Originally, detailed planning was to begin in 2010 with the line expected to fully open in 2018. However, in 2011 the plans were indefinitely postponed for economic reasons. In 2017 the plan was reactivated. The line is planned for an end-to-end journey time of 42 minutes, running at 15-minute
406: 438: 433: 343: 189:
A feasibility study on a railway line in Tenerife with a maximum speed of 220 km/h (140 mph) was first conducted in 1997.
284: 202: 443: 385: 319: 217:
The proposed route of 80 km will contain 7 railway stations with a possible extension to FonsalĂ­a, but starting from
249: 57: 239: 225: 218: 178: 174: 364: 261: 206: 21: 221:
to Costa Adeje, with the journey taking approximately 42 minutes. Stations will be located in:
344:"El Tren del Sur de Tenerife estará operativo en ocho años y generals más de mil empleos" 244: 170: 291: 427: 120: 127: 17: 365:"El Cabildo suspende los proyectos constructivos del tren del sur de Tenerife" 166: 201:
In 2010 the estimated cost of the line was €1.8 billion, with the
165:(Train of the South) is a planned railway line on the island of 264:
is studying a rail line linking northern towns on the island.
27:
Railway line on the island of Tenerife, Canary Islands
193:intervals, carrying up to 64,000 passengers daily. 126: 116: 108: 103: 95: 90: 82: 77: 69: 50: 42: 37: 32: 386:"Tenerife to restart planning for Tren del Sur" 8: 338: 336: 314: 312: 273: 279: 277: 260:Along with the Tren del Sur plan, the 29: 439:Proposed rail infrastructure in Spain 7: 14: 320:"Datos tĂ©cnicos del Tren del Sur" 177:with the south of the island via 434:Proposed railway lines in Spain 16:For the former railway line in 1: 205:allocating €5 million to the 460: 285:"Memoria del Tren del Sur" 209:to plan its construction. 15: 86:Metropolitano de Tenerife 203:Ministry of Development 58:Intercambiador Tenerife 240:Tenerife South Airport 226:Santa Cruz de Tenerife 219:Santa Cruz de Tenerife 179:Tenerife South Airport 175:Santa Cruz de Tenerife 173:, linking the capital 444:Transport in Tenerife 250:Playa de las AmĂ©ricas 262:Cabildo de Tenerife 207:Cabildo de Tenerife 22:Train of the South 297:on 7 January 2024 157: 156: 451: 418: 417: 415: 413: 407:"Tren del Norte" 403: 397: 396: 394: 392: 382: 376: 375: 373: 371: 361: 355: 354: 352: 350: 340: 331: 330: 328: 326: 316: 307: 306: 304: 302: 296: 290:. Archived from 289: 281: 152: 150: 149: 145: 142: 134: 117:Number of tracks 30: 459: 458: 454: 453: 452: 450: 449: 448: 424: 423: 422: 421: 411: 409: 405: 404: 400: 390: 388: 384: 383: 379: 369: 367: 363: 362: 358: 348: 346: 342: 341: 334: 324: 322: 318: 317: 310: 300: 298: 294: 287: 283: 282: 275: 270: 258: 215: 199: 187: 147: 143: 140: 138: 137:4 ft  136: 132: 96:Planned opening 65: 28: 25: 12: 11: 5: 457: 455: 447: 446: 441: 436: 426: 425: 420: 419: 398: 377: 356: 332: 308: 272: 271: 269: 266: 257: 256:Tren del Norte 254: 253: 252: 247: 245:Los Cristianos 242: 237: 234: 231: 228: 214: 211: 198: 195: 186: 183: 171:Canary Islands 155: 154: 130: 124: 123: 118: 114: 113: 110: 106: 105: 101: 100: 97: 93: 92: 88: 87: 84: 80: 79: 75: 74: 71: 67: 66: 64: 63: 60: 54: 52: 48: 47: 44: 40: 39: 35: 34: 26: 13: 10: 9: 6: 4: 3: 2: 456: 445: 442: 440: 437: 435: 432: 431: 429: 408: 402: 399: 387: 381: 378: 366: 360: 357: 345: 339: 337: 333: 321: 315: 313: 309: 293: 286: 280: 278: 274: 267: 265: 263: 255: 251: 248: 246: 243: 241: 238: 235: 232: 229: 227: 224: 223: 222: 220: 212: 210: 208: 204: 196: 194: 190: 184: 182: 180: 176: 172: 168: 164: 163: 133:1,435 mm 131: 129: 125: 122: 119: 115: 111: 107: 102: 98: 94: 89: 85: 81: 76: 72: 68: 61: 59: 56: 55: 53: 49: 45: 41: 36: 31: 23: 19: 410:. Retrieved 401: 389:. Retrieved 380: 368:. Retrieved 359: 347:. Retrieved 323:. Retrieved 299:. Retrieved 292:the original 259: 216: 200: 191: 188: 162:Tren del Sur 161: 160: 158: 62:Las AmĂ©ricas 33:Tren del Sur 128:Track gauge 109:Line length 83:Operator(s) 46:In planning 18:Puerto Rico 428:Categories 268:References 236:San Isidro 233:Candelaria 185:Background 104:Technical 412:10 April 349:10 April 325:10 April 301:10 April 167:Tenerife 151: in 70:Stations 38:Overview 391:13 July 146:⁄ 99:unknown 91:History 78:Service 51:Termini 370:9 June 121:Double 43:Status 20:, see 295:(PDF) 288:(PDF) 230:Añaza 213:Route 112:80 km 414:2010 393:2017 372:2012 351:2010 327:2010 303:2010 197:Cost 159:The 430:: 335:^ 311:^ 276:^ 181:. 169:, 416:. 395:. 374:. 353:. 329:. 305:. 153:) 148:2 144:1 141:+ 139:8 135:( 73:7 24:.

Index

Puerto Rico
Train of the South
Intercambiador Tenerife
Double
Track gauge
Tenerife
Canary Islands
Santa Cruz de Tenerife
Tenerife South Airport
Ministry of Development
Cabildo de Tenerife
Santa Cruz de Tenerife
Santa Cruz de Tenerife
Tenerife South Airport
Los Cristianos
Playa de las Américas
Cabildo de Tenerife


"Memoria del Tren del Sur"
the original


"Datos técnicos del Tren del Sur"


"El Tren del Sur de Tenerife estará operativo en ocho años y generals más de mil empleos"
"El Cabildo suspende los proyectos constructivos del tren del sur de Tenerife"
"Tenerife to restart planning for Tren del Sur"
"Tren del Norte"

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