619:Wind farm stubs 1599: 1598: 1597: 1596: 1539: 1537: 1532: 1514: 1505: 1452: 1438:Ten Mile Lagoon 1433:Nine Mile Beach 1394: 1285:Coonooer Bridge 1270:Challicum Hills 1241: 1203: 1139:Cathedral Rocks 1126:South Australia 1120: 1082: 1073: 986:New South Wales 980: 975: 938: 933: 932: 923: 922: 918: 909: 908: 904: 895: 894: 890: 880: 878: 869: 868: 864: 854: 852: 849: 845: 844: 840: 830: 828: 824: 823: 819: 809: 807: 804: 800: 799: 792: 782: 780: 777: 773: 772: 763: 753: 752: 748: 739: 738: 731: 722: 721: 717: 707: 706: 702: 692: 690: 682: 678: 677: 673: 663: 661: 652: 651: 647: 642: 630: 629: 622: 615: 608: 601: 594: 589: 587: 582: 351: 312: 300: 271: 250: 155:Hub height 140:Wind farm 121: 116: 81: 79: 75: 72: 67: 64: 62: 60: 59: 51: 17: 12: 11: 5: 1632: 1630: 1622: 1621: 1616: 1611: 1601: 1600: 1595: 1594: 1587: 1580: 1572: 1569: 1568: 1551: 1534: 1533: 1531: 1530: 1525: 1510: 1507: 1506: 1504: 1503: 1498: 1496:Stockyard Hill 1493: 1488: 1483: 1478: 1473: 1468: 1462: 1460: 1454: 1453: 1451: 1450: 1445: 1440: 1435: 1430: 1425: 1420: 1415: 1410: 1404: 1402: 1396: 1395: 1393: 1392: 1387: 1382: 1377: 1372: 1367: 1362: 1360:Stockyard Hill 1357: 1352: 1347: 1342: 1337: 1332: 1327: 1322: 1317: 1312: 1307: 1302: 1297: 1292: 1287: 1282: 1277: 1272: 1267: 1262: 1257: 1251: 1249: 1243: 1242: 1240: 1239: 1234: 1229: 1224: 1219: 1213: 1211: 1205: 1204: 1202: 1201: 1196: 1191: 1186: 1181: 1176: 1171: 1166: 1161: 1156: 1151: 1146: 1141: 1136: 1130: 1128: 1122: 1121: 1119: 1118: 1113: 1108: 1103: 1098: 1092: 1090: 1084: 1083: 1076: 1074: 1072: 1071: 1066: 1061: 1056: 1051: 1046: 1041: 1036: 1031: 1026: 1024:Cullerin Range 1021: 1016: 1011: 1006: 1001: 996: 990: 988: 982: 981: 976: 974: 973: 966: 959: 951: 945: 944: 937: 936:External links 934: 931: 930: 916: 902: 888: 862: 838: 817: 802:"GW140-3.57MW" 790: 761: 746: 729: 715: 700: 671: 644: 643: 641: 638: 637: 636: 628: 627: 613: 610:Weather portal 599: 584: 583: 581: 578: 572: 571: 569: 567: 565: 563: 561: 559: 556: 553: 550: 547: 544: 541: 539: 535: 534: 531: 528: 525: 522: 519: 516: 513: 510: 507: 504: 501: 498: 495: 491: 490: 487: 484: 481: 478: 475: 472: 469: 466: 463: 460: 457: 454: 451: 447: 446: 443: 440: 437: 434: 431: 428: 425: 422: 419: 416: 413: 410: 407: 403: 402: 399: 396: 393: 390: 387: 384: 381: 378: 375: 372: 369: 366: 363: 350: 347: 311:for less than 301:A$ 110 million 291:and bought by 273: 272: 265: 262: 261: 248: 244: 243: 239: 238: 232: 226: 225: 219: 213: 212: 206: 200: 199: 193: 189: 188: 185: 181: 180: 177: 176: 173: 172: 168: 167: 164: 160: 159: 156: 152: 151: 148: 142: 141: 137: 136: 131: 127: 126: 110: 106: 105: 102: 98: 97: 94: 90: 89: 57: 53: 52: 50: 49: 45: 43: 39: 38: 35: 34: 26: 25: 15: 13: 10: 9: 6: 4: 3: 2: 1631: 1620: 1617: 1615: 1612: 1610: 1607: 1606: 1604: 1593: 1588: 1586: 1581: 1579: 1574: 1573: 1567: 1565: 1561: 1557: 1552: 1549: 1545: 1540: 1529: 1526: 1524: 1523: 1518: 1512: 1511: 1508: 1502: 1499: 1497: 1494: 1492: 1489: 1487: 1484: 1482: 1479: 1477: 1474: 