64:
549:
announced. Designed by the Dutch company "TT Design", the year and a half long renovation will cost €17 million, though the exact dates are still unknown. Renovation will be conducted in phases, and the shopping mall will never be fully closed. Both the interior, and the façade, will be made more transparent, to allow more daylight, while the string of shops and restaurants will be allowed around the outer ground floor of the building, on the plateau which surrounds the building, as it is empty at the moment.
80:
585:
561:
597:
929:
573:
955:
397:
87:
388:. Beginning in 2003, the tower was reconstructed, including a 2-floor increase (103,9m / 340,9 ft in total) in height, with the addition of a 26m antenna, which in strict architectural terms does not count as structural height, however, in structural height would actually be 103,9 m. The reconstructed tower is now being rented out to tenants.
473:
527:
After years of announcing it, MPC Properties, another Matić's company, revealed in
January 2018 that the construction of the new tower, next to the old one, will commence in February. Characteristics of the new tower include height of 22 floors and 103.9 m (341 ft) and a total floor area of
502:
The multimillion-dollar project has 25 stories (above ground), totaling around 25,000 m of office space. An observation deck, fitness area and cafe are located on the top floor of the building. The observation deck is currently closed to the public, although there are plans to open it in the future.
532:
architectural company was hired to do the project, just as MPC hired
Chapman Taylor to do the interiors and parts of the façade of the Ušće shopping mall. There will be two-leveled garage below ground, with a total area equal to the total floor area of the building. The foundation stone was laid on
523:
in
February 2003 for the Block 16, a section of New Belgrade in which the tower is located. The winning project was a design by architect Branislav Redžić, who envisioned a multi-functional urban center which would consist of two towers and a shopping mall. Tower I was reconstructed, shopping mall
501:
Reconstruction work on the building started in early 2003 and was carried out by
European Construction. The reconstruction was completed in 2005 and the official opening took place in July that year. Two additional floors were added—conference halls are located on 24th and a restaurant on the 25th
544:
The Ušće Mall was opened on April 2009. The mall has an area of 130,000 square metres (1,400,000 sq ft) on 6 levels, of which 50,000 square metres (540,000 sq ft) is retail space, with 150 stores, restaurants and cafés. The shopping mall also has a multiplex cinema with 11
548:
At the time of opening, Ušće was the largest shopping mall in
Belgrade by floor area, and the most visited one. In sheer size, though not in number of visitors, it was surpassed by the Galerija Shopping Mall in Belgrade Waterfront in October 2020. In July 2022, a massive visual reimaging was
492:
cruise missiles were fired at the building. Despite the heavy damage, the building did not collapse and remained structurally intact. There were no reported deaths or injuries in the attack as the building was unoccupied at the time.
438:
occupied the first ten floors of the building. The party leased out many of the floors to domestic companies. They kept however 9 levels as offices for their party. The cabinet of Josip Broz Tito was cleared out.
366:
350:. It was the tallest building in the Balkans between 1964 and 1979. Construction of the second tower, designed as a twin of the first, began in 2018 and it was opened in June 2020.
1103:
633:
1505:
528:
28.000 m (301.39 sq ft) of an A-class commercial space. It is planned to have a restaurant on the top floor and a café and a bank on the ground floor.
918:
1191:
1480:
958:
772:
1439:
412:(Central Committee). During the "golden years" of Yugoslavia the lights were left partially turned on during the night to spell out "TITO", after president
1520:
536:
Of the total floor area, 23,200 m (250,000 sq ft) will be used for commercial purposes. The building was officially opened on 11 June 2020.
1525:
1510:
1401:
157:
1171:
843:
1454:
809:
Daliborka Mučibabić (28 February 2018). "Druga kula "Ušća" - još jedan poslovni centar" [Second "Ušće" tower - another business center].
1535:
524:
was built, albeit much larger than the one Redžić projected, but the Tower II remained on paper and a temporary parking lot was built instead.
