Southland Wind Farm

Source 📝

288:
invited people and entities such as the West Catlins Preservation Society, all adjacent landowners, multiple district and regional councils, Te Rūnanga o Ngāi Tahu, and multiple government ministers. Comments were required by 25 July 2024 and were published shortly after that. The EPA has also sought more information from Contact Energy on multiple occasions, such as light spill distances, dwellings near the wind farm, and why Contact did not prepare management plans in consultation with Te Ao Mārama Inc, the iwi liaison entity for Southland's four rūnanga.
825: 214:, is for 55 turbines that are 220 metres base to tip, with a total a maximum generation of 300MW. The site of the project is about 5,500 hectares sitting about 15 km east of Wyndham. Contact Energy has stated the project would take two and a half years to install and another 12 months for 'site rehabilitation', and that it would have 160-240 jobs during construction and 10-14 jobs once operational. 284:
to use it. The fast-track process gives the decision to an expert consenting panel. The chair of the panel is Clare Leniham, who began as an environmental and public law barrister in 2012 and has over 20 years of experience advising and acting in resource management law, conservation and public law and land law. The EPA will provide advice and administrative support to the panel.
228:. This smelter uses 13% of New Zealand's electricity, and has been considering closing subject to power price negotiations. If it did, Southland would have a large surplus of electricity generation and this could affect the viability of the Southland Wind Farm. However, Contact Energy have also said that power demand in Southland is growing, and if 262:. It would be Contact's first wind power station. This new version initially proposed 50 turbines, but this was later increased to 55. Contact said that if approved, construction would start in 2025. The project was initially estimated to cost $ 700 m to $ 900 m, though by November 2023 this was revised to $ 1 billion. 287:
The fast-track process blocks the general public from the resource consent process, and Southland District Council opposed the use of the fast-track process because of this. However, the panel is still required under the law to invite written comments on the application from certain groups. The panel
283:
approval under the COVID-19 Recovery (Fast-track Consenting) Act 2020. Contact Energy lodged a resource consent application with the Environmental Protection Authority (EPA) in December 2023. The laws creating the fast-track process have since been repealed but Contact's application was filed in time
291:
In August 2024, after public feedback was published, the consent application was paused at Contact Energy's request. Contact requested the pause so it could address the matters raised "and where necessary, work through issues with commenters". Contact stated it expected the pause "to be a month or
270:
The proposal faces opposition by the West Catlins Preservation Society. Members have stated that the project would visually impact the area, and affect the environment and wildlife. They have also questioned the need for more power generation in the province, and suggested that if more power is
249:
in June 2010. But by 2011 Genesis said the project was not a priority as the company focused its attention elsewhere, such as a wind farm in Wairarapa. The project had already attracted opposition, such as from the West Catlins Preservation Society which had concerns about the visual impact.
271:
needed that hydroelectric stations would be preferable. A petition against the project received at least 200 signatures. Part of the wind farm site has been identified as an "outstanding natural landscape" in a report commissioned by four Southland councils in 2018 and finalised in 2019.
602: 245:
The project was originally proposed by Wind Prospect CWP (NZ) Ltd in 2008. Wind Prospect's initial proposal was for a 150MW wind farm (50 turbines of 3MW each). The project was purchased by
191:
of New Zealand. If built it would be the largest wind farm in New Zealand. A wind farm on this site was first proposed in 2008, but did not progress. The idea was revived in 2023 by
555: 578: 891: 492: 862: 651: 221:. Other proposals for similar or larger wind farms exist, such as the Kaihiku Wind Farm which would also be in the Catlins and is also proposed to be 300MW. 881: 791: 766: 525: 718: 312: 855: 53: 625: 551: 848: 217:
