31: 230:. When completed, the SRTC will allow integrated systems testing for different trains and rail systems simultaneously, avoiding the need to conduct tests on operational lines. The testing facility, designed by the Korea Railroad Research Institute, will include an operations control centre, testing equipment and a rolling stock workshop. The SRTC will have 11 kilometres (6.8 mi) of track, which will be compatible with various types of signalling systems and will be powered by both 750V direct-current 130: 259:ā€™s Green Mark Platinum certification, the SRTC will include energy-efficient features such as LED lights, solar panels and a centralised cooling system. The facility includes bicycle parking facilities and sheltered linkways between various buildings to promote walking and cycling within the facility. As a shared testing and maintenance centre, the SRTC also aims for LTA engineers to collaborate with train operators and equipment manufacturers to improve rail capabilities in Singapore. 979: 923: 935: 217:
On 1 November 2022, the rolling stock test and research facility for the ITTC were 50% completed, with trackwork for the high-speed test track nearly completed. The other facilities, including the operations control centre and the administration building, are expected to be completed in 2023. In
205:
Contract 190 for the design and construction of the ITTC was awarded to GS Engineering and Construction Corp (GS Engineering) on 17 April 2020 for S$ 639.5 million (US$ 468.8 million). On 17 March 2021, construction of the ITTC began with a groundbreaking ceremony. The testing centre is to be
201:
on 24 April 2019. Hailing it as a "worthwhile investment" expected to cost a few hundred million dollars, Khaw said that the ITTC will allow "robust" testing of new railway systems without the need to close MRT lines. According to Khaw, such a facility would allow officials to develop deeper
318: 170:
The entrance/exit of Singapore Rail Test Centre is accessible from both Jalan Ahmad Ibrahim as well as 2 Wrexham Road (Wrexham Road's short intersection is public access, it has a locked gate and the suspension bridge to the SAFTI Live Firing Area).
868: 310: 580: 30: 421: 805: 348: 860: 621: 550: 210:
trains to be tested in 2023. The ITTC was originally expected to be completed by the end of 2024, with the construction of two additional test tracks and other facilities. However, due to the
519: 288: 1031: 1475: 643: 572: 178:
on 24 April 2019, and construction began with a groundbreaking ceremony on 17 March 2021. The testing facility was expected to be completed in phases from 2022 to 2024; because of the
1480: 1470: 1450: 452: 967: 1525: 413: 1435: 780: 1053: 1541: 1379: 1372: 340: 1070: 248:
A 3 km (1.9 mi) straight high-speed track with minimal curvature and gradient that enables speed testing of up to 100 kilometres per hour (62 mph).
1563: 1065: 613: 1410: 669: 1395: 542: 227: 834: 960: 945: 1058: 218:
2023, the ITTC was renamed the Singapore Rail Test Centre (SRTC). The first phase of the SRTC was completed and opened on 2 November of that year.
1770: 511: 311:"Speech by Minister Khaw Boon Wan at the visit to SMRTs New North-South and East-West Line NSEWL Operations Control Centre OCC at Kim Chuan Depot" 280: 753: 1388: 485: 730: 896: 953: 182:, the opening of the first phase was delayed to November 2023. When fully operational in 2025, the SRTC will be the first such facility in 444: 206:
constructed in two phases. The first phase, which includes the high-speed track, was planned to be completed by the end of 2022, allowing
186:, featuring sophisticated workshops, an operations control centre, an administration building and three types of tracks for safety tests. 1240: 1087: 705: 256: 901: 1535: 1075: 226:
The SRTC is constructed on the former site of the Raffles Country Club in Tuas, which was originally acquired for the now-cancelled
195: 1530: 806:"Speech by Acting Minister For Transport Mr Chee Hong Tat on the Completion of the First Phase of the Singapore Rail Test Centre" 381: 1178: 1171: 1520: 1425: 1025: 1021: 1015: 1011: 1006: 194:
The Singapore Rail Test Centre (SRTC), initially named Integrated Train Testing Centre (ITTC), was first announced by then
906: 913: 1765: 1638: 1455: 983: 614:"News Room ā€“ News Releases ā€“ Factsheet: Singapore's Integrated Train Testing Centre to be Fully Operational in 2024" 1627: 1503: 1326: 1108: 1101: 739: 1734: 1729: 1602: 1558: 1490: 1465: 1460: 1440: 1305: 245:
A looped 4.8 km (3.0 mi) S-curved performance and integration track for testing of train dynamics.
