Turin–Lyon high-speed railway

Source 📝

1232:
safety regulations applicable at the time. The study foresaw a maximum traffic of 180 freight trains per day, which had to be lowered to about 150 freight trains per day due to logistical inefficiency (the traffic flows between the two countries are asymmetric). A similar analysis for the full year led to a total of about 260 peak days per year. These conditions defined a maximum transport capacity per year of about 20 million tonnes when accounting for inefficiencies, and an absolute limit of about 32 million in "perfect" conditions. Additional traffic limitations stem from the impact of excessive train transit on the population living near the line. Some 60,000 people live within 250 m (820 ft) of the historical line, and would object to the noise from late-night transits. In 2007 the conventional line was used for only one-third of this calculated total capacity. This low use level was in part because restrictions such as an unusually low maximum allowable train height and the very steep gradients (26–30
1504:). Anyway, some experts disagree with the necessity for a new line connecting France and Italy on the Modane corridor, quoting wide margins for increase in traffic on the old line. Rather than as a natural consequence of faster transit times and a lower price for freight shipping (due to reduced energy use thanks to a much flatter profile, but without necessarily taking into account the full construction cost of the new line), they propose to increase rail traffic by coupling additional renovation of the existing rail infrastructure with sufficiently high financial incentives for rail transport and/or sufficiently heavy tolls and taxes on road transport. The political realism of such taxes is however questionable, as France demonstrated in 2013 when its government withdrew a much smaller trucking ecotax after the trucking industry initiated extensive riots (see 987: 31: 1508:). A 2018 study made this specific controversy much less relevant by finding that the existing line actually is close to saturation. This is primarily because updated safety regulations on train crossings in single-tube tunnels have significantly reduced its maximum allowed capacity. The construction of a brand-new line will also allow higher safety standards, and it will make the older infrastructure fully available for regional and suburban services, which is an important consideration near the congested Turin node. 995: 1517: 1249: 1838: 752: 303: 787: 662: 562: 533: 514: 412: 1167:. This initially single-track line was doubled and electrified in the early 20th century, and the Italian side of the line was renovated between 1962 and 1984, and again between 2001 and 2011. This historical line has a low maximum allowed height, and its sharp curves force low speeds. Its very poor profile, with a maximum gradient of 30‰, requires doubling or tripling the locomotives of freight trains. 864: 588: 308: 643: 507: 322: 728: 709: 636: 419: 368: 354: 924: 834: 826: 816: 808: 669: 467: 460: 438: 361: 246: 60: 883: 857: 595: 569: 72: 902: 614: 540: 329: 290: 1780:, and for several months made only very slow progress through it. Tunneling eventually passed this zone in Spring 2017 after injecting 30 tons of reinforcing resin, and resumed at nominal speed. That gallery makes up the first 9 km (5.6 mi) of the South tube of the tunnel, and it was completed in September 2019, in time and within budget. 1872:, high speed train. French opposition to the railway also exists but has been less visible. A 2019 poll in both countries, commissioned by TELT but conducted by respected polling companies, found that opposition to the railway link increases as one approaches the location of the tunnel, but that it was nonetheless a minority view even in the 1912: 1795:
officially asked TELT to stop the launch of tenders for further construction work. A few months later, and just before further delays would have threatened the EU funding of the project, the Italian government eventually agreed to the publication of calls for tender for the main tunneling work on the
1093:
The project has been criticized for its cost, because traffic (both by motorway and by rail) was decreasing when the project was decided, for potential environmental risks during the construction of the tunnel, and because airplanes will still, after including time to and from the airport and through
1524:
The new railway line will have a maximum gradient of 12.5‰, compared to 30‰ for the old line, a maximum altitude of 580 m (1,900 ft) instead of 1,338 m (4,390 ft), and much wider curves. This will allow heavy freight trains to transit at 100 km/h (62 mph) and passenger
1231:
tunnel. Its high elevation (1,338 m (4,390 ft)), sharp curves, steep gradients, and low tunnel ceilings make this section the limiting factor on the overall capacity of the line. A 2007 study used the CAPRES model to calculate a maximum capacity of 226 trains/day, 350 days/year, under the
1965:
movement generally questions the worthiness, cost, and safety of the project, drawing arguments from studies, experts, and governmental documents from Italy, France, and Switzerland. It deems the new line useless and too expensive, and decries its realization as driven by construction lobbies. Its
1824:
Drilling and blasting for the 3 km (1.9 mi) Lot 3 section started from the French portal in December 2022, and a year later had advanced by some 400 meters on each tube. On-going work at the other French work sites prepares for the 2024 arrival of the 5 tunnel boring machines. Those were
1833:
which is the sole European TBM builder. They were delivered to the Lot 2 and 1 consortia between July 2023 and February 2024 for in-factory tests, and started arriving on-site in July 2024 for their assembly. As of August 2024, 14 of the 115 km (57.5 km times 2 tubes) of the main tunnels had been
1240:
trains of one type must now fully cross before any train of the other type can be allowed in the other direction. The path of the historical line through the deep Maurienne valley is also exposed to rockfalls, and a major landslide in August 2023 forced its closure for at least a year and a half.
1239:
A 2018 analysis, by contrast, found the existing line close to saturation, largely because safety regulations now prohibit passenger and freight trains from crossing in a single-tube tunnel. This very significantly reduces the maximum allowed capacity of the 13.7 km long Fréjus tunnel, which
1495:
Promoters of the new line predict that it will about double rail traffic on the Modane corridor compared to the reference scenario (see table above). Traffic predictions of even the early traffic of major rail infrastructures are however intrinsically uncertain, with well-known examples of both
1849:
TELT awarded the contract for the excavation of the 25 km (16 mi) of tunneling on Italian territory in August 2023 and published in June 2023 a call for tender for the outfitting of the tunnel and its maintenance for the first 7 years of its operations. As of late 2022, the expected
1117:
towards Italy was presented as reconnaissance work because the project had not yet been formally approved, but it was dug at the position of the south tube of the tunnel and at its final diameter. It effectively represents the first 8% of the final tunnel length. As of late 2022, the expected
1080:
to transit between the two countries at 100 km/h (62 mph) and with much reduced energy costs. In spite of the name often used by media (and in the title of this page), the line is not high-speed under the definition used by the European Commission: its design speed of 220 km/h
1775:
towards Italy. While presented as a reconnaissance gallery because the project had yet to be fully approved, it was dug along the axis of the South tube of the tunnel and at its final diameter. In late 2016, that tunnel encountered a geologically difficult zone of fractured and water-soaked
1796:
French and Italian sides. 2.8 billion euros of construction contracts had been signed as of June 2020, and contracts worth a further 3 billion euros for the excavation of the 80% of the tunnel located on the French side of the border were signed in September 2021. Those contracts are:
1758:
Civil engineering work started in 2002 with the construction of access points and geological reconnaissance tunneling. Construction of the tunnel itself was at that time planned to start in 2014–2015, but the project was only approved in 2015 for a cost of
1256:(red) and BBT (green), compared to real traffic (blue) and a 2007 estimate of the capacity of existing line (pink); the 2007 capacity estimate pre-dates stricter safety regulations on train crossings in tunnels which have significantly reduced this capacity 1811:
Lot 3 (€228 mn) for 3 km (1.9 mi) between the Western (French) Portal at Saint-Julien-Mont-Denis and Saint-Martin-de-la-Porte; this lot is the shortest by far, but its difficult geology of fractured and sheared coal-bearing
2636: 1899:, a small French village, residents represented by the 'Association pour la Sauvegarde du Site du Moulin' have opposed the digging of a 4-kilometre (2.5 mi) survey tunnel since 2002 and are in close communication with the 1807:
Lot 2 (€1.43 bn) for 23 km (14.3 mi) between Saint-Martin-de-la-Porte/La Praz and Villarodin-Bourget/Modane is expected to take 65 months for 3 tunnel boring machines (10 kilometers of the South tube are already
1697:
The path of the Italian section was adopted in August 2011 by the Italian government, after extensive 2006–2011 consultations headed by Government Commissary Mario Virano within the "Italian Technical Observatory". In the
1688:
In January 2024, before a EU deadline for funding, the French national government and various local entities came to a last-minute agreement on their respective funding contributions to the studies of the French section.
