192:
Originally, detailed planning was to begin in 2010 with the line expected to fully open in 2018. However, in 2011 the plans were indefinitely postponed for economic reasons. In 2017 the plan was reactivated. The line is planned for an end-to-end journey time of 42 minutes, running at 15-minute
406:
438:
433:
343:
189:
A feasibility study on a railway line in
Tenerife with a maximum speed of 220 km/h (140 mph) was first conducted in 1997.
284:
202:
443:
385:
319:
217:
The proposed route of 80 km will contain 7 railway stations with a possible extension to FonsalĂa, but starting from
249:
57:
239:
225:
218:
178:
174:
364:
261:
206:
21:
221:
to Costa Adeje, with the journey taking approximately 42 minutes. Stations will be located in:
344:"El Tren del Sur de Tenerife estará operativo en ocho años y generals más de mil empleos"
244:
170:
291:
427:
120:
127:
17:
365:"El Cabildo suspende los proyectos constructivos del tren del sur de Tenerife"
166:
201:
In 2010 the estimated cost of the line was €1.8 billion, with the
165:(Train of the South) is a planned railway line on the island of
264:
is studying a rail line linking northern towns on the island.
27:
Railway line on the island of
Tenerife, Canary Islands
193:intervals, carrying up to 64,000 passengers daily.
126:
116:
108:
103:
95:
90:
82:
77:
69:
50:
42:
37:
32:
386:"Tenerife to restart planning for Tren del Sur"
8:
338:
336:
314:
312:
273:
279:
277:
260:Along with the Tren del Sur plan, the
29:
439:Proposed rail infrastructure in Spain
7:
14:
320:"Datos técnicos del Tren del Sur"
177:with the south of the island via
434:Proposed railway lines in Spain
16:For the former railway line in
1:
205:allocating €5 million to the
460:
285:"Memoria del Tren del Sur"
209:to plan its construction.
15:
86:Metropolitano de Tenerife
203:Ministry of Development
58:Intercambiador Tenerife
240:Tenerife South Airport
226:Santa Cruz de Tenerife
219:Santa Cruz de Tenerife
179:Tenerife South Airport
175:Santa Cruz de Tenerife
173:, linking the capital
444:Transport in Tenerife
250:Playa de las Américas
262:Cabildo de Tenerife
207:Cabildo de Tenerife
22:Train of the South
297:on 7 January 2024
157:
156:
451:
418:
417:
415:
413:
407:"Tren del Norte"
403:
397:
396:
394:
392:
382:
376:
375:
373:
371:
361:
355:
354:
352:
350:
340:
331:
330:
328:
326:
316:
307:
306:
304:
302:
296:
290:. Archived from
289:
281:
152:
150:
149:
145:
142:
134:
117:Number of tracks
30:
459:
458:
454:
453:
452:
450:
449:
448:
424:
423:
422:
421:
411:
409:
405:
404:
400:
390:
388:
384:
383:
379:
369:
367:
363:
362:
358:
348:
346:
342:
341:
334:
324:
322:
318:
317:
310:
300:
298:
294:
287:
283:
282:
275:
270:
258:
215:
199:
187:
147:
143:
140:
138:
137:4 ft
136:
132:
96:Planned opening
65:
28:
25:
12:
11:
5:
457:
455:
447:
446:
441:
436:
426:
425:
420:
419:
398:
377:
356:
332:
308:
272:
271:
269:
266:
257:
256:Tren del Norte
254:
253:
252:
247:
245:Los Cristianos
242:
237:
234:
231:
228:
214:
211:
198:
195:
186:
183:
171:Canary Islands
155:
154:
130:
124:
123:
118:
114:
113:
110:
106:
105:
101:
100:
97:
93:
92:
88:
87:
84:
80:
79:
75:
74:
71:
67:
66:
64:
63:
60:
54:
52:
48:
47:
44:
40:
39:
35:
34:
26:
13:
10:
9:
6:
4:
3:
2:
456:
445:
442:
440:
437:
435:
432:
431:
429:
408:
402:
399:
387:
381:
378:
366:
360:
357:
345:
339:
337:
333:
321:
315:
313:
309:
293:
286:
280:
278:
274:
267:
265:
263:
255:
251:
248:
246:
243:
241:
238:
235:
232:
229:
227:
224:
223:
222:
220:
212:
210:
208:
204:
196:
194:
190:
184:
182:
180:
176:
172:
168:
164:
163:
133:1,435 mm
131:
129:
125:
122:
119:
115:
111:
107:
102:
98:
94:
89:
85:
81:
76:
72:
68:
61:
59:
56:
55:
53:
49:
45:
41:
36:
31:
23:
19:
410:. Retrieved
401:
389:. Retrieved
380:
368:. Retrieved
359:
347:. Retrieved
323:. Retrieved
299:. Retrieved
292:the original
259:
216:
200:
191:
188:
162:Tren del Sur
161:
160:
158:
62:Las Américas
33:Tren del Sur
128:Track gauge
109:Line length
83:Operator(s)
46:In planning
18:Puerto Rico
428:Categories
268:References
236:San Isidro
233:Candelaria
185:Background
104:Technical
412:10 April
349:10 April
325:10 April
301:10 April
167:Tenerife
151: in
70:Stations
38:Overview
391:13 July
146:⁄
99:unknown
91:History
78:Service
51:Termini
370:9 June
121:Double
43:Status
20:, see
295:(PDF)
288:(PDF)
230:Añaza
213:Route
112:80 km
414:2010
393:2017
372:2012
351:2010
327:2010
303:2010
197:Cost
159:The
430::
335:^
311:^
276:^
181:.
169:,
416:.
395:.
374:.
353:.
329:.
305:.
153:)
148:2
144:1
141:+
139:8
135:(
73:7
24:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.