906:, this determined how the examination would be carried out, including consideration of more detailed hearings on site-specific matters, as well as project-wide issues. While the inspectors gave a commitment to consider the alternatives to the tunnel, in the event they were not reviewed as part of the examination. Government legislation and the NPSWW required that all efforts be made to reduce carbon emissions in new projects, but the examiners did not manage to study this issue. Once the Inspectorate concluded its examination of the application, a recommendation on whether or not to issue a development consent order would be submitted to ministers to make the final decision. 358:
suburbs were equipped with separated foul water and rainwater drainage pipe work. Extending such separate systems would stop sewage flooding of homes and businesses, as well as into the rivers and the estuary, would reduce carbon emissions, and be cheaper in the long term, than the multitude of pumped water tanks otherwise needed to stop homes flooding plus the Tideway tunnel. Pipes would be laid in a number of streets in each Borough each year over say twenty years, limiting traffic diversions. By 2011 overflows into the river took place more than once a week and as little as 2mm of rainfall can trigger a discharge. The mean total of this was 39,000,000 m (3.9
214: 1121:
and proper domain of its business which reduces tax; this is conventional practice. It explains that the money raised was used for essential maintenance and upgrade works. The earliest year in which customers' bills would be affected was 2014–15, with charges rising gradually after that. The project was estimated to add up to £70 to £80 (excluding inflation) to average annual wastewater bills from around 2019. However, these figures were subsequently revised downwards. In August 2015, the impact was expected to be around £20 to £25 per year by the mid-2020s.
680: 431:
outer London Boroughs is that separated storm drainage can sustainably prevent all pollution. In a 2006 report commissioned for Ofwat, Jacobs Babtie strongly recommended using the computer model of the existing system to do detailed studies of the effects of laying separate storm water pipes, but their advice and that from Ofwat in 2007 concerning the poor value of the tunnel was not followed. A number of parties questioned the integrity of the TTSS study, in particular the dismissal of separation and future
612:
sites were sent letters explaining that these sites were being considered as alternative sites, and invited to attend drop-in sessions to pose questions and gain a better understanding of the project. In total ten two-day sessions and one community liaison meeting were held. These were attended by over 800 people. In all 168 comment cards and 147 pieces of site specific correspondence were received and considered.
1130:
minimise the impacts of the construction and ensure best practice standards and requirements across all sites and contracts. The Code also covered transport (both road and river), noise and vibration mitigation, air quality and water resources, land quality, waste management and resource use, ecology and conservation and historic environment. In the report that concluded its inspection of these documents, the
440:
making them eligible for discounted water treatment bills. This would reduce pressure on the foul system and take away the need for the tunnel. In November 2010 the draft National Policy Statement for Waste Water (NPSWW) was issued, and eventually published largely unaltered, despite Parliamentary objections that it promoted the Tideway Tunnel as the only solution.
828:(TBMs) were needed to excavate the main tunnel plus two others for smaller connection tunnels. It also required two types of construction sites: main tunnel sites, where the TBM was either launched or received, and CSO sites, where interception tunnels and a connection culvert were built to connect the existing sewer to the new tunnel. 891:
Thames Water's consultation for the project had been adequate. All the application documents were made available in their own section of the Planning Inspectorate's National Infrastructure website. Thames Water also made the documents available for scrutiny at six public places along the route, three either side of the river.
935:
Mills, plus some £1bn for the Lee Tunnel and upgrade of works at Beckton. The total costs of all the Tideway schemes have therefore increased from £1.7bn six years ago to £4.6bn today (all costs at relevant year prices). There is no guarantee that the current estimate will not be subject to further escalation.
1095:
fully operational in 2025. In May 2024, a 1.5m thick reinforced concrete wall separating it from the Lee Tunnel 66m below ground was removed to allow commissioning and testing. This will enable flows captured by the Thames Tideway Tunnel to be transported to Beckton sewage treatment works for treatment.
1120:
confirmed the extent of leveraging on the balance sheet, reducing tax due and allowing annual payouts of dividends – money which some feel should have cut the cost of the scheme. Thames Water maintains that it has done nothing unusual by making tax-deductible investments in the natural
934:
The estimated cost of the project has escalated, from £1.7bn in 2004 (including Stratford to East Ham part and sewage treatment civil engineering construction movements (STW) costs) to £2.2bn in 2007 (also including Lee Tunnel and STW costs) to £3.6bn now for the shorter Thames Tunnel as far as Abbey
1215:
The number of CSO discharges is set to fall from an average of 60 a year to less than five. The Environment Agency is satisfied that the Tideway water quality after such discharges will be acceptable. When both the tunnels are operational, overflows will occur only after sustained periods of intense
1167:
to promote the infiltration of rain-water, preventing it from reaching the combined sewer system, thus reducing peak flows and limiting the number of CSO overflows. Some of these advocates denounce Thames Water's 2011 five theoretical case studies of the solution (finding the threefold cost), citing
1134:
found that Thames Water had "underestimated of impacts on those that have been identified as having a significant effect and underestimated the number of receptors experiencing a significant effect" (12.97) and concluded "We do not consider that proposals meet the first aim of the NPS test to avoid
670:
Following this consultation, and taking into consideration all the feedback received, the proposed route was finalised as the Abbey Mills route and the preferred construction and drive sites were identified. Several sites were also identified as needing further, targeted consultation which resulted
593:
Abbey Mills Route – this route would connect the Thames Tunnel to the head of the Stratford to East Ham part at Abbey Mills Pumping Station. This would follow the same route but deviate north-east to Abbey Mills. The main tunnel length would be about 9 km (5.6 mi) less than
1094:
Construction of the 25 km (16 mi) long tunnel was completed in March 2024 at a total cost of about £5bn. For test purposes, the first sewage was expected to flow into the tunnel during the summer of 2024 and, once testing was completed, it would be handed over to Thames Water, and become
839:
As the TBM moved forward, precast concrete segments were brought in and fixed together to create the tunnel wall. Excavated material would be transported out the tunnel via a conveyor belt and processed before being taken off-site. In order to minimise disruption, Thames Water committed to use the
615:
Based on this first round of consultation and interim engagement it was recommended that, for the project to be as cost-effective as possible and cause the least disruption, while still meeting the requirements of the UWWTD, the preferred scheme for the Thames Tideway Tunnel would need to involve:
611:
In response to the comments received, changes and improvements to some of the sites, including the potential use of alternative sites and alternative technical solutions, were considered. Based on this a round of interim engagement took place from March to August 2011. Residents around 11 specific
439:
as a solution. Some groups that opposed the tunnel stated that it is an unsustainable 19th-century solution to a 21st-century problem. They argued that rainwater from roads should be sent directly to canals, rivers or the estuary, and that landowners could install soakaways for their roof run off,
349:
In 2001, London's population density was 18,457 people per square kilometre, compared to just 6,825 per square kilometre in Bazalgette's day. As the population has grown, so has development involving the building on and paving over large areas. This has altered the natural drainage of the sewerage
309:
The estimated capital cost – excluding financing, operations and maintenance  – was £3.8bn with an additional £1.1bn for preparatory works. Due to the COVID-19 pandemic, additional costs of £233m were incurred. The 2021-22 annual report gave an updated cost of £4.3bn.
1129:
Some people who live alongside proposed sites were concerned about the noise, disruption and potential loss of public space resulting from construction. To address this Thames Water put together a Code of Construction Practice to outline site-specific and project-wide requirements and measures to
942:
Following detailed analysis it was decided that the best means to deliver the project would be through a regulated infrastructure provider (IP) as this would maximise value for money. The IP, originally to be formed through a competitive process starting in the spring of 2013, would hold its own
430:
After evaluation of alternatives it was decided that only one strategy, the screening, storage or treatment at the point of discharge, would meet the estuary objectives fully. The remainder were found to be either impractical or insufficient to provide a solution, although the evidence from the
357:
hosted just over 8.1 million residents and Thames Water in a leaflet of that year explained how its works and how sewers needed expansion. The older inner boroughs have combined sewerage systems which cannot cope with the extra hard standings. As London continued to grow the new developments and
890:
on 28 February 2013. It included a relatively recent quite inaccurate study of Separation. The Inspectorate then had 28 days to decide whether the application was valid and whether the consultation undertaken was adequate. On 27 March 2013, it was decided that the application was valid and that
603:
A long list of 373 potential sites was created using a desktop survey of the land on either side of the 34 most polluting CSOs (as identified in the Thames Tideway Strategic Report). These sites were then further evaluated against more detailed planning, engineering, environmental, property and
894:
On 3 June 2013, it was announced that the Secretary of State for Communities and Local Government had appointed inspectors Jan Bessell, Libby Gawith, Emrys Parry, Andrew Phillipson and David Prentis as the examining authority to consider any matters arising. As part of this process, interested
835:
At the main drive sites, four main activities took place: shaft construction (where a concrete cylinder 25–30 m (82–98 ft) in diameter and about 40–60 m (130–200 ft) deep was constructed), tunnelling preparations (preparing the site for arrival of the TBM), TBM assembly and
831:
Construction of the shafts at the CSO sites, to transfer flows from the existing sewer to the tunnel, would vary depending on the depth, the amount of flow they need to carry and the geology. The shaft would be a concrete cylinder with an internal diameter of 6–24 m (20–79 ft) and
1036:
In August 2015, the independent investors to finance and deliver the scheme were confirmed. Bazalgette Tunnel Limited, a new special-purpose company appointed to take the project forward, received its licence from Ofwat as a new regulated utilities business, separate from Thames Water. The
976:
However, procurement for main contractors (who would eventually be contracted to the IP) for up to three packages of work valued at around £500m each started in the summer of 2013. On 29 July, Thames Water announced that a contract notice for work on the tunnel had been published in the
971:
If Thames is unwilling to make a rights issue, the owners, Macquarie, should be expected to return funds to the utility. If they do not, Thames should go into special administration (allowing for continued service to customers) and another company or financier allowed to take over its
1168:
householders' assistance such as emptying water butts, gardening more, and not using land for parking, and say this could be the cheapest option. Green infrastructure would have further benefits for London in addition to addressing the rainwater overflow problem, such as:
571:
consulted with relevant authorities to get feedback from stakeholders who would potentially be affected by the construction of the Thames Tideway Tunnel. Thames Water sought feedback on the proposed tunnel routes and potential locations of construction sites.
