499:
months. "Failure to comply with the payment options . . . will result in the imposition of interest and the instalment plan will be cancelled. Interest will be imposed on any outstanding land tax or penalty tax. The current rate is 14.37 per cent per annum calculated daily," he said. The assessments related to sixteen properties in the Tweed Shire bought by the Department of Main Roads from 2001 for the bypass construction. Queensland Treasurer Andrew Fraser said at the time of the acquisition of the sixteen properties, the NSW Government provided a transfer duty exemption to Queensland.
510: 813: 799: 147: 115: 95: 847: 396: 417: 831: 779: 494:
this week, and I don't intend to either." Of the $ 543 million it cost to build the bypass, the Federal Government contributed $ 120 million and Queensland paid the balance. Approximately 4 kilometres (2.5 mi) of the 7-kilometre (4.3 mi) bypass is located in New South Wales. "Of the
342:
The tunnel was built with provision for a future rail line underneath. The Tugun Bypass was intended to be open to traffic on 2 June 2008 but was delayed until important line marking could be carried out at either end of the new road. Line marking could not be performed at the expected time due to
318:
While New South Wales finally agreed to the plan, it refused to contribute financially to the road. In February 2006, former Premier Peter Beattie announced the Commonwealth Government had given final approval for the road, with construction to start the following month. Beattie said the New South
338:
to design and build the road, complete with tunnel and bridges over Hidden Valley. Work on the 334-metre-long (1,096 ft) tunnel began in early June 2006, using a low headroom hydraulic cutting machine—one of two in the world—to meet the conditions of working so close to protected airspace.
498:
The NSW Office of State Revenue issued the bill to the Queensland Government on 6 May, asking for the payment for five years worth of land tax assessments. The NSW Chief Commissioner of State Revenue Tony Newbury said Queensland could pay in three instalments of $ 78,535.80 over the next three
274:
on the Gold Coast Highway corridor. The Tugun Bypass carries the M1 designation and is officially called the "Pacific Motorway". The Tugun bypass has two vehicle lanes in each direction, with provision for widening to three lanes in the future.
319:
Wales Government imposed additional approval conditions that bumped up the price tag. The tax-payer bill was now expected to exceed $ 540 million, and sixteen homes in New South Wales would be demolished to make way for the road.
310:
announced a 50 per cent joint agreement for the project allowing the project to proceed. In May 2004 the Queensland and New South Wales Governments finally agreed to build the Tugun bypass along the western side of the
386:
On the Tugun bypass, there is a big "eye-catching and unique" border marker called Hyphen that looks like a very tall and bent metal structure that sits in the median on the border of Queensland and New South Wales.
481:
rugby league tournament, the New South Wales State Government mailed the Queensland Government with a land tax invoice of $ 235,607.40 for building part of the Tugun Bypass on NSW land. Queensland Premier
768: 726: 315:, after New South Wales reneged on an agreement signed in 2000. The New South Wales government had previously been reluctant to go ahead with the project, citing environmental and planning reasons. 761: 283:
For more than 20 years the Gold Coast has grown by 17,000 permanent residents a year, placing enormous pressure on the city's infrastructure requirements, in particular the
322:
As part of a deal, Queensland was to fork out $ 7 million annual maintenance bill for the first 10 years. At the 10th year, in June 2018, the bypass was handed over to the
802: 263: 210: 150: 118: 754: 738: 941: 922: 711: 486:
confirmed that the bill would be ignored by Queensland because they did not contribute to the $ 543 million project, saying: "I don't expect the
346:
The design includes an amphibian fence about 40 centimetres (16 in) in height with an adjacent rock aggregate to suppress vegetation. A
335: 303: 589: 585: 701: 302:
Government was in office at the end of the 20th century that a firm commitment was made to the bypass. In 2003 Acting Prime Minister
491: 464: 951: 946: 664: 442: 192: 533: 438: 375: 323: 487: 478: 292: 183: 156: 901: 199: 891: 427: 911: 906: 562: 446: 431: 55: 680: 871: 706: 684: 400: 607: 514: 367: 881: 783: 228: 128: 721: 625: 239:. The speed limit on the Tugun bypass is 100 kilometres per hour (62 mph) and provides a high-speed 816: 716: 404: 363: 288: 267: 187: 178: 124: 746: 495:
total expenditure, $ 380 million – or 70 per cent – was spent in New South Wales," Ms Bligh said.
850: 312: 284: 271: 270:
and the Tweed Heads Bypass north of Kennedy Drive. Opened in 2008, it has significantly relieved
252: 820: 660: 351: 347: 295:. Speculation about a bypass began in the 1960s when the South Coast railway line was closed. 224: 65: 593: 629: 395: 509: 371: 307: 247:, separating interstate vehicles from local traffic. There is a 334-metre (1,096 ft) 244: 160: 39: 896: 866: 935: 886: 299: 259: 220: 876: 88: 654: 778: 416: 830: 541: 483: 232: 33: 343:
wet weather. The bypass finally opened during the afternoon of 3 June 2008.
