The New Zealand online education programme, LEARNZ, conducted a virtual field trip to Te Āpiti Wind Farm in April 2008. Over 1500 New Zealand school students joined LEARNZ teacher Darren on this trip. Telephone conferences were held between students and wind farm staff. Two telephone conferences were
405:
purchased 125,000 tonnes worth of carbon credits from Meridian generated by the wind farm. Meridian Energy also sold the Dutch government 530,000 tonnes of carbon credits from Te Āpiti. The price per tonne was considered to be about $ 10.40 a tonne. In both cases, the carbon credits for Te Āpiti were
444:
near the lookout, where the electricity is stepped-up to 110 kV for transmission. A 4.5-kilometre (2.8 mi) single-circuit transmission line connects the wind farm to the national grid at Transpower's
860: 365:
capable of generating 1.65 MW each, representing a total capacity of 90.75 MW. Each turbine is atop a 70-metre-high (230 ft) tower. It is fitted with 3 blades each 35 metres in length.
414:. The New Zealand Government granted the AAUs to Meridian Energy as an incentive for carbon neutral power development under the Projects to Reduce Emissions programme (or PRE). 385:
provide a barrier to the predominantly westerly winds that flow across New Zealand. Between the two ranges lies a lower range of hills that serve to funnel the wind.
697: 834: 84: 640:
Wind turbines now provide enough competitively priced and sustainably generated, electricity to meet the needs of 145,000 NZ households
865: 417:
As of 2007, installed capacity of wind turbines in New Zealand has reached 321 MW and a further 46.5 MW is under construction.
426: 690: 589: 615: 301: 389:, another New Zealand electricity generator and retailer, operates a wind farm on the south side of the Manawatū Gorge. 343:. At 90.75 MW, it was New Zealand's largest capacity wind farm until September 2007, when the third stage of the nearby 440:
Electricity from the 55 turbines is sent via a 48-kilometre (30 mi) network of underground cables to the Te Āpiti
38: 533: 683: 291: 735: 513: 750: 745: 446: 523: 441: 407: 139: 72: 818: 785: 740: 665: 493: 485: 253: 553: 813: 775: 434: 430: 374: 344: 332: 803: 68: 770: 730: 706: 328: 263: 172: 159: 499: 411: 273: 64: 854: 790: 398: 382: 378: 437:, connected to the national grid via local distribution and sub-transmission lines. 808: 780: 720: 457: 362: 336: 17: 725: 507: 340: 475: 386: 353: 466:
held while Darren and Meridian staff were on top of a 70m high wind turbine.
99: 86: 839: 579:"Intelligent energy metering", Electrical Automation, October/November 2007. 528: 324: 187: 765: 760: 755: 310: 425:
Te Āpiti was the first wind farm in New Zealand to connect directly to
245: 670: 675: 639: 402: 679: 429:'s national grid. Previously constructed windfarms, including 650: 575: 573: 331:. It is located on 11.5 km² of land north of the 361:
The $ 100 million wind farm consists of 55 separate
43:
Te Āpiti Wind Farm viewed from Ashhurst Domain, 2020
