215: CV-11-436012. The legal claim was initiated against the government of Dalton McGuinty in 2011. In 2015 Trillium Power uncovered evidence that evidence that been in the possession of the Government of Ontario had been destroyed and mislabelled (to not be found in searches) and presented this information to the court. The court then allowed Trillium Power to amend its litigation claims to include the claim of spoliation. A decision by the Ontario Court of Appeal is presently pending from the January 19, 2023 hearing.
324:
338:
159:. The project was placed in moratorium by the Ontario government on February 11, 2011 at exactly the same hour that Trillium Power was completing a $ 26 Million financing. A larger follow on equity investment of $ 400 Million was in discussion with two large global pension funds at the time. Had it not been placed in abeyance, TPW1 would have been the first offshore wind farm built in the
297:. The Appeal was heard on March 22, 2013. On November 12, 2013, the three judges of the Ontario Court of Appeal rendered their decision whereby they found Trillium Power's case could proceed on the claim of misfeasance in public office. On February 28, 2014, the Ontario Government filed a Statement of Defense.
183:
on the shoals southwest of Main Duck Island. The project will consist of approximately 80 x 6.0MW turbines and two offshore substations linked to the Lennox
Transmission Station by way of an underwater cable. The total project cost is estimated at $ 1.5 billion of private capital with no cost to
266:
Trillium Power followed
Ontario's Renewable Energy Approval process. As of February 11, 2011, when the project was placed in a moratorium, Trillium Power had completed over 105 studies, reports and regulatory actions including, but not limited to: avian, aquatic, geophysical, ice, wave, navigation,
210:
On May 19, 2011 Trillium Power Wind
Corporation gave notice to the McGuinty Government that if its action against Trillium Power was not corrected it would initiate litigation against the Government of Ontario for CDN$ 2.25 billion. No correction was made as requested. Therefore, on
289:
All offshore wind power projects were placed in moratorium by the
Ontario government, on February 11, 2011, at the exact time of Trillium Power's closing of a $ 26 million tranche of equity financing on February 11, 2011 at 3:00 pm.
163:. Recently, on January 19, 2023, the Ontario Court of Appeal heard an appeal by Trillium Power, focusing on evidence provided by Trillium Power of spoliation (destruction of evidence) in an ongoing litigation by the Ontario Government.
154:
at least 17 to 28 km (11 to 17 mi) from the nearest mainland. This renewable energy project is being developed by
Trillium Power Wind Corporation, a privately-held, Canadian-owned company headquartered in
195:
of 43% (due to the quality of its power density), which is equivalent to the amount of power consumed by a minimum of 130,000 typical
Ontario households. TPW1 will offset at least 1.5 million tonnes of
286:
that was paid for and secured through
Ontario's MNR Windpower Site Release and Development Program that included an embedded Land Use Permit (LUP) at the time of its registration.
596:
300:
On
January 19, 2023 the Ontario Court of Appeal heard an appeal by Trillium Power on the issue of spoliation and the administration of justice in Ontario.
175:-offshore wind site is acknowledged as the premier site in North America and especially The Great Lakes. The TPW1 site will be located in northeastern
465:
532:
211:
September 28, 2011, Trillium Power Wind
Corporation filed its claim in the Ontario Superior Court of Justice and was assigned the court file
621:
293:
The claim by
Trillium Power vs. Ontario was initially struck down by a motions judge and was then appealed to Ontario's highest court, the
64:
601:
411:
591:
312:. Trillium Power's additional sites include: Trillium Power Wind 2 (TPW2), The Great Lakes Array and The Superior Array.
616:
356:
294:
232:
and in-situ Meteorological Mast wind-measuring devices, along with 36 years of data collected on Main Duck Island;
554:
276:
366:
540:
351:
117:
492:
506:
180:
254:
Fresh water site that does not require expensive wind turbines for salt-water oceans or seas.
268:
248:
Average wave height of less than 1 m (3.2 feet) 94% of the time from April to November;
156:
272:
192:
440:
361:
197:
610:
519:
343:
329:
239:
308:
TPW1 is the first of Trillium Power's four unique offshore wind developments in the
567:
176:
151:
52:
309:
160:
319:
283:
225:
79:
66:
337:
188:
147:
386:
191:
will produce between 450 and 500 megawatts (MW) of electricity with a net
555:"Ministry of Northern Development, Mines, Natural Resources and Forestry"
143:
129:
228:
of 9.0 m/s at 100 m hub height based on data collected by both
597:
America's Offshore Wind Race is On: Can the US Compete with Canada?
245:
Close proximity to major grid interconnection points (28 km);
229:
267:
noise, etc. The first round of public consultations were held in
251:
Low/zero visibility from mainland shore or nearby major islands.
586:
412:"Who Will Build the First Offshore Wind Farm in North America?"
602:
Who Will Build the First Offshore Wind Farm in North America?
203:
emissions from coal-fired generation and 931,745 tonnes of CO
533:"Watertown Daily Times | Canadian wind project draws ire"
235:
Water depth ranging from 2 to 40 m (6 to 130 ft);
179:, approximately 38 km (24 mi) southwest of
257:
The Great Lakes (and other lakes) do not have tides.
520:
Ministry of the Environment, Conservation and Parks
116:
111:
103:
95:
58:
47:
33:
21:
207:emissions from natural gas generation every year.
51:Southwest of Main Duck Island Shoal, northeastern
592:The Great Lakes May Soon be Home to Offshore Wind
568:Offshore wind development hits a snag in Ontario
493:"Trillium Power Wind - Winds of the Great Lakes"
435:
433:
431:
429:
427:
425:
423:
421:
8:
282:The TPW1 site will be located on provincial
28:Location of Trillium Power Wind 1 in Ontario
573:, April 2011. Retrieved 29 September 2011.