950:
In January 2013, it was announced the IP was to be delayed because Thames Water as main funder sought state financial assurances. This was a polemic. Opponents argued the government should not bear any such risks; Thames Water have noted the government faced
607:
The three tunnel routes, as well as the shortlist of sites, were then put out for consultation between September 2010 and January 2011. In total 2,389 feedback forms (both online and hard copy), 480 pieces of correspondence and five petitions were received.
832:
20–60 m (66–197 ft) deep. Ventilation structures at CSO sites to allow air in and out of the shaft were also required. Construction at these sites was expected to take between 2½ and 3½ years and once complete each site would be landscaped.
350:
catchment so that now most rainfall and surface water run-off goes directly into London's sewers, rather than being naturally absorbed into permeable ground. An area twice the size of Hyde Park has been lost to hard surfacing every year up to 2001.
589:
Route – a similar alignment, but this would have cut additionally across the Rotherhithe Peninsula, reducing the length of the main tunnel by approximately 1.8 km (1.1 mi) but requiring longer connection tunnels from some
2723: 1091:, a project lockdown and revised working practices meant the project was delayed by nine months and had incurred additional costs of £233m (taking the estimated project cost to £4.133bn). Completion was targeted for the first half of 2025. 3427: 341:
was designed to capture both rainwater runoff and the sewage produced by four million people. As a failsafe, to prevent sewage backing up and flooding people's homes, Bazalgette's system had the ability to overflow into the Thames via 57
460:: a deep, broad storage and conveyance tunnel dug and lined from Jenkins Lane, Beckton to Abbey Mills, Stratford, sloping down the reverse way. This 6.9 km (4.3 mi) tunnel, running down to 75 m (246 ft) deep from 2811:"Thames Tideway Tunnel – Examining authority's Report of Findings and Conclusions and Recommendation to the Secretary of State for Communities and Local Government and the Secretary of State for Environment, Food and Rural Affairs" 4205: 294:
This tunnel will drain 34 of the most polluting combined sewer overflows (CSOs) and has been forecast to lead to the overflows operating for 3.7% of the time on a maximum of four days per year at the time of commissioning.
1151:, particularly uncovering streams and rivers in some places in inner London Boroughs where they were culverted in the past. Their most progressive arguments are for replacing paved, impermeable surfaces in London with 2884: 3069: 1103:
Since the initial proposal, questions focussed on the cost, the location of construction sites, duration, disruption, and whether a tunnel was the correct solution for London and for Thames Water customers.
3452: 2734: 2781: 554:
The final part is the Thames Tideway Tunnel. When built, it intercepts the outflows from London's most polluting CSOs, stores them and directs (conveys) them to sewage treatment works for processing.
3914: 3431: 1216:
rainfall and after the tunnels have captured the most damaging 'first flush' from the foul sewers. The remaining total overflow will average 2.6 million cubic metres per year, on 2011 estimates.
2992: 2674: 1493: 1380: 472:
10 L), or 16 million tonnes annually from the greatest-polluting CSO point in London. Thames Water awarded the £635 million construction contract to the MVB joint venture of
883:
In October 2012, the deadline of the tunnels' Section 48 consultation closed. This lasted 12 weeks and was the last opportunity for the public to have their say on the updated proposal.
843:
In 2017, the public voted on a short-list of 17 to name the six TBMs. They were named after female pioneers of their fields linked to where each began to dig. One began tunnelling from
2888: 914:
On 12 September 2014, the UK Government approved the plans, overriding some of the findings of the Planning Inspectorate. The decision gave rise to at least three Judicial Reviews.
3100: 3017: 647:
The second phase of consultation was carried out between November 2011 and February 2012 when local authorities, land owners, local businesses and communities were consulted on:
362:
10 L), that is 39 million tonnes, of storm sewage entering the river. These discharges, a mixture of raw sewage and rainwater, needed to be cut to comply with the EU's
3156: 2909: 386:, was intended to assess the impact of the CSO discharges into the Thames and to identify objectives and propose potential solutions, while keeping costs and benefits in mind. 1582: 3907: 379: 2441: 1674: 657:
Preferred sites and permanent works (taking into account the feedback received from the first phase of consultation such as the move from greenfield to brownfield sites)
257:. The tunnelling phase of the project was completed in April 2022; construction ended in March 2024 ahead of a testing and handover phase expected to conclude in 2025. 1354: 366:(UWWTD). If cut to such levels, it would thus restore the ecology of the river to that of 1865–70 or better, that is, before such unmitigated growth took place. 3073: 840:
river as much as possible to transport materials both in and out of the construction sites. At the main tunnelling sites, work was expected to occur 24 hours a day.
3402: 2259: 1427: 2285: 2155: 2493: 2103: 3900: 2415: 2207: 2025: 1999: 1147:
system (SUDS) under Central London streets and open spaces with small pumping stations in places of low gradient. They outline the added benefits of building
851:, after the engineer and advocate for women's employment rights, who set up the first women-only engineering company in Fulham. The others were cryobiologist 2785: 2389: 3044: 2941: 2311: 2233: 2129: 2648: 2467: 2724:"Application by Thames Water Utilities Limited for the Thames Tideway Tunnel Notice of preliminary meeting and availability of relevant representations" 2077: 1947: 922:
The budget for the scheme steadily increased since it was first estimated. For example, the budget in 2004 was estimated at £1.7bn, which included the
867:
who set up Bermondsey Medical Mission for Southwark's poor and disadvantaged residents. The machine for the Greenwich Connection Tunnel was named after
2181: 2337: 2051: 260:
Bazalgette Tunnel Limited (BTL) is the licensed infrastructure provider for its finance, building, maintenance and operation. It has as investors:
3351: 2678: 1466: 1384: 1088: 280: 2949: 886:
The Application for Development Consent – for the final, detailed plan for the construction – was delivered to the
1973: 981:(OJEU). Following prequalification questionnaires, Thames Water invited shortlisted contractors to tender between November 2013 and April 2014. 579:
River Thames Route – such an alignment, broadly, would follow the river from west London to Beckton STW and would cut across the
3532: 978: 2363: 3254: 363: 4175: 3659: 287:
in the west of London for over 25 km (16 mi) across the full width of Inner London finally reaching −70 m (−230 ft) at
2836: 2810: 283:
delayed this to early 2025. The main tunnel has an internal diameter of 7.2 m (24 ft) and runs from −30 m (−98 ft) at
1296: 4190: 3228: 3108: 3021: 4017: 3625: 3580: 2573: 1536: 4215: 4185: 3690: 1144: 432: 863:
for the Frogmore Connection Tunnel from Wandsworth to Fulham. The TBM for the east section from Bermondsey was named after doctor
3705: 3324: 514: 448:
The three-part solution to implement screening, storage and treatment was collectively known as the London Tideway Improvements.
3710: 2445: 1664: 3131: 4123: 3685: 1836: 1788: 1762: 1736: 1236: 520: 322: 303: 1358: 2701:"A Panel of 5 examining inspectors has been appointed to examine the application for the Thames Tideway Tunnel application" 3725: 3720: 1152: 508: 394:
After four years, the Thames Tideway Strategic Study report was published in 2005, and outlined the following objectives:
2700: 2263: 1423: 667:
A total of 1,374 feedback forms (online and hard copy), 4,636 pieces of correspondence and nine petitions were received.
4022: 3831: 3730: 2289: 2159: 872: 632:
selection of five out of 52 possible access shafts to be built including three to be combined with CSO interception; and
288: 167: 2497: 2315: 2237: 2107: 1269: 213: 4200: 3695: 3680: 3585: 3376: 2623: 2524: 1919: 1870: 1630: 1618: 812: 461: 2419: 2211: 1881: 1056:(RAB) model. If the cost overruns by more than 30%, the government would have to provide additional equity finance. 4210: 3811: 3525: 3279: 2029: 2003: 1143:
Some people prefer an option that Thames Water's studies show would be up to three times more expensive. This is a
927: 2393: 1696: 4037: 3876: 3715: 3700: 3620: 1449: 803: 3473: 2964: 2133: 1042: 4195: 3801: 3590: 679: 660:
Detailed proposals for the preferred sites (again taking into account feedback from the phase one consultation)
383: 318: 3460: 2837:"Planning Act 2008: Application for the proposed Thames Water Utilities Limited (Thames Tideway Tunnel) Order" 2652: 2471: 1116:
customers. This has angered customers who dispute an accounting practice confirmed by the industry regulator.
3892: 2081: 1951: 639:
The new preferred route and sites were then sent out for a second round of public consultation and feedback.
4002: 3947: 3942: 3796: 3791: 1669: 343: 249:
that currently overflows into the estuary. These events occur when rainfall volumes exceed the capacity of
2185: 3871: 3841: 3781: 3766: 3664: 3600: 2341: 1053: 737: 501: 374:
Instigated in 2001, the Thames Tideway Strategic Study, conducted by a group comprising Thames Water, the
338: 265: 254: 3306: 2624:"Notice publicising a proposed application for a development consent order for the Thames Tideway Tunnel" 2367: 2055: 1905: 1603: 4180: 4154: 3861: 3846: 3821: 3786: 3756: 3650: 3646: 3518: 1131: 903: 887: 825: 2921: 898:
A preliminary meeting, open to those who had registered an interest, began on 12 September 2013 at the
725: 710: 272:
and DIF. Since the licence award, it also trades as Tideway. On 3 November 2015, the award was made by
1030: 481: 4149: 4088: 4032: 4026: 3972: 3866: 3836: 3761: 1977: 1148: 1046: 749: 436: 269: 984:
The successful contractors for the three main tunnelling contracts were announced in February 2015:
663:
The effects the project would have (as outlined in the preliminary environmental information report)
3992: 3881: 3856: 3776: 3751: 3575: 868: 848: 767: 719: 580: 3183: 4113: 4047: 3851: 3826: 3816: 3641: 3610: 939:
Less than a year later, in November 2011, a further £500 million was added to the estimate.
