33:
24:
209:
255:
341:
Expected plant size (phase 1) 25 MW net. Expected on-line date (phase 1) - 2018. Expected cost to build (phase 1) $ 130 M. Qualified for 30% investment tax credit. Status – first well completed with additional drilling in planning.
385:
314:
Expected plant size 30 MW net. Expected on-line date - 2018. Expected cost to build $ 150 M. Qualified for 30% investment tax credit. Status – 5 wells drilled with 30 MW of steam currently available for production.
323:
Expected plant size 25 MW net. Expected on-line date (phase 1) - 2018. Expected cost to build (phase 1) $ 140 M. Qualified for 10 year income tax holiday. Status – production well drilling in progress.
332:
Expected plant size 10 MW net. Expected on-line date (phase 2) - 2017. Expected cost to build (phase 2) $ 60 M. Qualified for 30% investment tax credit. Status – production well drilling in progress.
355:
Board Member U.S. Geothermal since 2011. Previous SVP of
Calpine, prior experience at SCE/Mission and BP/ARCO. Engineer & MBA, 35 years energy management experience, 29 years in geothermal.
536:
516:
511:
531:
363:
Co-founder of U.S. Geothermal, Engineer with 37 years in natural resource exploration, development and operation, including 13 years of geothermal experience.
546:
526:
541:
284:: Idaho Power Company, 25-year term, Contract Average Energy Price $ 66.22 per megawatt-hour, Contract Average REC price $ 7.10.
125:
energy company focused on the development, production and sale of electricity from geothermal energy, until its acquisition by
386:"U.S. Geothermal Inc. Enters Into Definitive Agreement to Be Acquired by Ormat Technologies Inc. for $ 5.45 in Cash Per Share"
182:: Lender - U.S. Dept. of Energy, Fixed 2.6% APR, 22-year term, $ 61.8 M balance (2/29/16), 60% USG / 40% Enbridge.
145:, and is developing power plants in California, Nevada, Oregon as well as in Central America in the Republic of
521:
438:
163:
32:
228:: Lender - Prudential Insurance, Fixed 6.75% APR, 24-year term, $ 29.7 million balance (2/29/16).
126:
188:: Idaho Power Company, 25-year term, Contract Average Energy Price $ 126.36 per megawatt-hour.
262:
Pacific
Northwest and Idaho's first Geothermal power plant. It went on-line in January 2008.
130:
433:
122:
162:
U.S. Geothermal's flagship project and Oregon's first commercial
Geothermal power plant is
46:
505:
269:
234:: NV Energy, 25-year term, Contract Average Energy Price $ 103.52 per megawatt-hour.
60:
54:
90:
407:
461:
146:
173:
246:: Availability 2015 average 98.6% (excluding schedule annual overhaul).
200:: Availability 2015 average 97.9% (excluding schedule annual overhaul).
296:: Availability 2015 average 95.4% (excluding schedule annual overhaul)
64:
142:
138:
23:
208:
254:
253:
207:
134:
129:
in
January 2018. The company operates three geothermal plants in
493:
194:(annual average): Air Cooled, 30 MW (winter), 14 MW (summer).
105:
216:
Near-Term expansion opportunity, went on-line in May 2012.
290:(annual average): Water Cooled, 10 MW current production.
305:
Advanced development projects near term expectations:
100:
86:
78:
70:
52:
42:
462:"US Geothermal Inc: NYSEMKT:HTM quotes & news"
537:Renewable resource companies established in 2000
517:Electric power companies of the United States
8:
16:
15:
434:"U.S. Geothermal Provides Company Update"
377:
512:Geothermal energy in the United States
272:(5%), Tax equity ownership structure.
7:
532:Energy companies established in 2000
166:. It came online in November 2012.
176:(40%), $ 36 B Energy Pipeline Co.
14:
547:Companies listed on NYSE American
359:Doug Glaspey, President & COO
37:Neal Hot Springs geothermal plant
310:WGP Geysers Project - California
240:(annual average): Water Cooled.
31:
22:
527:Companies based in Boise, Idaho
408:"Profile: U.S. Geothermal Inc"
212:San Emidio Power Plant, Nevada
1:
258:Raft River Power Plant, Idaho
542:2000 establishments in Idaho
563:
30:
21:
337:Crescent Valley - Nevada
439:The Wall Street Journal
319:El Ceibillo - Guatemala
328:San Emidio II - Nevada
259:
250:Raft River Power Plant
213:
204:San Emidio Power Plant
257:
211:
119:U.S. Geothermal, Inc.