18:
507:"Trillium Power Wind - Visual Aesthetics"
184:taxpayers for the proposed construction.
441:"Trillium Power Wind - Project: Wind 1"
378:
150:in the Canadian waters of northeastern
7:
262:Approvals process and current status
466:"Trillium Power Statement of Clair"
14:
387:"Trillium Power Wind - Corporate"
336:
322:
142:(TPW1) is a proposed 450 to 500
107:Trillium Power Wind Corporation
212:
1:
622:Proposed wind farms in Canada
537:www.watertowndailytimes.com
357:List of Offshore Wind Farms
638:
126:
26:
295:Ontario Court of Appeal
118:Nameplate capacity
277:Cape Vincent, New York
445:www.trilliumpower.com
391:www.trilliumpower.com
367:Green Energy Act 2009
140:Trillium Power Wind 1
112:Power generation
80:43.84000°N 76.69000°W
22:Trillium Power Wind 1
571:Alberta Oil Magazine
352:Wind power in Canada
279:in early July 2010.
617:Offshore wind farms
304:Additional projects
167:Project description
85:43.84000; -76.69000
76: /
16:Wind farm in Canada
146:(MW) far-offshore
587:Corporate website
181:Kingston, Ontario
137:
136:
99:Under development
629:
574:
565:
559:
558:
551:
545:
544:
543:on 11 July 2010.
539:. Archived from
529:
523:
517:
511:
510:
503:
497:
496:
489:
483:
482:
480:
479:
470:
462:
456:
455:
453:
451:
437:
416:
415:
414:. 26 April 2010.
408:
402:
401:
399:
397:
383:
346:
341:
340:
332:
327:
326:
325:
269:Napanee, Ontario
214:
157:Toronto, Ontario
130:edit on Wikidata
91:
90:
88:
87:
86:
81:
77:
74:
73:
72:
69:
19:
637:
636:
632:
631:
630:
628:
627:
626:
607:
606:
583:
578:
577:
566:
562:
553:
552:
548:
531:
530:
526:
518:
514:
505:
504:
500:
491:
490:
486:
477:
475:
468:
464:
463:
459:
449:
447:
439:
438:
419:
410:
409:
405:
395:
393:
385:
384:
380:
375:
342:
335:
328:
323:
321:
318:
306:
273:Picton, Ontario
264:
221:
206:
201:
193:capacity factor
169:
133:
84:
82:
78:
75:
70:
67:
65:
63:
62:
43:
29:
17:
12:
11:
5:
635:
633:
625:
624:
619:
609:
608:
605:
604:
599:
594:
589:
582:
581:External links
579:
576:
575:
560:
546:
524:
512:
498:
484:
457:
417:
403:
377:
376:
374:
371:
370:
369:
364:
362:Feed-in tariff
359:
354:
348:
347:
333:
317:
314:
305:
302:
263:
260:
259:
258:
255:
252:
249:
246:
243:
236:
233:
220:
219:Key attributes
217:
204:
199:
168:
165:
135:
134:
127:
124:
123:
120:
114:
113:
109:
108:
105:
101:
100:
97:
93:
92:
60:
56:
55:
49:
45:
44:
42:
41:
37:
35:
31:
30:
27:
24:
23:
15:
13:
10:
9:
6:
4:
3:
2:
634:
623:
620:
618:
615:
614:
612:
603:
600:
598:
595:
593:
590:
588:
585:
584:
580:
572:
569:
564:
561:
556:
550:
547:
542:
538:
534:
528:
525:
521:
516:
513:
508:
502:
499:
494:
488:
485:
474:
467:
461:
458:
446:
442:
436:
434:
432:
430:
428:
426:
424:
422:
418:
413:
407:
404:
392:
388:
382:
379:
372:
368:
365:
363:
360:
358:
355:
353:
350:
349:
345:
344:Energy portal
339:
334:
331:
330:Canada portal
320:
315:
313:
311:
303:
301:
298:
296:
291:
287:
285:
280:
278:
274:
270:
261:
256:
253:
250:
247:
244:
241:
240:Power density
237:
234:
231:
227:
223:
222:
218:
216:
208:
202:
194:
190:
185:
182:
178:
174:
166:
164:
162:
158:
153:
149:
145:
141:
131:
125:
121:
119:
115:
110:
106:
102:
98:
94:
89:
61:
57:
54:
50:
46:
39:
38:
36:
32:
25:
20:
570:
563:
549:
541:the original
536:
527:
515:
501:
487:
476:. Retrieved
473:siskinds.com
472:
460:
450:November 22,
448:. Retrieved
444:
406:
396:November 22,
394:. Retrieved
390:
381:
307:
299:
292:
288:
281:
265:
209:
186:
177:Lake Ontario
172:
170:
152:Lake Ontario
139:
138:
53:Lake Ontario
310:Great Lakes
242:of 938 W/m;
161:Great Lakes
83: /
59:Coordinates
611:Categories
522:Ontario.ca
478:2017-08-11
373:References
284:Crown Land
226:wind speed
71:76°41′24″W
68:43°50′24″N
238:A unique
189:wind farm
171:The TPW1
148:wind farm
316:See also
144:megawatt
104:Owner(s)
48:Location
34:Country
122:500 MW
96:Status
40:Canada
469:(PDF)
230:LIDAR
224:Mean
128:[
452:2022
398:2022
275:and
187:The
213:No.
173:far
613::
535:.
471:.
443:.
420:^
389:.
271:,
198:CO
557:.
509:.
495:.
481:.
454:.
400:.
205:2
200:2
132:]
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.