827: 713: 297: 287: 282: 272: 262: 252: 220: 212: 204: 196: 186: 181: 165: 155: 138: 123: 115: 78: 60: 52: 31: 590:"HSBC Corporate Social Responsibility Report 2005" 861:Buildings and structures in Manawatū-Whanganui 691: 8: 698: 684: 676: 28: 456: 545: 302:Related media on Commons 835:Electricity Corporation of New Zealand 461:Construction of the Te Āpiti wind farm 616:"Full credit for turning off the gas" 7: 292:Te Āpiti Wind Farm - Meridian Energy 216:11.5 km (4.44 sq mi) 401:project. In 2005 the British bank 377:area is ideal for wind farms. The 25: 397:The Te Āpiti wind farm is also a 506: 492: 478: 352: 37: 1: 666:Te Āpiti Wind Farm pictures 274:Annual net output 882: 671:LEARNZ Virtual Field Trips 651:LEARNZ Virtual Field Trips 866:Wind farms in New Zealand 534:Wind power in New Zealand 307: 229: 225: 48: 36: 242:Make and model 514:Renewable energy portal 254:Nameplate capacity 208:72 m (236 ft) 200:70 m (230 ft) 124:Construction began 620:The New Zealand Herald 614:Fallow, Brian (2005). 462: 327:owned and operated by 234:Units operational 100:40.29611°S 175.80833°E 524:Te Rere Hau Wind Farm 460: 408:Assigned amount units 221:Power generation 786:Project Central Wind 554:"Te Āpiti wind farm" 410:allocated under the 264:Capacity factor 140:Commission date 105:-40.29611; 175.80833 406:from New Zealand's 283:External links 205:Rotor diameter 96: /  486:New Zealand portal 463: 453:Virtual field trip 373:The site near the 73:Manawatū-Whanganui 32:Te Āpiti Wind Farm 18:Te Apiti Wind Farm 848: 847: 776:North Bank tunnel 345:Tararua Wind Farm 318: 317: 16:(Redirected from 873: 700: 693: 686: 677: 653: 648: 642: 637: 631: 630: 628: 626: 611: 605: 604: 602: 600: 594: 586: 580: 577: 568: 567: 565: 564: 550: 516: 511: 510: 502: 497: 496: 488: 483: 482: 481: 356: 311:edit on Wikidata 151: 149: 134: 132: 111: 110: 108: 107: 106: 101: 97: 94: 93: 92: 89: 69:Palmerston North 67:, north-east of 41: 29: 21: 881: 880: 876: 875: 874: 872: 871: 870: 851: 850: 849: 844: 823: 771:Mokihinui Hydro 709: 707:Meridian Energy 704: 662: 657: 656: 649: 645: 638: 634: 624: 622: 613: 612: 608: 598: 596: 592: 588: 587: 583: 578: 571: 562: 560: 558:Meridian Energy 552: 551: 547: 542: 520: 519: 512: 505: 498: 491: 484: 479: 477: 472: 455: 423: 395: 371: 359: 358: 357: 347:was completed. 329:Meridian Energy 314: 197:Hub height 182:Wind farm 177: 173:Meridian Energy 160:Meridian Energy 147: 145: 130: 128: 104: 102: 98: 95: 90: 87: 85: 83: 82: 44: 23: 22: 15: 12: 11: 5: 879: 877: 869: 868: 863: 853: 852: 846: 845: 843: 842: 837: 831: 829: 825: 824: 822: 821: 816: 811: 806: 801: 796: 793: 788: 783: 778: 773: 768: 763: 758: 753: 748: 743: 738: 733: 728: 723: 717: 715: 714:Power stations 711: 710: 705: 703: 702: 695: 688: 680: 674: 673: 668: 661: 660:External links 658: 655: 654: 643: 632: 606: 581: 569: 544: 543: 541: 538: 537: 536: 531: 526: 518: 517: 503: 500:Weather portal 489: 474: 473: 471: 468: 454: 451: 422: 419: 412:Kyoto Protocol 394: 393:Carbon offsets 391: 383:Ruahine Ranges 375:Manawatū Gorge 370: 367: 351: 350: 349: 333:Manawatū Gorge 316: 315: 308: 305: 304: 299: 295: 294: 289: 285: 284: 280: 279: 276: 270: 269: 266: 260: 259: 256: 250: 249: 243: 239: 238: 235: 231: 230: 227: 226: 223: 222: 