511:
is now renting out the first four floors of the building and has become the anchor tenant. This bank also has a light-ad on the building roof.
1231:
1515:
1216:
1196:
677:
613:
584:
79:
1495:
911:
596:
1449:
405:
374:
370:
1176:
1108:
1186:
520:
342:. The first tower, 98 meters tall, was the tallest building in Serbia and Belgrade for 15 years until 1979 and construction of
63:
1485:
1366:
1277:
904:
1356:
1320:
1166:
1052:
709:
572:
1325:
1181:
656:
424:
150:
560:
380:
Ušće was frequently leased out to commercial interests until 21 April 1999, when it was severely damaged by successive
1444:
778:
38:
1211:
1072:
1027:
994:
485:
477:
385:
545:
screens, a bowling alley and a casino. Subterranean levels house a 4,000 m hypermarket and two levels of parking.
408:. The original building was 105 meters tall. Even today many people still call it "CK", which is the acronym for
1490:
1098:
489:
435:
307:
1371:
948:
866:
754:
472:
1335:
1252:
316:
1293:
1267:
1257:
1057:
1500:
1459:
1421:
1391:
1361:
1351:
1262:
974:
431:
886:
1530:
1226:
1151:
1067:
1032:
797:
31:
1434:
1409:
1330:
1134:
1077:
442:
Later in the 1990s, three
Serbian television stations occupied some of the levels in the building:
268:
1272:
1037:
979:
684:
1247:
1139:
1129:
1201:
1042:
1303:
1144:
928:
413:
896:
1414:
1381:
1376:
1062:
984:
529:
461:
443:
1474:
1082:
420:
365:
rivers from the New
Belgrade side. It was originally used as the headquarters of the
933:
331:
127:
451:
404:
Ušće Tower was built in 1964 as the headquarters of the
Central Committee of the
1386:
1161:
1124:
508:
457:
347:
343:
216:
1310:
1221:
1047:
734:
327:
660:
353:
Built in 1964, the first Ušće Tower glass building overlooks the confluence (
172:
159:
1315:
1298:
1156:
989:
396:
17:
1206:
937:
638:
447:
335:
131:
488:
hit the building, setting the upper floors on fire. Days later, several
1010:
891:
358:
339:
135:
533:
27 February 2018. The building of the skyscraper cost €65 million.
471:
395:
869:[Seventeen million euros for the new look of „Ušće” 17].
505:
The facade was redesigned and is now made entirely out of glass.
30:
For the
Belgrade neighborhood in which the tower is located, see
381:
362:
900:
427:
with the intention of crashing the plane into the building.
346:, and the second-tallest freestanding structure, after the
289:
757:[Foundation stone for the second "Ušće" tower].
321:
1400:
1344:
1286:
1240:
1117:
1091:
1020:
967:
828:[Business building "Ušće Two" was opened].
282:
274:
264:
259:
251:
243:
235:
230:
222:
212:
204:
196:
188:
149:
141:
123:
107:
102:
46:
912:
8:
672:
670:
1506:Buildings and structures completed in 1964
919:
905:
897:
748:
746:
744:
330:located at Mihajlo Pupin Boulevard in the
43:
867:"Za novi izgled "Ušća" 17 miliona evra"
753:Daliborka Mučibabić (31 January 2018).
729:
727:
651:
649:
632:Daliborka Mučibabić (1 February 2009),
624:
556:
247:25,000 m (269,100 sq ft)
737:(in Serbian). Vreme. 29 November 2001.
419:In 1979, the Tower became a target of
1232:Yugoslav Ministry of Defence Building
755:"Kamen temeljac za drugu kulu "Ušća""
602:View from an office in the Ušće Tower
7:
1481:Buildings and structures in Belgrade
1217:Serbian Academy of Sciences and Arts
1192:Ministry of Foreign Affairs Building
959:Buildings and structures in Belgrade
865:Daliborka Mučibabić (18 July 2022).