773: 743: 529:– an £85 million upgrade to improve water quality and produce renewable energy on site 375: 1037:
special-purpose company is backed by pension funds and other long-term investors represented by
864: 623:
a main tunnel 23 km (14 mi) long with an internal diameter of 7.2 m (24 ft);
2840: 2814: 4108: 3937: 3771: 3746: 3605: 3560: 1194: 1013: 860: 856: 761: 716:
Carnwath Road riverside – main tunnel drive and reception and connection tunnel reception site
500:
The second part was the £675 million project to modernise and extend London's five major
353:
In the 2011 census returns (that is, omitting residents who did not disclose their residence)
334: 250: 4103: 4067: 4052: 4012: 3957: 3806: 3565: 1185: 1160: 532: 2782:"More on the Government's summary dismissal of the Planning Inspectorate's recommendations" 2598: 217:
Proposed route. Black arrows show direction of boring machine movement, not flow of sewage
4093: 4062: 1568: 1543: 1328: 899: 755: 526: 485: 3967: 2862: 2759: 542:
These intend to improve the standard to which the sewage is treated, thus improving the
504:
to treat more sewage, thus greatly reducing the need for storm discharges to the river:
4118: 3982: 3976: 3595: 3555: 1181: 1000: 996: 952: 473: 354: 226: 200: 186: 124: 4169: 4042: 3962: 1176: 1022: 692: 635:
selection of seventeen out of 71 CSO alternate positionings from the final shortlist.
489: 284: 156: 4144: 4128: 4057: 3541: 1206:
Earlier avoidance of EU fines for not meeting water standards than under the scheme
1201: 1113: 964: 852: 568: 238: 234: 3453:"The role of the civil engineer in society: engineering ethics and major projects" 3209: 1840: 1814: 1792: 1766: 1740: 1714: 1641: 1398: 1240: 629:
indirect interception of a further 12, and a local solution for the remaining CSO;
3070:"Thousands of jobs to be created as contractors named for London's 'super sewer'" 4098: 3570: 1135:
significant adverse impacts on health and quality of life from noise" (12.357).
992: 779: 731: 698: 586: 836:
lowering into the shaft, and then driving the TBM to excavate the main tunnel.
651:
The need for the project and whether a tunnel was the most appropriate solution
306:. Following treatment the water will then be released into the Thames Estuary. 4072: 3952: 3654: 1164: 1156: 923: 583:, reducing the length of the tunnel where there are no CSOs to be intercepted. 457: 314: 299: 59: 3997: 3987: 3615: 3280:"BBC – Democracy Live – Peers calls on Thames Water not to pay shareholders" 1009: 960: 797: 704: 654:
The preferred tunnel route (including the detailed alignment of the tunnel)
4007: 2364:"Earl Pumping Station – phase one site information paper – Thames Tunnel" 1197:
effects with an associated reduction in cooling load and carbon emissions
1026: 791: 536: 484:, in January 2010. Construction began in 2010 and on 28 January 2016 the 477: 1112:
The £4.3bn cost of the Thames Tideway Tunnel project is to be funded by
1071:
2016: Primary work completed; Main works preliminary construction begins
310:
The final cost was £5bn. It is set to become fully operational in 2025.
1038: 543: 523:– a £190 million upgrade to extend treatment capacity by 60% 517:– a £220 million upgrade to extend treatment capacity by 44% 511:– a £140 million upgrade to extend treatment capacity by 50% 465: 261: 230: 3162:. Department for Business, Energy & Industrial Strategy. July 2019 844: 684: 242: 1190:
Enjoyment, aesthetics and health benefits of green spaces and nature
423:
Screening, storage or treatment at the discharge point to river; and
3307:"Water companies pay billions to shareholders but little tax. Why?" 1583:"Census gives insights into characteristics of London's population" 800:
pumping station – CSO interception and connection tunnel drive site
758:
pumping station – CSO interception and connection tunnel drive site
701:
pumping station – CSO interception and connection tunnel drive site
3474:"Roger S. Ulrich, Ph.D., EDAC | The Center for Health Design" 2885:"Walney wind farm gets consent as A160 beats records – Other News" 2314:. Thamestunnelconsultation.co.uk. 21 November 2011. Archived from 2210:. Thamestunnelconsultation.co.uk. 21 November 2011. Archived from 2184:. Thamestunnelconsultation.co.uk. 21 November 2011. Archived from 2132:. Thamestunnelconsultation.co.uk. 21 November 2011. Archived from 2002:. Thamestunnelconsultation.co.uk. 11 November 2011. Archived from 1976:. Thamestunnelconsultation.co.uk. 21 November 2011. Archived from 1117: 944: 678: 279:
Started in 2016, the project was due to be completed by 2024. The
273: 212: 2262:. Thamestunnelconsultation.co.uk. 7 December 2011. Archived from 1942: 1940: 671:
in further refinement and improvement of designs at those sites.
2675:"Green light for examination of Thames Tideway Tunnel proposals" 246: 4206:
Nationally Significant Infrastructure Projects (United Kingdom)
3896: 3514: 3510: 3461:
Proceedings of the ICE – Civil Engineering, Volume 165, Issue 3
3184:"London super sewer causes stink over opaque funding structure" 1381:"Green Light for examination of Thames Tideway Tunnel Proposal" 401:
To reduce aesthetic pollution due to sewage-derived litter; and
926:
and sewage treatment works upgrade costs. In the words of the
3352:"Supersewer tunneling set to force hundreds from their homes" 2550: 770:
foreshore – CSO interception and connection tunnel drive site
764:
foreshore – CSO interception and connection tunnel drive site
746:
foreshore – CSO interception and connection tunnel drive site
713:
foreshore – CSO interception and connection tunnel drive site
3503: 604:
community considerations resulting in a shortlist of sites.
3255:"Final work starts to connect super sewer to London system" 1837:"Long Reach Sewage Treatment Works – Sewage Works Upgrades" 1467:"In London, the Long Wait for a Super Sewer Is Almost Over" 3923:
Approved and current major construction projects in London
3403:"Axe supersewer and adopt my greener plan, says US expert" 2863:"Southwark Council launches 'super sewer' legal challenge" 1815:"Riverside Sewage Treatment Works – Sewage Works Upgrades" 1763:"Crossness Sewage Treatment Works – Sewage Works Upgrades" 420:
Separation of foul and surface drainage and local storage;
417:
Adoption of source control and sustainable urban drainage;
298:
The tunnel will transfer the combined sewers water to the
3428:"Tideway Tunnel chief responds to 'supersewer' criticism" 1297:"Tideway | Tunnelling complete on London's 'super sewer'" 241:
intended to capture, store and convey almost all the raw
1789:"Beckton Sewage Treatment Works – Sewage Works Upgrades" 1494:""Sweet Thames, run softly": Constructing a Clean River" 695:
Storm Tanks – main tunnel reception and CSO interception
1866: 1864: 1862: 1860: 1858: 1737:"Mogden Sewage Treatment Works – Sewage Works Upgrades" 1357:. Thames Tideway Forum. 3 November 2015. Archived from 3401:
Lindsay Watling and Matthew Beard (17 December 2012).
2651:. Infrastructure.planningportal.gov.uk. Archived from 734:
pumping station – CSO and connection tunnel drive site
3430:. Waterbriefing.org. 17 December 2012. Archived from 3350:
Matthew Beard and Lindsay Watling (16 October 2012).
3229:"London 25km Super Sewer hooked up for commissioning" 3018:"Contract Notice published for Thames Tideway Tunnel" 2574:"Video | First of six TBMs delivered to Tideway site" 2442:"King Edward Memorial Park Foreshore – Thames Tunnel" 1920:"Thames Tunnel – main report on Phase 2 consultation" 1715:"Sewage Works Upgrades – London Tideway Improvements" 785:
Chambers Wharf – main tunnel drive and reception site
2805: 2803: 1184:
mitigation – contrasted to the tunnel's significant
62:, Abbey Mills, between Hackney and Stratford, London 4137: 4081: 3928: 3739: 3673: 3634: 3548: 1083:
2024: All works completed (now scheduled for 2025).
955:fines if the work was not done. In a letter to the 947:, and would build, manage and maintain the tunnel. 740:– CSO interception and connection tunnel drive site 722:
CSO – interception and connection tunnel drive site
707:– CSO interception and connection tunnel drive site 594:
the River Thames Route and save about £900 million.