1260:
The following table summarizes 2007 predictions (in million tons per year) of the future freight traffic on both the Frejus and Mont-Blanc corridors, from an analysis of then current data and macroeconomic predictions:
3381: 1089:
funds 40% of the tunnel costs, and has indicated its willingness to increase its contribution to 55%, as well as to help fund its French accesses if those go beyond mere adaptations of the existing infrastructure.
1892:, a French town of 1,100 which will be split by the railway, the town council has opposed the plans since 1992 and the 2014-2020 mayor, Marie Chabert, saw the economic uncertainty as damaging for the region. 1999:
Members of the protest movement have summarized their ideas against the construction of the new line in a document containing 150 reasons against it and in a wide number of specific documents and meetings.
1994:
in and around the mountains where the tunnel is bored, though the extensive reconnaissance tunneling has found none to date. Supporters of the tunnel argue that the risk of contamination is overstated or
2973: 1126:
The merits of the new line were the subject of heated debate, primarily in Italy. After violent confrontations between opponents and police during a 2005 attempt to start reconnaissance work near
209: 1977:. A more recent study, though, found the existing rail line close to saturation because toughened safety standards on train crossings in single-tube tunnels have sharply reduced its capacity. 1113:
Civil engineering work started in 2002 with the construction of access points and geological reconnaissance tunneling. A 9 km (5.6 mi) gallery tunneled between 2016 and 2019 from
1783:
The contracting for the bulk of the tunnel construction was then delayed by deep disagreements on the merits of the Turin–Lyon project within the Italian coalition government between the
2841: 1525:
trains at a top speed of 220 km/h (140 mph), while also sharply reducing the energy used. The construction of the full higher-speed line will cut passenger travel time from
1072:
emissions as well as local air pollution and of providing faster passenger transport to reduce air traffic. The new line will considerably shorten the journey times, and its reduced
1746:
and is the major engineering work of the overall future Turin–Lyon line. An underground service and rescue train station is planned around the half-way point of the tunnel, East of
2357: 3925: 2442: 1858:
Ever since plans for the railway line were first mentioned in the 1990s, some residents of most of the 112 towns and villages along its path have been set strongly against it.
3508: 2153:
Nuova linea Torino-Lione parte comune tratta italiana – Progetto in variante – Studio d'impatto ambientale – sintesi non tecnica 9-7-2010 (document PP2 C3C TS3 0105A AP NOT)
2789: 2556: 2491: 202: 3262:; Piazza, Gianni (17 October 2007). "Local contention, global framing: The protest campaigns against the TAV in Val di Susa and the bridge on the Messina Straits". 1130:, an Italian governmental commission was set up in 2006 to study all the issues. The work of the commission between 2007 and 2009 was summarized into seven papers ( 2307: 2683: 2618: 1938:
centres, a trade union solidarity project and a social forum. The resistance was spoken about in terms of the partisan resistance to the Nazis in World War II.
3807: 3581: 2768: 3905: 195: 3900: 3434: 2415: 1903:
movement. The mayor, Gilles Margueron, said "after we started looking at the project in details, we soon arrived at a position of complete opposition."
3058: 3910: 2235: 3586: 3915: 3501: 1767:. The ratification of the corresponding international treaty by the parliaments of the two countries concluded with a 26 January 2017 vote of the 1106:
questioned the realism of the costs estimates and traffic forecasts. Opposition to the project is mostly organised under the loose banner of the
2811: 3101: 1673:. That tunnel will eventually have two 23-kilometre (14 mi) long tubes, but it will initially be single-track. The line will then reach 1800:
Lot 1 (€1.47 bn) for 22 km (13.7 mi) between Villarodin-Bourget/Modane and the Italian border is expected to take 72 months for 2
2126: 3648: 2263: 1061:
25 billion, of which €8 billion is for the international section. The latter is the only part of the line where construction has started.
548: 2948: 2361: 3402: 937: 3895: 3494: 1681:
mountains. The separate freight line will divert the freight traffic away from Aix-les-Bains and Chambéry, and from the shores of the
1161:
connects Turin with Lyon via the 13.7 km (8.5 mi)-long high-altitude (maximum tunnel altitude 1,338 metres (4,390 ft))
910: 2696: 2654: 2336:"Dichiarazioni alla stampa del Presidente Monti al termine della riunione sui lavori di realizzazione della Tav tratto Torino-Lione" 3229: 3203: 298: 2739: 2386: 2163: 1930:
movement began in 1990, with actions to inform local people affected by the plans, supported by the mayors of the valley and the
1025:
networks and will be 270 km (170 mi) long. The core of the project is its international section, which will cross the
3920: 1685:
where a freight accident on the existing lakeside line could catastrophically pollute this major natural freshwater reservoir.
1556:. Its ongoing construction is managed by Tunnel Euralpin Lyon Turin (TELT SAS), a joint venture of RFI and SNCF which replaced 986: 945: 393: 2521: 2499: 1771:. Starting in 2016, and therefore before the ratification of the treaty, a 9 km (5.6 mi) gallery was tunneled from 3633: 3628: 1830: 1702:, this path sidesteps through additional tunneling the strong opposition to a previous planned path on the left bank of the 3536: 3308: 1619: 2210: 227: 3044: 2099: 2078: 30: 2058: 3367: 3129: 2711: 2038: 1842: 1739: 1553: 1030: 998:
Map of the French (green and blue) and international (red) route of the new line compared to the existing one (black)
737: 2688: 2637:"Éboulement en Maurienne : la voie ferrée et la RD1006 ne rouvriront pas « avant une petite année »" 2193:"The European Commission welcomes the agreement between France and Italy to move ahead with the Lyon-Turin project" 1953:, a land squat called the 'Presidio' is situated next to where the survey tunnel was originally planned to be dug. 3653: 3087: 2192: 3880: 3833: 3576: 3517: 2249: 2073: 2048: 2020: 1942: 1591: 1019: 3643: 1603:
The French section of the new line is planned with eventually separate paths for passengers and freight between
1158: 1068:
project, the line has twin aims of transferring freight traffic across the Alps from trucks to rail to reduce CO
682: 480: 1772: 1738:, and it is the only part of the line on which major construction has started. The 57.5 km (35.7 mi) 1114: 1103: 1015: 990:
Map of the Italian (blue) and international (red) route of the new line compared to the traditional one (black)
1658:
line from its TGV traffic. This would remove traffic at mismatched speeds, and therefore would free many more
1533:
from seven hours to four, becoming time-competitive with plane travel for city-centre to city-centre travel.
3623: 3188: 3059:"TELT Lyon Turin • les entreprises signent les 3 milliards de contrats pour le creusement du tunnel de base" 2053: 1723: 1674: 1564: 1545: 1541: 1050: 622: 143: 3658: 3828: 3696: 3691: 3546: 2063: 2043: 2033: 1868: 1557: 1253: 3551: 2974:""Ligne ferroviaire Lyon-Turin : malgré les tensions, Rome valide le lancement des appels d'offres"" 389: 3618: 3259: 1817: 1801: 1146: 1142: 1081:(137 mph) is 12% below the 250 km/h (155 mph) threshold used by the commission to define 1974: 1163: 994: 2790:"Laurent Wauquiez : " On n'est pas passé loin de la catastrophe, mais on a sauvé le Lyon-Turin "" 2619:"TRANSPORTS. Lyon-Turin : le tunnel actuel est pratiquement saturé, selon Réseau ferré de France" 3823: 3706: 3271: 3143: 2603:
Quaderno 1 – p. 35. Data are from 2007, while capacity was reduced by the 2007–10 modernization work.
2443:""Telt annonce le percement de la section du tunnel de base entre Saint-Martin-la-Porte et La Praz "" 1670: 1054: 3174: 3160: 2335: 1837: 3735: 2819: 2008: 1516: 2903: 1949:
construction site, while other networks organise communal dinners, discussions and flash mobs. In
3287: 1896: 1784: 1665:
The freight line will start from a connection to the future Lyon rail freight bypass, follow the
1082: 165: 3750: 3701: 3566: 381: 259: 2416:"Manuel Valls inaugure le tunnelier Federica au chantier du Lyon-Turin à Saint-Martin-La-Porte" 2267: 3774: 3769: 3561: 3428: 2692: 2308:"What is happening with the Lyon Turin high-speed line? Euronews traces the route to find out" 3483:. Osservatorio Ministeriale per il collegamento ferroviario Torino-Lione, Rome, December 2007 3355: 2468: 1722:
The international section of the Lyon–Turin line spans about 70 km (43 mi) between
3409: 3279: 3022: 307: 3001: 1973:
Low level of saturation on the Frejus rail tunnel and stable or decreasing traffic also on
1248: 3869: 3718: 3453: 3115: 1022: 3477:. Osservatorio Ministeriale per il collegamento ferroviario Torino-Lione, Rome, June 2007 3189:"Publication d'un nouvel appel d'offres de 3 milliards d'euros pour le tunnel Lyon-Turin" 2522:"Covid-19 : retour à la normalité sur les chantiers du Lyon-Turin • TELT Lyon-Turin" 1743: 1662:
for much needed additional local trains than the number of TGVs shifted to the new line.