735:"Prodata Palata Ušće: Overavanje CK"
614:List of tallest structures in Serbia
826:Отворена пословна зграда "Ушће два"
659:(in Serbian). Danas. Archived from
590:A view of the Ušće Tower in daytime
86:
1521:League of Communists of Yugoslavia
683:. www.uscetower.rs. Archived from
519:The city of Belgrade announced an
464:, purchased the building in 2002.
406:League of Communists of Yugoslavia
371:League of Communists of Yugoslavia
25:
1526:1964 establishments in Yugoslavia
1511:Headquarters of political parties
777:(in Serbian), B92, archived from
954:
953:
927:
846:(in Serbian). RTS. 31 March 2009
774:Službena (zlo)upotreba, deo prvi
595:
583:
578:View of the Ušće Tower at sunset
571:
559:
521:architectural design competition
384:air-strikes as part of the 1999
85:
78:
62:
226:roof 110 m (360.9 ft)
195:
1367:Historical Archive of Belgrade
1278:Metropol Palace Hotel Belgrade
1172:House of the National Assembly
844:"Otvoren šoping centar "Ušće""
712:(in Serbian). B92. 2 July 2005
311:
27:Skyscraper in Belgrade, Serbia
1:
1536:Yugoslav Serbian architecture
1321:Residence of Princess Ljubica
657:"Lepša i modernija nego ikad"
480:- reconstruction - Ušće Tower
326:) are two 25-story mixed-use
1182:Monument to the Unknown Hero
425:American Airlines Flight 293
1516:Skyscraper office buildings
322:
1552:
1496:Shopping malls in Belgrade
1197:Old General Staff Building
1053:Ranko Žeravica Sports Hall
386:NATO bombing of Yugoslavia
68:Ušće Towers in August 2019
36:
29:
1430:
1326:Residence of Prince Miloš
1099:Clinical Centre of Serbia
944:
873:(in Serbian). p. 13.
832:(in Serbian). p. 16.
813:(in Serbian). p. 19.
761:(in Serbian). p. 17.
678:"Ušće Tower - Fact Sheet"
634:"Oblakoderi u prestonici"
436:Socialist Party of Serbia
287:
73:
61:
51:
1440:Educational institutions
1109:Military Medical Academy
949:Architecture of Belgrade
825:
824:J.N.C. (12 June 2020).
710:"Ponovo otvoreno "Ušće""
94:Location within Belgrade
1177:Main Post Office Palace
1092:Healthcare institutions
1073:Tašmajdan Sports Centre
1028:Aleksandar Nikolić Hall
460:, a holding company of
260:Design and construction
145:Bulevar Mihajlo Pupin 6
1450:Religious architecture
1294:Dedinje Royal Compound
1258:Aleksandar Palas Hotel
1253:Hyatt Regency Belgrade
1187:National Bank Building
481:
432:collapse of Yugoslavia
401:
357:in Serbo-Croatian) of
1486:Skyscrapers in Serbia
1422:Airport City Belgrade
1392:Belgrade City Library
1362:Knez Mihailova Street
1352:Belgrade New Cemetery
1263:Crowne Plaza Belgrade
975:Airport City Belgrade
475:
399:
278:European Construction
173:44.81611°N 20.43694°E
1336:Captain Miša Mansion
1227:Vuk Foundation House
1152:Belgrade Cooperative
1118:Historical landmarks
1068:King Peter I Stadium
1021:Entertainment venues
892:Ušće Shopping Center
540:Ušće Business Center
323:Poslovni centar Ušće
312:Пословни центар Ушће
189:Construction started
55:Poslovni centar Ušće
53:Пословни центар Ушће
37:For other uses, see
1455:Streets and squares
1410:Belgrade Waterfront
1372:Nikola Pašić Square
1357:General Post Office
1331:Despot Stefan Tower
1287:Palaces and castles
1167:Government Building
1135:Despot Stefan Tower
1104:KBC Dragiša Mišović
1058:Rajko Mitić Stadium
515:Ušće Office Tower 2
169: /
103:General information
1402:Under construction
1273:Jat Airways Hotels
1038:Omladinski stadion
798:BLIZNAKINJE, Kurir
484:On April 21, 1999
482:
434:in the 1990s, the
402:
400:Ušće Tower in 2005
178:44.81611; 20.43694
1468:
1467:
1248:Hotel Jugoslavija
1140:Gates of Belgrade
1130:Belgrade Fortress
995:Skyline AFI Tower
663:on July 25, 2011.