196: 185: 173: 162: 151: 143: 135: 130: 120: 112: 95: 87: 79: 71: 66: 55: 47: 39: 31: 26: 3182: 2963: 2942:"Invalid UDL link. - TED Tenders Electronic Daily" 1665:"Boris Johnson opens new 'super sewer' Lee Tunnel" 1619:Thames Tideway Strategic Study – Executive Summary 963:(former Director General of Ofwat) and politician 3325:"Londoners to pay £25 a year for Thames clean-up" 2993:"Thames Water delays £4.1bn 'super sewer' tender" 1914: 1912: 2649:"The process – National Infrastructure Planning" 2496:. Thamestunnelconsultation.co.uk. Archived from 2470:. Thamestunnelconsultation.co.uk. Archived from 2444:. Thamestunnelconsultation.co.uk. Archived from 2418:. Thamestunnelconsultation.co.uk. Archived from 2392:. Thamestunnelconsultation.co.uk. Archived from 2366:. Thamestunnelconsultation.co.uk. Archived from 2340:. Thamestunnelconsultation.co.uk. Archived from 2288:. Thamestunnelconsultation.co.uk. Archived from 2236:. Thamestunnelconsultation.co.uk. Archived from 2158:. Thamestunnelconsultation.co.uk. Archived from 2106:. Thamestunnelconsultation.co.uk. Archived from 2080:. Thamestunnelconsultation.co.uk. Archived from 2054:. Thamestunnelconsultation.co.uk. Archived from 2028:. Thamestunnelconsultation.co.uk. Archived from 1950:. Thamestunnelconsultation.co.uk. Archived from 1068:2015: Main works and financing contracts awarded 3455:. Prof Richard Ashley. 1 August 2012. section " 2551:"Thames Tunnel Construction Animation on Vimeo" 2519: 2517: 2515: 2260:"Victoria Embankment Foreshore – Thames Tunnel" 1791:. Thames Water. 22 January 2013. Archived from 1697:"Boris Flushed With Pride At New 'Super Sewer'" 1323: 1321: 1319: 1317: 1264: 1262: 1260: 1258: 558:Thames Tideway Tunnel planning and consultation 16:Sewage system being created for London, England 3132:"All systems go for £4.2bn London super sewer" 2965:"Thames Water is obliged to fund big projects" 2286:"Blackfriars Bridge Foreshore – Thames Tunnel" 2156:"Chelsea Embankment Foreshore – Thames Tunnel" 1839:. Thames Water. 27 August 2012. Archived from 1765:. Thames Water. 27 August 2012. Archived from 1663:Amy Ashenden; Luke Garrett (28 January 2016). 567:Following the Thames Tideway Strategic Study, 404:Protect the health of recreational water users 3908: 3526: 3101:"Green light for £4.2bn London 'super sewer'" 2784:. Clean Thames Now and Always. Archived from 2494:"Abbey Mills Pumping Station – Thames Tunnel" 2312:"Shad Thames Pumping Station – Thames Tunnel" 2234:"Albert Embankment Foreshore – Thames Tunnel" 2104:"Falconbrook Pumping Station – Thames Tunnel" 1424:"Who will pay for the Thames Tideway Tunnel?" 1383:. Thames Water. 27 March 2013. Archived from 1355:"Green light for £4.2bn London 'super sewer'" 1329:"Thames Tideway Tunnel super sewer completed" 809:Bekesbourne Street – system modification site 468:is forecast to capture 16,000,000 m (1.6 8: 3377:"Section 48 – code of construction practice" 1739:. Thames Water. 5 March 2013. Archived from 1052:The funding scheme used was later named the 871:, the first female scientist to work at the 788:Earl pumping station – CSO interception site 21: 2912:. Consumer Council for Water. January 2011. 2910:"Thames Water's Thames Tunnel Consultation" 2813:. The Planning Inspectorate. Archived from 2416:"Greenwich Pumping Station – Thames Tunnel" 2208:"Heathwall Pumping Station – Thames Tunnel" 895:parties were able to make representations. 3915: 3901: 3893: 3533: 3519: 3511: 2928:. 3 November 2011. Retrieved 30 July 2013 2760:"London's 'super sewer' gets the go ahead" 1642:"Lee Tunnel – London Tideway Improvements" 1231: 1229: 1172:Increased resilience to drought and floods 782:pumping station – system modification site 728:– CSO and connection tunnel reception site 413:Four potential strategies were discussed: 20: 2026:"Carnwath Road Riverside – Thames Tunnel" 2000:"Putney Bridge Foreshore – Thames Tunnel" 1542:. Thames Water. July 2011. Archived from 1537:"Why does London need the Thames Tunnel?" 824:To build the Thames Tideway Tunnel, four 3045:"Thames Tideway names preferred bidders" 2390:"Deptford Church Street – Thames Tunnel" 3107:. Thames Tideway Tunnel. Archived from 3095: 3093: 3091: 3072:. Thames Tideway Tunnel. Archived from 2733:. Planning Inspectorate. Archived from 1609:(Summer 2010) accessed: 16 January 2014 1531: 1225: 563:Initial design and phase 1 consultation 2549:Thames Tunnel Plus (4 November 2011). 2130:"Cremorne Wharf Depot – Thames Tunnel" 1529: 1527: 1525: 1523: 1521: 1519: 1517: 1515: 1513: 1511: 1108:Cost and reward to the business owners 979:Official Journal of the European Union 575:Three tunnel routes were considered: 535:– a £40 million upgrade in 398:To protect the ecology of the Tideway; 3043:Wynne, Alexandra (27 February 2015). 1270:"Tideway sewer hits nine-month delay" 1065:2014: Planning decisions and approval 943:license from the industry regulator, 794:Church Street – CSO interception site 276:, ensuring the start of the project. 7: 3660:Thames Gateway Water Treatment Works 2887:. Bircham Dyson Bell. Archived from 2468:"Bekesbourne Street – Thames Tunnel" 2078:"King George's Park – Thames Tunnel" 1677:from the original on 28 January 2016 859:for the Central area and suffragist 496:Sewage treatment works modernisation 346:(CSO) along the banks of the river. 3305:Boffey, Daniel (10 November 2012). 2525:"Project Information Paper – Build" 1948:"Acton Storm Tanks – Thames Tunnel" 1498:The London Literary Society Journal 1455:. Bazalgette Tunnel Ltd. p. 6. 4018:Northumberland Development Project 3626:1854 Broad Street cholera outbreak 2839:. Defra & DGLG. Archived from 1882:"Site Selection Methodology paper" 683:Thames Tideway construction site, 14: 3691:Coppermills Water Treatment Works 2922:"Super-sewer's price rises £500m" 2182:"Kirtling Street – Thames Tunnel" 1430:from the original on 1 April 2019 1027:Vinci Construction Grands Projets 776:foreshore – CSO interception site 643:Phase 2 and targeted consultation 533:Long Reach Sewage Treatment Works 478:VINCI Construction Grands Projets 3706:Crossness Sewage Treatment Works 2338:"Chambers Wharf – Thames Tunnel" 1621:(2005). Accessed 17 January 2014 1239:. Tideway London. Archived from 820:Proposed design and construction 527:Riverside Sewage Treatment Works 515:Crossness Sewage Treatment Works 452:Stratford to Beckton: Lee Tunnel 444:Screening, storage and treatment 300:Stratford to East Ham Lee Tunnel 3711:Deephams Sewage Treatment Works 3181:Plimmer, Gill (8 August 2017). 3130:Morby, Aaron (24 August 2015). 2052:"Dormay Street – Thames Tunnel" 1644:. Thames Water. 17 January 2013 1450:"Tideway Annual Report 2021-22" 752:– main tunnel double drive site 626:direct interception of 21 CSOs; 364:Waste Water Treatment Directive 3686:Beckton Sewage Treatment Works 3020:. Thames Water. Archived from 2991:Pitt, Vern (31 January 2013). 2677:. Thames Water. Archived from 1817:. Thames Water. 27 August 2012 1585:. Ons.gov.uk. 11 December 2012 521:Beckton Sewage Treatment Works 323:Beckton Sewage Treatment Works 304:Beckton Sewage Treatment Works 203:5 billion (2024 estimate) 1: 3726:Mogden Sewage Treatment Works 3721:Hampton Water Treatment Works 2762:. BBC News. 12 September 2014 2599:"Nine Elms on the South Bank" 2530:. Thames Water. November 2011 1717:. Thames Water. 23 March 2011 1492:Skilton, David (March 2007). 