If the site is built out to the proposed 300MW it would be the largest wind farm in the country ahead of today's largest, the
364: 340: 225: 679: 317: 466: 301: 384: 318:
Environmental Protection Authority - publications on the resource consent application, including public feedback
413: 246: 517: 232:
plants were electrified this would consume "quite a significant chunk" of the wind farm's generation.
886: 184: 313:
Ministry for the Environment - Decision to consider Southland Wind Farm under the fast-track process
188: 441: 358: 218: 113: 832: 280: 199: 740: 603:"Contact Energy's proposed 50-turbine Southland windfarm will cost $ 900 million to build" 259: 211: 192: 149: 96: 824: 875: 493:"Contact Energy to lodge $ 1b Southland wind farm consent application by year's end" 33: 68: 55: 180: 161: 108: 652:"Opposition to Contact's proposed 50-turbine wind farm grows in Southland" 229: 202:, and is opposed by some nearby residents mainly on its visual impact. 792:"Persons identified to be invited to comment on Southland Wind Farm" 579:"Contact Energy plans to build a 50-turbine wind farm in Southland" 279:
In July 2023 the project was accepted for fast-tracking towards
224:
Whether the project goes ahead may be tied to the future of the
719:"Wind Farm consent lodged; preservation society 'devastated'" 831:
This article about a New Zealand building or structure is a
836: 680:"EPA requests further details about proposed wind-farm" 148: 143: 135: 127: 119: 107: 102: 92: 84: 47: 39: 29: 20: 626:"Community fight proposed Southland wind farm" 241:Original proposal by Wind Prospect and Genesis 856: 552:"Slopedown wind farm not a priority: Genesis" 8: 545: 543: 414:"Slopedown project now costing $ 1 billion" 863: 849: 17: 892:New Zealand building and structure stubs 328: 210:The latest version of the proposal, by 467:"Plan for large South Otago wind farm" 356: 712: 710: 708: 706: 704: 702: 700: 673: 671: 669: 645: 643: 7: 821: 819: 765:Environmental Protection Authority. 436: 434: 408: 406: 404: 378: 376: 374: 334: 332: 258:In 2023 the proposal was revived by 385:"Wind farm pause for 'month or so'" 882:Proposed wind farms in New Zealand 835:. You can help Knowledge (XXG) by 442:"Wind farm linked to Tiwai future" 254:Revived proposal by Contact Energy 14: 558:from the original on 27 June 2021 528:from the original on 12 July 2023 518:"$ 390m Southland wind farm plan" 491:Harding, Evan (9 November 2023). 198:The project is currently seeking 823: 717:Evan Harding (11 January 2024). 767:"Comments from invited parties" 678:Kelly, Rachael (17 July 2024). 341:"Wind farm pause 'not unusual'" 650:Rachael Kelly (23 July 2023). 339:Andrews, Ben (7 August 2024). 1: 745:Otago Daily Times Online News 741:"Panel for Contact wind farm" 624:Diane Bishop (15 June 2023). 577:Kelly, Rachael (2023-05-11). 550:Alana Dixon (15 April 2011). 522:Otago Daily Times Online News 516:Conway, Glenn (28 May 2008). 446:Otago Daily Times Online News 418:Otago Daily Times Online News 226:Tiwai Point Aluminium Smelter 275:Resource consent application 383:Andrews, Ben (2024-08-03). 150:Annual net output 908: 818: 363:: CS1 maint: url-status ( 175:, also referred to as the 790:Expert Consenting Panel. 302:Wind power in New Zealand 158: 25: 219:222MW Turitea Wind Farm 247:Genesis Energy Limited 69:46.35111°S 169.06833°E 686:. The Southland Times 144:Power generation 605:. Stuff. 26 May 2023 74:-46.35111; 169.06833 684:www.pressreader.com 177:Slopedown Wind Farm 173:Southland Wind Farm 136:Site elevation 128:Rotor diameter 65: /  21:Southland Wind Farm 189:Southland district 844: 843: 389:Otago Daily Times 345:Otago Daily Times 169: 168: 114:Onshore wind farm 43:Wyndham Southland 899: 865: 858: 851: 827: 820: 810: 809: 807: 805: 796: 787: 781: 780: 778: 777: 762: 756: 755: 753: 752: 737: 731: 730: 728: 726: 714: 695: 694: 692: 691: 675: 664: 663: 661: 659: 647: 638: 637: 635: 633: 621: 615: 614: 612: 610: 599: 593: 592: 590: 589: 574: 568: 567: 565: 563: 547: 538: 537: 535: 533: 513: 507: 506: 504: 503: 488: 482: 481: 479: 478: 463: 457: 456: 454: 453: 438: 429: 428: 426: 425: 410: 399: 398: 396: 395: 380: 369: 368: 362: 354: 352: 351: 336: 281:resource consent 200:resource consent 179:, is a proposed 162:edit on Wikidata 80: 79: 77: 76: 75: 70: 66: 63: 62: 61: 58: 18: 907: 906: 902: 901: 900: 