148:, which established the company on 1 October 1946. All municipalities in Vágar, all in Eysturoy except for Sjóvar municipality and all municipalities in Streymoy except for Tórshavn, Kvívík and Kollafjørður met at the first establishing meeting. Later all municipalities in the Faroe Islands joined SEV. In 2015 60% of the produced electricity of SEV came from green energy sources, 17,8% came from the windmills in Neshagi and Húsahagi, 42,3% came was hydropower.
370:
202:
As of 1 January 2016, 60% of total electricity produced in the Faroe
Islands was generated by hydro or wind power, with 65% of the generated electricity before 21 June 2015 coming from renewables, this is an increase of 15% compared to the same period the year before, while at the same time
349:
The board of SEV consists of seven members. Since 2007, CEO of the company is Hákun
Djurhuus. Before that, Hjalgrím Winther (1953–1983) and Klæmint Weihe (1983–2007) served as CEO of the company. President of the board is Jákup Suni Lauritsen since November 2011. Before that
231:
SEV's oil consumption decreased by 4,100 tonnes over the period
January to June 2015, compared to the same period in 2014. Electricity production from oil decreased by 26.6% for the first half of 2015, compared to the same period last year.
217:. In 2005, the number of operational wind turbines increased up to three. In addition, in 2003 SEV also signed a 10 years agreement to buy electricity from Sp/f Røkt, which operates three wind turbines in Mýrunum above
325:
V47 turbines were put up in
Neshagi in 2005, but in the winter 2011/2012 two of them were wrecked during a storm and it was decided to take the last one down, two ENERCON E44 turbines were put up in their place.
851:
180:
and mayor of
Vestmanna was the first president of SEV. By 1963, all Faroe's municipalities had been join the company and transferred their own power production capacities to SEV.
199:)was used to recreate balance in an island power system by decoupling large industrial units in less than a second from the main power system, thereby avoiding blackouts.
270:
project in Nípan. Although SEV does not have the electricity distribution monopoly by law, it is the only company who supplies electricity on the Faroe
Islands.
856:
228:
have a total production capacity of 11.7 MW, generating annually some 41 GWh. The windmills produce about 23% of the electricity of the Faroe
Islands.
203:
electricity consumption has increased overall 5%. As the year ended it was revealed that 60% of consumed electricity in 2015 came from renewables.
519:
307:, these five are not connected to the main grid and only supply the individual islands and communities. None having engines exceeding 80 kW.
393:
209:
SEV is also developing other sources of renewable energy. In 1993, the company started to research wind energy with the establishment of a
318:. The company Røkt owns 3 Vestas V47(660 kW) turbines in Vestmanna, however SEV buys and distributes the power produced there.
762:
184:
27:
544:
565:
176:
and was attended by representatives from 19 municipalities from
Streymoy, Eysturoy and Vágar. Gunnar Dahl Olsen who was
457:
244:
206:
SEV has exclusive rights to produce hydroelectricity and it operates nine large and seven smaller hydro electric plants.
681:
388:
341:
in the Faroe
Islands in 2022, joined in February 2024 by a larger 1.2 MW Dragon 12, all powering the Faroese grid.
156:
812:
383:
494:
351:
635:
415:
589:
281:
SEV owns and operates 13 various power plants, of these, 3 are thermal, the Strond-, Sund- and Vágur plants.
337:
for installing paravane-based electricity generation. Two 100 kW Dragon 4 turbines were installed at
330:
292:
284:
6 are
Hydroelectric, the Strond-, Eiðis-, Fossá-, Mýru- and Heyga plants, as well as the plant in Botni.
224:
The windfarm in Húshagi, came officially online on 9 October 2014. The 13 wind turbines on Húsahaga from
472:
375:
236:
195:
In November 2012 the Faroe Islands became the first place in the world where a virtual power plant (
273:
SEV has been setting a target of the islands being 100% supplied by renewable electricity by 2030.
248:
251:. In co-operation with the municipality of Vestmanna, SEV investigates possibilities to develop a
161:
304:
747:
37:
845:
133:
78:
210:
786:
354:
was the president of the board, but he had to resign when he was elected for the
260:
252:
173:
72:
449:
287:
In addition to these there are five smaller thermal plants providing power for
365:
355:
177:
165:
685:
338:
267:
240:
218:
26:
300:
315:
311:
145:
141:
137:
699:
659:
613:
498:
221:. In 2012 five Enercon winturbines were set up in Neshagi and running.