1472: 1469: 1467: 1464: 1463: 1461: 1459: 1455: 1449: 1446: 1444: 1441: 1439: 1436: 1434: 1431: 1429: 1426: 1424: 1421: 1419: 1416: 1414: 1411: 1409: 1406: 1405: 1403: 1401: 1397: 1391: 1388: 1386: 1383: 1381: 1378: 1376: 1373: 1371: 1368: 1366: 1363: 1361: 1358: 1356: 1353: 1351: 1350:Oaklands Hill 1348: 1346: 1343: 1341: 1338: 1336: 1333: 1331: 1328: 1326: 1323: 1321: 1318: 1316: 1315:Leonards Hill 1313: 1311: 1308: 1306: 1303: 1301: 1298: 1296: 1293: 1291: 1288: 1286: 1283: 1281: 1278: 1276: 1273: 1271: 1268: 1266: 1263: 1261: 1258: 1256: 1253: 1252: 1250: 1248: 1244: 1238: 1235: 1233: 1230: 1228: 1225: 1223: 1220: 1218: 1215: 1214: 1212: 1210: 1206: 1200: 1197: 1195: 1192: 1190: 1187: 1185: 1184:Starfish Hill 1182: 1180: 1177: 1175: 1172: 1170: 1167: 1165: 1162: 1160: 1157: 1155: 1152: 1150: 1147: 1145: 1142: 1140: 1137: 1135: 1132: 1131: 1129: 1127: 1123: 1117: 1114: 1112: 1111:Mount Emerald 1109: 1107: 1104: 1102: 1099: 1097: 1094: 1093: 1091: 1089: 1085: 1080: 1070: 1067: 1065: 1062: 1060: 1057: 1055: 1052: 1050: 1047: 1045: 1042: 1040: 1037: 1035: 1032: 1030: 1027: 1025: 1022: 1020: 1017: 1015: 1012: 1010: 1007: 1005: 1002: 1000: 997: 995: 992: 991: 989: 987: 983: 979: 972: 967: 965: 960: 958: 953: 952: 949: 943: 940: 939: 935: 926: 920: 917: 912: 906: 903: 898: 892: 889: 877: 873: 866: 863: 848: 842: 839: 827: 821: 818: 803: 797: 795: 791: 776: 775:"FACTS SHEET" 770: 768: 766: 762: 757: 750: 747: 742: 736: 734: 730: 725: 719: 716: 711: 704: 701: 688: 687:Origin Energy 681: 675: 672: 659: 655: 649: 646: 639: 635: 632: 631: 625: 619: 614: 611: 605: 600: 597: 586: 579: 577: 570: 568: 566: 564: 562: 560: 557: 554: 551: 548: 545: 542: 540: 537: 536: 532: 529: 526: 523: 520: 517: 514: 511: 508: 505: 502: 499: 496: 493: 492: 488: 485: 482: 479: 476: 473: 470: 467: 464: 461: 458: 455: 452: 449: 448: 444: 441: 438: 435: 432: 429: 426: 423: 420: 417: 414: 411: 408: 405: 404: 400: 397: 394: 391: 388: 385: 382: 379: 376: 373: 370: 367: 364: 361: 360: 354: 348: 346: 344: 343:Origin Energy 339: 334: 331: 329: 325: 321: 316: 310: 306: 303:and signed a 298: 294: 293:Origin Energy 290: 285: 283: 279: 269: 263: 259: 249: 245: 240: 233: 231: 227: 220: 218: 214: 211: 207: 205: 201: 197: 194: 191: 190: 187:149 × 3.57 MW 186: 183: 182: 178: 174: 169: 165: 161: 157: 153: 149: 147: 143: 138: 135: 132: 128: 124: 119: 114: 111: 107: 103: 99: 95: 91: 86: 58: 54: 47: 46: 44: 40: 36: 32: 27: 22: 19: 1564:expanding it 1553: 1538: 1513: 1495: 1481:Goyder South 1466:Archer Point 1390:Yaloak South 1359: 1340:Mount Mercer 1330:Mortons Lane 1199:Willogoleche 1194:Wattle Point 1174:Mount Millar 1144:Clements Gap 1034:Gullen Range 919: 905: 891: 879:. Retrieved 875: 865: 853:. Retrieved 841: 829:. Retrieved 820: 808:. Retrieved 781:. Retrieved 758:. Bloomberg. 749: 718: 703: 693:20 September 691:. Retrieved 689:. 