1295:Horgan, Rob (29 April 2022). 1077:2019: Secondary lining begins 509:Mogden Sewage Treatment Works 492:, confirmed the tunnel open. 333:Built between 1859 and 1875, 225:is a 25 km (16 mi) 166:−70 m (−230 ft) at 3832:Queen Elizabeth II Reservoir 3731:Walton water treatment works 3457:Examples of ethical dilemmas 3227:Morby, Aaron (14 May 2024). 1211:Continued overflows forecast 815:– main tunnel reception site 456:This earliest phase was the 155:−30 m (−98 ft) at 4176:London water infrastructure 3953:Canary Wharf's New District 3696:Cricklewood Pumping Station 3681:Abbey Mills Pumping Station 3586:Metropolitan Board of Works 3382:. Thames Water. Summer 2012 3253:Morby, Aaron (3 May 2024). 2603:Nine Elms on the South Bank 1974:"Barn Elms – Thames Tunnel" 1887:. Thames Water. Summer 2011 1087:In August 2020, during the 1014:Laing O'Rourke Construction 813:Abbey Mills pumping station 231:the tidal section (estuary) 4232: 4191:2024 in the United Kingdom 3812:Lee Valley Reservoir Chain 1145:sustainable urban drainage 1043:Amber Infrastructure Group 928:Consumer Council for Water 924:East Ham to Stratford part 3877:William Girling Reservoir 3716:Greenwich pumping station 3701:Crossness Pumping Station 3463:. Retrieved 30 July 2013. 2629:. Thames Water. July 2012 1155:options and implementing 804:King Edward Memorial Park 599:Route and sites selection 437:blue-green infrastructure 253:'s and other engineers' 207: 181: 4216:Infrastructure in London 4186:Tunnelling organizations 4068:Westfield London Phase 2 3802:King George VI Reservoir 3591:Metropolitan Water Board 1925:. Thames Water. May 2012 869:Annie Scott Dill Russell 384:Greater London Authority 344:combined sewer overflows 319:London Borough of Newham 3948:Brent Cross Cricklewood 3943:Battersea Power Station 3797:King George V Reservoir 3792:Kempton Park Reservoirs 3407:London Evening Standard 3356:London Evening Standard 3157:"RAB Model for Nuclear" 2930:(subscription required) 2703:. Planning Inspectorate 1670:London Evening Standard 1074:2018: Tunnelling begins 806:– CSO interception site 302:for onward delivery to 177:7.2 m (24 ft) 147:25 km (16 mi) 3872:West Warwick Reservoir 3867:Walthamstow Reservoirs 3842:Queen Mother Reservoir 3782:High Maynard Reservoir 3767:East Warwick Reservoir 3665:Thames Water Ring Main 3601:William Chadwell Mylne 3329:The Construction Index 1274:The Construction Index 974: 959:in November 2012, Sir 937: 826:tunnel boring machines 688: 502:sewage treatment works 339:London sewerage system 317:, runs deep under the 255:London sewerage system 218: 4155:Thames Tideway Tunnel 3973:Elephant & Castle 3862:Tilehurst Water Tower 3847:Stain Hill Reservoirs 3822:Low Maynard Reservoir 3787:Island Barn Reservoir 3757:Bessborough Reservoir 3651:Thames Tideway Tunnel 3647:Thames Tideway Scheme 3259:Construction Enquirer 3233:Construction Enquirer 3136:Construction Enquirer 3105:Thames Tideway Tunnel 1139:The need for a tunnel 1132:Planning Inspectorate 1080:2022: Tunnelling ends 969: 932: 904:Planning Inspectorate 888:Planning Inspectorate 873:Greenwich Observatory 853:Audrey 'Ursula' Smith 682: 620:the Abbey Mills route 335:Sir Joseph Bazalgette 229:running mostly under 223:Thames Tideway Tunnel 216: 139:Various (see article) 116:Bazalgette Tunnel Ltd 102:Bazalgette Tunnel Ltd 83:Various (see article) 22:Thames Tideway Tunnel 4150:London Power Tunnels 4089:40 Leadenhall Street 4033:Paddington Waterside 4003:King's Cross Central 3837:Queen Mary Reservoir 3762:Chingford Reservoirs 2952:on 17 February 2013. 2731:Letter dated 25 July 2110:on 22 September 2012 1843:on 18 September 2012 1795:on 18 September 2012 1769:on 18 September 2012 1149:green infrastructure 1054:Regulated Asset Base 1010:Ferrovial Agroman UK 1001:Balfour Beatty Group 918:Funding and delivery 879:Planning application 738:Cremorne Wharf Depot 409:Potential strategies 266:Amber Infrastructure 105:(trading as Tideway) 3993:Greenwich Peninsula 3882:Wraysbury Reservoir 3857:Sunnyside Reservoir 3777:Grimsbury Reservoir 3752:Bath Road Reservoir 3581:London water supply 3576:London sewer system 3434:on 18 February 2016 3170:– via gov.uk. 2740:on 18 February 2016 2292:on 13 December 2012 2136:on 10 February 2012 2032:on 3 September 2012 1980:on 13 December 2012 1743:on 10 February 2013 1473:. 24 September 2023 1361:on 17 November 2015 1243:on 12 February 2019 1175:Reduction in urban 1021:: Joint venture of 1008:: Joint venture of 991:: Joint venture of 910:Planning acceptance 768:Victoria Embankment 581:Greenwich Peninsula 23: 4201:2020s architecture 4048:Southall Gas Works 3852:Staines Reservoirs 3827:Molesey Reservoirs 3817:Lockwood Reservoir 3642:Abingdon Reservoir 3210:"Tideway timeline" 3049:New Civil Engineer 2972:. 11 November 2012 2891:on 4 December 2014 2578:New Civil Engineer 2572:Smale, Katherine. 2500:on 2 February 2012 2474:on 2 February 2012 2448:on 2 February 2012 2344:on 2 February 2012 2266:on 2 February 2012 2188:on 2 February 2012 2162:on 6 December 2011 2084:on 2 February 2012 2006:on 5 February 2012 1954:on 5 February 2012 1549:on 16 January 2014 1301:New Civil Engineer 774:Blackfriars Bridge 744:Chelsea Embankment 726:King George's Park 689: 675:Site list and type 550:Acton to Stratford 546:'s water quality. 426:In-river treatment 376:Environment Agency 370:Options assessment 219: 4211:Tunnels in London 4163: 4162: 4109:Landmark Pinnacle 4063:Westfield Croydon 4038:Royal Albert Dock 3998:Kidbrooke Village 3938:Barking Riverside 3890: 3889: 3772:Farmoor Reservoir 3747:Banbury Reservoir 3606:New River Company 3561:Joseph Bazalgette 3286:. 15 January 2013 3111:on 26 August 2015 3076:on 27 August 2015 3024:on 21 August 2013 2843:on 8 October 2014 2817:on 8 October 2014 2788:on 9 October 2014 2396:on 24 August 2013 1195:urban heat island 1089:COVID-19 pandemic 902:. Chaired by the 861:Charlotte Despard 857:Millicent Fawcett 762:Albert Embankment 711:Putney Embankment 313:Its outfall, the 281:COVID-19 pandemic 211: 210: 152:Highest elevation 4223: 4104:Heron Quays West 4053:South Quay Plaza 4013:London Riverside 4008:Lewisham Gateway 3958:Chelsea Barracks 3917: 3910: 3903: 3894: 3807:Knight Reservoir 3566:Edmund Colthurst 3535: 3528: 3521: 3512: 3507: 3506: 3504:Official website 3489: 3488: 3486: 3484: 3478:Healthdesign.org 3470: 3464: 3450: 3444: 3443: 3441: 3439: 3424: 3418: 3417: 3415: 3413: 3398: 3392: 3391: 3389: 3387: 3381: 3373: 3367: 3366: 3364: 3362: 3347: 3341: 3340: 3338: 3336: 3331:. 