236: 477:
On Sunday 18 May 2008, three days prior to the commencement of that year's
739:
Queensland (Department of Transport and Main Roads) - Tugun Bypass Project
370:
22% at a cost of $ 543 million. Despite over 60% of the road being within
240: 350:
was also incorporated into the design to allow for the movement of the
334:
The Pacific Link Alliance consortium won the contract to work with the
219:
is a 7.5-kilometre-long (4.7 mi) stretch of motorway-grade road,
255: 248: 394: 374:, there was no financial contribution towards the road from the 750: 410: 681:"Tugun Bypass border marker competition – and the winner is…" 859: 838: 790: 170: 138: 106: 101: 87: 79: 71: 61: 51: 46: 23: 16:Motorway on the Gold Coast, Queensland, Australia 656:Reducing the Impacts of Development on Wildlife 626:"Newly opened Tugun bypass closed due to rain" 762: 8: 803:Pacific Motorway (Brisbane–Brunswick Heads) 445:. Unsourced material may be challenged and 211:Pacific Motorway (Brisbane–Brunswick Heads) 769: 755: 747: 20: 712:Tugun Bypass to shave 20 mins off journey 707:Bligh announces open day for Tugun Bypass 465:Learn how and when to remove this message 243:link between the Gold Coast and northern 653:Gleeson, James; Deborah Gleeson (2012). 266:between the Stewart Road interchange at 648: 646: 525: 490:to give an inch to the New South Wales 821:Coomera Connector (under construction) 619: 617: 659:. Csiro Publishing. pp. 62, 98. 580: 578: 576: 574: 572: 362:The project is jointly funded by the 7: 702:Make road funding a big issue: Bligh 443:adding citations to reliable sources 942:Roads on the Gold Coast, Queensland 306:and Queensland Transport Minister 14: 845: 829: 811: 797: 777: 610:. Tweed Daily News. 4 June 2018. 508: 415: 145: 113: 93: 624:Ironside, Robyn (2 June 2008). 1: 717:Snail may stop $ 400m project 376:Government of New South Wales 923:Transport on the Gold Coast 782:Road infrastructure in the 608:"Bypass handed back to NSW" 515:Australian roads portal 251:under the extension to the 200:Highways in New South Wales 968: 912:Surfers Paradise Boulevard 722:Tugun bypass has dream run 208: 920: 827: 565:. Goldcoast.com.au. 2007. 262:connects directly to the 175: 872:Burleigh Connection Road 336:Department of Main Roads 902:Southport–Burleigh Road 330:Construction and design 75:7 km (4.3 mi) 892:Nerang–Broadbeach Road 727:Weekly road conditions 592:. 2008. Archived from 586:"Tugun bypass opening" 408: 223:through the suburb of 193:Highways in Queensland 952:Bypasses in Australia 947:Highways in Australia 907:Southport–Nerang Road 817:Smith Street Motorway 685:Queensland Government 596:on 27 September 2009. 398: 368:Australian Government 364:Queensland Government 348:small fauna underpass 298:It was not until the 188:Freeways in Australia 179:Highways in Australia 439:improve this section 47:General information 851:Gold Coast Highway 409: 313:Gold Coast Airport 285:Gold Coast Highway 272:traffic congestion 253:Gold Coast Airport 186: • 929: 928: 563:"Highway To Hell" 475: 474: 467: 352:wallum sedge frog 207: 206: 163: 131: 959: 849: 848: 833: 815: 814: 801: 800: 781: 771: 764: 757: 748: 689: 688: 677: 671: 670: 650: 641: 640: 638: 636: 630:The Courier-Mail 621: 612: 611: 604: 598: 597: 582: 567: 566: 559: 553: 552: 550: 548: 530: 513: 512: 470: 463: 459: 456: 450: 419: 411: 403:at Stewart Road 264:Pacific Motorway 184:National Highway 155: 151:Pacific Motorway 149: 148: 123: 119:Pacific Motorway 117: 116: 97: 96: 42: 29:Pacific Motorway 21: 967: 966: 962: 961: 960: 958: 957: 956: 932: 931: 930: 925: 916: 855: 846: 834: 825: 812: 798: 786: 775: 744: 735: 698: 696:Further reading 693: 692: 679: 678: 674: 667: 652: 651: 644: 634: 632: 623: 622: 615: 606: 605: 601: 584: 583: 570: 561: 560: 556: 546: 544: 532: 531: 527: 522: 507: 505: 479:State of Origin 471: 460: 454: 451: 436: 420: 393: 384: 372:New South Wales 360: 332: 308:Steve Bredhauer 281: 245:New South Wales 213: 166: 161:New South Wales 