3471:. Osservatorio Ministeriale per il collegamento ferroviario Torino-Lione, Rome, May 2007 3275: 2925: 3796: 3725: 3531: 2743: 2390: 2167: 1792: 1682: 1572: 1505: 1497: 1134:). An eighth summary paper focused on cost–benefit analysis was unveiled in June 2012. 1127: 1086: 843: 690: 135: 2655:"Éboulement sur la voie ferrée : la ligne vers Modane ne réouvrira pas cet hiver" 3889: 3674: 3335: 3291: 2713:
TGV Est 11 millions de voyageurs en un an : la SNCF en avance sur ses objectifs
1768: 1666: 1643: 1077: 1073: 339: 2842:"L'accord franco-italien pour la ligne ferroviaire Lyon-Turin définitivement adopté" 1862:
is an Italian movement against the construction of the line, named from the Italian
3866:– The company responsible for the Turin–Lyon line, owned 50% by RFI and 50% by RFF. 3792: 3745: 3679: 3638: 3389:
Parte Comune Italo-francese. Revisione del Progetto Definitivo, CUP C11J05000030001
2881: 1826: 1703: 302: 271: 100: 3382:"Progetto preliminare in variante – Chiarimenti ed integrazioni (Richiesta N° 11)" 1816:
is ill-suited for tunnel boring machines; it instead is being bored entirely by
1536:
The line is divided into three sections constructed under separate managements:
1174:(see References) divides the international and Italian sides into four sections: 3571: 2717: 1923: 1873: 1764: 1699: 1647: 1623: 1615: 1583: 1034: 267: 107: 3762: 3740: 3730: 3283: 1678: 1659: 446: 3757: 3486: 3045:"Attribution de marchés pour plus de 250 millions d'euros • TELT Lyon-Turin" 2859: 1946: 1877: 1788: 1731: 1711: 1608: 1579: 1549: 1233: 1207: 1199: 1193: 1185: 1042: 3002:""Avis de marchés lancés pour la construction du tunnel de base en France"" 1076:
and much wider curves compared to the existing line will also allow heavy
188: 3686: 3556: 2978: 2769:"Liaison Lyon-Turin : pourquoi le Smmag financera 1 million d'euros" 1991: 1935: 1889: 1735: 1655: 1038: 148: 3023:""Lyon-Turin : les avis de marché publiés pour le tronçon italien"" 2236:"L'Union européenne confirme une participation accrue sur le Lyon-Turin" 3541: 2338:[Press conference by president Mario Monti]. Italian Government 1987: 1934:(mountainous community). From 2000 onwards, there were demonstrations, 1501: 1006:
is an international rail line under construction between the cities of
2127:"Italy agrees to resume controversial Turin-Lyon high-speed rail link" 1926:
in Italy have been resisting the railway project since the 1990s. The
1677:
through a second 20 to 23 km (12 to 14 mi) tunnel under the
933: 761: 678: 476: 377: 255: 1950: 1813: 1777: 1747: 1727: 1707: 1651: 1587: 1179: 1138: 1046: 65: 3088:"Une année de creusement du tunnel de base à Saint-Julien-Montdenis" 2949:"Italy's prime minister halts project to build train line to France" 2100:"Future of Turin-Lyon high-speed railway: is the line still viable?" 1911: 1236:) and sharp curves in its high valley sections discourage its use. 3802: 3713: 1910: 1836: 1635: 1530: 1526: 1515: 1247: 1213: 1170:
The characteristics of the line vary widely along its length. The
1099: 1095: 1007: 993: 985: 488: 170: 77: 2250:"Lyon-Turin : vers les 55 % de contribution européenne" 3175:"Contrat attribué pour l'excavation du tunnel de base en Italie" 1760: 1639: 1604: 1568: 1065: 1058: 1026: 1011: 3490: 2926:"Realisation des 9 premiers Km du tunnel de base du Lyon-Turin" 1945:, but some protests have turned violent. Catholics pray at the 1149:
is used for the corresponding 5 km (3.1 mi) section.
3863: 3336:"Railway Related Impacts: THE TURIN-LYON HIGH-SPEED RAIL CASE" 3102:"Lyon-Turin : le premier tunnelier sera terminé fin juin" 2068: 1049:. At 57.5 kilometres (35.7 mi), that tunnel will be the 3368:
4 km de sondages a la Maddalena : pas de trace d’amiante
1669:, and will pass South of Chambéry through a tunnel under the 3130:"Le tunnelier qui traversera la frontière a été réceptionné" 1137:
Test drilling found some fractured and sheared coal-bearing
2904:""SMP4: Federica creuse avec des pics de 15/19 m par jour"" 2007:
movement, by contrast, characterize it as a typical NIMBY (
2015:
emission elimination benefits of the tunnel. In response,
1654:. The line may also be used to offload the saturated Lyon– 1845:(excavated sections in blue, sections in progress in red) 1520:
Geothermal profile of the Turin-Lyon railway base tunnel
3144:"Le cinquième tunnelier du Lyon-Turin a été réceptionné" 1141:
close to the French portal that are poorly suited for a
3454:
http://www.notavtorino.org/documenti/inglese/indice.htm
2358:"Situation et perspectives des finances publiques 2012" 2011:) movement and point out the pollution reduction and CO 2681:
Flyvbjerg, B.; Buzelius, N.; Rothengatter, W. (2003).