8 May 2017 674: 662:. Retrieved 657: 648: 575: 352: 335: 332: 317: 286: 277: 276: 198:GW140-3.57MW 118:Nebras Power 18: 1413:Badgingarra 1345:Murra Warra 1227:King Island 1217:Cattle Hill 1164:Lincoln Gap 1159:Lake Bonney 1096:Coopers Gap 881:16 November 236:(projected) 223:(projected) 130:Operator(s) 96:Operational 80: / 56:Coordinates 1603:Categories 1501:Warradarge 1476:Crows Nest 1471:Coppabella 1365:Salt Creek 1295:Dundonnell 1280:Codrington 1260:Bald Hills 1116:Windy Hill 1088:Queensland 1064:White Rock 1029:Glen Innes 855:19 October 831:18 October 810:19 October 783:19 October 664:18 October 640:References 497:1,625,690 453:1,404,781 349:Operations 166:140 metres 158:110 metres 68:143°15′5″E 1556:wind farm 1491:Moorabool 1423:Emu Downs 1380:Wonthaggi 1320:Macarthur 1290:Crowlands 1275:Chepstowe 1237:Woolnorth 1232:Musselroe 1154:Hornsdale 1054:Silverton 1019:Crookwell 1009:Bodangora 1004:Boco Rock 743:. Origin. 471:171,289* 456:105,442* 234:1900 GWh 65:37°32′9″S 48:Australia 1443:Walkaway 1355:Portland 1247:Victoria 1209:Tasmania 1189:Waterloo 1179:Snowtown 1069:Woodlawn 1049:Sapphire 580:See also 558:127,368 549:113,289 546:108,809 543:126,150 533:149,472 530:125,172 527:151,992 524:116,793 521:143,457 518:178,105 515:206,066 512:110,008 509:113,519 506:124,576 503:105,686 500:100,844 489:102,025 486:101,139 483:116,451 480:132,041 477:172,662 474:120,838 468:95,479* 465:99,742* 462:93,968* 459:93,705* 445:96,888* 442:69,296* 439:52,208* 436:32,661* 433:13,813* 409:307,556 338:Goldwind 324:Beaufort 322:between 320:Ballarat 196:Goldwind 109:Owner(s) 104:May 2018 1428:Mumbida 1418:Collgar 1325:Maroona 1300:Hepburn 1265:Bulgana 1149:Hallett 1134:Canunda 1106:Kennedy 1101:Dulacca 1059:Taralga 1044:Hampton 1039:Gunning 1014:Capital 999:Blayney 555:89,237 552:95,444 430:6,544* 328:Skipton 315:/MWh. 247:Website 150:Onshore 42:Country 1448:Yandin 1408:Albany 1385:Yambuk 1375:Waubra 1255:Ararat 365:Total 221:40.9% 120:(49%) 115:(49%) 93:Status 1558:is a 1370:Toora 1305:Kiata 994:Bango 850:(PDF) 805:(PDF) 778:(PDF) 683:(PDF) 538:2024 494:2023 450:2022 406:2021 362:Year 313:A$ 60 266:[ 1560:stub 883:2021 857:2021 833:2021 812:2021 785:2021 695:2019 666:2021 427:N/A 424:N/A 421:N/A 418:N/A 415:N/A 412:N/A 401:Dec 398:Nov 395:Oct 392:Sep 389:Aug 386:Jul 383:Jun 380:May 377:Apr 374:Mar 371:Feb 368:Jan 326:and 299:for 256:.com 208:530 146:Type 125:(2%) 258:.au 252:www 1605:: 874:. 793:^ 764:^ 732:^ 656:. 210:MW 1591:e 1584:t 1577:v 1566:. 970:e 963:t 956:v 927:. 913:. 899:. 885:. 859:. 835:. 814:. 787:. 712:. 697:. 668:. 270:]

Index


37°32′9″S 143°15′5″E / 37.53583°S 143.25139°E / -37.53583; 143.25139
Palisade Investment Partners Limited
Nebras Power
Goldwind Australia
Goldwind Australia
Type
Goldwind
Nameplate capacity
MW
Capacity factor
Annual net output
www.stockyardhillwindfarm.com.au
edit on Wikidata
Victoria (Australia)
Windpower Australia
Origin Energy
Goldwind Australia
power purchase agreement
Renewable Energy Certificates
Ballarat
Beaufort
Skipton
Goldwind
Origin Energy
Australia portal
icon
Weather portal
icon
Renewable energy portal

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.