410:Centralni Komitet
367:Central Committee
320:
300:
299:
231:Technical details
16:(Redirected from
1543:
1491:Towers in Serbia
1202:Palace of Serbia
1078:Voždovac Stadium
1043:Partizan Stadium
957:
956:
931:
921:
914:
907:
898:
875:
874:
862:
856:
855:
853:
851:
840:
834:
833:
821:
815:
814:
806:
800:
795:
789:
788:
787:
786:
769:
763:
762:
750:
739:
738:
731:
722:
721:
719:
717:
706:
700:
699:
697:
695:
689:
682:
674:
665:
664:
653:
644:
643:
629:
599:
587:
575:
563:
486:NATO air strikes
334:municipality of
325:
315:
313:
308:Serbian Cyrillic
296:
293:
291:
269:Mihailo Janković
184:
183:
181:
180:
179:
174:
170:
167:
166:
165:
162:
119:
114:
89:
88:
82:
66:
44:
21:
1551:
1550:
1546:
1545:
1544:
1542:
1541:
1540:
1471:
1470:
1469:
1464:
1426:
1396:
1382:Students Square
1340:
1304:Kraljevski Dvor
1282:
1236:
1212:Republic Square
1145:Kalemegdan Park
1113:
1087:
1016:
1007:Business Garden
1004:GTC Green Heart
963:
940:
925:
883:
878:
864:
863:
859:
849:
847:
842:
841:
837:
827:
823:
822:
818:
808:
807:
803:
796:
792:
784:
782:
771:
770:
766:
752:
751:
742:
733:
732:
725:
715:
713:
708:
707:
703:
693:
691:
690:on 20 June 2013
687:
680:
676:
675:
668:
655:
654:
647:
631:
630:
626:
622:
610:
603:
600:
591:
588:
579:
576:
567:
564:
555:
542:
517:
499:
470:
423:, who hijacked
414:Josip Broz Tito
394:
288:
275:Main contractor
255:7 (+ 1 freight)
252:Lifts/elevators
177:
175:
171:
168:
163:
160:
158:
156:
155:
117:
115:
112:
98:
97:
96:
95:
92:
91:
90:
69:
57:
42:
35:
28:
23:
22:
15:
12:
11:
5:
1549:
1547:
1539:
1538:
1533:
1528:
1523:
1518:
1513:
1508:
1503:
1498:
1493:
1488:
1483:
1473:
1472:
1466:
1465:
1463:
1462:
1457:
1452:
1447:
1442:
1437:
1431:
1428:
1427:
1425:
1424:
1419:
1418:
1417:
1415:Belgrade Tower
1406:
1404:
1398:
1397:
1395:
1394:
1389:
1384:
1379:
1377:Slavija Square
1374:
1369:
1364:
1359:
1354:
1348:
1346:
1342:
1341:
1339:
1338:
1333:
1328:
1323:
1318:
1313:
1308:
1307:
1306:
1301:
1290:
1288:
1284:
1283:
1281:
1280:
1275:
1270:
1265:
1260:
1255:
1250:
1244:
1242:
1238:
1237:
1235:
1234:
1229:
1224:
1219:
1214:
1209:
1204:
1199:
1194:
1189:
1184:
1179:
1174:
1169:
1164:
1159:
1154:
1149:
1148:
1147:
1142:
1137:
1127:
1121:
1119:
1115:
1114:
1112:
1111:
1106:
1101:
1095:
1093:
1089:
1088:
1086:
1085:
1080:
1075:
1070:
1065:
1063:Belgrade Arena
1060:
1055:
1050:
1045:
1040:
1035:
1033:Obilić Stadium
1030:
1024:
1022:
1018:
1017:
1015:
1014:
1008:
1005:
1002:
997:
992:
987:
982:
977:
971:
969:
965:
964:
962:
961:
951:
945:
942:
941:
926:
924:
923:
916:
909:
901:
895:
894:
889:
882:
881:External links
879:
877:
876:
857:
835:
816:
801:
790:
764:
740:
723:
701:
666:
645:
623:
621:
618:
617:
616:
609:
606:
605:
604:
601:
594:
592:
589:
582:
580:
577:
570:
568:
566:Reconstruction
565:
558:
554:
551:
541:
538:
530:Chapman Taylor
516:
513:
498:
497:Reconstruction
495:
469:
466:
444:RTV BK Telecom
393:
390:
298:
297:
285:
284:
280:
279:
276:
272:
271:
266:
262:
261:
257:
256:
253:
249:
248:
245:
241:
240:
237:
233:
232:
228:
227:
224:
220:
219:
214:
210:
209:
206:
202:
201:
198:
194:
193:
190:
186:
185:
153:
147:
146:
143:
139:
138:
125:
121:
120:
118:(Second tower)
109:
105:
104:
100:
99:
93:
84:
83:
77:
76:
75:
74:
71:
70:
67:
59:
58:
52:
49:
48:
32:Ušće, Belgrade
26:
24:
14:
13:
10:
9:
6:
4:
3:
2:
1548:
1537:
1534:
1532:
1529:
1527:
1524:
1522:
1519:
1517:
1514:
1512:
1509:
1507:
1504:
1502:
1499:
1497:
1494:
1492:
1489:
1487:
1484:
1482:
1479:
1478:
1476:
1461:
1458:
1456:
1453:
1451:
1448:
1446:
1443:
1441:
1438:
1436:
1433:
1432:
1429:
1423:
1420:
1416:
1413:
1412:
1411:
1408:
1407:
1405:
1403:
1399:
1393:
1390:
1388:
1385:
1383:
1380:
1378:
1375:
1373:
1370:
1368:
1365:
1363:
1360:
1358:
1355:
1353:
1350:
1349:
1347:
1343:
1337:
1334:
1332:
1329:
1327:
1324:
1322:
1319:
1317:
1314:
1312:
1309:
1305:
1302:
1300:
1297:
1296:
1295:
1292:
1291:
1289:
1285:
1279:
1276:
1274:
1271:
1269:
1266:
1264:
1261:
1259:
1256:
1254:
1251:
1249:
1246:
1245:
1243:
1239:
1233:
1230:
1228:
1225:
1223:
1220:
1218:
1215:
1213:
1210:
1208:
1205:
1203:
1200:
1198:
1195:
1193:
1190:
1188:
1185:
1183:
1180:
1178:
1175:
1173:
1170:
1168:
1165:
1163:
1160:
1158:
1155:
1153:
1150:
1146:
1143:
1141:
1138:
1136:
1133:
1132:
1131:
1128:
1126:
1123:
1122:
1120:
1116:
1110:
1107:
1105:
1102:
1100:
1097:
1096:
1094:
1090:
1084:
1083:Zemun Stadium
1081:
1079:
1076:
1074:
1071:
1069:
1066:
1064:
1061:
1059:
1056:
1054:
1051:
1049:
1046:
1044:
1041:
1039:
1036:
1034:
1031:
1029:
1026:
1025:
1023:
1019:
1012:
1009:
1006:
1003:
1001:
998:
996:
993:
991:
988:
986:
983:
981:
978:
976:
973:
972:
970:
966:
960:
952:
950:
947:
946:
943:
939:
935:
930:
922:
917:
915:
910:
908:
903:
902:
899:
893:
890:
888:
885:
884:
880:
872:
868:
861:
858:
845:
839:
836:
831:
820:
817:
812:
805:
802:
799:
794:
791:
781:on 2014-02-22
780:
776:
775:
768:
765:
760:
756:
749:
747:
745:
741:
736:
730:
728:
724:
711:
705:
702:
686:
679:
673:
671:
667:
662:
658:
652:
650:
646:
641:
640:
635:
628:
625:
619:
615:
612:
611:
607:
598:
593:
586:
581:
574:
569:
562:
557:
552:
550:
546:
539:
537:
534:
531:
525:
522:
514:
512:
510:
506:
503:
496:
494:
491:
487:
479:
474:
467:
465:
463:
459:
455:
453:
449:
445:
440:
437:
433:
428:
426:
422:
421:Nikola Kavaja
417:
415:
411:
407:
398:
391:
389:
387:
383:
378:
376:
372:
368:
364:
360:
356:
351:
349:
345:
341:
337:
333:
329:
324:
318:
309:
305:
295:
286:
281:
277:
273:
270:
267:
263:
258:
254:
250:
246:
242:
238:
234:
229:
225:
221:
218:
215:
211:
207:
203:
199:
191:
187:
182:
154:
152:
148:
144:
140:
137:
133:
129:
126:
122:
113:(First tower)
110:
106:
101:
81:
72:
65:
60:
56:
50:
45:
40:
33:
19:
1501:New Belgrade
1268:Hotel Moskva
999:
934:architecture
870:
860:
848:. Retrieved
838:
829:
819:
810:
804:
793:
783:, retrieved
779:the original
773:
767:
758:
714:. Retrieved
704:
692:. Retrieved
685:the original
661:the original
642:(in Serbian)
637:
627:
547:
543:
535:
526:
518:
507:
504:
500:
483:
478:NATO bombing
468:NATO bombing
456:
441:
429:
418:
409:
403:
379:
354:
352:
332:New Belgrade
303:
301:
265:Architect(s)
128:New Belgrade
54:
1531:Twin towers
1162:Genex Tower
1125:Avala Tower
1000:Ušće Towers
985:Beograđanka
509:Addiko Bank
462:Petar Matić
458:MPC Holding
430:During the
375:broke apart
348:Avala Tower
344:Genex Tower
328:skyscrapers
304:Ušće Towers
236:Floor count
217:MPC Holding
176: /
151:Coordinates
47:Ušće Towers
1475:Categories
1311:Stari Dvor
1222:Stari Dvor
1048:Pinki Hall
887:Ušće Tower
785:2014-02-11
620:References
292:.uscetower
244:Floor area
164:20°26′13″E
161:44°48′58″N
18:Ušće Tower
1460:Transport
1316:Novi Dvor
1299:Beli Dvor
1157:Beli Dvor
990:Sava City
850:14 August
716:14 August
452:TV Košava
377:in 1990.
317:romanized
205:Renovated
197:Completed
116:Complete
111:Complete
1387:Topčider
1207:Pobednik
980:Belville
968:Business
938:Belgrade
932:Notable
871:Politika
830:Politika
811:Politika
759:Politika
694:9 August
639:Politika
608:See also
490:Tomahawk
448:RTV Pink
373:, which
336:Belgrade
132:Belgrade
124:Location
1445:Museums
1435:Culture
1011:West 65
553:Gallery
392:History
369:of the
319::
283:Website
142:Address
1241:Hotels
359:Danube
340:Serbia
223:Height
136:Serbia
108:Status
1345:Other
1013:Tower
688:(PDF)
681:(PDF)
476:CK -
213:Owner
852:2013
718:2013
696:2013
450:and
382:NATO
363:Sava
361:and
355:ušće
302:The
208:2005
200:1964
192:1962
39:Ušće
936:in
294:.rs
290:www
1477::
743:^
726:^
669:^
648:^
636:,
454:.
446:,
416:.
338:,
314:,
310::
239:25
134:,
130:,
920:e
913:t
906:v
854:.
720:.
698:.
306:(
41:.
34:.
20:)
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.