As part of their application to purchase the facility, MG&E and WPS conducted an economic feasibility analysis. The analysis indicated it would cost between $ 90 million to $ 180 million (2018 dollars) to repower the facility, that is to replace the existing solar panels with new solar panels.
279:
in southwestern Wisconsin, would save $ 100 million over its lifetime. Construction formally started later in 2019 and by July 2020 half of the panels had been installed. An estimated 300 people were required to construct the facility, mostly in the form of installing support posts and racking the
937: 296:
In 2023 Two Creeks generated 193 GWh, approximately 0.3% of the total electric power generated in Wisconsin (63,216 GWh) for that year. The facility had an approximate annual capacity factor of 14.6% in 2023. A capacity factor of 24% was used during the economic analysis during the transfer of
247:
Construction for the plant was completed in November 2020 at a cost of $ 195 million. As part of project application materials, the facility was expected to require three full-time staff once constructed. The facility is eligible for the Federal Solar Investment Tax Credit (ITC). The ITC is
287:
Energy Resources, LCC) for approximately $ 1,299 per kW for a total project cost of $ 195 million. The PSC denied MGE and WPS's request for authorization to acquire Two Creeks at a cost of up to 110 percent of the $ 195 million cost, which would have covered allowance for funds used during
268:(CPCN) on May 31, 2018. On May 31, 2019, the CPCN application to construct the facility was approved by the PSC. In its approval ruling, the PSC found that the project satisfied the requirements of Wisconsin Statute § 1.12 and 196.025(1), known as the Energy Priorities Law. 678:
over time due to ultraviolet light and weather, reducing the efficiency and electrical output of the panel. Repowering aims to increase the output efficiency of a solar facility by replacing some or all of the photovoltaic panels.
768: 865: 889: 823:"Re: Docket 5-BS-228: Joint Application of Wisconsin Public Service Corporation and Madison Gas and Electric Company for Approval to Acquire Ownership of Solar Generating Facilities" 996: 275:
and senior executives from MG&E, WPS, WEC, and Next Era Energy Resources LCC. At the time, a spokesperson for WPS stated that the Two Creeks plant, along with the
265: 240:
output rating of the facility is 213 MW. The facility covers approximately 800 acres within the towns of Two Creeks and Two Rivers, southwest of the nearby
61: 236:. PV panels are Jinko Eagle HC mono-crystalline measuring approximately 2 meters by 1 meter and rated at 400 watts (i.e. maximum output). The total 261: 222: 991: 229:, at 100 MW and 50MW, respectively. It was the first utility-scale solar plant approved and constructed in Wisconsin. 796:"Two Creeks Solar, LLC Solar CPCN Application Manitowoc and Kewaunee Counties, Wisconsin PSC Docket No. 9696-CE-100" 283:
The PSC approved MG&E and WPS's purchase and acquisition of the solar park from Two Creeks Solar (an entity of
218: 241: 276: 249: 226: 961: 913: 109: 769:"Wisconsin's first large-scale solar plant enters service; Two Creeks plant to power 33,000 homes" 697: 171: 822: 795: 746: 715: 840: 727: 181: 284: 237: 191: 28: 985: 304: 233: 151: 675: 272: 76: 63: 203: 890:"Construction at halfway mark for Wisconsin's first large-scale solar farm" 866:"Wisconsin's first large-scale solar project breaks ground in Two Rivers" 232:
The facility consists of approximately 533,000 PV panels on single-axis
280:
panels. The facility started generating electricity in November 2020.