172:
SEV was founded on 1 October 1946. The foundation meeting took place in
723:
334:
256:
225:
419:
322:
296:
288:
264:
214:
787:"28-ton, 1.2-megawatt tidal kite is now exporting power to the grid"
520:"Nordic Council Nature and Environment Prize to energy company SEV"
763:"Minesto starts commissioning second 'Dragon 4' tidal power plant"
155:
91:
Hákun Djurhuus, CEO, Jákup Suni Lauritsen, president of the board
310:
SEV has 5 ENERCON E44(900 kW) wind turbines in Neshagi, on
196:
160:
The first hydroelectric powerplant of the Faroe Islands,
136:. The company name is derived from the names of islands
836:
813:"Jákup Suni Lauritsen nýggjur nevndarformaður í SEV"
116:
111:
103:
95:
85:
67:
59:
51:
43:
33:
16:
Power producer and distributor on the Faroe Islands
63:Municipalities of 3 islands of the Faroe Islands
239:, and the authorities in the Faroe Islands and
852:Electric power companies of the Faroe Islands
444:
442:
440:
438:
436:
8:
19:
132:is a power producer and distributor on the
566:"65% green electricity first half of 2015"
410:
408:
25:
18:
314:and 13 ENERCON E44 turbines in Húsahagi,
539:
537:
404:
168:in 1921. It is owned by SEV since 1963.
107:All municipalities of the Faroe Islands
560:
558:
394:List of companies of the Faroe Islands
329:SEV has formed agreement with Swedish
460:from the original on 6 February 2021.
183:In 2015, the company was awarded the
7:
857:Danish companies established in 1946
660:"Týdningarmikið stig á grønu kósini"
590:"Elorkan var 60 prosent grøn í 2015"
545:"Elorkan var 60 prosent grøn í 2015"
416:"SEV - The Faroese Electric Company"
245:North Atlantic Hydrogen Association
748:"Faroes to fly Minesto tidal kite"
471:Rana, Hallur av (5 January 2016).
14:
636:"Húsahagi – An Important Project"
522:. Nordic Council. 27 October 2015
473:"60 prosent av elorkuni var grøn"
475:(in Faroese). in.fo (Sosialurin)
368:
185:Nordic Council Environment Prize
811:Klein, Dan (14 November 2011).
761:Garanovic, Amir (2022-09-07).
1:
389:Economy of the Faroe Islands
815:(in Faroese). Oyggjatíðindi
384:Energy in the Faroe Islands
873:
724:"Elfelagið SEV - Vindorka"
418:. Randburg. Archived from
263:company, SEV develops the
614:"Wind turbine at Neshaga"
24:
164:, was built in Botni in
255:system. Together with
169:
497:. SEV. Archived from
259:, a Scottish leading
243:have established the
159:
376:Faroe Islands portal
237:Icelandic New Energy
750:. 12 November 2018.
249:hydrogen technology
21:
700:"The Power Plants"
213:in Neshagi, above
170:
162:Botnur power plant
662:(in Faroese). SEV
352:Páll á Reynatúgvu
127:
126:
864:
825:
824:
822:
820:
808:
802:
801:
799:
798:
783:
777:
776:
774:
773:
758:
752:
751:
744:
738:
737:
735:
734:
720:
714:
713:
711:
710:
696:
690:
689:
684:. Archived from
678:
672:
671:
669:
667:
656:
650:
649:
647:
646:
632:
626:
625:
623:
621:
610:
604:
603:
601:
600:
586:
580:
579:
577:
576:
562:
553:
552:
541:
532:
531:
529:
527:
516:
510:
509:
507:
506:
491:
485:
484:
482:
480:
468:
462:
461:
446:
431:
430:
428:
427:
412:
378:
373:
372:
371:
123:
120:
118:
47:power generation
29:
22:
872:
871:
867:
866:
865:
863:
862:
861:
842:
841:
837:Company website
833:
828:
818:
816:
810:
809:
805:
796:
794:
785:
784:
780:
771:
769:
767:Offshore Energy
760:
759:
755:
746:
745:
741:
732:
730:
722:
721:
717:
708:
706:
698:
697:
693:
680:
679:
675:
665:
663:
658:
657:
653:
644:
642:
634:
633:
629:
619:
617:
612:
611:
607:
598:
596:
588:
587:
583:
574:
572:
564:
563:
556:
543:
542:
535:
525:
523:
518:
517:
513:
504:
502:
501:on 4 March 2016
495:"SEV's History"
493:
492:
488:
478:
476:
470:
469:
465:
448:
447:
434:
425:
423:
414:
413:
406:
402:
374:
369:
367:
364:
347:
279:
247:to investigate
193:
154:
115:
88:
81:
75:
17:
12:
11:
5:
870:
868:
860:
859:
854:
844:
843:
840:
839:
832:
831:External links
829:
827:
826:
803:
778:
753:
739:
715:
691:
688:on 2009-02-26.
