42: 657: 2716: 2010: 671: 643: 1998: 2022: 417:. Until September 2012 it was the world's largest operational offshore wind farm, and regained this title when the expansion completed in September 2018. The first two phases were expected to generate about 1,300 GW·h/year of electricity, with a load factor of 43%. The Walney Extension opened in September 2018 with a further 87 630:
In 2014 a dive vessel, owned by Danish firm Offshore Marine Services, was carrying out routine inspection work when an anchor cable broke and the ship hit one of 102 turbines installed at the Walney Offshore Wind Farm. The UK’s Maritime and Coastguard Agency surveyed the crash site and reported that
617:
In November 2014 DONG Energy was given development consent for an extension to the Walney offshore wind farm. The development consent allowed a maximum of 207 turbines to be added to the existing 102 turbines. The maximum generating capacity of the extension was said to be 750 MW although DONG
604:
Walney 2 began sending power to the grid on 1 November 2011. In February 2012, DONG Energy claimed to have installed the 51 turbines in Walney 2 in 5 months and 14 days, including monopiles and complete turbines; about 3.25 days per turbine. Walney 1 took 7 months. The improvement is due to
951: 597:. All the construction work was expected to take less than 2 years, with both phases operational by the end of 2011. On 11 July 2011 Phase 1 became operational, comprising 51 turbines with an installed capacity of 183.6 MW. Its 1198: 2060: 827: 944: 744: 631:
a surface sheen stretching 33 feet wide and 0.7 nautical miles long was trailing the vessel. The agency said that, unlike heavier crude oil, the marine engine oil should evaporate or disperse naturally.
622:
for Phase 1, and the 7 MW Siemens gearless turbine for Phase 2. In April 2018, the final turbine of the 87 installed for Phase 1 was completed, with full operation commencing in September 2018.
618:
was reported to be proceeding with a project based around 660 MW. Offshore construction began in 2017, onshore support construction having started in 2015. In 2015 DONG chose the 8 MW
1057:
Aldersey-Williams, John; Broadbent, Ian; Strachan, Peter (2019). "Better estimates of LCOE from audited accounts – A new methodology with examples from United Kingdom offshore wind and CCGT".
2053: 1287: 905: 1230: 849: 2701: 2740: 1194: 2046: 1173: 824: 1327: 1124: 1971: 1670: 684: 1006: 2765: 1395: 711: 869: 736: 1280: 2755: 1149: 1093: 888: 379:(formerly Dong Energy), consists of Walney Phase 1, Phase 2 and the Walney Extension. The extension has a capacity of 659 MW and it was the world's 770: 2014: 1317: 1273: 973: 2025: 1710: 2760: 909: 1220: 1312: 1031: 846: 558:. The farm was constructed sequentially in two phases with overlapping installation activities to reduce the overall construction timeframe. 2750: 2667: 2255: 1805: 1170: 2686: 2545: 1755: 1720: 1931: 1740: 1296: 923: 873: 689: 555: 1625: 1120: 1075: 514: 41: 2745: 2614: 1825: 1765: 999: 395: 708: 605:
commonality of projects and resources. The wind farm was officially opened on 9 February 2012 by the new energy secretary,
2589: 2490: 1700: 1570: 2440: 2359: 2200: 2105: 1307: 1225: 391: 1261:
Documenting the installation of the landfall cable from WOW2 through the beach at Cleveleys to the substation at Stanah
2579: 2305: 1800: 1425: 380: 326: 2195: 792: 90: 2550: 2535: 2240: 2185: 1861: 1830: 1705: 2720: 2584: 1760: 1715: 1685: 1146: 1090: 885: 554:
to develop a wind farm off Walney Island, as part of the second UK offshore wind farm tendering process known as
2461: 2456: 2384: 2155: 2619: 2379: 2369: 2364: 2320: 2285: 2235: 2205: 2190: 2180: 2175: 2135: 1871: 1730: 1695: 1635: 1615: 1535: 1455: 1450: 562: 2389: 766: 2330: 2300: 2290: 2275: 2270: 2260: 2215: 2210: 2170: 1976: 1902: 1610: 1575: 1545: 1445: 1430: 676: 2280: 977: 2325: 2315: 2310: 2230: 2140: 2069: 1981: 1907: 1795: 1590: 1560: 1540: 1505: 2681: 2594: 2295: 2250: 2220: 2165: 2145: 1912: 1846: 1620: 1555: 1520: 1500: 1485: 1460: 570: 138: 1953: 2604: 2265: 2245: 2150: 1790: 1605: 1595: 1475: 1440: 594: 1775: 1651: 1600: 1565: 1435: 1420: 1415: 1410: 1350: 1035: 656: 376: 166: 569:
power cables, one for each phase, and two short onshore cables to connect to two existing onshore
2540: 2435: 2225: 2160: 2073: 1946: 1810: 1690: 1630: 1510: 574: 464: 410: 269: 189: 2038: 386:
The wind farms were developed by Walney (UK) Offshore Windfarms Limited, a partnership between
2599: 2002: 1939: 1856: 1851: 1780: 1770: 399: 161: 402:, are in water depths ranging from 19m to 23m and cover an area of approximately 73 km. 1866: 1815: 1656: 1525: 551: 2420: 1745: 1735: 1530: 1480: 1470: 1375: 1177: 1153: 1097: 892: 853: 831: 715: 609:, MP, although the last of the 51 turbines in Walney 2 were only activated in April 2012. 283: 2648: 2081: 1892: 1725: 1515: 1490: 1370: 1365: 1260: 662: 648: 598: 302: 261: 256: 251: 1195:"Final turbines installed as Walney wind farm prepares to meet demand | the Mail" 927: 2734: 2475: 1580: 1465: 1385: 1355: 825:
World's biggest offshore wind farm opens off Britain as new minister admits high cost
578: 360: 74: 1897: 1876: 1750: 1265: 418: 406: 2633: 2416: 2344: 1550: 1221:"Oil Spill Offshore Triggered When Maintenance Ship Hits Wind Turbine Generator" 1101: 857: 796: 670: 619: 508: 387: 17: 2666: 2564: 2506: 2374: 1917: 1785: 1585: 1495: 1335: 638: 105: 92: 2696: 2520: 590: 372: 356: 181: 1997: 800: 606: 566: 414: 335: 2090: 1340: 582: 421:
capable of generating 659 megawatts. And the area reaches 145 km.
368: 364: 78: 1255: 2691: 1380: 1345: 586: 2120: 2042: 1269: 1360: 561:
The project involved constructing the wind turbines and their
737:"World's largest offshore windfarm opens off Cumbrian coast" 939: 937: 731: 729: 727: 565:, building two offshore substations and installing two 1121:"UK OK to Dong's 660MW Walney Extension offshore wind" 550:
In 2004 DONG Energy was awarded a 50-year lease from
394:. The farms, which are immediately northwest of the 27:
Offshore wind farm off the coast of Cumbria, England
2674: 2641: 2632: 2572: 2563: 2528: 2519: 2499: 2483: 2474: 2449: 2428: 2415: 2398: 2352: 2343: 2128: 2119: 2098: 2089: 2080: 1964: 1930: 1885: 1839: 1678: 1669: 1644: 1403: 1394: 1326: 926:. Lindoe Offshore Renewables Center. Archived from 908:. Lindoe Offshore Renewables Center. Archived from 322: 317: 301: 282: 268: 220: 206: 198: 180: 175: 151: 137: 129: 121: 84: 69: 55: 34: 1972:List of offshore wind farms in the United Kingdom 906:"Datasheet for site: Walney 1 Offshore Wind Farm" 685:List of offshore wind farms in the United Kingdom 721:, 6 September 2018. Accessed: 6 September 2018. 709:The World's Biggest Offshore Wind Farm Is Here 2741:Buildings and structures in Barrow-in-Furness 2054: 1281: 1081:, 9 February 2012. Accessed: 9 February 2012. 837:, 9 February 2012. Accessed: 9 February 2012. 