1122: 1115: 1744: 1739: 1724: 1445: 1257: 1250: 1193: 1186: 573:"Speech by Minister for Transport Mr Ong Ye Kung at Groundbreaking of the Integrated Train Testing Centre" 1209: 1202: 129: 242:
A looped 3 km (1.9 mi) endurance track with a 3% maximum gradient for performance testing.
1136: 1129: 1496: 159:, the 50 ha (120-acre) SRTC will be used to test new rolling stock and rail systems for the 477: 1652: 1485: 1271: 1264: 1164: 1157: 341:"News Room ā€“ News Releases ā€“ New Integrated Train Testing Centre for Greater Rail Reliability" 235: 211: 179: 1701: 1592: 1331: 1285: 1278: 927: 781:"High-speed MRT test track at $ 640m facility completed amid 'unprecedented' rail expansion" 1617: 1612: 1310: 1226: 1150: 1143: 207: 214:
at the time, the scheduled completion dates were pushed to 2023 and 2025, respectively.
1607: 183: 164: 370: 1759: 1689: 1364: 1357: 1046: 939: 198: 160: 1645: 1632: 1597: 1587: 1430: 1706: 1694: 512:"S'pore begins construction on $ 640m three-track train testing centre in Tuas" 251:
Stabling and maintenance tracks for any major refurbishment of existing trains.
1622: 231: 156: 978: 670:"$ 640m train testing centre delayed by a year, first phase to open in 2023" 152: 53: 644:"Deepening Capabilities for Developing and Operating Train Testing Centres" 155:. Constructed on the former site of the Raffles Country Club and opposite 414:"LTA Awards Civil Contract to Construct Integrated Train Testing Centre" 371:"Contract 190 ā€“ Land Transport Authority ā€“ Schedule of tenders received" 1041: 281:"New rail facility in Tuas aims to reduce MRT line testing closures" 934: 1036: 445:"South Korean firm to build first MRT testing centre for $ 640m" 148: 49: 35:
Construction site of the Singapore Rail Test Centre, in May 2022
949: 835:"5 reasons the SRTC is breaking barriers to rail reliability" 754:"Completion of First Phase of the Singapore Rail Test Centre" 706:"Singapore's Integrated Train Testing Centre makes progress" 543:"MRT train testing facility to be fully operational by 2024" 608: 606: 604: 602: 600: 598: 478:"GS E&C inks deal to build ITTC in Singapore by 2024" 911: 993:
Italicized entries are planned or under construction
1717: 1682: 1662: 1576: 1551: 1513: 1418: 1409: 1344: 1319: 1294: 1239: 1219: 1086: 999: 861:"ģƒģ„ø > ė³“ė„ģžė£Œ > ė‰“ģŠ¤Ā·ķ–‰ģ‚¬ > KRRIģ†Œģ‹ >ķ•œźµ­ģ² ė„źø°ģˆ ģ—°źµ¬ģ›" 408: 406: 404: 402: 109: 104: 72: 67: 59: 45: 40: 23: 472: 470: 202:expertise in railway operations and maintenance. 829: 827: 961: 699: 697: 695: 693: 691: 505: 503: 8: 1580: 1415: 1380:Johor Bahruā€“Singapore Rapid Transit System 1348: 1298: 1092: 968: 954: 946: 274: 272: 118: 29: 147:(SRTC) is a railway testing facility in 918: 268: 120: 1396:Kuala Lumpurā€“Singapore high-speed rail 228:Kuala Lumpurā€“Singapore high-speed rail 167:features in its design and operation. 20: 18:Railway testing facility in Singapore 7: 174:The SRTC was first announced as the 257:Building and Construction Authority 871:from the original on 21 March 2021 624:from the original on 21 March 2021 583:from the original on 21 March 2021 553:from the original on 21 March 2021 522:from the original on 21 March 2021 488:from the original on 21 March 2021 455:from the original on 21 March 2021 443:Tan, Christopher (17 April 2020). 