1244:
Traffic predictions on Frejus and Mont-Blanc corridors
3857: 3851: 3230:"Un sondage indique une forte adhésion au Lyon-Turin" 2330: 2328: 1986:
Health concerns, due to the hypothesized presence of
16:
Rail line under construction between Italy and France
3816: 3785: 3667: 3611: 3595: 3524: 3161:"Les grandes technologies arrivent sur le chantier" 1791:parties, and in March 2019, Italy's Prime Minister 164: 156: 142: 106: 96: 88: 83: 53: 45: 40: 23: 2469:"Un nouveau front de percement pour le Lyon-Turin" 1980:Economical feasibility in doubt due to high costs. 1622:) and the central Lyon stations to both Italy and 2763: 2761: 1650:will be almost 45 minutes, and almost an hour to 3881:TAV Turin–Lyon planned line in Google Earth/Maps 3309:"Jail for Italy high-speed rail link protesters" 2215:Official Journal L 235 , 17/09/1996 P. 0006-0024 1834:dug, as well as 23.5 km of auxiliary galleries. 2613: 2611: 2609: 2437: 2435: 2433: 3254: 3252: 3250: 3155: 3153: 3116:"Cinq tunneliers en construction en Allemagne" 3082: 3080: 2463: 2461: 2459: 1850:completion date for the base tunnel was 2032. 1626:. It will connect near Chambéry to the Annecy 1118:completion date for the base tunnel was 2032. 3502: 3475:Quaderno 2: Scenari di traffico – Arco Alpino 3204:"Italy Divided Over Rail Line Meant to Unite" 2684:Megaprojects and Risk: An Anatomy of Ambition 203: 8: 3469:Quaderno 1: Linea storica – Tratta di valico 3303: 3301: 2197:Mobility and Transport – European Commission 3926:High-speed railway lines under construction 3481:Quaderno 3: Linea storica – Tratta di valle 2492:"Progressing the Lyon-Turin base rail link" 1763:25 billion, of which €8 billion is for the 1094:security, be slightly faster over the full 1053:, ahead of the 57.1 km (35.5 mi) 3854:– owner of the Italian rail infrastructure 3509: 3495: 3487: 3452:For specific documentation in English see 2187: 2185: 1630:Aix les Bains and the Bourg Saint-Maurice 1057:. The estimated total cost of the line is 235: 210: 196: 177: 3860:– owner of the French rail infrastructure 2306:Montalto Monella, Lillo (26 March 2019). 1970:Better to update existing infrastructure. 3873:documents against the project in English 3356:Feu vert au projet de variante en Italie 3334:Marina Clerico; et al. (May 2015). 3074:October 2021 (Volume 177 No 10) pp 40-43 2557:École polytechnique fédérale de Lausanne 2301: 2299: 2297: 2295: 2293: 2291: 2289: 2287: 2285: 1263: 2848:. 26 January 2017 – via Le Monde. 2410: 2408: 2381: 2379: 2091: 1706:, which would have needed a viaduct in 1189:(Frejus tunnel and high valley section) 193: 179: 3433:: CS1 maint: archived copy as title ( 3426: 3228:THIERS, Frédéric (24 September 2019). 3202:Povoledo, Elisabetta (17 March 2014). 1941:The movement advocates the tactics of 1634:Albertville lines. The time gain from 20: 7: 3358:, 29 juillet 2017, site tel-sas.com. 1820:, and is expected to take 70 months. 833: 825: 815: 807: 3380:Commissione VIA (5 December 2010). 2882:""A SMP4 la faille a ete franchie"" 751: 3906:High-speed railway lines in France 2264:"OFT - Trafic à travers les Alpes" 1983:Danger of environmental disasters. 1614:The passenger line will link the 1540:the international section between 1441:Heavy vehicles (thousand per year) 35:Status at the end of December 2018 14: 3901:High-speed railway lines in Italy 2553:CAPacité des RESéaux ferroviaires 786: 661: 561: 532: 3911:Proposed railway lines in France 3343:Fresenius Environmental Bulletin 2947:Bellamy, Daniel (9 March 2019). 2125:Bellamy, Daniel (27 July 2019). 1227:The first section comprises the 1051:longest rail tunnel in the world 922: 900: 881: 862: 855: 832: 824: 814: 806: 785: 750: 726: 707: 667: 660: 641: 634: 612: 593: 586: 567: 560: 538: 531: 513: 512: 505: 465: 458: 436: 417: 411: 410: 366: 359: 352: 327: 320: 306: 301: 288: 244: 70: 58: 29: 3916:Proposed railway lines in Italy 3852:RFI – Rete Ferroviaria Italiana 1618:(through a connection South of 1500:) and underestimates (e.g. the 863: 587: 506: 321: 3649:LGV Provence-Alpes-Côte d'Azur 1153:The present high-altitude line 938:Turin–Milan high-speed railway 727: 708: 635: 418: 367: 353: 1: 3537:LGV Bretagne-Pays de la Loire 3072:Railway Gazette International 2860:"SMLP : en route !" 1014:. It is intended to link the 1004:Turin–Lyon high-speed railway 923: 668: 642: 623:Saint-Jean-de-Maurienne Arvan 466: 459: 437: 360: 245: 219:Turin–Lyon high-speed railway 24:Turin–Lyon high-speed railway 3858:RFF – Réseau Ferré de France 2818:(in Italian). Archived from 1966:main stated objections are: 1829:, a German company based in 1578:the Italian section between 1102:route. A 2012 report by the 882: 856: 594: 568: 160:220 km/h (140 mph) 3668:Operators and rolling stock 2211:"EUR-Lex – 31996L0048 – EN" 2059:List of tunnels by location 2019:activists talk about LULU ( 1563:the French section between 901: 613: 539: 328: 289: 3942: 3612:Planned or projected lines 2689:Cambridge University Press 1620:Gare de Lyon Saint-Exupéry 3896:Railway lines in Piedmont 3834:Transmission Voie-Machine 3786:Adjacent high-speed lines 3634:Paris – Normandy new line 3629:LGV Montpellier–Perpignan 3577:LGV Sud Europe Atlantique 3518:High-speed rail in France 3284:10.1080/09644010701634257 2074:Rete Ferroviaria Italiana 2049:High-speed rail in Europe 2021:Locally unwanted land use 1943:non-violent direct action 1854:Opposition to the project 931: 916: 909: 894: 890: 875: 871: 849: 842: 798: 794: 779: 759: 744: 735: 720: 716: 701: 676: 654: 650: 628: 621: 606: 602: 580: 576: 554: 549:Chambéry-Challes-les-Eaux 547: 525: 521: 499: 474: 452: 445: 430: 426: 404: 375: 346: 336: 314: 297: 282: 253: 238: 176: 92:271 km (168 mi) 28: 2039:Mont d'Ambin Base Tunnel 1907:No TAV movement in Italy 1843:Mont d'Ambin Base Tunnel 1773:Saint-Martin-de-la-Porte 1740:Mont d'Ambin base tunnel 1554:Mont d'Ambin Base Tunnel 1496:overestimates (e.g. the 1122:Pre-construction studies 1115:Saint-Martin-de-la-Porte 