218: 217: 214: 213:Site area 210: 209: 206: 202: 201: 198: 194: 193: 190: 184: 183: 179: 178: 176: 175: 169: 167: 163: 162: 157: 153: 152: 142: 136: 135: 125: 121: 120: 117: 113: 112: 80: 76: 75: 65:Ruahine Ranges 62: 58: 57: 54: 50: 49: 46: 45: 42: 34: 33: 24: 14: 13: 10: 9: 6: 4: 3: 2: 878: 867: 864: 862: 859: 858: 856: 841: 838: 836: 833: 832: 830: 826: 820: 817: 815: 812: 810: 807: 805: 802: 800: 797: 794: 792: 791:Project Hayes 789: 787: 784: 782: 779: 777: 774: 772: 769: 767: 764: 762: 759: 757: 754: 752: 749: 747: 744: 742: 739: 737: 734: 732: 729: 727: 724: 722: 719: 718: 716: 712: 708: 701: 696: 694: 689: 687: 682: 681: 678: 672: 669: 667: 664: 663: 659: 652: 647: 644: 641: 636: 633: 621: 617: 610: 607: 591: 585: 582: 576: 574: 570: 559: 555: 549: 546: 539: 535: 532: 530: 527: 525: 522: 521: 515: 509: 504: 501: 495: 490: 487: 476: 469: 467: 459: 452: 450: 448: 443: 438: 436: 432: 428: 420: 418: 415: 413: 409: 404: 400: 399:carbon offset 392: 390: 388: 384: 380: 376: 368: 366: 364: 355: 348: 346: 342: 338: 334: 330: 326: 322: 312: 306: 303: 300: 296: 293: 290: 286: 281: 277: 275: 271: 267: 265: 261: 258:90.75 MW 257: 255: 251: 248::vNM72-1.65MW 247: 244: 241: 240: 236: 233: 232: 228: 224: 219: 215: 211: 207: 203: 199: 195: 191: 189: 185: 180: 174: 171: 170: 168: 164: 161: 158: 154: 148:December 2004 144:December 2004 143: 141: 137: 131:November 2003 127:November 2003 126: 122: 118: 114: 109: 81: 77: 74: 70: 66: 63: 59: 55: 51: 47: 40: 35: 30: 27: 19: 798: 781:Project Aqua 646: 635: 623:. Retrieved 619: 609: 597:. Retrieved 584: 561:. Retrieved 557: 548: 464: 449:substation. 439: 424: 421:Transmission 416: 396: 372: 360: 337:North Island 320: 319: 278:258 GWh 26: 625:2 September 599:2 September 341:New Zealand 166:Operator(s) 119:Operational 103: / 91:175°48′30″E 79:Coordinates 56:New Zealand 855:Categories 819:White Hill 741:Mill Creek 563:2023-08-16 540:References 442:substation 427:Transpower 387:TrustPower 88:40°17′46″S 840:Powershop 814:West Wind 751:Mt Mercer 746:Mt Millar 736:Manapouri 529:Wind farm 447:Woodville 325:wind farm 799:Te Āpiti 795:Rototuna 721:Aviemore 470:See also 369:Location 363:turbines 321:Te Āpiti 156:Owner(s) 61:Location 828:Related 809:Waitaki 731:Hurunui 726:Benmore 435:Tararua 431:Hau Nui 379:Tararua 335:in the 298:Commons 288:Website 192:Onshore 146: ( 129: ( 53:Country 804:Te Uku 766:Ōhau C 761:Ōhau B 756:Ōhau A 595:. 2005 246:Vestas 116:Status 593:(PDF) 323:is a 309:[ 268:32.4% 627:2012 601:2012 433:and 403:HSBC 381:and 188:Type 339:of 857:: 618:. 572:^ 556:. 237:55 71:, 699:e 692:t 685:v 629:. 603:. 566:. 313:] 150:) 133:) 20:)

Index

Te Apiti Wind Farm

Ruahine Ranges
Palmerston North
Manawatū-Whanganui
40°17′46″S 175°48′30″E / 40.29611°S 175.80833°E / -40.29611; 175.80833
Commission date
Meridian Energy
Meridian Energy
Type
Vestas
Nameplate capacity
Capacity factor
Annual net output
Te Āpiti Wind Farm - Meridian Energy
Related media on Commons
edit on Wikidata
wind farm
Meridian Energy
Manawatū Gorge
North Island
New Zealand
Tararua Wind Farm

turbines
Manawatū Gorge
Tararua
Ruahine Ranges
TrustPower
carbon offset