424:from the original on 21 March 2021 387:from the original on 21 March 2021 351:from the original on 21 March 2021 321:from the original on 21 March 2021 291:from the original on 21 March 2021 279:Tan, Christopher (24 April 2019). 14: 1076:Public Transport Security Command 163:network. It incorporates several 977: 933: 921: 897:LTA official website of the SRTC 704:Smith, Kevin (1 November 2022). 128: 779:Kok, Yufeng (2 November 2023). 176:Integrated Train Testing Centre 1771:Mass Rapid Transit (Singapore) 907:Artist impressions of the SRTC 345:Land Transport Authority (LTA) 1: 710:International Railway Journal 510:Yufeng, Kok (18 March 2021). 1735:2016 Pasir Ris rail accident 1730:2004 Nicoll Highway collapse 91:; 1 year's time 1745:2017 Joo Koon rail accident 1740:2017 Bishan tunnel flooding 1725:1993 Clementi rail accident 984:Rail transport in Singapore 810:Ministry of Transport (MOT) 541:Co, Cindy (17 March 2021). 315:Ministry of Transport (MOT) 238:. The tracks will include: 234:and 25kV alternate current 1787: 1670:Singapore Rail Test Centre 145:Singapore Rail Test Centre 24:Singapore Rail Test Centre 1583: 1351: 1327:Jurong Bird Park Panorail 1301: 1095: 990: 732:LTA Annual Report 2022/23 117: 28: 740:Land Transport Authority 255:Intended to achieve the 113:11 km (6.8 mi) 1306:Changi Airport Skytrain 1179:Thomsonā€“East Coast Line 78:; 10 months ago 902:Site plan of the SRTC 87:(partial completion) 76:2 November 2023 1766:Railway test tracks 1032:Fares and ticketing 208:Circle line Stage 6 122:Map of the facility 1365:KTM Tebrau Shuttle 1194:Jurong Region Line 841:. 24 November 2023 196:Transport Minister 1753: 1752: 1678: 1677: 1603:Ten Mile Junction 1572: 1571: 1405: 1404: 1340: 1339: 1258:Bukit Panjang LRT 1235: 1234: 1210:Cross Island Line 812:. 2 November 2023 785:The Straits Times 760:. 2 November 2023 676:. 4 November 2022 674:The Straits Times 650:. 4 November 2022 620:. 17 March 2021. 579:. 17 March 2021. 516:The Straits Times 484:. 21 April 2020. 449:The Straits Times 420:. 17 April 2020. 347:. 24 April 2019. 317:. 24 April 2019. 285:The Straits Times 236:overhead catenary 212:COVID-19 pandemic 180:COVID-19 pandemic 141: 140: 137: 136: 100:(fully completed) 1778: 1702:SMRT Corporation 1581: 1564:Hitachi Monorail 1416: 1394: 1391: 1378: 1375: 1363: 1360: 1349: 1332:Sentosa Monorail 1299: 1284: 1281: 1270: 1267: 1256: 1253: 1208: 1205: 1192: 1189: 1177: 1174: 1163: 1160: 1149: 1146: 1135: 1132: 1121: 1118: 1109:Northā€“South Line 1107: 1104: 1093: 982: 981: 970: 963: 956: 947: 938: 937: 926: 925: 924: 917: 881: 880: 878: 876: 857: 851: 850: 848: 846: 831: 822: 821: 819: 817: 802: 796: 795: 793: 791: 776: 770: 769: 767: 765: 750: 744: 743: 737: 727: 721: 720: 718: 716: 701: 686: 685: 683: 681: 666: 660: 659: 657: 655: 640: 634: 633: 631: 629: 610: 593: 592: 590: 588: 569: 563: 562: 560: 558: 538: 532: 531: 529: 527: 507: 498: 497: 495: 493: 474: 465: 464: 462: 460: 440: 