8: 2702:Pre-nationalisation electric power companies 1256:Walney Extension offshore wind farm Website 895:, 30 June 2018. Accessed: 8 September 2018. 820: 818: 46:Walney Wind Farm under construction in 2011 2638: 2569: 2525: 2480: 2425: 2349: 2125: 2095: 2086: 2061: 2047: 2039: 1675: 1400: 1288: 1274: 1266: 31: 1318:Offshore wind power in the United Kingdom 1123:. www.rechargenews.com. 7 November 2014. 870:announcement on Walney Offshore Wind Farm 847:announcement on Walney Offshore Wind Farm 1711:European Offshore Wind Deployment Centre 428: 2766:Energy infrastructure completed in 2018 1115: 1113: 1111: 701: 327:Related media on Commons 1313:Renewable energy in the United Kingdom 585:and Phase 2 connects to substation at 581:. Phase 1 connects to a substation at 1233:from the original on 8 September 2014 1127:from the original on 11 February 2015 954:from the original on 8 September 2018 945:"Walney Extension Offshore Wind Farm" 747:from the original on 6 September 2018 593:. Both undersea cables pass close by 7: 2756:Offshore wind farms in the Irish Sea 2021: 773:from the original on 15 January 2011 202:107 m; 120 m; 154 m; 164 m 1201:from the original on 13 August 2018 1171:Napper Dong-ordre med ny supermølle 974:"Walney wind farm project history" 25: 2687:Lancashire Electric Power Company 1012:from the original on 10 July 2011 405:Both of the first phases have 51 381:second largest offshore wind farm 2714: 2665: 2020: 2009: 2008: 1996: 1297:Wind power in the United Kingdom 690:Wind power in the United Kingdom 669: 655: 641: 601:has been estimated at £120/MWh. 40: 1169:Pedersen, Maria Berg Badstue. " 1145:Pedersen, Maria Berg Badstue. " 213:73 km (28 sq mi) 2761:2018 establishments in England 1147:Dong vælger Vestas' supermølle 886:Walney Extension - 4C Offshore 396:West of Duddon Sands Wind Farm 1: 2721:North West England portal 2196:Dickinson Street (Manchester) 1091:Newsletter no 25 - April 2012 924:"Walney 2 Offshore Wind Farm" 876:. Accessed: 14 February 2012. 860:. Accessed: 14 February 2012. 767:"DONG Energy Project website" 359:9 miles (14 km) west of 1308:Energy in the United Kingdom 1226:International Business Times 487:Siemens SWT-3.6-120 (3.6 MW) 392:Scottish and Southern Energy 2751:Round 2 offshore wind farms 2201:Fiddlers Ferry (Warrington) 793:"UKWED Offshore wind farms" 573:for connection into the UK 435:Offshore construction start 303:Annual net output 249:MHI Vestas V164-8.25MW (40) 2782: 2306:Stuart Street (Manchester) 1105:. Retrieved: 14 June 2012. 147:September 2018 (extension) 2710: 2663: 2191:Clarence Dock (Liverpool) 2156:Bloom Street (Manchester) 2146:Back o' th' Bank (Bolton) 1990: 1303: 1076:Walney opens for business 1000:"Walney Project brochure" 375:. The group, operated by 332: 229: 225: 51: 39: 2241:Lister Drive (Liverpool) 1872:Sofia Offshore Wind Farm 355:are a group of offshore 246:Make and model 2256:Percival Lane (Runcorn) 1977:North Sea Offshore Grid 677:Renewable energy portal 270:Nameplate capacity 130:Construction began 2070:Electricity generation 1982:Wind power in Scotland 1756:Lynn and Inner Dowsing 577:. A cable was laid by 571:electrical substations 274:367 MW (phase 1 and 2) 234:Units operational 2746:Wind farms in England 2682:British Nuclear Fuels 2331:Whitebirk (Blackburn) 2003:Wind power portal 1032:"SSE - News articles" 221:Power generation 2615:West of Duddon Sands 1932:Installation vessels 1826:West of Duddon Sands 467:SWT-3.6-107 (3.6 MW) 447:Total capacity (MW) 284:Capacity factor 145:March 2012 (phase 2) 139:Commission date 2580:Askam & Ireleth 2186:Chamber Hall (Bury) 1671:Offshore wind farms 1571:Little Cheyne Court 1160:, 18 February 2015. 