1031:Mont d'Ambin Base Tunnel 738:Mont d'Ambin Base Tunnel 3596:Line under construction 3582:LGV Perpignan–Barcelona 2054:List of longest tunnels 1742:is being dug under the 1724:Saint-Jean-de-Maurienne 1675:Saint-Jean-de-Maurienne 1565:Saint-Jean-de-Maurienne 1542:Saint-Jean-de-Maurienne 1407:Modane corridor – Total 1320:Modane corridor – Total 3921:2032 in rail transport 3829:TGV track construction 3624:LGV Interconnexion Sud 3547:LGV Interconnexion Est 3315:. AFP. 27 January 2015 3264:Environmental Politics 3260:Porta, Donatella Della 2729:Quaderno 2 – pp. 36-39 2594:Quaderno 1 – pp. 33–34 2079:Réseau Ferré de France 2044:Lyon Turin Ferroviaire 2034:Mediterranean Corridor 1919: 1846: 1802:tunnel boring machines 1558:Lyon Turin Ferroviaire 1521: 1424:Modane corridor – Rail 1337:Modane corridor – Rail 1257: 1217:(metropolitan section) 999: 991: 299:Lyon Saint-Exupéry TGV 3659:LGV Toulouse–Narbonne 3654:LGV Bordeaux–Toulouse 3587:LGV Nîmes–Montpellier 2742:. LTF. Archived from 2389:. LTF. Archived from 2166:. LTF. Archived from 1914: 1840: 1818:drilling and blasting 1754:Construction progress 1718:International section 1567:and the outskirts of 1519: 1252:Traffic prevision by 1251: 1147:drilling and blasting 1143:tunnel boring machine 1104:French Court of Audit 997: 989: 3644:LGV Poitiers–Limoges 3391:(in Italian): 21–22. 2199:. 22 September 2016. 2164:"The Alpine tunnels" 1671:Chartreuse Mountains 1571:will be built under 1460:Without the new line 1267:Without the new line 1203:(low valley section) 1159:Turin–Modane railway 1145:, and old-fashioned 1055:Gotthard Base Tunnel 683:Culoz–Modane railway 481:Culoz–Modane railway 3808:Perpignan–Barcelona 3370:, site tel-sas.com. 3276:2007EnvPo..16..864P 2716:, Simon Barthélémy 2502:on 12 December 2021 2393:on 22 February 2012 2387:"Close-up on works" 2064:Treno Alta Velocità 2009:Not In My Back Yard 1922:Some people in the 1869:Treno Alta Velocità 1083:high-speed railways 3619:LGV Bordeaux–Spain 3208:The New York Times 2822:on 12 January 2014 2746:on 12 January 2014 2671:Quaderno 2 – p. 18 2659:www.ledauphine.com 2641:www.ledauphine.com 2623:www.ledauphine.com 2585:Quaderno 1 – p. 32 2576:Quaderno 1 – p. 31 2567:Quaderno 1 – p. 30 2543:Quaderno 1 – p. 16 2534:Quaderno 1 – p. 17 2496:www.tunneltalk.com 2170:on 31 October 2006 2104:Railway Technology 1975:Fréjus Road Tunnel 1920: 1897:Villarodin-Bourget 1884:Local French views 1847: 1785:Five Star Movement 1522: 1258: 1164:Fréjus Rail Tunnel 1000: 992: 911:Torino Porta Nuova 49:Under construction 3842: 3841: 3775:Frecciarossa 1000 3770:Trenitalia France 3441:Pro Natura Torino 2792:. Dauphine Libere 2740:"The base tunnel" 2481:Quaderno 1 – p. 4 2270:on 6 October 2013 1493: 1492: 1477:With the new line 1354:With the new line 984: 983: 980: 979: 976: 975: 972: 971: 951: 950: 774: 773: 696: 695: 494: 493: 399: 398: 277: 276: 3933: 3879: 3552:LGV Méditerranée 3525:Lines in service 3511: 3504: 3497: 3488: 3456: 3450: 3444: 3438: 3432: 3424: 3422: 3420: 3414: 3408:. Archived from 3407: 3399: 3393: 3392: 3386: 3377: 3371: 3365: 3359: 3353: 3347: 3346: 3340: 3331: 3325: 3324: 3322: 3320: 3305: 3296: 3295: 3256: 3245: 3244: 3242: 3240: 3225: 3219: 3218: 3216: 3214: 3199: 3193: 3192: 3185: 3179: 3178: 3171: 3165: 3164: 3157: 3148: 3147: 3140: 3134: 3133: 3126: 3120: 3119: 3112: 3106: 3105: 3098: 3092: 3091: 3084: 3075: 3069: 3063: 3062: 3055: 3049: 3048: 3041: 3035: 3034: 3032: 3030: 3019: 3013: 3012: 3010: 3008: 2998: 2992: 2991: 2989: 2987: 2970: 2964: 2963: 2961: 2959: 2944: 2938: 2937: 2935: 2933: 2922: 2916: 2915: 2913: 2911: 2900: 2894: 2893: 2891: 2889: 2878: 2872: 2871: 2869: 2867: 2856: 2850: 2849: 2838: 2832: 2831: 2829: 2827: 2808: 2802: 2801: 2799: 2797: 2786: 2780: 2779: 2777: 2775: 2765: 2756: 2755: 2753: 2751: 2736: 2730: 2727: 2721: 2709: 2703: 2702: 2678: 2672: 2669: 2663: 2662: 2651: 2645: 2644: 2633: 2627: 2626: 2615: 2604: 2601: 2595: 2592: 2586: 2583: 2577: 2574: 2568: 2565: 2559: 2550: 2544: 2541: 2535: 2532: 2526: 2525: 2518: 2512: 2511: 2509: 2507: 2498:. Archived from 2488: 2482: 2479: 2473: 2472: 2465: 2454: 2453: 2451: 2449: 2439: 2428: 2427: 2425: 2423: 2412: 2403: 2402: 2400: 2398: 2383: 2374: 2373: 2371: 2369: 2360:. Archived from 2354: 2348: 2347: 2345: 2343: 2332: 2323: 2322: 2320: 2318: 2303: 2280: 2279: 2277: 2275: 2266:. Archived from 2260: 2254: 2253: 2246: 2240: 2239: 2232: 2226: 2225: 2223: 2221: 2207: 2201: 2200: 2189: 2180: 2179: 2177: 2175: 2160: 2154: 2152: 2148: 2142: 2141: 2139: 2137: 2122: 2116: 2115: 2113: 2111: 2096: 1932:Comunità Montana 1918:protests in 2005 1710:and a tunnel in 1512:New railway line 1264: 1157:Since 1872, the 934: 926: 925: 904: 903: 885: 884: 866: 865: 859: 858: 836: 835: 828: 827: 818: 817: 810: 809: 789: 788: 762: 754: 753: 730: 729: 711: 710: 679: 671: 670: 664: 663: 645: 644: 638: 637: 616: 615: 597: 596: 590: 589: 571: 570: 564: 563: 542: 541: 535: 534: 516: 515: 509: 508: 477: 469: 468: 462: 461: 440: 439: 421: 420: 414: 413: 390:LGV Méditerranée 378: 370: 369: 363: 362: 356: 355: 331: 330: 324: 323: 310: 305: 292: 291: 256: 248: 247: 236: 212: 205: 198: 189: 178: 151: 138: 132: 130: 129: 125: 122: 114: 97:Number of tracks 76: 74: 73: 64: 62: 61: 33: 21: 3941: 3940: 3936: 3935: 3934: 3932: 3931: 3930: 3886: 3885: 3877: 3864:TELT Lyon–Turin 3848: 3843: 3838: 3812: 3781: 3719:Renfe Class 100 3663: 3607: 3591: 3567:LGV Rhône-Alpes 3520: 3515: 3465: 3460: 3459: 3451: 3447: 3425: 3418: 3416: 3415:on 12 July 2014 3412: 3405: 3403:"Archived copy" 3401: 3400: 3396: 3384: 3379: 3378: 3374: 3366: 3362: 3354: 3350: 3338: 3333: 3332: 3328: 3318: 3316: 3307: 3306: 3299: 3258: 3257: 3248: 3238: 3236: 3234:Dauphine Libere 3227: 3226: 3222: 3212: 3210: 3201: 3200: 3196: 3187: 3186: 3182: 3173: 3172: 3168: 3159: 3158: 3151: 3142: 3141: 3137: 3128: 3127: 3123: 3114: 3113: 3109: 3100: 3099: 3095: 3086: 3085: 3078: 3070: 3066: 3057: 3056: 3052: 3043: 3042: 3038: 3028: 3026: 3021: 3020: 3016: 3006: 3004: 3000: 2999: 2995: 2985: 2983: 2982:. 