434: 433: 431: 429: 410: 397: 396: 394: 392: 386: 375: 367: 361: 360: 358: 356: 337: 331: 330: 328: 326: 307: 301: 300: 298: 296: 276: 132: 119: 99: 97: 92: 86: 84: 79: 33: 21: 1786: 1785: 1781: 1780: 1779: 1777: 1776: 1775: 1756: 1755: 1754: 1749: 1718:Major incidents 1713: 1674: 1658: 1568: 1547: 1509: 1401: 1389: 1386: 1373: 1370: 1358: 1355: 1336: 1315: 1311:Sentosa Express 1290: 1279: 1276: 1265: 1262: 1251: 1248: 1231: 1215: 1203: 1200: 1187: 1184: 1172: 1169: 1158: 1155: 1144: 1141: 1137:North East Line 1130: 1127: 1116: 1113: 1102: 1099: 1082: 995: 986: 976: 974: 944: 932: 922: 920: 912: 893: 887: 885: 884: 874: 872: 859: 858: 854: 844: 842: 833: 832: 825: 815: 813: 804: 803: 799: 789: 787: 778: 777: 773: 763: 761: 752: 751: 747: 735: 729: 728: 724: 714: 712: 703: 702: 689: 679: 677: 668: 667: 663: 653: 651: 642: 641: 637: 627: 625: 612: 611: 596: 586: 584: 571: 570: 566: 556: 554: 540: 539: 535: 525: 523: 509: 508: 501: 491: 489: 482:The Korea Times 476: 475: 468: 458: 456: 442: 441: 437: 427: 425: 412: 411: 400: 390: 388: 384: 373: 369: 368: 364: 354: 352: 339: 338: 334: 324: 322: 309: 308: 304: 294: 292: 278: 277: 270: 265: 224: 192: 95: 93: 90: 88: 82: 80: 77: 73:Began operation 36: 19: 12: 11: 5: 1784: 1782: 1774: 1773: 1768: 1758: 1757: 1751: 1750: 1748: 1747: 1742: 1737: 1732: 1727: 1721: 1719: 1715: 1714: 1712: 1711: 1710: 1709: 1699: 1698: 1697: 1686: 1684: 1680: 1679: 1676: 1675: 1673: 1672: 1666: 1664: 1660: 1659: 1657: 1656: 1649: 1642: 1635: 1630: 1625: 1620: 1615: 1610: 1605: 1600: 1595: 1590: 1584: 1578: 1574: 1573: 1570: 1569: 1567: 1566: 1561: 1555: 1553: 1549: 1548: 1546: 1545: 1538: 1533: 1528: 1523: 1517: 1515: 1511: 1510: 1508: 1507: 1500: 1493: 1488: 1483: 1478: 1473: 1468: 1463: 1458: 1453: 1448: 1443: 1438: 1433: 1428: 1422: 1420: 1413: 1407: 1406: 1403: 1402: 1400: 1399: 1383: 1367: 1352: 1346: 1342: 1341: 1338: 1337: 1335: 1334: 1329: 1323: 1321: 1317: 1316: 1314: 1313: 1308: 1302: 1296: 1292: 1291: 1289: 1288: 1274: 1260: 1245: 1243: 1237: 1236: 1233: 1232: 1230: 1229: 1223: 1221: 1217: 1216: 1214: 1213: 1197: 1181: 1167: 1153: 1139: 1125: 1123:Eastā€“West Line 1111: 1096: 1090: 1084: 1083: 1081: 1080: 1079: 1078: 1068: 1063: 1062: 1061: 1051: 1050: 1049: 1044: 1039: 1029: 1019: 1009: 1003: 1001: 997: 996: 991: 988: 987: 975: 973: 972: 965: 958: 950: 943: 942: 930: 910: 909: 904: 899: 892: 891:External links 889: 883: 882: 852: 823: 797: 771: 745: 722: 687: 661: 635: 594: 564: 533: 499: 466: 435: 398: 362: 332: 302: 267: 266: 264: 261: 253: 252: 249: 246: 243: 223: 220: 191: 188: 184:Southeast Asia 165:green building 139: 138: 135: 134: 124: 123: 115: 114: 111: 107: 106: 102: 101: 74: 70: 69: 65: 64: 61: 57: 56: 47: 43: 42: 38: 37: 34: 26: 25: 17: 13: 10: 9: 6: 4: 3: 2: 1783: 1772: 1769: 1767: 1764: 1763: 1761: 1746: 1743: 1741: 1738: 1736: 1733: 1731: 1728: 1726: 1723: 1722: 1720: 1716: 1708: 1705: 1704: 1703: 1700: 1696: 1693: 1692: 1691: 1690:ComfortDelGro 1688: 1687: 1685: 1681: 1671: 1668: 1667: 1665: 1661: 1655: 1654: 1650: 1648: 1647: 1643: 1641: 1640: 1636: 1634: 1631: 1629: 1626: 1624: 1621: 1619: 1616: 