318:External links 199:Rotor diameter 102: /  2211:Greenhill (Oldham) 2074:North West England 1396:Onshore wind farms 1176:2015-04-02 at the 1152:2015-04-02 at the 1096:2012-06-04 at the 980:on 20 January 2011 891:2018-09-08 at the 852:2012-03-23 at the 830:2013-09-21 at the 714:2018-09-06 at the 425:Development phases 411:nameplate capacity 276:659 MW (extension) 2728: 2727: 2661: 2660: 2657: 2656: 2628: 2627: 2559: 2558: 2515: 2514: 2470: 2469: 2441:Red Moss Landfill 2411: 2410: 2339: 2338: 2296:Spa Road (Bolton) 2115: 2114: 2036: 2035: 1926: 1925: 1665: 1664: 1426:Askam and Ireleth 1038:on 14 August 2011 912:on 26 March 2011. 543: 542: 400:Ormonde Wind Farm 363:off the coast of 353:Walney Wind Farms 343: 342: 241:40 × 8.25 MW 237:102 × 3.6 MW 162:Greencoat UK Wind 77:off the coast of 16:(Redirected from 2773: 2719: 2718: 2717: 2669: 2639: 2570: 2526: 2481: 2426: 2350: 2266:Ribble (Preston) 2126: 2096: 2087: 2063: 2056: 2049: 2040: 2024: 2023: 2012: 2011: 2001: 2000: 1867:Neart Na Gaoithe 1831:Westermost Rough 1806:Sheringham Shoal 1676: 1401: 1290: 1283: 1276: 1267: 1243: 1242: 1240: 1238: 1217: 1211: 1210: 1208: 1206: 1191: 1185: 1184:, 12 March 2015. 1167: 1161: 1143: 1137: 1136: 1134: 1132: 1117: 1106: 1088: 1082: 1073: 1067: 1066: 1054: 1048: 1047: 1045: 1043: 1034:. Archived from 1028: 1022: 1021: 1019: 1017: 1011: 1004: 996: 990: 989: 987: 985: 976:. Archived from 970: 964: 963: 961: 959: 950:. Ørsted. 2018. 949: 941: 932: 931: 920: 914: 913: 902: 896: 883: 877: 867: 861: 844: 838: 822: 813: 812: 810: 808: 803:on 19 March 2011 799:. Archived from 789: 783: 782: 780: 778: 763: 757: 756: 754: 752: 733: 722: 706: 679: 674: 673: 665: 660: 659: 651: 646: 645: 644: 613:Walney Extension 595:Barrow Wind Farm 552:The Crown Estate 495:Walney Extension 429: 347:Wind farm layout 336:edit on Wikidata 278:1,026 MW (total) 264:SWT-7.0-154 (47) 259:SWT-3.6-120 (51) 254:SWT-3.6-107 (51) 117: 116: 114: 113: 112: 107: 106:54.044°N 3.522°W 103: 100: 99: 98: 95: 44: 35:Walney Wind Farm 32: 21: 18:Walney Extension 2781: 2780: 2776: 2775: 2774: 2772: 2771: 2770: 2731: 2730: 2729: 2724: 2715: 2713: 2706: 2670: 2653: 2642:Proposed/future 2624: 2585:Barrow Offshore 2555: 2511: 2495: 2466: 2450:Proposed/future 2445: 2407: 2399:Proposed/future 2394: 2335: 2111: 2076: 2067: 2037: 2032: 1995: 1986: 1960: 1922: 1881: 1835: 1736:Hywind Scotland 1716:Greater Gabbard 1661: 1640: 1531:Goonhilly Downs 1390: 1376:Talisman Energy 1322: 1299: 1294: 1252: 1247: 1246: 1236: 1234: 1219: 1218: 1214: 1204: 1202: 1193: 1192: 1188: 1178:Wayback Machine 1168: 1164: 1154:Wayback Machine 1144: 1140: 1130: 1128: 1119: 1118: 1109: 1098:Wayback Machine 1089: 1085: 1074: 1070: 1056: 1055: 1051: 1041: 1039: 1030: 1029: 1025: 1015: 1013: 1009: 1002: 998: 997: 993: 983: 981: 972: 971: 967: 957: 955: 947: 943: 942: 935: 922: 921: 917: 904: 903: 899: 893:Wayback Machine 884: 880: 868: 864: 854:Wayback Machine 845: 841: 832:Wayback Machine 823: 816: 806: 804: 791: 790: 786: 776: 774: 765: 764: 760: 750: 748: 735: 734: 725: 716:Wayback Machine 707: 703: 698: 675: 668: 661: 654: 647: 642: 640: 637: 628: 615: 548: 512: 427: 350: 349: 348: 339: 313: 297: 277: 275: 260: 255: 250: 