300:Development Projects
282:Power Sales Contract
232:Power Sales Contract
186:Power Sales Contract
17:U.S. Geothermal Inc.
153:Existing operations
121:was an independent
18:
442:. January 13, 2014
388:. January 24, 2018
351:Dennis Gilles, CEO
260:
214:
127:Ormat Technologies
131:the United States
116:
115:
554:
497:
496:
494:Official website
478:
477:
475:
473:
458:
452:
451:
449:
447:
430:
424:
423:
421:
419:
404:
398:
397:
395:
393:
382:
294:High Reliability
244:High Reliability
198:High Reliability
164:Neal Hot Springs
158:Neal Hot Springs
112:
109:
107:
74:Renewable Energy
35:
26:
19:
562:
561:
557:
556:
555:
553:
552:
551:
522:Energy in Idaho
502:
501:
492:
491:
487:
482:
481:
471:
469:
460:
459:
455:
445:
443:
432:
431:
427:
417:
415:
406:
405:
401:
391:
389:
384:
383:
379:
369:
361:
353:
348:
339:
330:
321:
312:
302:
252:
206:
160:
155:
104:
96:
57:
38:
12:
11:
5:
560:
558:
550:
549:
544:
539:
534:
529:
524:
519:
514:
504:
503:
500:
499:
486:
485:External links
483:
480:
479:
466:Google Finance
453:
425:
412:Yahoo! Finance
399:
376:
375:
374:
373:
368:
365:
360:
357:
352:
349:
347:
346:Key management
344:
338:
335:
329:
326:
320:
317:
311:
308:
301:
298:
266:Equity Partner
251:
248:
220:Equity Partner
205:
202:
170:Equity Partner
159:
156:
154:
151:
114:
113:
102:
98:
97:
94:
88:
84:
83:
80:
76:
75:
72:
68:
67:
58:
53:
50:
49:
44:
40:
39:
36:
28:
27:
13:
10:
9:
6:
4:
3:
2:
559:
548:
545:
543:
540:
538:
535:
533:
530:
528:
525:
523:
520:
518:
515:
513:
510:
509:
507:
498:
495:
489:
488:
484:
467:
463:
457:
454:
441:
440:
435:
429:
426:
413:
409:
403:
400:
387:
381:
378:
371:
370:
366:
364:
358:
356:
350:
345:
343:
336:
334:
327:
325:
318:
316:
309:
307:
306:
299:
297:
295:
291:
289:
285:
283:
279:
277:
273:
271:
270:Goldman Sachs
267:
263:
256:
249:
247:
245:
241:
239:
235:
233:
229:
227:
223:
221:
217:
210:
203:
201:
199:
195:
193:
189:
187:
183:
181:
177:
175:
171:
167:
165:
157:
152:
150:
148:
144:
140:
136:
133:. located in
132:
128:
124:
120:
111:
108:.usgeothermal
103:
99:
95:United States
92:
89:
85:
81:
77:
73:
69:
66:
62:
59:
56:
51:
48:
45:
41:
34:
29:
25:
20:
490:
472:November 17,
470:. Retrieved
465:
456:
446:February 25,
444:. Retrieved
437:
428:
418:November 17,
416:. Retrieved
411:
402:
390:. Retrieved
380:
362:
354:
340:
331:
322:
313:
304:
303:
293:
292:
287:
286:
281:
280:
276:Project Loan
275:
274:
265:
264:
261:
243:
242:
237:
236:
231:
230:
226:Project Loan
225:
224:
219:
218:
215:
197:
196:
191:
190:
185:
184:
180:Project Loan
179:
178:
169:
168:
161:
118:
117:
91:Boise, Idaho
87:Headquarters
43:Company type
506:Categories
367:References
123:geothermal
392:April 23,
288:13 net MW
238:10 net MW
192:22 net MW
147:Guatemala
55:Traded as
278:: None.
222:: None.
174:Enbridge
71:Industry
101:Website
79:Founded
63::
468:. 2015
414:. 2015
143:Nevada
139:Oregon
47:Public
372:Notes
135:Idaho
474:2015
448:2014
420:2015
394:2019
141:and
110:.com
82:2000
61:AMEX
106:www
65:HTM
508::
464:.
436:.
410:.
268::
172::
149:.
137:,
93:,
476:.
450:.
422:.
396:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.