11 March 2019 2972: 2971: 2967: 2957: 2955: 2946: 2945: 2941: 2931: 2929: 2924: 2923: 2919: 2909: 2907: 2902: 2901: 2897: 2887: 2885: 2880: 2879: 2875: 2865: 2863: 2858: 2857: 2853: 2840: 2839: 2835: 2825: 2823: 2810: 2809: 2805: 2795: 2793: 2788: 2787: 2783: 2773: 2771: 2767: 2766: 2759: 2749: 2747: 2738: 2737: 2733: 2728: 2724: 2710: 2706: 2699: 2680: 2679: 2675: 2670: 2666: 2653: 2652: 2648: 2635: 2634: 2630: 2617: 2616: 2607: 2602: 2598: 2593: 2589: 2584: 2580: 2575: 2571: 2566: 2562: 2551: 2547: 2542: 2538: 2533: 2529: 2520: 2519: 2515: 2505: 2503: 2490: 2489: 2485: 2480: 2476: 2467: 2466: 2457: 2447: 2445: 2441: 2440: 2431: 2421: 2419: 2414: 2413: 2406: 2396: 2394: 2385: 2384: 2377: 2367: 2365: 2356: 2355: 2351: 2341: 2339: 2334: 2333: 2326: 2316: 2314: 2305: 2304: 2283: 2273: 2271: 2262: 2261: 2257: 2248: 2247: 2243: 2234: 2233: 2229: 2219: 2217: 2209: 2208: 2204: 2191: 2190: 2183: 2173: 2171: 2162: 2161: 2157: 2150: 2149: 2145: 2135: 2133: 2124: 2123: 2119: 2109: 2107: 2098: 2097: 2093: 2088: 2083: 2029: 2014: 2003:Critics of the 1959: 1909: 1886: 1856: 1756: 1720: 1695: 1693:Italian section 1601: 1514: 1454: 1367: 1280: 1246: 1223:(urban section) 1155: 1124: 1071: 1064:Like the Swiss 1023:high-speed rail 946:Milano Centrale 927: 905: 886: 867: 860: 838: 837: 830: 829: 820: 819: 812: 811: 790: 755: 731: 712: 672: 665: 646: 639: 617: 598: 591: 572: 565: 543: 536: 517: 510: 470: 463: 441: 422: 415: 382:LGV Rhône-Alpes 371: 364: 357: 332: 325: 293: 260:LGV Rhône-Alpes 249: 230: 221: 220: 216: 183: 157:Operating speed 149: 144:Electrification 134: 127: 123: 120: 118: 117:4 ft  116: 112: 71: 69: 59: 57: 36: 17: 12: 11: 5: 3939: 3937: 3929: 3928: 3923: 3918: 3913: 3908: 3903: 3898: 3888: 3887: 3884: 3883: 3875: 3867: 3861: 3855: 3847: 3846:External links 3844: 3840: 3839: 3837: 3836: 3831: 3826: 3820: 3818: 3814: 3813: 3811: 3810: 3805: 3800: 3797:Channel Tunnel 3789: 3787: 3783: 3782: 3780: 3779: 3778: 3777: 3767: 3766: 3765: 3755: 3754: 3753: 3748: 3743: 3738: 3736:TGV Atlantique 3733: 3726:SNCF Voyageurs 3723: 3722: 3721: 3711: 3710: 3709: 3704: 3699: 3694: 3684: 3683: 3682: 3680:ICE 3 Velaro D 3671: 3669: 3665: 3664: 3662: 3661: 3656: 3651: 3646: 3641: 3636: 3631: 3626: 3621: 3615: 3613: 3609: 3608: 3606: 3605: 3603:LGV Lyon–Turin 3599: 3597: 3593: 3592: 3590: 3589: 3584: 3579: 3574: 3569: 3564: 3562:LGV Rhin-Rhône 3559: 3554: 3549: 3544: 3539: 3534: 3532:LGV Atlantique 3528: 3526: 3522: 3521: 3516: 3514: 3513: 3506: 3499: 3491: 3485: 3484: 3478: 3472: 3464: 3461: 3458: 3457: 3445: 3394: 3372: 3360: 3348: 3326: 3297: 3270:(5): 864–882. 3246: 3220: 3194: 3180: 3166: 3149: 3135: 3121: 3107: 3093: 3076: 3064: 3050: 3036: 3014: 2993: 2965: 2939: 2917: 2895: 2873: 2851: 2833: 2803: 2781: 2757: 2731: 2722: 2704: 2697: 2673: 2664: 2646: 2628: 2605: 2596: 2587: 2578: 2569: 2560: 2545: 2536: 2527: 2513: 2483: 2474: 2455: 2429: 2404: 2375: 2364:on 8 July 2012 2349: 2324: 2281: 2255: 2241: 2227: 2202: 2181: 2155: 2143: 2117: 2090: 2089: 2087: 2084: 2082: 2081: 2076: 2071: 2066: 2061: 2056: 2051: 2046: 2041: 2036: 2030: 2028: 2025: 2012: 1997: 1996: 1984: 1981: 1978: 1971: 1958: 1955: 1908: 1905: 1885: 1882: 1855: 1852: 1822: 1821: 1809: 1805: 1793:Giuseppe Conte 1755: 1752: 1719: 1716: 1694: 1691: 1683:Lac du Bourget 1600: 1599:French section 1597: 1596: 1595: 1576: 1561: 1513: 1510: 1506:Bonnets Rouges 1498:Channel tunnel 1491: 1490: 1487: 1484: 1481: 1478: 1474: 1473: 1470: 1467: 1464: 1461: 1457: 1456: 1451: 1448: 1445: 1442: 1438: 1437: 1434: 1431: 1428: 1425: 1421: 1420: 1417: 1414: 1411: 1408: 1404: 1403: 1400: 1397: 1394: 1391: 1387: 1386: 1383: 1380: 1377: 1374: 1370: 1369: 1364: 1361: 1358: 1355: 1351: 1350: 1347: 1344: 1341: 1338: 1334: 1333: 1330: 1327: 1324: 1321: 1317: 1316: 1313: 1310: 1307: 1304: 1300: 1299: 1296: 1293: 1290: 1287: 1283: 1282: 1277: 1274: 1271: 1268: 1245: 1242: 1225: 1224: 1218: 1204: 1190: 1154: 1151: 1123: 1120: 1087:European Union 1078:freight trains 1069: 982: 981: 978: 977: 974: 973: 970: 969: 967: 965: 963: 961: 959: 957: 954: 953: 949: 948: 941: 940: 930: 928: 921: 919: 917: 914: 913: 908: 906: 899: 897: 895: 892: 891: 889: 887: 880: 878: 876: 873: 872: 870: 868: 861: 854: 852: 850: 847: 846: 841: 839: 831: 823: 822: 821: 813: 805: 804: 803: 801: 799: 796: 795: 793: 791: 784: 782: 780: 777: 776: 772: 771: 767: 766: 758: 756: 749: 747: 745: 742: 741: 734: 732: 725: 723: 721: 718: 717: 715: 713: 706: 704: 702: 699: 698: 694: 693: 686: 685: 675: 673: 666: 659: 657: 655: 652: 651: 649: 647: 640: 633: 631: 629: 626: 625: 620: 618: 611: 609: 607: 604: 603: 601: 599: 592: 585: 583: 581: 578: 577: 575: 573: 566: 559: 557: 555: 552: 551: 546: 544: 537: 530: 528: 526: 523: 522: 520: 518: 511: 504: 502: 500: 497: 496: 492: 491: 484: 483: 473: 471: 464: 457: 455: 453: 450: 449: 444: 442: 435: 433: 431: 428: 427: 425: 423: 416: 409: 407: 405: 402: 401: 397: 396: 385: 384: 374: 372: 365: 358: 351: 349: 347: 344: 343: 335: 333: 326: 319: 317: 315: 312: 311: 296: 294: 287: 285: 283: 280: 279: 275: 274: 263: 262: 252: 250: 243: 241: 239: 232: 231: 226: 223: 222: 218: 217: 215: 214: 207: 200: 192: 185: 184: 181: 174: 173: 168: 162: 161: 158: 154: 153: 146: 140: 139: 136:standard gauge 110: 104: 103: 98: 94: 93: 90: 86: 85: 81: 80: 55: 51: 50: 47: 43: 42: 38: 37: 34: 26: 25: 15: 13: 10: 9: 6: 4: 3: 2: 3938: 3927: 3924: 3922: 3919: 3917: 3914: 3912: 3909: 3907: 3904: 3902: 3899: 3897: 3894: 3893: 3891: 3882: 3876: 3874: 3872: 3868: 3865: 3862: 3859: 3856: 3853: 3850: 3849: 3845: 3835: 3832: 3830: 3827: 3825: 3822: 3821: 3819: 3815: 3809: 3806: 3804: 3801: 3798: 3794: 3791: 3790: 3788: 3784: 3776: 3773: 3772: 3771: 3768: 3764: 3761: 3760: 3759: 3756: 3752: 3749: 3747: 3744: 3742: 3739: 3737: 3734: 3732: 3729: 3728: 3727: 3724: 3720: 3717: 3716: 3715: 3712: 3708: 3705: 3703: 3700: 3698: 3697:Eurostar e320 3695: 3693: 3692:Eurostar e300 3690: 3689: 3688: 3685: 