898: 897: 896: 872: 871: 870: 869: 816: 814: 813: 803: 801: 794: 789: 788: 784: 775: 773: 771:www.epa.govt.nz 764: 763: 759: 750: 748: 739: 738: 734: 724: 722: 716: 715: 698: 689: 687: 677: 676: 667: 657: 655: 649: 648: 641: 631: 629: 623: 622: 618: 608: 606: 601: 600: 596: 587: 585: 576: 575: 571: 561: 559: 549: 548: 541: 531: 529: 515: 514: 510: 501: 499: 497:www.stuff.co.nz 490: 489: 485: 476: 474: 465: 464: 460: 451: 449: 440: 439: 432: 423: 421: 412: 411: 402: 393: 391: 382: 381: 372: 355: 349: 347: 338: 337: 330: 325: 310: 298: 277: 268: 256: 243: 238: 208: 165: 120:Hub height 103:Wind farm 73: 71: 67: 64: 59: 56: 54: 52: 51: 12: 11: 5: 905: 903: 895: 894: 889: 884: 874: 873: 868: 867: 860: 853: 845: 842: 841: 828: 812: 811: 782: 757: 732: 696: 665: 639: 616: 594: 569: 539: 508: 483: 458: 430: 400: 370: 327: 326: 324: 321: 309: 308:External links 306: 305: 304: 297: 294: 276: 273: 267: 264: 260:Contact Energy 255: 252: 242: 239: 237: 234: 212:Contact Energy 207: 204: 193:Contact Energy 167: 166: 159: 156: 155: 152: 146: 145: 141: 140: 137: 133: 132: 129: 125: 124: 121: 117: 116: 111: 105: 104: 100: 99: 97:Contact Energy 94: 90: 89: 86: 82: 81: 49: 45: 44: 41: 37: 36: 31: 27: 26: 23: 22: 13: 10: 9: 6: 4: 3: 2: 904: 893: 890: 888: 885: 883: 880: 879: 877: 866: 861: 859: 854: 852: 847: 846: 840: 838: 834: 829: 826: 822: 817: 800: 793: 786: 783: 772: 768: 761: 758: 746: 742: 736: 733: 720: 713: 711: 709: 707: 705: 703: 701: 697: 685: 681: 674: 672: 670: 666: 653: 646: 644: 640: 627: 620: 617: 604: 598: 595: 584: 580: 573: 570: 557: 553: 546: 544: 540: 527: 523: 519: 512: 509: 498: 494: 487: 484: 472: 468: 462: 459: 447: 443: 437: 435: 431: 419: 415: 409: 407: 405: 401: 390: 386: 379: 377: 375: 371: 366: 360: 346: 342: 335: 333: 329: 322: 320: 319: 315: 314: 307: 303: 300: 299: 295: 293: 289: 285: 282: 274: 272: 265: 263: 261: 253: 251: 248: 240: 235: 233: 231: 227: 222: 220: 215: 213: 205: 203: 201: 196: 194: 190: 186: 182: 178: 174: 163: 157: 153: 151: 147: 142: 138: 134: 130: 126: 122: 118: 115: 112: 110: 106: 101: 98: 95: 91: 87: 83: 78: 50: 46: 42: 38: 35: 32: 28: 24: 19: 16: 837:expanding it 830: 815: 802:. Retrieved 798: 785: 774:. Retrieved 770: 760: 749:. Retrieved 747:. 2024-05-11 744: 735: 723:. Retrieved 688:. Retrieved 683: 656:. Retrieved 630:. Retrieved 619: 607:. Retrieved 597: 586:. Retrieved 582: 572: 560:. Retrieved 530:. Retrieved 521: 511: 500:. Retrieved 496: 486: 475:. Retrieved 473:. 2023-10-28 470: 461: 450:. Retrieved 448:. 2024-02-03 445: 422:. Retrieved 420:. 2023-11-09 417: 392:. Retrieved 388: 348:. Retrieved 344: 316: 311: 290: 286: 278: 269: 257: 244: 223: 216: 209: 197: 176: 172: 170: 139:380m to 630m 15: 887:The Catlins 799:epa.govt.nz 154:900-1200GWh 72: / 60:169°04′06″E 48:Coordinates 34:New Zealand 876:Categories 776:2024-07-31 751:2024-07-31 725:11 January 690:2024-07-31 588:2023-07-12 502:2024-07-31 477:2024-07-31 452:2024-07-31 424:2024-07-31 394:2024-08-08 350:2024-08-08 323:References 266:Opposition 230:Fonterra's 131:up to 170m 123:up to 135m 57:46°21′04″S 554:. Stuff. 181:wind farm 556:Archived 526:Archived 359:cite web 296:See also 206:Proposal 93:Owner(s) 88:Proposed 40:Location 804:31 July 721:. Stuff 658:23 July 654:. Stuff 632:12 July 628:. Stuff 609:12 July 562:13 July 532:13 July 236:History 187:in the 185:Wyndham 30:Country 85:Status 795:(PDF) 583:Stuff 292:so". 183:near 160:[ 833:stub 806:2024 727:2024 660:2023 634:2023 611:2023 564:2023 534:2023 365:link 171:The 109:Type 471:RNZ 878:: 797:. 769:. 743:. 699:^ 682:. 668:^ 642:^ 581:. 542:^ 524:. 520:. 495:. 469:. 444:. 433:^ 416:. 403:^ 387:. 373:^ 361:}} 357:{{ 343:. 331:^ 195:. 864:e 857:t 850:v 839:. 808:. 779:. 754:. 729:. 693:. 662:. 636:. 613:. 591:. 566:. 536:. 505:. 480:. 455:. 427:. 397:. 367:) 353:. 164:]

Index

New Zealand
46°21′04″S 169°04′06″E / 46.35111°S 169.06833°E / -46.35111; 169.06833
Contact Energy
Type
Onshore wind farm
Annual net output
edit on Wikidata
wind farm
Wyndham
Southland district
Contact Energy
resource consent
Contact Energy
222MW Turitea Wind Farm
Tiwai Point Aluminium Smelter
Fonterra's
Genesis Energy Limited
Contact Energy
resource consent
Wind power in New Zealand
Ministry for the Environment - Decision to consider Southland Wind Farm under the fast-track process
Environmental Protection Authority - publications on the resource consent application, including public feedback


"Wind farm pause 'not unusual'"