248:
normalized over the 30 year life of the project as required by the
271:
A groundbreaking ceremony was held in late August 2019 featuring
221:
in Manitowoc County, Wisconsin. Ownership is shared between
260:
Two Creeks Solar, LLC submitted an engineering plan to the
190: 180: 170: 165: 157: 147: 142: 134: 126: 118: 108: 100: 92: 55: 47: 39: 21: 264:(PSC) on March 20, 2018, and an application for a 266:Certificate of Public Convenience and Necessity 8: 997:Solar energy companies of the United States 51:Town of Two Creeks & Town of Two Rivers 767:Journal, Chris Hubbuch | Wisconsin State. 223:Wisconsin Public Service Corporation (WPS) 18: 299: 688: 262:Public Services Commission of Wisconsin 723: 713: 7: 817: 815: 813: 790: 788: 741: 739: 737: 227:Madison Gas and Electric (MG&E) 14: 219:solar photovoltaic energy station 27: 1: 841:"Wisconsin Legislature: 1.12" 192:Annual net output 1013: 962:"Electricity Data Browser" 938:"Electricity Data Browser" 914:"Electricity Data Browser" 242:Point Beach Nuclear Plant 200: 35: 26: 845:docs.legis.wisconsin.gov 674:Solar panels experience 277:Badger Hollow Solar Farm 16:Solar plant in Wisconsin 870:Green Bay Press-Gazette 773:Wisconsin State Journal 308:) Two Creeks Solar Park 172:Nameplate capacity 101:Construction began 292:Electricity Production 288:construction (AFUDC). 119:Construction cost 669:Repower Cost Analysis 215:Two Creeks Solar Park 166:Power generation 77:44.24778°N 87.54333°W 22:Two Creeks Solar Park 182:Capacity factor 110:Commission date 992:Energy in Wisconsin 696:Group, WEC Energy. 310: 273:Governor Tony Evers 82:44.24778; -87.54333 73: /  864:Edquist, Kaitlin. 726:has generic name ( 698:"WEC Clean Energy" 300: 297:ownership stage. 158:Solar tracker 130:WPS & MG&E 666: 665: 640: 635: 622: 617: 612: 607: 602: 597: 592: 587: 582: 577: 572: 567: 554: 549: 544: 539: 534: 529: 524: 519: 514: 509: 504: 499: 486: 481: 476: 471: 466: 461: 456: 451: 446: 441: 436: 431: 418: 413: 408: 403: 398: 393: 388: 383: 378: 373: 368: 363: 211: 210: 1004: 976: 975: 973: 972: 958: 952: 951: 949: 948: 934: 928: 927: 925: 924: 910: 904: 903: 901: 900: 886: 880: 879: 877: 876: 861: 855: 854: 852: 851: 837: 831: 830: 819: 808: 807: 805: 803: 792: 783: 782: 780: 779: 764: 758: 757: 755: 754: 749:. April 18, 2019 747:"FINAL DECISION" 743: 732: 731: 725: 721: 719: 711: 709: 708: 702:WEC Energy Group 693: 638: 633: 620: 615: 610: 605: 600: 595: 590: 585: 580: 575: 570: 565: 552: 547: 542: 537: 532: 527: 522: 517: 512: 507: 502: 497: 484: 479: 474: 469: 464: 459: 454: 449: 444: 439: 434: 429: 416: 411: 406: 401: 396: 391: 386: 381: 376: 371: 366: 361: 311: 234:tracking systems 204:edit on Wikidata 143:Solar farm 88: 87: 85: 84: 83: 78: 74: 71: 70: 69: 66: 31: 19: 1012: 1011: 1007: 1006: 1005: 1003: 1002: 1001: 982: 981: 980: 979: 970: 968: 960: 959: 955: 946: 944: 936: 935: 931: 922: 920: 912: 911: 907: 898: 896: 888: 887: 883: 874: 872: 863: 862: 858: 849: 847: 839: 838: 834: 829:. May 31, 2018. 827:January 8, 2023 821: 820: 811: 801: 799: 794: 793: 786: 777: 775: 766: 765: 761: 752: 750: 745: 744: 735: 722: 712: 706: 704: 695: 694: 690: 685: 671: 353:Annual (Total) 294: 258: 207: 81: 79: 75: 72: 67: 64: 62: 60: 59: 17: 12: 11: 5: 1010: 1008: 1000: 999: 994: 984: 983: 978: 977: 953: 929: 905: 881: 856: 832: 809: 798:. May 31, 2018 784: 759: 733: 687: 686: 684: 681: 670: 667: 664: 663: 661: 659: 657: 655: 653: 651: 649: 647: 645: 643: 641: 636: 631: 627: 626: 623: 618: 613: 608: 603: 598: 593: 588: 583: 578: 573: 568: 563: 559: 558: 555: 550: 545: 540: 535: 530: 525: 520: 515: 510: 505: 500: 495: 491: 490: 487: 482: 477: 472: 467: 462: 457: 452: 447: 442: 437: 432: 427: 423: 422: 419: 414: 409: 404: 399: 394: 389: 384: 379: 374: 369: 364: 359: 355: 354: 351: 348: 345: 342: 339: 336: 333: 330: 327: 324: 321: 318: 315: 293: 290: 257: 254: 209: 208: 201: 198: 197: 196:192 GWh (2023) 194: 188: 187: 184: 178: 177: 174: 168: 167: 163: 162: 159: 155: 154: 149: 145: 144: 140: 139: 136: 132: 131: 128: 124: 123: 120: 116: 115: 112: 106: 105: 102: 98: 97: 94: 90: 89: 57: 53: 52: 49: 45: 44: 41: 37: 36: 33: 32: 24: 23: 15: 13: 10: 9: 6: 4: 3: 2: 1009: 998: 995: 993: 990: 989: 987: 967: 963: 957: 954: 943: 939: 933: 930: 919: 915: 909: 906: 895: 891: 885: 882: 871: 867: 860: 857: 846: 842: 836: 833: 828: 824: 818: 816: 814: 810: 797: 791: 789: 785: 774: 770: 763: 760: 748: 742: 740: 738: 734: 729: 717: 703: 699: 692: 689: 682: 680: 677: 668: 662: 660: 658: 656: 654: 652: 650: 648: 646: 644: 642: 637: 632: 629: 628: 624: 619: 614: 609: 604: 599: 594: 589: 584: 579: 574: 569: 564: 561: 560: 556: 551: 546: 541: 536: 531: 526: 521: 516: 511: 506: 501: 496: 493: 492: 488: 483: 478: 473: 468: 463: 458: 453: 448: 443: 438: 433: 428: 425: 424: 420: 415: 410: 405: 400: 395: 390: 385: 380: 375: 370: 365: 360: 357: 356: 352: 349: 346: 343: 340: 337: 334: 331: 328: 325: 322: 319: 316: 313: 312: 309: 306: 303: 298: 291: 289: 286: 281: 278: 274: 269: 267: 263: 255: 253: 251: 245: 243: 239: 235: 230: 228: 224: 220: 216: 205: 199: 195: 193: 189: 185: 183: 179: 175: 173: 169: 164: 160: 156: 153: 152:Flat-panel PV 150: 146: 141: 137: 133: 129: 125: 122:$ 195 Million 121: 117: 113: 111: 107: 103: 99: 95: 91: 86: 58: 54: 50: 46: 43:United States 42: 38: 34: 30: 25: 20: 969:. Retrieved 965: 956: 945:. Retrieved 941: 932: 921:. Retrieved 917: 908: 897:. Retrieved 893: 884: 873:. Retrieved 869: 859: 848:. Retrieved 844: 835: 826: 800:. Retrieved 776:. Retrieved 772: 762: 751:. Retrieved 705:. Retrieved 701: 691: 672: 307: 302:Generation ( 301: 295: 282: 270: 259: 246: 231: 217:is a 150 MW 214: 212: 186:14.6% (2023) 96:Commissioned 966:www.eia.gov 942:www.eia.gov 918:www.eia.gov 894:madison.com 724:|last= 676:degradation 161:Single-Axis 80: / 56:Coordinates 986:Categories 971:2024-05-14 947:2024-05-14 923:2023-01-08 899:2023-01-08 875:2023-01-08 850:2023-01-09 802:January 8, 778:2023-01-08 753:2023-01-08 707:2023-01-08 683:References 68:87°32′36″W 65:44°14′52″N 135:Employees 716:cite web 625:192,900 557:186,381 489:196,818 127:Owner(s) 114:Nov 2020 48:Location 421:13,405 285:NextEra 256:History 104:Q4 2019 40:Country 639:11,800 611:10,699 606:16,241 601:24,137 596:27,610 591:25,744 586:24,606 581:17,220 576:16,707 571:11,565 543:14,015 538:17,862 533:23,210 528:26,583 523:25,563 518:23,380 513:15,312 508:15,136 470:19,253 465:23,884 460:27,087 455:25,736 450:22,339 445:19,017 440:17,514 435:15,428 176:150 MW 93:Status 634:4,846 630:2024 621:4,467 616:9,454 566:4,450 562:2023 553:3,423 548:7,876 503:9,861 498:7,583 494:2022 485:3,120 480:8,067 475:9,865 430:5,508 426:2021 417:4,568 412:8,837 358:2020 314:Year 202:[ 804:2021 728:help 350:Dec 347:Nov 344:Oct 341:Sep 338:Aug 335:Jul 332:Jun 329:May 326:Apr 323:Mar 320:Feb 317:Jan 225:and 213:The 148:Type 305:MWh 250:IRS 988:: 964:. 940:. 916:. 892:. 868:. 843:. 825:. 812:^ 787:^ 771:. 736:^ 720:: 718:}} 714:{{ 700:. 407:-- 402:-- 397:-- 392:-- 387:-- 382:-- 377:-- 372:-- 367:-- 362:-- 252:. 244:. 238:DC 974:. 950:. 926:. 902:. 878:. 853:. 806:. 781:. 756:. 730:) 710:. 206:] 138:3

Index


44°14′52″N 87°32′36″W / 44.24778°N 87.54333°W / 44.24778; -87.54333
Commission date
Flat-panel PV
Nameplate capacity
Capacity factor
Annual net output
edit on Wikidata
solar photovoltaic energy station
Wisconsin Public Service Corporation (WPS)
Madison Gas and Electric (MG&E)
tracking systems
DC
Point Beach Nuclear Plant
IRS
Public Services Commission of Wisconsin
Certificate of Public Convenience and Necessity
Governor Tony Evers
Badger Hollow Solar Farm
NextEra
MWh
degradation
"WEC Clean Energy"
cite web
help



"FINAL DECISION"
"Wisconsin's first large-scale solar plant enters service; Two Creeks plant to power 33,000 homes"

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.