3681: 3678: 3677: 3676: 3675:Deutsche Bahn 3673: 3672: 3670: 3666: 3660: 3657: 3655: 3652: 3650: 3647: 3645: 3642: 3640: 3637: 3635: 3632: 3630: 3627: 3625: 3622: 3620: 3617: 3616: 3614: 3610: 3604: 3601: 3600: 3598: 3594: 3588: 3585: 3583: 3580: 3578: 3575: 3573: 3570: 3568: 3565: 3563: 3560: 3558: 3555: 3553: 3550: 3548: 3545: 3543: 3540: 3538: 3535: 3533: 3530: 3529: 3527: 3523: 3519: 3512: 3507: 3505: 3500: 3498: 3493: 3492: 3489: 3482: 3479: 3476: 3473: 3470: 3467: 3466: 3462: 3455: 3449: 3446: 3442: 3436: 3430: 3411: 3404: 3398: 3395: 3390: 3383: 3376: 3373: 3369: 3364: 3361: 3357: 3352: 3349: 3344: 3337: 3330: 3327: 3314: 3310: 3304: 3302: 3298: 3293: 3289: 3285: 3281: 3277: 3273: 3269: 3265: 3261: 3255: 3253: 3251: 3247: 3235: 3231: 3224: 3221: 3209: 3205: 3198: 3195: 3190: 3184: 3181: 3176: 3170: 3167: 3162: 3156: 3154: 3150: 3145: 3139: 3136: 3131: 3125: 3122: 3117: 3111: 3108: 3103: 3097: 3094: 3089: 3083: 3081: 3077: 3073: 3068: 3065: 3060: 3054: 3051: 3046: 3040: 3037: 3024: 3018: 3015: 3003: 2997: 2994: 2981: 2980: 2975: 2969: 2966: 2954: 2950: 2943: 2940: 2927: 2921: 2918: 2905: 2899: 2896: 2883: 2877: 2874: 2861: 2855: 2852: 2847: 2843: 2837: 2834: 2821: 2817: 2813: 2807: 2804: 2791: 2785: 2782: 2770: 2764: 2762: 2758: 2745: 2741: 2735: 2732: 2726: 2723: 2719: 2715: 2714: 2708: 2705: 2700: 2698:0-521-00946-4 2694: 2690: 2687:. Cambridge: 2686: 2685: 2677: 2674: 2668: 2665: 2660: 2656: 2650: 2647: 2642: 2638: 2632: 2629: 2624: 2620: 2614: 2612: 2610: 2606: 2600: 2597: 2591: 2588: 2582: 2579: 2573: 2570: 2564: 2561: 2558: 2554: 2549: 2546: 2540: 2537: 2531: 2528: 2523: 2517: 2514: 2501: 2497: 2493: 2487: 2484: 2478: 2475: 2470: 2464: 2462: 2460: 2456: 2444: 2438: 2436: 2434: 2430: 2417: 2411: 2409: 2405: 2392: 2388: 2382: 2380: 2376: 2363: 2359: 2353: 2350: 2337: 2331: 2329: 2325: 2313: 2309: 2302: 2300: 2298: 2296: 2294: 2292: 2290: 2288: 2286: 2282: 2269: 2265: 2259: 2256: 2251: 2245: 2242: 2237: 2231: 2228: 2216: 2212: 2206: 2203: 2198: 2194: 2188: 2186: 2182: 2169: 2165: 2159: 2156: 2147: 2144: 2132: 2128: 2121: 2118: 2106:. 24 May 2019 2105: 2101: 2095: 2092: 2085: 2080: 2077: 2075: 2072: 2070: 2067: 2065: 2062: 2060: 2057: 2055: 2052: 2050: 2047: 2045: 2042: 2040: 2037: 2035: 2032: 2031: 2026: 2024: 2022: 2018: 2010: 2006: 2001: 1995:non-existent. 1993: 1989: 1985: 1982: 1979: 1976: 1972: 1969: 1968: 1967: 1964: 1956: 1954: 1952: 1948: 1944: 1939: 1937: 1933: 1929: 1925: 1917: 1913: 1906: 1904: 1902: 1898: 1893: 1891: 1883: 1881: 1879: 1875: 1871: 1870: 1865: 1861: 1853: 1851: 1844: 1839: 1835: 1832: 1828: 1819: 1815: 1810: 1806: 1803: 1799: 1798: 1797: 1794: 1790: 1786: 1781: 1779: 1776:coal-bearing 1774: 1770: 1769:French Senate 1766: 1762: 1753: 1751: 1749: 1745: 1741: 1737: 1733: 1729: 1725: 1717: 1715: 1713: 1709: 1705: 1701: 1692: 1690: 1686: 1684: 1680: 1676: 1672: 1668: 1663: 1661: 1657: 1653: 1649: 1645: 1644:Aix-les-Bains 1641: 1637: 1633: 1629: 1625: 1621: 1617: 1612: 1610: 1606: 1598: 1593: 1589: 1585: 1581: 1577: 1574: 1570: 1566: 1562: 1559: 1555: 1552:includes the 1551: 1547: 1543: 1539: 1538: 1537: 1534: 1532: 1528: 1518: 1511: 1509: 1507: 1503: 1499: 1488: 1485: 1482: 1479: 1476: 1475: 1471: 1468: 1465: 1462: 1459: 1458: 1453:Annual growth 1452: 1449: 1446: 1443: 1440: 1439: 1435: 1432: 1429: 1426: 1423: 1422: 1418: 1415: 1412: 1409: 1406: 1405: 1401: 1398: 1395: 1392: 1389: 1388: 1384: 1381: 1378: 1375: 1372: 1371: 1366:Annual growth 1365: 1362: 1359: 1356: 1353: 1352: 1348: 1345: 1342: 1339: 1336: 1335: 1331: 1328: 1325: 1322: 1319: 1318: 1314: 1311: 1308: 1305: 1302: 1301: 1297: 1294: 1291: 1288: 1285: 1284: 1279:Annual growth 1278: 1275: 1272: 1269: 1266: 1265: 1262: 1255: 1250: 1243: 1241: 1237: 1235: 1230: 1222: 1219: 1216: 1215: 1210: 1209: 1205: 1202: 1201: 1196: 1195: 1191: 1188: 1187: 1182: 1181: 1177: 1176: 1175: 1173: 1168: 1166: 1165: 1160: 1152: 1150: 1148: 1144: 1140: 1135: 1133: 1129: 1121: 1119: 1116: 1111: 1109: 1105: 1101: 1097: 1091: 1088: 1084: 1079: 1075: 1067: 1062: 1060: 1056: 1052: 1048: 1044: 1040: 1036: 1032: 1028: 1024: 1021: 1017: 1013: 1009: 1005: 996: 988: 968: 966: 964: 962: 960: 958: 956: 955: 947: 943: 942: 939: 936: 935: 929: 920: 918: 915: 912: 907: 898: 896: 893: 888: 879: 877: 874: 869: 853: 851: 848: 845: 840: 802: 800: 797: 792: 783: 781: 778: 769: 768: 764: 763: 757: 748: 746: 743: 740: 739: 733: 724: 722: 719: 714: 705: 703: 700: 692: 688: 687: 684: 681: 680: 674: 658: 656: 653: 648: 632: 630: 627: 624: 619: 610: 608: 605: 600: 584: 582: 579: 574: 558: 556: 553: 550: 545: 529: 527: 524: 519: 503: 501: 498: 490: 486: 485: 482: 479: 478: 472: 456: 454: 451: 448: 443: 434: 432: 429: 424: 408: 406: 403: 395: 391: 387: 386: 383: 380: 379: 373: 350: 348: 345: 342: 341: 340:Lyon Perrache 334: 318: 316: 313: 309: 304: 300: 295: 286: 284: 281: 273: 269: 265: 264: 261: 258: 257: 251: 242: 240: 237: 234: 233: 229: 225: 224: 213: 208: 206: 201: 199: 194: 191: 190: 187: 186: 180: 175: 172: 171:ERTMS Level 2 169: 167: 163: 159: 155: 152: 147: 145: 141: 137: 113:1,435 mm 111: 109: 105: 102: 99: 95: 91: 87: 82: 79: 67: 56: 52: 48: 44: 39: 32: 27: 22: 19: 3878:(in Italian) 3870: 3824:TGV stations 3793:High Speed 1 3639:LGV Picardie 3602: 3480: 3474: 3468: 3448: 3440: 3417:. Retrieved 3410:the original 3397: 3388: 3375: 3363: 3351: 3342: 3329: 3317:. Retrieved 3312: 3267: 3263: 3239:24 September 3237:. Retrieved 3233: 3223: 3211:. Retrieved 3207: 3197: 3183: 3169: 3163:(in French). 3146:(in French). 3138: 3132:(in French). 3124: 3118:(in French). 3110: 3104:(in French). 