24 August 2015 3321: 3315: 3314: 3302: 3296: 3295: 3293: 3291: 3276: 3270: 3269: 3267: 3265: 3250: 3244: 3243: 3241: 3239: 3224: 3218: 3217: 3206: 3200: 3199: 3197: 3195: 3186: 3178: 3172: 3171: 3169: 3167: 3161: 3153: 3147: 3146: 3144: 3142: 3127: 3121: 3120: 3118: 3116: 3097: 3086: 3085: 3083: 3081: 3066: 3060: 3059: 3057: 3055: 3040: 3034: 3033: 3031: 3029: 3014: 3008: 3007: 3005: 3003: 2988: 2982: 2981: 2979: 2977: 2967: 2960: 2954: 2953: 2948:. Archived from 2938: 2932: 2931: 2919: 2913: 2907: 2901: 2900: 2898: 2896: 2881: 2875: 2874: 2872: 2870: 2859: 2853: 2852: 2850: 2848: 2833: 2827: 2826: 2824: 2822: 2807: 2798: 2797: 2795: 2793: 2778: 2772: 2771: 2769: 2767: 2756: 2750: 2749: 2747: 2745: 2739: 2728: 2719: 2713: 2712: 2710: 2708: 2697: 2691: 2690: 2688: 2686: 2671: 2665: 2664: 2662: 2660: 2655:on 22 March 2013 2645: 2639: 2638: 2636: 2634: 2628: 2620: 2614: 2613: 2611: 2609: 2595: 2589: 2588: 2586: 2584: 2569: 2563: 2562: 2560: 2558: 2546: 2540: 2539: 2537: 2535: 2529: 2521: 2510: 2509: 2507: 2505: 2490: 2484: 2483: 2481: 2479: 2464: 2458: 2457: 2455: 2453: 2438: 2432: 2431: 2429: 2427: 2412: 2406: 2405: 2403: 2401: 2386: 2380: 2379: 2377: 2375: 2360: 2354: 2353: 2351: 2349: 2334: 2328: 2327: 2325: 2323: 2318:on 21 April 2013 2308: 2302: 2301: 2299: 2297: 2282: 2276: 2275: 2273: 2271: 2256: 2250: 2249: 2247: 2245: 2240:on 21 April 2013 2230: 2224: 2223: 2221: 2219: 2214:on 29 March 2012 2204: 2198: 2197: 2195: 2193: 2178: 2172: 2171: 2169: 2167: 2152: 2146: 2145: 2143: 2141: 2126: 2120: 2119: 2117: 2115: 2100: 2094: 2093: 2091: 2089: 2074: 2068: 2067: 2065: 2063: 2048: 2042: 2041: 2039: 2037: 2022: 2016: 2015: 2013: 2011: 1996: 1990: 1989: 1987: 1985: 1970: 1964: 1963: 1961: 1959: 1944: 1935: 1934: 1932: 1930: 1924: 1916: 1907: 1903: 1897: 1896: 1894: 1892: 1886: 1878: 1872: 1868: 1853: 1852: 1850: 1848: 1833: 1827: 1826: 1824: 1822: 1811: 1805: 1804: 1802: 1800: 1785: 1779: 1778: 1776: 1774: 1759: 1753: 1752: 1750: 1748: 1733: 1727: 1726: 1724: 1722: 1711: 1705: 1704: 1693: 1687: 1686: 1684: 1682: 1660: 1654: 1653: 1651: 1649: 1638: 1632: 1628: 1622: 1616: 1610: 1601: 1595: 1594: 1592: 1590: 1579: 1573: 1565: 1559: 1558: 1556: 1554: 1548: 1541: 1533: 1506: 1505: 1489: 1483: 1482: 1480: 1478: 1463: 1457: 1456: 1454: 1446: 1440: 1439: 1437: 1435: 1426:. Thames Water. 1420: 1414: 1413: 1411: 1409: 1395: 1389: 1388: 1377: 1371: 1370: 1368: 1366: 1351: 1345: 1344: 1342: 1340: 1325: 1312: 1311: 1309: 1307: 1292: 1286: 1285: 1283: 1281: 1276:. 25 August 2020 1266: 1253: 1252: 1250: 1248: 1233: 1186:carbon footprint 1060:Planned timeline 1031:Bachy Soletanche 482:Bachy Soletanche 471: 361: 163:Lowest elevation 24: 4231: 4230: 4226: 4225: 4224: 4222: 4221: 4220: 4196:2020s in London 4166: 4165: 4164: 4159: 4133: 4124:Riverside South 4094:100 Bishopsgate 4077: 3988:Embassy Gardens 3930: 3924: 3921: 3891: 3886: 3735: 3669: 3630: 3621:William Webster 3544: 3539: 3502: 3501: 3498: 3493: 3492: 3482: 3480: 3472: 3471: 3467: 3451: 3447: 3437: 3435: 3426: 3425: 3421: 3411: 3409: 3400: 3399: 3395: 3385: 3383: 3379: 3375: 3374: 3370: 3360: 3358: 3349: 3348: 3344: 3334: 3332: 3323: 3322: 3318: 3304: 3303: 3299: 3289: 3287: 3278: 3277: 3273: 3263: 3261: 3252: 3251: 3247: 3237: 3235: 3226: 3225: 3221: 3208: 3207: 3203: 3193: 3191: 3189:Financial Times 3180: 3179: 3175: 3165: 3163: 3159: 3155: 3154: 3150: 3140: 3138: 3129: 3128: 3124: 3114: 3112: 3099: 3098: 3089: 3079: 3077: 3068: 3067: 3063: 3053: 3051: 3042: 3041: 3037: 3027: 3025: 3016: 3015: 3011: 3001: 2999: 2990: 2989: 2985: 2975: 2973: 2970:Financial Times 2962: 2961: 2957: 2940: 2939: 2935: 2929: 2926:Financial Times 2920: 2916: 2908: 2904: 2894: 2892: 2883: 2882: 2878: 2868: 2866: 2861: 2860: 2856: 2846: 2844: 2835: 2834: 2830: 2820: 2818: 2809: 2808: 2801: 2791: 2789: 2780: 2779: 2775: 2765: 2763: 2758: 2757: 2753: 2743: 2741: 2737: 2726: 2721: 2720: 2716: 2706: 2704: 2699: 2698: 2694: 2684: 2682: 2673: 2672: 2668: 2658: 2656: 2647: 2646: 2642: 2632: 2630: 2626: 2622: 2621: 2617: 2607: 2605: 2597: 2596: 2592: 2582: 2580: 2571: 2570: 2566: 2556: 2554: 2548: 2547: 2543: 2533: 2531: 2527: 2523: 2522: 2513: 2503: 2501: 2492: 2491: 2487: 2477: 2475: 2466: 2465: 2461: 2451: 2449: 2440: 2439: 2435: 2425: 2423: 2422:on 23 June 2012 2414: 2413: 2409: 2399: 2397: 2388: 2387: 2383: 2373: 2371: 2362: 2361: 2357: 2347: 2345: 2336: 2335: 2331: 2321: 2319: 2310: 2309: 2305: 2295: 2293: 2284: 2283: 2279: 2269: 2267: 2258: 2257: 2253: 2243: 2241: 2232: 2231: 2227: 2217: 2215: 2206: 2205: 2201: 2191: 2189: 2180: 2179: 2175: 2165: 2163: 2154: 2153: 2149: 2139: 2137: 2128: 2127: 2123: 2113: 2111: 2102: 2101: 2097: 2087: 2085: 2076: 2075: 2071: 2061: 2059: 2058:on 27 July 2012 2050: 2049: 2045: 2035: 2033: 2024: 2023: 2019: 2009: 2007: 1998: 1997: 1993: 1983: 1981: 1972: 1971: 1967: 1957: 1955: 1946: 1945: 1938: 1928: 1926: 1922: 1918: 1917: 1910: 1904: 1900: 1890: 1888: 1884: 1880: 1879: 1875: 1869: 1856: 1846: 1844: 1835: 1834: 1830: 1820: 1818: 1813: 1812: 1808: 1798: 1796: 1787: 1786: 1782: 1772: 1770: 1761: 1760: 1756: 1746: 1744: 1735: 1734: 1730: 1720: 1718: 1713: 1712: 1708: 1695: 1694: 1690: 1680: 1678: 1662: 1661: 1657: 1647: 1645: 1640: 1639: 1635: 1629: 1625: 1617: 1613: 1602: 1598: 1588: 1586: 1581: 1580: 1576: 1569:Daily Telegraph 1566: 1562: 1552: 1550: 1546: 1539: 1535: 1534: 1509: 1491: 1490: 1486: 1476: 1474: 1465: 1464: 1460: 1452: 1448: 1447: 1443: 1433: 1431: 1422: 1421: 1417: 1407: 1405: 1397: 1396: 1392: 1387:on 7 June 2013. 1379: 1378: 1374: 1364: 1362: 1353: 1352: 1348: 1338: 1336: 1335:. 27 March 2024 1327: 1326: 1315: 1305: 1303: 1294: 1293: 1289: 1279: 1277: 1268: 1267: 1256: 1246: 1244: 1235: 1234: 1227: 1222: 1213: 1200:Improved urban 1141: 1127: 1110: 1101: 1062: 1047:Dalmore Capital 957:Financial Times 920: 912: 900:Barbican Centre 881: 855:and suffragist 822: 750:Kirtling Street 677: 645: 601: 565: 560: 552: 498: 486:Mayor of London 469: 454: 446: 411: 392: 372: 359: 331: 270:Dalmore Capital 136:Design engineer 108: 17: 12: 11: 5: 4229: 4227: 4219: 4218: 4213: 4208: 4203: 4198: 4193: 4188: 4183: 4178: 4168: 4167: 4161: 4160: 4158: 4157: 4152: 4147: 4141: 4139: 4138:Infrastructure 4135: 4134: 4132: 4131: 4126: 4121: 4119:One Park Drive 4116: 4111: 4106: 4101: 4096: 4091: 4085: 4083: 4079: 4078: 4076: 4075: 4070: 4065: 4060: 4055: 4050: 4045: 4040: 4035: 4030: 4020: 4015: 4010: 4005: 4000: 3995: 3990: 3985: 3983:Meridian Water 3980: 3977:Heygate Estate 3970: 3965: 3960: 3955: 3950: 3945: 3940: 3934: 3932: 3926: 3925: 3922: 3920: 3919: 3912: 3905: 3897: 3888: 3887: 3885: 3884: 3879: 3874: 3869: 3864: 3859: 3854: 3849: 3844: 3839: 3834: 3829: 3824: 3819: 3814: 3809: 3804: 3799: 3794: 3789: 3784: 3779: 3774: 3769: 3764: 3759: 3754: 3749: 3743: 3741: 3737: 3736: 3734: 3733: 3728: 3723: 3718: 3713: 3708: 3703: 3698: 3693: 3688: 3683: 3677: 3675: 3674:Infrastructure 3671: 3670: 3668: 3667: 3662: 3657: 3644: 3638: 3636: 3635:Major projects 3632: 3631: 3629: 3628: 3623: 3618: 3613: 3608: 3603: 3598: 3596:Hugh Myddelton 3593: 3588: 3583: 3578: 3573: 3568: 3563: 3558: 3556:John Backhouse 3552: 3550: 3546: 3545: 3540: 3538: 3537: 3530: 3523: 3515: 3509: 3508: 3497: 3496:External links 3494: 3491: 3490: 3465: 3445: 3419: 3393: 3368: 3342: 3316: 3297: 3271: 3245: 3219: 3214:Tideway.london 3201: 3173: 3148: 3122: 3087: 3061: 3035: 3009: 2983: 2955: 2933: 2914: 2902: 2876: 2854: 2828: 2799: 2773: 2751: 2722:Bessell, Jan. 2714: 2692: 2681:on 7 June 2013 2666: 2640: 2615: 2590: 2564: 2541: 2511: 2485: 2459: 2433: 2407: 2381: 2355: 2329: 2303: 2277: 2251: 2225: 2199: 2173: 2147: 2121: 2095: 2069: 2043: 2017: 1991: 1965: 1936: 1908: 1898: 1873: 1854: 1828: 1806: 1780: 1754: 1728: 1706: 1688: 1655: 1633: 1623: 1611: 1596: 1574: 1560: 1507: 1484: 1458: 1441: 1415: 1390: 1372: 1346: 1313: 1287: 1254: 1224: 1223: 1221: 1218: 1212: 1209: 1208: 1207: 1204: 1198: 1191: 1188: 1182:Climate change 1179: 1173: 1140: 1137: 1126: 1123: 1109: 1106: 1100: 1097: 1085: 1084: 1081: 1078: 1075: 1072: 1069: 1066: 1061: 1058: 1034: 1033: 1016: 1003: 997:Morgan Sindall 919: 916: 911: 908: 880: 877: 849:Rachel Parsons 821: 818: 817: 816: 810: 807: 801: 795: 789: 786: 783: 777: 771: 765: 759: 753: 747: 741: 735: 729: 723: 717: 714: 708: 702: 696: 676: 673: 665: 664: 