1614: 1611: 1609: 1606: 1604: 1601: 1599: 1596: 1594: 1591: 1589: 1586: 1585: 1582: 1579: 1575: 1565: 1562: 1560: 1559:Crystal Mover 1557: 1556: 1554: 1550: 1544: 1543: 1539: 1537: 1534: 1532: 1529: 1527: 1524: 1522: 1519: 1518: 1516: 1512: 1506: 1505: 1501: 1499: 1498: 1494: 1492: 1489: 1487: 1484: 1482: 1479: 1477: 1474: 1472: 1469: 1467: 1464: 1462: 1459: 1457: 1454: 1452: 1449: 1447: 1444: 1442: 1439: 1437: 1434: 1432: 1429: 1427: 1424: 1423: 1421: 1417: 1414: 1412: 1411:Rolling stock 1408: 1398: 1397: 1392: 1384: 1382: 1381: 1376: 1368: 1366: 1361: 1354: 1353: 1350: 1347: 1343: 1333: 1330: 1328: 1325: 1324: 1322: 1318: 1312: 1309: 1307: 1304: 1303: 1300: 1297: 1293: 1287: 1282: 1275: 1273: 1268: 1261: 1259: 1254: 1247: 1246: 1244: 1242: 1238: 1228: 1225: 1224: 1222: 1218: 1212: 1211: 1206: 1198: 1196: 1195: 1190: 1182: 1180: 1175: 1168: 1166: 1165:Downtown Line 1161: 1154: 1152: 1147: 1140: 1138: 1133: 1126: 1124: 1119: 1112: 1110: 1105: 1098: 1097: 1094: 1091: 1089: 1085: 1077: 1074: 1073: 1072: 1069: 1067: 1064: 1060: 1057: 1056: 1055: 1052: 1048: 1047:NETS FlashPay 1045: 1043: 1040: 1038: 1035: 1034: 1033: 1030: 1027: 1023: 1020: 1017: 1013: 1010: 1008: 1005: 1004: 1002: 998: 994: 989: 985: 980: 971: 966: 964: 959: 957: 952: 951: 948: 941: 936: 931: 929: 919: 915: 908: 905: 903: 900: 898: 895: 894: 890: 888: 870: 867:(in Korean). 866: 862: 856: 853: 840: 836: 830: 828: 824: 811: 807: 801: 798: 786: 782: 775: 772: 759: 755: 749: 746: 742:. p. 19. 741: 734: 733: 726: 723: 711: 707: 700: 698: 696: 694: 692: 688: 675: 671: 665: 662: 649: 645: 639: 636: 623: 619: 615: 609: 607: 605: 603: 601: 599: 595: 582: 578: 574: 568: 565: 552: 548: 544: 537: 534: 521: 517: 513: 506: 504: 500: 487: 483: 479: 473: 471: 467: 454: 450: 446: 439: 436: 423: 419: 415: 409: 407: 405: 403: 399: 383: 379: 372: 366: 363: 350: 346: 342: 336: 333: 320: 316: 312: 306: 303: 290: 286: 282: 275: 273: 269: 262: 260: 258: 250: 247: 244: 241: 240: 239: 237: 233: 229: 221: 219: 215: 213: 209: 203: 200: 199:Khaw Boon Wan 197: 189: 187: 185: 181: 177: 172: 168: 166: 162: 161:Singapore MRT 158: 154: 150: 146: 133: 131: 126: 125: 121: 116: 112: 110:System length 108: 103: 75: 71: 66: 63:Rapid transit 62: 58: 55: 51: 48: 44: 39: 32: 27: 22: 16: 1669: 1651: 1644: 1637: 1540: 1502: 1495: 1385: 1369: 1345:Cross-border 1272:Sengkang LRT 1199: 1183: 992: 886: 873:. Retrieved 864: 855: 843:. Retrieved 838: 814:. Retrieved 809: 800: 788:. Retrieved 784: 774: 762:. Retrieved 757: 748: 731: 725: 713:. Retrieved 709: 678:. Retrieved 673: 664: 652:. Retrieved 647: 638: 626:. Retrieved 617: 585:. Retrieved 576: 567: 555:. Retrieved 546: 536: 524:. Retrieved 515: 490:. Retrieved 481: 457:. Retrieved 448: 438: 426:. Retrieved 417: 389:. Retrieved 377: 365: 353:. Retrieved 344: 335: 323:. Retrieved 314: 305: 293:. Retrieved 284: 254: 225: 216: 204: 193: 175: 173: 169: 144: 142: 127: 60:Transit type 15: 1707:SMRT Trains 1695:SBS Transit 1653:Changi East 1286:Punggol LRT 1227:Branch Line 1151:Circle Line 845:24 November 222:Description 1760:Categories 1639:East Coast 1593:Ulu Pandan 1054:Facilities 