3096: 3071: 3067: 3053: 3039: 3027:. Retrieved 3017: 3005:. Retrieved 2996: 2984:. Retrieved 2977: 2968: 2956:. Retrieved 2952: 2942: 2932:24 September 2930:. Retrieved 2920: 2908:. Retrieved 2898: 2886:. Retrieved 2876: 2864:. Retrieved 2854: 2845: 2836: 2824:. Retrieved 2820:the original 2815: 2812:"Calendario" 2806: 2794:. Retrieved 2784: 2772:. Retrieved 2748:. Retrieved 2744:the original 2734: 2725: 2712: 2707: 2682: 2676: 2667: 2658: 2649: 2640: 2631: 2622: 2599: 2590: 2581: 2572: 2563: 2552: 2548: 2539: 2530: 2516: 2506:14 September 2504:. Retrieved 2500:the original 2495: 2486: 2477: 2448:18 September 2446:. Retrieved 2420:. Retrieved 2395:. Retrieved 2391:the original 2366:. Retrieved 2362:the original 2352: 2340:. Retrieved 2315:. Retrieved 2311: 2272:. Retrieved 2268:the original 2258: 2244: 2230: 2218:. Retrieved 2214: 2205: 2196: 2172:. Retrieved 2168:the original 2158: 2151:(in Italian) 2146: 2136:10 September 2134:. Retrieved 2130: 2120: 2110:10 September 2108:. Retrieved 2103: 2094: 2016: 2004: 2002: 1998: 1962: 1960: 1940: 1931: 1927: 1921: 1915: 1900: 1894: 1887: 1867: 1866:acronym for 1863: 1859: 1857: 1848: 1827:Herrenknecht 1823: 1782: 1757: 1744:Mont d'Ambin 1721: 1704:Dora Riparia 1696: 1687: 1667:A43 Motorway 1664: 1631: 1627: 1613: 1602: 1535: 1523: 1494: 1373:Alps – Total 1286:Alps – Total 1259: 1238: 1228: 1226: 1220: 1212: 1206: 1198: 1192: 1184: 1178: 1172:Osservatorio 1171: 1169: 1162: 1156: 1136: 1131: 1125: 1112: 1107: 1092: 1063: 1033:between the 1029:through the 1003: 1001: 736: 337: 101:Double track 18: 3572:LGV Sud-Est 3025:(in French) 2846:Le Monde.fr 2816:ltf-sas.com 2774:10 February 2720:6 juin 2008 2220:3 September 1924:Susa Valley 1841:Profile of 1765:base tunnel 1700:Susa valley 1660:train paths 1616:LGV Sud-Est 1584:Susa valley 1575:management; 1573:SNCF Réseau 1390:Alps – Rail 1303:Alps – Rail 1035:Susa Valley 268:LGV Sud-Est 150:25 kV 50 Hz 108:Track gauge 89:Line length 3890:Categories 3751:TGV Réseau 3741:TGV Duplex 3463:References 2796:29 January 2555:, Rivier, 1679:Belledonne 1455:2004–2030 1368:2004–2030 1281:2004–2030 1221:Turin node 1110:movement. 447:Avressieux 166:Signalling 3758:TGV Lyria 3313:The Local 3292:145761725 3213:9 October 2368:22 August 1957:Arguments 1947:Chiomonte 1880:valleys. 1878:Maurienne 1825:built by 1732:Bussoleno 1712:Bussoleno 1609:Maurienne 1590:is under 1580:Bussoleno 1550:Bussoleno 1208:Avigliana 1200:Avigliana 1194:Bussoleno 1186:Bussoleno 1074:gradients 1043:Maurienne 394:Marseille 182:Route map 84:Technical 3707:TGV PBKA 3687:Eurostar 3557:LGV Nord 3429:cite web 3419:24 April 2986:11 March 2979:Le Monde 2953:Euronews 2910:8 August 2866:12 April 2718:L'Alsace 2422:1 August 2312:Euronews 2131:euronews 2027:See also 1992:asbestos 1936:squatted 1890:Chimilin 1831:Schwanau 1736:Piemonte 1656:Grenoble 1648:Chambéry 1624:Chambéry 1611:valley. 1607:and the 1132:Quaderni 1039:Piedmont 131: in 41:Overview 3763:TGV 2N2 3746:TGV POS 3731:TGV 2N2 3702:TGV PBA 3542:LGV Est 3272:Bibcode 3029:17 July 2750:5 March 2397:2 March 2342:9 March 2174:2 March 1988:uranium 1814:schists 1778:schists 1502:TGV Est 1139:schists 1016:Italian 126:⁄ 3871:No TAV 3290:  3007:21 May 2888:5 July 2826:24 May 2695:  2274:24 May 2017:No TAV 2005:No TAV 1963:No TAV 1951:Venaus 1928:No TAV 1916:No TAV 1901:No TAV 1860:No TAV 1748:Modane 1728:Savoie 1708:Venaus 1652:Annecy 1588:Torino 1586:) and 1546:Savoie 1229:Fréjus 1180:Modane 1108:No TAV 1085:. The 1047:Savoie 1020:French 952: 775: 765:France 697: 691:Modane 495: 400: 278: 228:Legend 75:  68:& 66:France 63:  54:Locale 46:Status 3817:Other 3803:HSL 1 3795:(via 3714:Renfe 3439:from 3413:(PDF) 3406:(PDF) 3385:(PDF) 3339:(pdf) 3319:2 May 3288:S2CID 2958:2 May 2928:. LTF 2906:. LTF 2884:. LTF 2862:. LTF 2418:. LTF 2317:2 May 2086:Notes 1808:dug). 1636:Paris 1531:Paris 1527:Milan 1489:1.9% 1486:2,447 1483:2,244 1480:1,485 1472:2.9% 1469:3,121 1466:2,791 1463:1,485 1436:7.2% 1419:3.9% 1402:3.9% 1399:130.7 1396:111.4 1385:2.8% 1382:293.4 1379:264.5 1376:144.0 1349:3.6% 1332:3.1% 1315:3.3% 1312:112.5 1298:2.8% 1295:293.4 1292:264.5 1289:144.0 1214:Turin 1100:Paris 1096:Milan 1008:Turin 932: 770:Italy 760: 677: 489:Culoz 475: 376: 272:Paris 254: 78:Italy 3435:link 3421:2013 3321:2019 3241:2019 3215:2017 3031:2019 3009:2019 2988:2019 2960:2019 2934:2019 2912:2017 2890:2017 2868:2017 2828:2013 2798:2024 2776:2024 2752:2012 2693:ISBN 2508:2020 2450:2019 2424:2016 2399:2012 2370:2012 2344:2012 2319:2019 2276:2013 2222:2021 2176:2012 2138:2019 2112:2019 1990:and 1961:The 1876:and 1874:Susa 1789:Lega 1787:and 1730:and 1640:Lyon 1605:Lyon 1569:Lyon 1548:and 1450:2030 1447:2025 1444:2004 1433:39.4 1430:29.5 1416:76.5 1413:63.5 1410:28.5 1393:48.0 1363:2030 1360:2025 1357:2004 1346:16.4 1343:15.8 1329:63.8 1326:58.1 1323:28.5 1309:97.7 1306:48.0 1276:2030 1273:2025 1270:2004 1128:Susa 1066:NRLA 1041:and 1027:Alps 1018:and 1012:Lyon 1010:and 1002:The 844:Susa 392:and 270:and 3280:doi 2069:TGV 2023:). 1895:In 1888:In 1864:TAV 1734:in 1726:in 1646:or 1642:to 1638:or 1632:via 1628:via 1592:RFI 1544:in 1529:to 1427:6.5 1340:6.5 1254:LTF 1045:in 1037:in 944:to 689:to 487:to 388:to 338:to 266:to 3892:: 3431:}} 3427:{{ 3387:. 3341:. 3311:. 3300:^ 3286:. 3278:. 3268:16 3266:. 3249:^ 3232:. 3206:. 3152:^ 3079:^ 2976:. 2951:. 2844:. 2814:. 2760:^ 2691:. 2657:. 2639:. 2621:. 2608:^ 2494:. 2458:^ 2432:^ 2407:^ 2378:^ 2327:^ 2310:. 2284:^ 2213:. 2195:. 2184:^ 2129:. 2102:. 1750:. 1714:. 133:) 3799:) 3510:e 3503:t 3496:v 3443:. 3437:) 3423:. 3345:. 3323:. 3294:. 3282:: 3274:: 3243:. 3217:. 3191:. 3177:. 3090:. 3061:. 3047:. 3033:. 3011:. 2990:. 2962:. 2936:. 2914:. 2892:. 2870:. 2830:. 2800:. 2778:. 2754:. 2701:. 2661:. 2643:. 2625:. 2524:. 2510:. 2471:. 2452:. 2426:. 2401:. 2372:. 2346:. 2321:. 2278:. 2252:. 2238:. 2224:. 2178:. 2140:. 2114:. 2013:2 1804:. 1761:€ 1594:; 1582:( 1560:. 1234:‰ 1211:– 1197:– 1183:– 1098:– 1070:2 1059:€ 211:e 204:t 197:v 128:2 124:1 121:+ 119:8 115:(

Index


France
Italy
Double track
Track gauge
standard gauge
Electrification
25 kV 50 Hz
Signalling
ERTMS Level 2
v
t
e
Legend
LGV Rhône-Alpes
LGV Sud-Est
Paris
Lyon Saint-Exupéry TGV
Lyon tramway
Airport interchange
Lyon Perrache
LGV Rhône-Alpes
LGV Méditerranée
Marseille
Avressieux
Culoz–Modane railway
Culoz
Chambéry-Challes-les-Eaux
Saint-Jean-de-Maurienne Arvan
Culoz–Modane railway