661: 658: 655: 652: 644: 641: 637: 636: 633: 630: 627: 624: 621: 600: 597: 596: 595: 591: 584: 564: 561: 559: 556: 551: 548: 540: 539: 530: 524: 518: 512: 497: 494: 474:Morgan Sindall 453: 450: 445: 442: 428: 427: 424: 421: 418: 410: 407: 406: 405: 402: 399: 391: 388: 371: 368: 355:Greater London 330: 327: 227:combined sewer 209: 208: 205: 204: 198: 194: 193: 190: 183: 182: 179: 178: 175: 171: 170: 164: 160: 159: 153: 149: 148: 145: 141: 140: 137: 133: 132: 128: 127: 125:Combined sewer 122: 118: 117: 114: 110: 109: 107: 106: 103: 99: 97: 93: 92: 89: 85: 84: 81: 77: 76: 73: 69: 68: 64: 63: 57: 53: 52: 49: 45: 44: 41: 37: 36: 35:Greater London 33: 29: 28: 15: 13: 10: 9: 6: 4: 3: 2: 4228: 4217: 4214: 4212: 4209: 4207: 4204: 4202: 4199: 4197: 4194: 4192: 4189: 4187: 4184: 4182: 4179: 4177: 4174: 4173: 4171: 4156: 4153: 4151: 4148: 4146: 4143: 4142: 4140: 4136: 4130: 4127: 4125: 4122: 4120: 4117: 4115: 4112: 4110: 4107: 4105: 4102: 4100: 4097: 4095: 4092: 4090: 4087: 4086: 4084: 4080: 4074: 4071: 4069: 4066: 4064: 4061: 4059: 4056: 4054: 4051: 4049: 4046: 4044: 4043:Ruskin Square 4041: 4039: 4036: 4034: 4031: 4028: 4024: 4021: 4019: 4016: 4014: 4011: 4009: 4006: 4004: 4001: 3999: 3996: 3994: 3991: 3989: 3986: 3984: 3981: 3978: 3974: 3971: 3969: 3966: 3964: 3963:Convoys Wharf 3961: 3959: 3956: 3954: 3951: 3949: 3946: 3944: 3941: 3939: 3936: 3935: 3933: 3927: 3918: 3913: 3911: 3906: 3904: 3899: 3898: 3895: 3883: 3880: 3878: 3875: 3873: 3870: 3868: 3865: 3863: 3860: 3858: 3855: 3853: 3850: 3848: 3845: 3843: 3840: 3838: 3835: 3833: 3830: 3828: 3825: 3823: 3820: 3818: 3815: 3813: 3810: 3808: 3805: 3803: 3800: 3798: 3795: 3793: 3790: 3788: 3785: 3783: 3780: 3778: 3775: 3773: 3770: 3768: 3765: 3763: 3760: 3758: 3755: 3753: 3750: 3748: 3745: 3744: 3742: 3738: 3732: 3729: 3727: 3724: 3722: 3719: 3717: 3714: 3712: 3709: 3707: 3704: 3702: 3699: 3697: 3694: 3692: 3689: 3687: 3684: 3682: 3679: 3678: 3676: 3672: 3666: 3663: 3661: 3658: 3656: 3652: 3648: 3645: 3643: 3640: 3639: 3637: 3633: 3627: 3624: 3622: 3619: 3617: 3614: 3612: 3609: 3607: 3604: 3602: 3599: 3597: 3594: 3592: 3589: 3587: 3584: 3582: 3579: 3577: 3574: 3572: 3569: 3567: 3564: 3562: 3559: 3557: 3554: 3553: 3551: 3547: 3543: 3536: 3531: 3529: 3524: 3522: 3517: 3516: 3513: 3505: 3500: 3499: 3495: 3479: 3475: 3469: 3466: 3462: 3458: 3454: 3449: 3446: 3433: 3429: 3423: 3420: 3408: 3404: 3397: 3394: 3378: 3372: 3369: 3357: 3353: 3346: 3343: 3330: 3326: 3320: 3317: 3312: 3308: 3301: 3298: 3285: 3281: 3275: 3272: 3260: 3256: 3249: 3246: 3234: 3230: 3223: 3220: 3215: 3211: 3205: 3202: 3190: 3185: 3177: 3174: 3158: 3152: 3149: 3137: 3133: 3126: 3123: 3110: 3106: 3102: 3096: 3094: 3092: 3088: 3075: 3071: 3065: 3062: 3050: 3046: 3039: 3036: 3023: 3019: 3013: 3010: 2998: 2994: 2987: 2984: 2971: 2966: 2959: 2956: 2951: 2947: 2946:ted.europa.eu 2943: 2937: 2934: 2927: 2923: 2918: 2915: 2911: 2906: 2903: 2890: 2886: 2880: 2877: 2864: 2858: 2855: 2842: 2838: 2832: 2829: 2816: 2812: 2806: 2804: 2800: 2787: 2783: 2777: 2774: 2761: 2755: 2752: 2736: 2732: 2725: 2718: 2715: 2702: 2696: 2693: 2680: 2676: 2670: 2667: 2654: 2650: 2644: 2641: 2625: 2619: 2616: 2604: 2600: 2594: 2591: 2579: 2575: 2568: 2565: 2552: 2545: 2542: 2526: 2520: 2518: 2516: 2512: 2499: 2495: 2489: 2486: 2473: 2469: 2463: 2460: 2447: 2443: 2437: 2434: 2421: 2417: 2411: 2408: 2395: 2391: 2385: 2382: 2370:on 5 May 2013 2369: 2365: 2359: 2356: 2343: 2339: 2333: 2330: 2317: 2313: 2307: 2304: 2291: 2287: 2281: 2278: 2265: 2261: 2255: 2252: 2239: 2235: 2229: 2226: 2213: 2209: 2203: 2200: 2187: 2183: 2177: 2174: 2161: 2157: 2151: 2148: 2135: 2131: 2125: 2122: 2109: 2105: 2099: 2096: 2083: 2079: 2073: 2070: 2057: 2053: 2047: 2044: 2031: 2027: 2021: 2018: 2005: 2001: 1995: 1992: 1979: 1975: 1969: 1966: 1953: 1949: 1943: 1941: 1937: 1921: 1915: 1913: 1909: 1906: 1902: 1899: 1883: 1877: 1874: 1871: 1867: 1865: 1863: 1861: 1859: 1855: 1842: 1838: 1832: 1829: 1816: 1810: 1807: 1794: 1790: 1784: 1781: 1768: 1764: 1758: 1755: 1742: 1738: 1732: 1729: 1716: 1710: 1707: 1702: 1698: 1692: 1689: 1676: 1672: 1671: 1666: 1659: 1656: 1643: 1637: 1634: 1631: 1627: 1624: 1620: 1615: 1612: 1608: 1607: 1604:Thames Water 1600: 1597: 1584: 1578: 1575: 1571: 1570: 1564: 1561: 1545: 1538: 1532: 1530: 1528: 1526: 1524: 1522: 1520: 1518: 1516: 1514: 1512: 1508: 1503: 1499: 1495: 1488: 1485: 1472: 1471:Bloomberg.com 1468: 1462: 1459: 1451: 1445: 1442: 1429: 1425: 1419: 1416: 1404: 1400: 1394: 1391: 1386: 1382: 1376: 1373: 1360: 1356: 1350: 1347: 1334: 1330: 1324: 1322: 1320: 1318: 1314: 1302: 1298: 1291: 1288: 1275: 1271: 1265: 1263: 1261: 1259: 1255: 1242: 1238: 1232: 1230: 1226: 1219: 1217: 1210: 1205: 1203: 1199: 1196: 1192: 1189: 1187: 1183: 1180: 1178: 1177:air pollution 1174: 1171: 1170: 1169: 1166: 1162: 1158: 1154: 1150: 1146: 1138: 1136: 1133: 1124: 1122: 1119: 1115: 1107: 1105: 1098: 1096: 1092: 1090: 1082: 1079: 1076: 1073: 1070: 1067: 1064: 1063: 1059: 1057: 1055: 1050: 1048: 1044: 1040: 1032: 1028: 1024: 1020: 1017: 1015: 1011: 1007: 1004: 1002: 998: 994: 990: 987: 986: 985: 982: 980: 973: 968: 966: 962: 958: 954: 948: 946: 940: 936: 931: 929: 925: 917: 915: 909: 907: 905: 901: 896: 892: 889: 884: 878: 876: 874: 870: 866: 862: 858: 854: 850: 847:in 2018, the 846: 841: 837: 833: 829: 827: 819: 814: 811: 808: 805: 802: 799: 796: 793: 790: 787: 784: 781: 778: 775: 772: 769: 766: 763: 760: 757: 754: 751: 748: 745: 742: 739: 736: 733: 730: 727: 724: 721: 720:Dormay Street 718: 715: 712: 709: 706: 703: 700: 697: 694: 691: 690: 686: 681: 674: 672: 668: 662: 659: 656: 653: 650: 649: 648: 642: 640: 634: 631: 628: 625: 622: 619: 618: 617: 613: 609: 605: 598: 592: 588: 585: 582: 578: 577: 576: 573: 570: 562: 557: 555: 549: 547: 545: 538: 534: 531: 528: 525: 522: 519: 516: 513: 510: 507: 506: 505: 503: 495: 493: 491: 490:Boris Johnson 487: 483: 479: 475: 467: 463: 459: 451: 449: 443: 441: 438: 434: 425: 422: 419: 416: 415: 414: 408: 403: 400: 397: 396: 395: 389: 387: 385: 381: 377: 369: 367: 365: 356: 351: 347: 345: 340: 336: 328: 326: 324: 320: 316: 311: 307: 305: 301: 296: 292: 291:in the east. 290: 286: 282: 277: 275: 271: 267: 263: 258: 256: 252: 248: 244: 240: 236: 232: 228: 224: 215: 206: 202: 199: 195: 191: 188: 184: 180: 176: 172: 169: 165: 161: 158: 154: 150: 146: 142: 138: 134: 129: 126: 123: 119: 115: 111: 104: 101: 100: 98: 94: 90: 86: 82: 78: 74: 70: 65: 61: 58: 54: 51:Acton, London 50: 46: 42: 38: 34: 30: 25: 19: 4181:Thames Water 4145:High Speed 2 4129:Spire London 4058:Wembley City 4027:East Village 4023:Olympic Park 3968:Earl's Court 3649:, including 3542:Thames Water 3481:. Retrieved 3477: 3468: 3456: 3448: 3436:. Retrieved 3432:the original 3422: 3410:. Retrieved 3406: 3396: 3384:. Retrieved 3371: 3359:. Retrieved 3355: 3345: 3333:. Retrieved 3328: 3319: 3311:The Guardian 3310: 3300: 3288:. Retrieved 3283: 3274: 3262:. Retrieved 3258: 3248: 3236:. Retrieved 3232: 3222: 3213: 3204: 3192:. Retrieved 3188: 3176: 3164:. Retrieved 3151: 3139:. Retrieved 3135: 3125: 3113:. Retrieved 3109:the original 3104: 3078:. Retrieved 3074:the original 3064: 3052:. Retrieved 3048: 3038: 3026:. Retrieved 3022:the original 3012: 3000:. Retrieved 2996: 2986: 2974:. Retrieved 2969: 2958: 2950:the original 2945: 2936: 2925: 2917: 2905: 2893:. Retrieved 2889:the original 2879: 2867:. Retrieved 2857: 2845:. Retrieved 2841:the original 2831: 2819:. Retrieved 