216:-led consortium built a power station equipped with three turbines, heat recovery steam generators and ancillary power generation equipment. The first stage cost about US$ 850 million. The first unit came into operation in July 2001. The other two units were completed in August 2003. The contract for construction of the second stage was awarded to a consortium led by
251:
The power station is connected to the 380 kV grid. The potable water is transferred via an 80 kilometres (50 mi) long water pipeline to the national water pipeline network. The power station provides the desalination facility with steam to heat the seawater distillers while reducing its own
243:
After completing the third stage the power station consists of 14 units with a total capacity of 5,600 MW, which makes it one of the largest fossil fuel-fired power stations in the world. The last expansion was built by Alstom and is operational since 2012. The oil for power production is
211:
The construction of the first plant 1 of the
Shoaiba power station began in 1985 and second plant 2 1995 (although there was a power generation and saline desalination plant in operation at the site as far back as 1985 with commissioning support from Stuttgart-based Fichtner Consulting Engineers).
235:. The desalination plant of shoiaba phase 1 and phase 2 has a capacity of 76800 tons/day. 2017 awarded ph4 ro plant to doosan, started full production on 2020 February 384000 m3 per day.currently all three plants director Eng Abdur rahman al aofi.
277:
377:
367:
285:
56:
372:
260:
The
Shoaiba power station Saline Water Conversion Corporation is aided by the kingdom of Saudi Arabia and is monitored by the power and water ministry.
306:
281:
221:
203:. It is one of the world's largest fossil fuel power plants, and the world's third largest integrated water and power plant.
188:
228:
88:
278:"Milbank Makes it a One, Two, Three by Advising on Fujairah F2 IWPP, the World's Second Largest IWPP"
17:
329:
224:
161:
129:
361:
343:
351:
245:
192:
44:
319:
71:
58:
337:
213:
122:
173:
232:
196:
217:
200:
307:
Alstom: Alstom completes
Shoaiba III power plant ahead of schedule
160:
139:
128:
118:
113:
105:
97:
87:
50:
40:
31:
199:, about 120 kilometres (75 mi) south of
8:
378:Water supply and sanitation in Saudi Arabia
352:Shoaiba Oil Fired Power Plant, Saudi Arabia
28:
368:Oil-fired power stations in Saudi Arabia
269:
7:
185:Shoaiba power and desalination plant
32:Shoaiba power and desalination plant
18:Shoaiba power and desalination plant
282:Milbank, Tweed, Hadley & McCloy
109:Saudi Consolidated Electric Company
101:Saudi Consolidated Electric Company
284:. 18 December 2007. Archived from
191:power and desalination complex in
25:
373:Integrated water and power plants
336:
322:
227:plant was built by Hanjung (now
114:Thermal power station
222:multi-stage flash distillation
1:
394:
189:combined cycle gas turbine
170:
148:
144:
36:
229:Doosan Heavy Industries
162:Nameplate capacity
72:20.680084°N 39.523233°E
231:) in partnership with
153:Units operational
140:Power generation
89:Commission date
77:20.680084; 39.523233
330:Saudi Arabia portal
130:Combined cycle
68: /
354:. Power Technology
288:on 28 January 2013
239:Technical features
225:water desalination
280:(Press release).
256:Operating company
252:cooling demands.
187:is an oil-fired,
181:
180:
119:Primary fuel
16:(Redirected from
385:
346:
341:
340:
332:
327:
326:
325:
309:
304:
298:
297:
295:
293:
274:
195:on the coast of
174:edit on Wikidata
83:
82:
80:
79:
78:
73:
69:
66:
65:
64:
61:
29:
21:
393:
392:
388:
387:
386:
384:
383:
382:
358:
357:
342:
335:
328:
323:
321:
318:
313:
312:
305:
301:
291:
289:
276:
275:
271:
266:
258:
241:
209:
177:
76:
74:
70:
67:
62:
59:
57:
55:
54:
23:
22:
15:
12:
11:
5:
391:
389:
381:
380:
375:
370:
360:
359:
356:
355:
348:
347:
333:
317:
316:External links
314:
311:
310:
299:
268:
267:
265:
262:
257:
254:
244:supplied from
240:
237:
208:
205:
179:
178:
171:
168:
167:
164:
158:
157:
154:
150:
149:
146:
145:
142:
141:
137:
136:
133:
126:
125:
120:
116:
115:
111:
110:
107:
103:
102:
99:
95:
94:
91:
85:
84:
52:
48:
47:
42:
38:
37:
34:
33:
24:
14:
13:
10:
9:
6:
4:
3:
2:
390:
379:
376:
374:
371:
369:
366:
365:
363:
353:
350:
349:
345:
344:Energy portal
339:
334:
331:
320:
315:
308:
303:
300:
287:
283:
279:
273:
270:
263:
261:
255:
253:
249:
247:
238:
236:
234:
230:
226:
223:
219:
215:
206:
204:
202:
198:
194:
190:
186:
175:
169:
166:5,600 MW
165:
163:
159:
155:
152:
151:
147:
143:
138:
134:
131:
127:
124:
121:
117:
112:
108:
104:
100:
96:
93:February 2014
92:
90:
86:
81:
53:
49:
46:
43:
39:
35:
30:
27:
19:
302:
290:. Retrieved
286:the original
272:
259:
250:
248:by tankers.
246:Saudi Aramco
242:
218:Alstom Power
210:
193:Saudi Arabia
184:
182:
45:Saudi Arabia
26:
106:Operator(s)
75: /
51:Coordinates
362:Categories
292:23 October
264:References
63:39°31′24″E
60:20°40′48″N
123:Fuel oil
98:Owner(s)
233:Bechtel
207:History
197:Red Sea
41:Country
201:Jeddah
172:[
294:2010
220:. A
212:The
183:The
214:ABB
135:Yes
364::
156:14
296:.
176:]
132:?
20:)
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.