240: 238: 216: 194: 176:Wind farm 171: 146: 144: 110: 108: 104: 101: 96: 93: 91: 89: 88: 65: 47: 28: 23: 22: 15: 12: 11: 5: 2779: 2777: 2769: 2768: 2763: 2758: 2753: 2748: 2743: 2733: 2732: 2726: 2725: 2711: 2708: 2707: 2705: 2704: 2699: 2694: 2689: 2684: 2678: 2676: 2672: 2671: 2664: 2662: 2659: 2658: 2655: 2654: 2652: 2651: 2649:Mersey Barrage 2645: 2643: 2636: 2630: 2629: 2626: 2625: 2623: 2622: 2620:Winscales Moor 2617: 2612: 2607: 2602: 2597: 2592: 2587: 2582: 2576: 2574: 2567: 2561: 2560: 2557: 2556: 2554: 2553: 2548: 2543: 2538: 2532: 2530: 2523: 2517: 2516: 2513: 2512: 2510: 2509: 2503: 2501: 2497: 2496: 2494: 2493: 2487: 2485: 2478: 2472: 2471: 2468: 2467: 2465: 2464: 2459: 2453: 2451: 2447: 2446: 2444: 2443: 2438: 2432: 2430: 2423: 2413: 2412: 2409: 2408: 2406: 2405: 2402: 2400: 2396: 2395: 2393: 2392: 2387: 2382: 2377: 2372: 2367: 2362: 2360:Blackburn Mill 2356: 2354: 2347: 2341: 2340: 2337: 2336: 2334: 2333: 2328: 2323: 2318: 2313: 2308: 2303: 2298: 2293: 2288: 2283: 2278: 2273: 2268: 2263: 2258: 2253: 2248: 2243: 2238: 2233: 2228: 2223: 2218: 2213: 2208: 2203: 2198: 2193: 2188: 2183: 2178: 2173: 2168: 2163: 2158: 2153: 2148: 2143: 2138: 2132: 2130: 2123: 2117: 2116: 2113: 2112: 2110: 2109: 2106:Fiddlers Ferry 2102: 2100: 2093: 2084: 2082:Power stations 2078: 2077: 2068: 2066: 2065: 2058: 2051: 2043: 2034: 2033: 2031: 2030: 2018: 2006: 1991: 1988: 1987: 1985: 1984: 1979: 1974: 1968: 1966: 1962: 1961: 1959: 1958: 1951: 1948:MPI Resolution 1944: 1936: 1934: 1928: 1927: 1924: 1923: 1921: 1920: 1915: 1910: 1905: 1900: 1895: 1893:Atlantic Array 1889: 1887: 1883: 1882: 1880: 1879: 1874: 1869: 1864: 1859: 1854: 1849: 1843: 1841: 1837: 1836: 1834: 1833: 1828: 1823: 1818: 1813: 1808: 1803: 1798: 1793: 1788: 1783: 1778: 1773: 1768: 1763: 1758: 1753: 1748: 1743: 1738: 1733: 1731:Humber Gateway 1728: 1723: 1721:Gunfleet Sands 1718: 1713: 1708: 1703: 1698: 1693: 1688: 1682: 1680: 1673: 1667: 1666: 1663: 1662: 1660: 1659: 1654: 1648: 1646: 1642: 1641: 1639: 1638: 1636:Winscales Moor 1633: 1628: 1623: 1618: 1616:Trimdon Grange 1613: 1608: 1603: 1598: 1593: 1588: 1583: 1578: 1573: 1568: 1563: 1558: 1553: 1548: 1543: 1538: 1536:Great Eppleton 1533: 1528: 1523: 1518: 1513: 1508: 1503: 1498: 1493: 1491:Cold Northcott 1488: 1483: 1478: 1473: 1468: 1463: 1458: 1456:Brechfa Forest 1453: 1451:Braes of Doune 1448: 1443: 1438: 1433: 1431:Beinn an Tuirc 1428: 1423: 1418: 1413: 1407: 1405: 1398: 1392: 1391: 1389: 1388: 1383: 1378: 1373: 1371:SSE Renewables 1368: 1366:Siemens Gamesa 1363: 1358: 1353: 1348: 1343: 1338: 1332: 1330: 1324: 1323: 1321: 1320: 1315: 1310: 1304: 1301: 1300: 1295: 1293: 1292: 1285: 1278: 1270: 1264: 1263: 1258: 1251: 1250:External links 1248: 1245: 1244: 1212: 1186: 1162: 1138: 1107: 1083: 1079:RE News Europe 1068: 1049: 1023: 991: 965: 933: 930:on 2 May 2012. 915: 897: 878: 862: 839: 814: 784: 758: 723: 700: 699: 697: 694: 693: 692: 687: 681: 680: 666: 663:Weather portal 652: 649:England portal 636: 633: 627: 624: 614: 611: 599:levelised cost 547: 544: 541: 540: 537: 535: 532: 530: 528: 522: 521: 518: 515:Siemens Gamesa 505: 502: 499: 496: 492: 491: 488: 485: 482: 479: 476: 472: 471: 468: 462: 459: 456: 453: 449: 448: 445: 442: 439: 436: 433: 426: 423: 346: 345: 344: 341: 340: 333: 330: 329: 324: 320: 319: 315: 314: 312: 311: 310:1,300 GWh 307: 305: 299: 298: 296: 295: 292: 288: 286: 280: 279: 272: 266: 265: 262:Siemens Gamesa 257:Siemens Gamesa 252:Siemens