2815:the original 2790:. Retrieved 2786:the original 2776: 2766:21 September 2764:. Retrieved 2754: 2742:. Retrieved 2735:the original 2730: 2717: 2705:. Retrieved 2695: 2683:. Retrieved 2679:the original 2669: 2657:. Retrieved 2653:the original 2643: 2631:. Retrieved 2618: 2606:. Retrieved 2602: 2593: 2581:. Retrieved 2577: 2567: 2555:. Retrieved 2544: 2532:. Retrieved 2502:. Retrieved 2498:the original 2488: 2476:. Retrieved 2472:the original 2462: 2450:. Retrieved 2446:the original 2436: 2424:. Retrieved 2420:the original 2410: 2398:. Retrieved 2394:the original 2384: 2372:. Retrieved 2368:the original 2358: 2346:. Retrieved 2342:the original 2332: 2320:. Retrieved 2316:the original 2306: 2294:. Retrieved 2290:the original 2280: 2268:. Retrieved 2264:the original 2254: 2242:. Retrieved 2238:the original 2228: 2216:. Retrieved 2212:the original 2202: 2190:. Retrieved 2186:the original 2176: 2164:. Retrieved 2160:the original 2150: 2138:. Retrieved 2134:the original 2124: 2112:. Retrieved 2108:the original 2098: 2086:. Retrieved 2082:the original 2072: 2060:. Retrieved 2056:the original 2046: 2034:. Retrieved 2030:the original 2020: 2008:. Retrieved 2004:the original 1994: 1982:. Retrieved 1978:the original 1968: 1956:. Retrieved 1952:the original 1927:. Retrieved 1901: 1889:. Retrieved 1876: 1845:. Retrieved 1841:the original 1831: 1819:. Retrieved 1809: 1797:. Retrieved 1793:the original 1783: 1771:. Retrieved 1767:the original 1757: 1745:. Retrieved 1741:the original 1731: 1719:. Retrieved 1709: 1700: 1691: 1679:. Retrieved 1668: 1658: 1646:. Retrieved 1636: 1626: 1614: 1606:Needs report 1605: 1599: 1587:. Retrieved 1577: 1567: 1563: 1551:. Retrieved 1544:the original 1501: 1497: 1487: 1475:. Retrieved 1470: 1461: 1444: 1432:. Retrieved 1418: 1408:16 September 1406:. Retrieved 1402: 1393: 1385:the original 1375: 1363:. Retrieved 1359:the original 1349: 1337:. Retrieved 1332: 1304:. Retrieved 1300: 1290: 1278:. Retrieved 1273: 1245:. Retrieved 1241:the original 1214: 1202:biodiversity 1142: 1128: 1114:Thames Water 1111: 1102: 1093: 1086: 1051: 1035: 1018: 1005: 988: 983: 975: 970: 965:Simon Hughes 956: 949: 941: 938: 933: 921: 913: 897: 893: 885: 882: 842: 838: 834: 830: 823: 669: 666: 646: 638: 614: 610: 606: 602: 574: 569:Thames Water 566: 553: 541: 499: 455: 447: 429: 412: 393: 373: 352: 348: 337:'s original 332: 312: 308: 297: 293: 278: 259: 239:Inner London 235:River Thames 222: 220: 18: 4099:Arena Tower 3929:Development 3571:Great Stink 3459:". Also in 3386:13 February 2895:21 November 2869:21 November 2633:13 February 2553:. Vimeo.com 2534:13 February 1929:13 February 1891:13 February 1572:8 June 2011 1434:10 November 1365:15 November 1306:6 September 1247:10 November 1165:water butts 1157:green roofs 1099:Controversy 993:BAM Nuttall 972:activities. 967:MP stated: 780:Shad Thames 732:Falconbrook 699:Hammersmith 587:Rotherhithe 462:Abbey Mills 289:Abbey Mills 189:intercepted 168:Abbey Mills 80:Constructed 4170:Categories 4114:North Quay 4073:Wood Wharf 3740:Reservoirs 3655:Lee Tunnel 3002:31 January 1399:"Timeline" 1237:"Timeline" 1220:References 1125:Disruption 865:Selina Fox 458:Lee Tunnel 329:Background 315:Lee Tunnel 251:Bazalgette 72:Work begun 60:Lee Tunnel 4082:Buildings 3616:John Snow 3611:New River 3335:24 August 3313:. London. 3141:24 August 3115:24 August 3080:24 August 3054:24 August 2847:6 October 2821:6 October 2792:6 October 1280:26 August 1153:permeable 1049:and DIF. 961:Ian Byatt 930:in 2011: 798:Greenwich 756:Heathwall 705:Barn Elms 247:rainwater 131:Technical 121:Character 67:Operation 43:Completed 3438:23 March 3412:23 March 3361:23 March 3290:23 March 3284:BBC News 2997:Building 2659:23 March 2557:23 March 2504:23 March 2478:23 March 2452:23 March 2426:23 March 2400:23 March 2374:23 March 2348:23 March 2322:23 March 2296:23 March 2270:23 March 2244:23 March 2218:23 March 2192:23 March 2166:23 March 2140:23 March 2114:23 March 2088:23 March 2062:23 March 2036:23 March 2010:23 March 1984:23 March 1958:23 March 1847:23 March 1821:23 March 1799:23 March 1773:23 March 1747:23 March 1721:23 March 1701:Sky News 1681:27 March 1675:Archived 1648:23 March 1589:23 March 1553:23 March 1477:31 March 1428:Archived 1333:BBC News 1193:Reduced 792:Deptford 537:Dartford 390:Outcomes 382:and the 113:Operator 32:Location 27:Overview 3549:History 3483:28 July 3194:23 July 3166:23 July 3028:31 July 2976:28 July 2744:31 July 2707:31 July 2685:31 July 2608:17 June 2583:17 June 1403:Tideway 1339:2 April 1039:Allianz 1023:Costain 1006:Central 544:Tideway 466:Beckton 262:Allianz 237:across 233:of the 3238:14 May 1161:swales 845:Fulham 687:, 2021 685:Putney 243:sewage 144:Length 40:Status 3931:sites 3380:(PDF) 3264:3 May 3160:(PDF) 2865:. BBC 2738:(PDF) 2727:(PDF) 2627:(PDF) 2528:(PDF) 1923:(PDF) 1885:(PDF) 1547:(PDF) 1540:(PDF) 1453:(PDF) 1118:Ofwat 945:Ofwat 693:Acton 590:CSOs. 380:DEFRA 285:Acton 274:Ofwat 174:Width 157:Acton 96:Owner 88:Opens 48:Start 3653:and 3485:2016 3440:2013 3414:2013 3388:2016 3363:2013 3337:2015 3292:2013 3266:2024 3240:2024 3196:2022 3168:2022 3143:2015 3117:2015 3082:2015 3056:2015 3030:2013 3004:2013 2978:2016 2897:2014 2871:2014 2849:2014 2823:2014 2794:2014 2768:2014 2746:2013 2709:2013 2687:2013 2661:2013 2635:2016 2610:2019 2585:2019 2559:2013 2536:2016 2506:2013 2480:2013 2454:2013 2428:2013 2402:2013 2376:2013 2350:2013 2324:2013 2298:2013 2272:2013 2246:2013 2220:2013 2194:2013 2168:2013 2142:2013 2116:2013 2090:2013 2064:2013 2038:2013 2012:2013 1986:2013 1960:2013 1931:2016 1893:2016 1849:2013 1823:2013 1801:2013 1775:2013 1749:2013 1723:2013 1683:2016 1650:2013 1591:2013 1555:2013 1504:(1). 1479:2024 1436:2019 1410:2019 1367:2015 1341:2024 1308:2022 1282:2020 1249:2019 1163:and 1029:and 1019:East 1012:and 999:and 989:West 480:and 433:SUDs 245:and 221:The 197:Cost 187:CSOs 91:2025 75:2016 464:to 321:to 56:End 4172:: 3476:. 3405:. 3354:. 3327:. 3309:. 3282:. 3257:. 3231:. 3212:. 3187:. 3134:. 3103:. 3090:^ 3047:. 2995:. 2968:. 2944:. 2924:. 2802:^ 2729:. 2601:. 2576:. 2514:^ 1939:^ 1911:^ 1857:^ 1699:. 1673:. 1667:. 1510:^ 1500:. 1496:. 1469:. 1401:. 1331:. 1316:^ 1299:. 1272:. 1257:^ 1228:^ 1159:, 1045:, 1041:, 1025:, 995:, 953:EU 875:. 488:, 476:, 378:, 325:. 268:, 264:, 192:34 4029:) 4025:( 3979:) 3975:( 3916:e 3909:t 3902:v 3534:e 3527:t 3520:v 3487:. 3442:. 3416:. 3390:. 3365:. 3339:. 3294:. 3268:. 3242:. 3216:. 3198:. 3145:. 3119:. 3084:. 3058:. 3032:. 3006:. 2980:. 2899:. 2873:. 2851:. 2825:. 2796:. 2770:. 2748:. 2711:. 2689:. 2663:. 2637:. 2612:. 2587:. 2561:. 2538:. 2508:. 2482:. 2456:. 2430:. 2404:. 2378:. 2352:. 2326:. 2300:. 2274:. 2248:. 2222:. 2196:. 2170:. 2144:. 2118:. 2092:. 2066:. 2040:. 2014:. 1988:. 1962:. 1933:. 1895:. 1851:. 1825:. 1803:. 1777:. 1751:. 1725:. 1703:. 1685:. 1652:. 1593:. 1557:. 1502:5 1481:. 1438:. 1412:. 1369:. 1343:. 1310:. 1284:. 1251:. 470:× 435:/ 360:× 201:£

Index

Lee Tunnel
Combined sewer
Acton
Abbey Mills
CSOs
£

combined sewer
the tidal section (estuary)
River Thames
Inner London
sewage
rainwater
Bazalgette
London sewerage system
Allianz
Amber Infrastructure
Dalmore Capital
Ofwat
COVID-19 pandemic
Acton
Abbey Mills
Stratford to East Ham Lee Tunnel
Beckton Sewage Treatment Works
Lee Tunnel
London Borough of Newham
Beckton Sewage Treatment Works
Sir Joseph Bazalgette
London sewerage system
combined sewer overflows