673:
651:
627:
605:
581:
554:
533:
511:
486:
463:
432:
403:
401:
398:
397:
396:
391:
386:
380:
379:
363:
360:
346:
343:
278:
275:
192:
189:
153:
150:
125:
124:
113:
109:
108:
105:
101:
100:
99:electric power
97:
93:
92:
89:
86:
83:
82:
77:
71:
69:
65:
64:
61:
57:
56:
53:
49:
48:
45:
41:
40:
35:
31:
30:
15:
13:
10:
9:
6:
4:
3:
2:
869:
858:
855:
853:
850:
849:
847:
838:
835:
834:
830:
814:
807:
804:
792:
788:
782:
779:
768:
764:
757:
754:
749:
743:
740:
729:
725:
719:
716:
705:
701:
695:
692:
687:
683:
677:
674:
661:
655:
652:
641:
637:
631:
628:
615:
609:
606:
595:
591:
585:
582:
571:
567:
561:
559:
555:
550:
546:
540:
538:
534:
521:
515:
512:
500:
496:
490:
487:
474:
467:
464:
459:
455:
451:
445:
443:
441:
439:
437:
433:
422:on 1997-03-27
421:
417:
411:
409:
405:
399:
395:
392:
390:
387:
385:
382:
381:
377:
366:
361:
359:
357:
353:
344:
342:
340:
339:Vestmannasund
336:
332:
327:
324:
319:
317:
313:
308:
306:
302:
298:
294:
290:
285:
282:
276:
274:
271:
269:
266:
262:
258:
254:
250:
246:
242:
238:
233:
229:
227:
222:
220:
216:
212:
207:
204:
200:
198:
190:
188:
186:
181:
179:
175:
167:
163:
158:
151:
149:
147:
143:
139:
135:
134:Faroe Islands
131:
122:
114:
110:
106:
102:
98:
94:
90:
84:
80:
79:Faroe Islands
74:
70:
66:
62:
58:
54:
50:
46:
42:
39:
36:
32:
28:
23:
817:. Retrieved
806:
795:. Retrieved
793:. 2024-02-12
790:
781:
770:. Retrieved
766:
756:
742:
731:. Retrieved
727:
718:
707:. Retrieved
703:
694:
686:the original
682:"SeWave Ltd"
676:
664:. Retrieved
654:
643:. Retrieved
639:
630:
618:. Retrieved
608:
597:. Retrieved
593:
584:
573:. Retrieved
569:
548:
524:. Retrieved
514:
503:. Retrieved
499:the original
489:
477:. Retrieved
466:
453:
424:. Retrieved
420:the original
348:
328:
320:
309:
286:
283:
280:
277:Power plants
272:
234:
230:
223:
211:wind turbine
208:
205:
201:
194:
182:
171:
129:
128:
68:Headquarters
34:Company type
305:Stóru Dímun
261:wave energy
253:solar power
846:Categories
819:27 October
797:2024-02-12
772:2024-01-01
733:2016-01-05
728:www.sev.fo
709:2016-01-05
704:www.sev.fo
666:1 November
645:2016-01-04
640:www.sev.fo
620:1 November
599:2016-01-06
594:www.sev.fo
575:2016-01-04
570:www.sev.fo
549:www.sev.fo
526:1 November
505:2015-10-28
454:www.sev.fo
426:2008-02-13
400:References
345:Management
331:tidal-kite
191:Activities
178:sysselmann
87:Key people
791:New Atlas
479:6 January
450:"History"
268:wave farm
241:Greenland
219:Vestmanna
197:Power Hub
458:Archived
362:See also
316:Streymoy
312:Eysturoy
174:Tórshavn
142:Eysturoy
138:Streymoy
96:Products
73:Tórshavn
44:Industry
356:Løgting
335:Minesto
293:Mykines
257:Wavegen
226:ENERCON
166:Suðuroy
152:History
112:Website
60:Founder
52:Founded
323:Vestas
321:Three
301:Skúvoy
297:Koltur
289:Fugloy
265:SeWave
215:Toftir
616:. SEV
333:firm
235:SEV,
146:Vágar
104:Owner
821:2015
668:2015
622:2015
528:2015
481:2016
303:and
144:and
119:.sev
55:1946
130:SEV
121:.fo
117:www
38:ApS
20:SEV
848::
789:.
765:.
726:.
702:.
638:.
592:.
568:.
557:^
547:.
536:^
456:.
452:.
435:^
407:^
358:.
299:,
295:,
291:,
187:.
140:,
76:,
823:.
800:.
775:.
736:.
712:.
670:.
648:.
624:.
602:.
578:.
551:.
530:.
508:.
483:.
429:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.