Gamesa 247: 243: 242: 239:47 × 7 MW 235: 231: 230: 227: 226: 223: 222: 218: 217: 215: 214: 210: 208: 207:Site area 204: 203: 200: 196: 195: 193: 192: 186: 184: 178: 177: 173: 172: 170: 169: 164: 159: 155: 153: 149: 148: 143:2011 (phase 1) 141: 135: 134: 131: 127: 126: 123: 119: 118: 111:54.044; -3.522 86: 82: 81: 71: 67: 66: 64: 63: 62:United Kingdom 59: 57: 53: 52: 49: 48: 45: 37: 36: 26: 24: 14: 13: 10: 9: 6: 4: 3: 2: 2778: 2767: 2764: 2762: 2759: 2757: 2754: 2752: 2749: 2747: 2744: 2742: 2739: 2738: 2736: 2723: 2722: 2709: 2703: 2700: 2698: 2695: 2693: 2690: 2688: 2685: 2683: 2680: 2679: 2677: 2675:Organisations 2673: 2668: 2650: 2647: 2646: 2644: 2640: 2637: 2635: 2631: 2621: 2618: 2616: 2613: 2611: 2608: 2606: 2603: 2601: 2598: 2596: 2593: 2591: 2588: 2586: 2583: 2581: 2578: 2577: 2575: 2571: 2568: 2566: 2562: 2552: 2549: 2547: 2544: 2542: 2539: 2537: 2534: 2533: 2531: 2527: 2524: 2522: 2518: 2508: 2505: 2504: 2502: 2498: 2492: 2489: 2488: 2486: 2482: 2479: 2477: 2473: 2463: 2460: 2458: 2455: 2454: 2452: 2448: 2442: 2439: 2437: 2434: 2433: 2431: 2427: 2424: 2422: 2418: 2414: 2404: 2403: 2401: 2397: 2391: 2388: 2386: 2383: 2381: 2378: 2376: 2373: 2371: 2368: 2366: 2363: 2361: 2358: 2357: 2355: 2351: 2348: 2346: 2342: 2332: 2329: 2327: 2324: 2322: 2319: 2317: 2314: 2312: 2309: 2307: 2304: 2302: 2299: 2297: 2294: 2292: 2289: 2287: 2286:Slacks Valley 2284: 2282: 2279: 2277: 2274: 2272: 2269: 2267: 2264: 2262: 2259: 2257: 2254: 2252: 2249: 2247: 2244: 2242: 2239: 2237: 2234: 2232: 2229: 2227: 2224: 2222: 2219: 2217: 2214: 2212: 2209: 2207: 2204: 2202: 2199: 2197: 2194: 2192: 2189: 2187: 2184: 2182: 2179: 2177: 2174: 2172: 2169: 2167: 2164: 2162: 2159: 2157: 2154: 2152: 2149: 2147: 2144: 2142: 2139: 2137: 2134: 2133: 2131: 2127: 2124: 2122: 2118: 2107: 2104: 2103: 2101: 2097: 2094: 2092: 2088: 2085: 2083: 2079: 2075: 2071: 2064: 2059: 2057: 2052: 2050: 2045: 2044: 2041: 2029: 2028: 2019: 2017: 2016: 2007: 2005: 2004: 1999: 1993: 1992: 1989: 1983: 1980: 1978: 1975: 1973: 1970: 1969: 1967: 1963: 1957: 1956: 1955:MPI Discovery 1952: 1950: 1949: 1945: 1943: 1942: 1941:MPI Adventure 1938: 1937: 1935: 1933: 1929: 1919: 1916: 1914: 1911: 1909: 1906: 1904: 1903:Docking Shoal 1901: 1899: 1896: 1894: 1891: 1890: 1888: 1884: 1878: 1875: 1873: 1870: 1868: 1865: 1863: 1860: 1858: 1855: 1853: 1850: 1848: 1845: 1844: 1842: 1838: 1832: 1829: 1827: 1824: 1822: 1819: 1817: 1814: 1812: 1809: 1807: 1804: 1802: 1799: 1797: 1794: 1792: 1789: 1787: 1784: 1782: 1779: 1777: 1774: 1772: 1769: 1767: 1764: 1762: 1759: 1757: 1754: 1752: 1749: 1747: 1744: 1742: 1741:Kentish Flats 1739: 1737: 1734: 1732: 1729: 1727: 1724: 1722: 1719: 1717: 1714: 1712: 1709: 1707: 1704: 1702: 1699: 1697: 1694: 1692: 1689: 1687: 1684: 1683: 1681: 1677: 1674: 1672: 1668: 1658: 1655: 1653: 1650: 1649: 1647: 1643: 1637: 1634: 1632: 1629: 1627: 1624: 1622: 1619: 1617: 1614: 1612: 1611:Slieve Rushen 1609: 1607: 1604: 1602: 1599: 1597: 1594: 1592: 1589: 1587: 1584: 1582: 1581:Moel Maelogan 1579: 1577: 1576:Milton Keynes 1574: 1572: 1569: 1567: 1564: 1562: 1559: 1557: 1554: 1552: 1549: 1547: 1546:Holmside Hall 1544: 1542: 1539: 1537: 1534: 1532: 1529: 1527: 1524: 1522: 1519: 1517: 1514: 1512: 1509: 1507: 1504: 1502: 1499: 1497: 1494: 1492: 1489: 1487: 1484: 1482: 1479: 1477: 1474: 1472: 1469: 1467: 1466:Carland Cross 1464: 1462: 1459: 1457: 1454: 1452: 1449: 1447: 1446:Blyth Harbour 1444: 1442: 1439: 1437: 1434: 1432: 1429: 1427: 