Mines Rail connectivity with the National Railways Network was carried out between July 2019 and March 2020. The primary objective of this study was to comprehensively assess the potential for extending rail links strategically and to provide recommendations for the effective implementation of the
111:. Funding for this project is expected to be secured soon, with the overall project cost amounting to Rs 58.240 billion. The financing will follow an equal cost-sharing approach through the Public Sector Development Programme and the Annual Development Plan. 209:
The project involves the construction of a 105-kilometer railway line that will connect Thar coal mines to Bin Qasim. The primary objective is to establish a seamless connection between the coal mines in
146:(PRFTC). The key focus of this company is to manage the transportation of freight, with a specific emphasis on coal, by rail from the port area in Karachi to destinations up-country. 139:
from ]Thar in power plants, effectively replacing the need for imported coal. The shift to local coal is anticipated to result in substantial savings of up to $ 2 billion per year.
280: 400: 390: 313: 345: 218:
and integrate with the existing railway network. Additionally, a double rail line will be established from the Bin Qasim railways to the
363: 143: 63: 83: 197: 395: 331: 108: 239: 188: 295: 163: 168: 266: 385: 178: 405: 193: 183: 135:
and the national railway network by March 2023. This crucial connection aims to enable the utilization of local
173: 158: 33: 281:"Senate Body Recommends Allocating Rs. 40 Billion for Construction of Railway Link to Carry Thar Coal" 215: 267:"Energy Update - News, Updates related to Power, Nuclear, Solar, Renewable Energy in Pakistan" 214:
and both the national and global energy markets. The proposed railway line will extend from
132: 79: 128: 51: 379: 142:
The entity responsible for spearheading the development of this project is the
219: 120: 104: 346:"Thar mine's linking with rail network to help boost coal supply chain" 364:"Govt to Provide Railway Access to Thar Coal Mines and Port Qasim" 211: 136: 332:"MoU signed to construct 105KM rail track in Thar Coal" 240:"Long-awaited rail track to ferry Thar coal okayed" 131:issued a directive to establish a link between the 103:is a infrastructure project focused on linking the 89: 75: 70: 57: 47: 39: 29: 24: 222:Terminal, enhancing transportation capabilities. 16:Transportation infrastructure project in Pakistan 144:Pakistan Railway Freight Transportation Company 64:Pakistan Railway Freight Transportation Company 8: 19: 314:"Railway Link to Thar Coal Mines Approved" 127:On 5 October 2023, former Prime Minister 296:"How feasible is the Thar coal railway?" 294:Kamran, Asad Ullah (December 31, 2022). 231: 261: 259: 257: 255: 253: 18: 119:A bankable feasibility study for the 7: 401:Transport infrastructure in Pakistan 14: 391:Energy infrastructure in Pakistan 198:Hyderabad-Khokhrapar Branch Line 1: 422: 109:Pakistan's Railway network 318:www.constructionworld.in 300:Profit by Pakistan Today 84:National Railway Network 396:Coal mines in Pakistan 154:The stations will be: 34:Railway Infrastructure 352:. December 24, 2022. 334:. December 21, 2021. 246:. September 3, 2023. 244:The Express Tribune 216:Thar Coal Block -II 189:Sain Talib-ul-Moula 59:Current operator(s) 21: 269:. January 1, 2023. 164:Sain Soore Badshah 90:Distance travelled 386:Pakistan Railways 101:Thar Coal Railway 97: 96: 43:Under Development 20:Thar Coal Railway 413: 406:Economy of Sindh 368: 367: 360: 354: 353: 342: 336: 335: 328: 322: 321: 310: 304: 303: 291: 285: 284: 277: 271: 270: 263: 248: 247: 236: 60: 22: 421: 420: 416: 415: 414: 412: 411: 410: 376: 375: 372: 371: 362: 361: 357: 344: 343: 339: 330: 329: 325: 312: 311: 307: 293: 292: 288: 279: 278: 274: 265: 264: 251: 238: 237: 233: 228: 207: 205:Project Details 169:Khan Sahab Somo 152: 133:Thar Coal Mines 117: 82: 80:Thar Coal Mines 58: 17: 12: 11: 5: 419: 417: 409: 408: 403: 398: 393: 388: 378: 377: 370: 369: 355: 337: 323: 305: 286: 272: 249: 230: 229: 227: 224: 206: 203: 202: 201: 191: 186: 181: 176: 171: 166: 161: 151: 148: 129:Shehbaz Sharif 116: 113: 95: 94: 93:105 kilometers 91: 87: 86: 77: 73: 72: 68: 67: 61: 55: 54: 52:Thar, Pakistan 49: 45: 44: 41: 37: 36: 31: 27: 26: 15: 13: 10: 9: 6: 4: 3: 2: 418: 407: 404: 402: 399: 397: 394: 392: 389: 387: 384: 383: 381: 374: 365: 359: 356: 351: 347: 341: 338: 333: 327: 324: 319: 315: 309: 306: 301: 297: 290: 287: 282: 276: 273: 268: 262: 260: 258: 256: 254: 250: 245: 241: 235: 232: 225: 223: 221: 217: 213: 204: 199: 195: 192: 190: 187: 185: 182: 180: 177: 175: 172: 170: 167: 165: 162: 160: 157: 156: 155: 149: 147: 145: 140: 138: 134: 130: 125: 122: 114: 112: 110: 106: 102: 92: 88: 85: 81: 78: 74: 69: 65: 62: 56: 53: 50: 46: 42: 38: 35: 32: 28: 23: 373: 358: 349: 340: 326: 317: 308: 299: 289: 275: 243: 234: 208: 179:Muhammadabad 153: 141: 126: 118: 100: 98: 30:Service type 184:Arbab Nagar 107:deposit to 380:Categories 350:The Nation 226:References 220:Port Qasim 194:New Chhor 174:Mominabad 124:project. 121:Thar Coal 105:Thar coal 159:Islamkot 150:Stations 25:Overview 115:History 76:Termini 66:(PRFTC) 48:Locale 40:Status 212:Sindh 71:Route 196:(On 137:coal 99:The 382:: 348:. 316:. 298:. 252:^ 242:. 366:. 320:. 302:. 283:. 200:)

Index

Railway Infrastructure
Thar, Pakistan
Pakistan Railway Freight Transportation Company
Thar Coal Mines
National Railway Network
Thar coal
Pakistan's Railway network
Thar Coal
Shehbaz Sharif
Thar Coal Mines
coal
Pakistan Railway Freight Transportation Company
Islamkot
Sain Soore Badshah
Khan Sahab Somo
Mominabad
Muhammadabad
Arbab Nagar
Sain Talib-ul-Moula
New Chhor
Hyderabad-Khokhrapar Branch Line
Sindh
Thar Coal Block -II
Port Qasim
"Long-awaited rail track to ferry Thar coal okayed"




Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.