146: 134: 114: 102:Major junctions 94: 89:Route number(s) 40:New South Wales 37: 36: 31: 30: 27: 26: 17: 12: 11: 5: 965: 963: 955: 954: 949: 944: 934: 933: 927: 926: 921: 918: 917: 915: 914: 909: 904: 899: 897:Robina Parkway 894: 889: 884: 879: 874: 869: 867:Bermuda Street 863: 861: 857: 856: 854: 853: 842: 840: 836: 835: 828: 826: 824: 823: 809: 794: 792: 788: 787: 776: 774: 773: 766: 759: 751: 742: 741: 734: 733:External links 731: 730: 729: 724: 719: 714: 709: 704: 697: 694: 691: 690: 672: 665: 642: 613: 599: 568: 554: 534:"Tugun Bypass" 524: 523: 521: 518: 504: 501: 473: 472: 423: 421: 414: 392: 389: 383: 380: 359: 356: 331: 328: 324:NSW Government 280: 277: 209:Main article: 205: 204: 203: 202: 197: 195: 190: 181: 173: 172: 171:Highway system 168: 167: 165: 164: 153: 142: 140: 136: 135: 133: 132: 121: 110: 108: 104: 103: 99: 98: 91: 85: 84: 81: 77: 76: 73: 69: 68: 63: 59: 58: 53: 49: 48: 44: 43: 32: 28: 24: 15: 13: 10: 9: 6: 4: 3: 2: 964: 953: 950: 948: 945: 943: 940: 939: 937: 924: 919: 913: 910: 908: 905: 903: 900: 898: 895: 893: 890: 888: 887:Gooding Drive 885: 883: 880: 878: 875: 873: 870: 868: 865: 864: 862: 858: 852: 844: 843: 841: 837: 832: 822: 818: 810: 808: 804: 796: 795: 793: 789: 785: 780: 772: 767: 765: 760: 758: 753: 752: 749: 745: 740: 737: 736: 732: 728: 725: 723: 720: 718: 715: 713: 710: 708: 705: 703: 700: 699: 695: 686: 682: 676: 673: 668: 662: 658: 657: 649: 647: 643: 631: 627: 620: 618: 614: 609: 603: 600: 595: 591: 587: 581: 579: 577: 575: 573: 569: 564: 558: 555: 543: 539: 535: 529: 526: 519: 517: 516: 511: 502: 500: 496: 493: 489: 485: 480: 469: 466: 458: 448: 444: 440: 434: 433: 429: 424:This section 422: 418: 413: 412: 406: 402: 397: 390: 388: 382:Border marker 381: 379: 377: 373: 369: 365: 357: 355: 353: 349: 344: 340: 337: 329: 327: 325: 320: 316: 314: 309: 305: 304:John Anderson 301: 296: 294: 290: 286: 278: 276: 273: 269: 265: 261: 257: 254: 250: 246: 242: 238: 234: 230: 226: 222: 218: 212: 201: 198: 196: 194: 191: 189: 185: 182: 180: 177: 176: 174: 169: 162: 158: 154: 152: 144: 143: 141: 137: 130: 126: 122: 120: 112: 111: 109: 105: 100: 92: 90: 86: 82: 78: 74: 70: 67: 64: 60: 57: 54: 50: 45: 41: 35: 22: 19: 877:Bundall Road 860:Major roads: 807:Tugun Bypass 806: 743: 675: 655: 633:. Retrieved 602: 594:the original 557: 545:. Retrieved 537: 528: 506: 497: 476: 461: 452: 437:Please help 425: 385: 366:78% and the 361: 345: 341: 333: 321: 317: 297: 282: 217:Tugun Bypass 216: 214: 25:Tugun Bypass 18: 547:6 September 391:Controversy 293:Tweed Heads 157:Tweed Heads 936:Categories 882:Ferry Road 791:Motorways: 784:Gold Coast 666:0643100326 542:Lend Lease 520:References 484:Anna Bligh 401:earthworks 233:Queensland 229:Gold Coast 129:Gold Coast 34:Queensland 839:Highways: 426:does not 405:Currumbin 289:Currumbin 268:Currumbin 237:Australia 221:bypassing 125:Currumbin 83:July 2008 538:Projects 503:See also 455:May 2020 287:between 241:motorway 62:Location 687:. 2007. 635:19 July 488:Maroons 447:removed 432:sources 358:Funding 300:Beattie 279:History 227:on the 56:Freeway 663:  399:Early 260:bypass 258:. The 256:runway 249:tunnel 139:SW end 107:NE end 80:Opened 72:Length 492:Blues 231:, in 225:Tugun 66:Tugun 805:and 661:ISBN 637:2008 549:2017 430:any 428:cite 291:and 215:The 52:Type 590:ABC 441:by 938:: 819:, 683:. 645:^ 628:. 616:^ 588:. 571:^ 540:. 536:. 378:. 354:. 326:. 235:, 159:, 127:, 770:e 763:t 756:v 669:. 639:. 551:. 468:) 462:( 457:) 453:( 449:. 435:. 407:. 38:–

Index

Queensland
New South Wales
Freeway
Tugun
Route number(s)
Pacific Motorway
Currumbin
Gold Coast
Pacific Motorway
Tweed Heads
New South Wales
Highways in Australia
National Highway
Freeways in Australia
Highways in Queensland
Highways in New South Wales
Pacific Motorway (Brisbane–Brunswick Heads)
bypassing
Tugun
Gold Coast
Queensland
Australia
motorway
New South Wales
tunnel
Gold Coast Airport
runway
bypass
Pacific Motorway
Currumbin

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