1424: 1422: 1419: 1417: 1414: 1412: 1409: 1408: 1406: 1402: 1399: 1397: 1393: 1387: 1386:ScottishPower 1384: 1382: 1379: 1377: 1374: 1372: 1369: 1367: 1364: 1362: 1359: 1357: 1356:REG WindPower 1354: 1352: 1349: 1347: 1344: 1342: 1339: 1337: 1334: 1333: 1331: 1329: 1325: 1319: 1316: 1314: 1311: 1309: 1306: 1305: 1302: 1298: 1291: 1286: 1284: 1279: 1277: 1272: 1271: 1268: 1262: 1259: 1257: 1254: 1253: 1249: 1232: 1228: 1227: 1222: 1216: 1213: 1200: 1196: 1190: 1187: 1183: 1182:Energy-supply 1179: 1175: 1172: 1166: 1163: 1159: 1158:Energy-supply 1155: 1151: 1148: 1142: 1139: 1126: 1122: 1116: 1114: 1112: 1108: 1104: 1103: 1099: 1095: 1092: 1087: 1084: 1080: 1077: 1072: 1069: 1064: 1060: 1059:Energy Policy 1053: 1050: 1037: 1033: 1027: 1024: 1008: 1001: 995: 992: 979: 975: 969: 966: 953: 946: 940: 938: 934: 929: 925: 919: 916: 911: 907: 901: 898: 894: 890: 887: 882: 879: 875: 871: 866: 863: 859: 855: 851: 848: 843: 840: 836: 835:The Telegraph 833: 829: 826: 821: 819: 815: 802: 798: 794: 788: 785: 772: 768: 762: 759: 746: 742: 738: 732: 730: 728: 724: 720: 717: 713: 710: 705: 702: 695: 691: 688: 686: 683: 682: 678: 672: 667: 664: 658: 653: 650: 639: 634: 632: 625: 623: 621: 612: 610: 608: 602: 600: 596: 592: 588: 584: 580: 579:Stemat Spirit 576: 575:National Grid 572: 568: 564: 559: 557: 553: 545: 538: 536: 533: 531: 529: 527: 524: 523: 519: 516: 511:8.25 MW & 510: 506: 503: 500: 498:February 2017 497: 494: 493: 489: 486: 483: 480: 477: 474: 473: 469: 466: 463: 460: 457: 454: 451: 450: 446: 444:Turbine model 443: 440: 437: 434: 431: 430: 424: 422: 420: 416: 412: 408: 403: 401: 397: 393: 389: 384: 382: 378: 374: 370: 366: 362: 361:Walney Island 358: 354: 337: 331: 328: 325: 321: 316: 309: 308: 306: 304: 300: 293: 290: 289: 287: 285: 281: 273: 271: 267: 263: 258: 253: 248: 245: 244: 236: 233: 232: 228: 224: 219: 212: 211: 209: 205: 201: 197: 191: 188: 187: 185: 183: 179: 174: 168: 165: 163: 160: 157: 156: 154: 150: 142: 140: 136: 132: 128: 124: 120: 115: 87: 83: 80: 76: 75:Walney Island 73:14km west of 72: 68: 61: 60: 58: 54: 50: 43: 38: 33: 30: 19: 2712: 2609: 2546:Macclesfield 2462:Weston Point 2417:Incinerators 2385:Weston Point 2026: 2013: 1994: 1954: 1947: 1940: 1908:First Flight 1898:Celtic Array 1877:Triton Knoll 1820: 1796:Scroby Sands 1751:London Array 1591:Ovenden Moor 1561:Langley Park 1541:Hadyard Hill 1235:. Retrieved 1224: 1215: 1203:. Retrieved 1189: 1181: 1165: 1157: 1141: 1129:. Retrieved 1100: 1086: 1078: 1071: 1062: 1058: 1052: 1040:. Retrieved 1036:the original 1026: 1014:. Retrieved 994: 982:. Retrieved 978:the original 968: 956:. Retrieved 928:the original 918: 910:the original 900: 881: 865: 842: 834: 805:. Retrieved 801:the original 787: 775:. Retrieved 761: 749:. Retrieved 741:The Guardian 740: 718: 704: 629: 616: 603: 560: 549: 546:Construction 525: 413:of 367  404: 398:and west of 385: 352: 351: 29: 2595:Coal Clough 2536:Bromborough 2507:Calder Hall 2365:Bridgewater 1913:Navitus Bay 1852:East Anglia 1847:Dogger Bank 1766:North Hoyle 1726:Gwynt y Môr 1621:West Durham 1556:Knabs Ridge 1551:Kilgallioch 1521:Fraisthorpe 1501:Crystal Rig 1486:Coal Clough 1461:Burton Wold 1237:9 September 1131:11 February 1102:DONG Energy 958:7 September 858:DONG Energy 797:RenewableUK 751:6 September 719:fortune.com 620:Vestas V164 589:, south of 563:foundations 438:Inaugurated 388:DONG Energy 125:Operational 109: / 85:Coordinates 2735:Categories 2605:Scout Moor 2590:Burbo