816:2 November 790:2 November 764:2 November 715:5 November 680:4 November 654:4 November 263:References 232:third rail 157:Tuas Depot 83:2023-11-02 1683:Companies 1618:Gali Batu 1613:Kim Chuan 1359:Intercity 928:Singapore 865:ķ•œźµ­ģ² ė„źø°ģˆ ģ—°źµ¬ģ› 153:Singapore 105:Technical 68:Operation 54:Singapore 1628:Tai Seng 1608:Sengkang 1071:Security 1026:stations 1016:stations 1000:Overview 875:21 March 869:Archived 628:21 March 622:Archived 587:21 March 581:Archived 557:21 March 551:Archived 526:21 March 520:Archived 492:21 March 486:Archived 459:21 March 453:Archived 428:21 March 422:Archived 391:21 March 382:Archived 355:21 March 349:Archived 325:21 March 319:Archived 295:21 March 289:Archived 41:Overview 1526:C810(A) 1456:C951(A) 1320:Defunct 1220:Defunct 1042:EZ-Link 1007:History 914:Portals 190:History 94: ( 81: ( 1646:Tengah 1633:Mandai 1598:Changi 1588:Bishan 1577:Depots 1393:  1387:  1377:  1371:  1362:  1356:  1295:Others 1283:  1277:  1269:  1263:  1255:  1249:  1207:  1201:  1191:  1185:  1176:  1170:  1162:  1156:  1148:  1142:  1134:  1128:  1120:  1114:  1106:  1100:  1066:Safety 1059:STARiS 940:Trains 46:Locale 1663:Other 1552:Other 1542:C810D 1536:C801B 1531:C801A 1504:CR151 1491:C851E 1476:C151C 1471:C151B 1466:C751C 1461:C830C 1451:C151A 1441:C751A 1436:C751B 1280:PGLRT 1266:SKLRT 1252:BPLRT 1037:CEPAS 736:(PDF) 385:(PDF) 374:(PDF) 1623:Tuas 1521:C801 1497:J151 1486:R151 1481:T251 1446:C830 1431:C651 1426:C151 877:2021 847:2023 818:2023 792:2023 766:2023 717:2022 682:2022 656:2022 630:2021 589:2021 559:2021 528:2021 494:2021 461:2021 430:2021 393:2021 357:2021 327:2021 297:2021 149:Tuas 143:The 96:2025 89:2025 50:Tuas 1514:LRT 1419:MRT 1390:HSR 1374:RTS 1241:LRT 1204:CRL 1188:JRL 1173:TEL 1159:DTL 1145:CCL 1131:NEL 1117:EWL 1103:NSL 1088:MRT 1022:LRT 1012:MRT 839:LTA 758:LTA 648:LTA 618:LTA 577:MOT 547:CNA 418:LTA 378:LTA 1762:: 863:. 837:. 826:^ 808:. 783:. 756:. 738:. 708:. 690:^ 672:. 646:. 616:. 597:^ 575:. 549:. 545:. 518:. 514:. 502:^ 480:. 469:^ 451:. 447:. 416:. 401:^ 380:. 376:. 343:. 313:. 287:. 283:. 271:^ 151:, 52:, 1028:) 1024:( 1018:) 1014:( 969:e 962:t 955:v 916:: 879:. 849:. 820:. 794:. 768:. 719:. 684:. 658:. 632:. 591:. 561:. 530:. 496:. 463:. 432:. 395:. 359:. 329:. 299:. 98:) 85:)

Index

Construction site of the Singapore Rail Test Centre, in May 2022
Tuas
Singapore

Tuas
Singapore
Tuas Depot
Singapore MRT
green building
COVID-19 pandemic
Southeast Asia
Transport Minister
Khaw Boon Wan
Circle line Stage 6
COVID-19 pandemic
Kuala Lumpurā€“Singapore high-speed rail
third rail
overhead catenary
Building and Construction Authority


"New rail facility in Tuas aims to reduce MRT line testing closures"
Archived
"Speech by Minister Khaw Boon Wan at the visit to SMRTs New North-South and East-West Line NSEWL Operations Control Centre OCC at Kim Chuan Depot"
Archived
"News Room ā€“ News Releases ā€“ New Integrated Train Testing Centre for Greater Rail Reliability"
Archived
"Contract 190 ā€“ Land Transport Authority ā€“ Schedule of tenders received"
Archived

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

ā†‘