Bank 2551:Merseyside 2541:Ince A + B 2390:Winnington 2380:Rocksavage 2370:Carrington 2321:Warrington 2181:Chadderton 2176:Carrington 2136:Accrington 2108:(co-fires) 1918:Shell Flat 1862:Moray East 1791:Robin Rigg 1786:Rhyl Flats 1701:Burbo Bank 1606:Scout Moor 1596:Pates Hill 1586:Out Newton 1496:Conisholme 1476:Cefn Croes 1441:Blood Hill 1336:Ecotricity 807:8 November 696:References 509:MHI-Vestas 481:March 2012 478:March 2011 357:wind farms 94:54°02′38″N 2697:SP Manweb 2301:Stockport 2291:Southport 2276:St Helens 2271:Roosecote 2261:Radcliffe 2236:Lancaster 2216:Hartshead 2206:Fleetwood 1886:Cancelled 1776:Race Bank 1652:Den Brook 1601:Royd Moor 1566:Lindhurst 1436:Black Law 1421:Arecleoch 1416:Ardrossan 1411:Alltwalis 1328:Companies 1205:12 August 1042:23 August 626:Incidents 591:Fleetwood 556:"Round 2" 501:June 2018 409:giving a 383:in 2018. 373:Irish Sea 371:, in the 294:43 % 291:40 % 97:3°31′19″W 2375:Fellside 2326:Westwood 2316:Wallasey 2311:Trafford 2231:Kearsley 2171:Carlisle 2141:Agecroft 2015:Category 1840:Proposed 1811:Teesside 1801:Seagreen 1691:Beatrice 1645:Proposed 1631:Whitelee 1626:Westmill 1511:Delabole 1506:Dagenham 1231:Archived 1199:Archived 1174:Archived 1150:Archived 1125:Archived 1094:Archived 1065:: 25–35. 1016:20 April 1007:Archived 984:20 April 952:Archived 889:Archived 850:Archived 828:Archived 777:20 April 771:Archived 745:Archived 712:Archived 635:See also 607:Ed Davey 567:undersea 475:Walney 2 452:Walney 1 441:Turbines 419:turbines 407:turbines 190:Offshore 152:Owner(s) 70:Location 2600:Ormonde 2491:Heysham 2476:Nuclear 2281:Salford 2251:Padiham 2221:Huncoat 2166:Burnley 2091:Biomass 2027:Commons 1857:Hornsea 1781:Rampion 1771:Ormonde 1706:Dudgeon 1341:Equinor 583:Heysham 539:1026.2 465:Siemens 369:England 365:Cumbria 323:Commons 79:Cumbria 56:Country 2692:Norweb 2610:Walney 2573:Active 2529:Closed 2500:Closed 2484:Active 2436:Bolton 2429:Active 2353:Active 2246:Nelson 2226:Ince A 2151:Barton 2129:Closed 2099:Closed 1821:Walney 1816:Thanet 1761:Methil 1686:Barrow 1679:Active 1657:Viking 1526:Garves 1404:Active 1381:Vestas 1351:Ørsted 1346:Innogy 587:Stanah 517:(7 MW) 490:183.6 470:183.6 377:Ørsted 167:Ørsted 122:Status 2634:Tidal 2421:Waste 1965:Other 1746:Lincs 1696:Blyth 1481:Clyde 1471:Carno 1010:(PDF) 1003:(PDF) 948:(pdf) 526:Total 513:47 × 507:40 × 432:Phase 334:[ 2565:Wind 2457:Ince 2161:Bold 2121:Coal 1516:Farr 1239:2014 1207:2018 1133:2015 1044:2011 1018:2017 986:2017 960:2018 809:2010 779:2017 753:2018 520:659 458:2011 455:2010 390:and 182:Type 158:PGGM 133:2010 2521:Oil 2345:Gas 2072:in 1361:RWE 1063:128 874:SSE 872:by 856:by 534:189 2737:: 1229:. 1223:. 1197:. 1180:" 1156:" 1110:^ 1061:. 1005:. 936:^ 817:^ 795:. 769:. 743:. 739:. 726:^ 504:87 484:51 461:51 415:MW 367:, 2419:/ 2062:e 2055:t 2048:v 1289:e 1282:t 1275:v 1241:. 1209:. 1135:. 1046:. 1020:. 988:. 962:. 811:. 781:. 755:. 338:] 20:)

Index

Walney Extension

Walney Island
Cumbria
54°02′38″N 3°31′19″W / 54.044°N 3.522°W / 54.044; -3.522
Commission date
Greencoat UK Wind
Ørsted
Type
Offshore
Siemens Gamesa
Siemens Gamesa
Siemens Gamesa
Nameplate capacity
Capacity factor
Annual net output
Related media on Commons
edit on Wikidata
wind farms
Walney Island
Cumbria
England
Irish Sea
Ørsted
second largest offshore wind farm
DONG Energy
Scottish and Southern Energy
West of Duddon Sands Wind Farm
Ormonde Wind Farm
turbines

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.