465:
43:
144:
903:
313:
238:
503:
The adjacent High Street grade crossing, and the Canal Street crossing 0.2 miles (0.32 km) southeast, are the only grade crossings on the line south of
Wilmington. Elimination of the High Street crossing was considered in 1932, but not implemented. The depot structure, built in 1886, was
934:
523:
and the inner Lowell Line, making stops including West
Medford. This routing was resumed in April 2021, with the trains no longer making the intermediate stops. Until May 2023, West Medford and
765:
789:
724:
534:
In 2019, the MBTA listed West
Medford as a "Tier I" accessibility priority. As of November 2023, the MBTA plans to pilot a freestanding temporary accessible platform design at
939:
929:
538:
in March 2024. If successful, West
Medford would be one of the first four stations to receive a temporary platform while a full reconstruction is planned.
497:
316:
312:
241:
237:
78:
861:
830:
772:
748:
500:
to
Medford Square in 1847; the B&L station was renamed West Medford in the early 1850s. A new station building was constructed in 1854.
796:
731:
708:
477:
331:
377:
847:
907:
882:
813:
624:
392:
888:. Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. November 27, 2023. p. 8.
473:
476:(B&L) was laid out in the 1830s, West Medford was mostly farmland. The route of the new railroad (one of the
493:
362:
571:
531:
outside of weekday peak hours. Effective May 22, 2023, they were made regular scheduled stops at all times.
449:
66:
62:
587:
464:
504:
demolished in the 1960s. The decorative weathervane from the roof of the station was acquired by the
481:
606:
509:
445:
704:
698:
679:
661:
524:
505:
488:
station was open by 1838. The name reflected the large gates built to warn passerby about the
372:
326:
251:
642:
42:
556:
520:
516:
489:
339:
256:
484:, who sold a strip for the right-of-way plus a parcel for the station on High Street.
923:
535:
397:
349:
271:
158:
151:
124:
453:
385:
264:
113:
914:
730:. Massachusetts Bay Transportation Authority. November 2, 2020. Archived from
93:
80:
528:
17:
795:. Massachusetts Bay Transportation Authority. April 5, 2021. Archived from
771:. Massachusetts Bay Transportation Authority. April 5, 2021. Archived from
902:
850:(Press release). Massachusetts Bay Transportation Authority. May 16, 2023.
147:
871:. Massachusetts Bay Transportation Authority. April 1, 2019. p. 12.
613:. Vol. 12, no. 3. Medford Historical Society. pp. 49–67.
463:
754:. Massachusetts Bay Transportation Authority. December 14, 2020.
819:. Massachusetts Bay Transportation Authority. October 17, 2022.
935:
MBTA Commuter Rail stations in
Middlesex County, Massachusetts
848:"Commuter Rail Spring/Summer Schedule to Take Effect May 22"
649:. September 29, 1932. p. 10 – via Newspapers.com.
862:"Preview of 2019 Recommendations: Presentation to the FMCB"
836:. Massachusetts Bay Transportation Authority. May 22, 2023.
686:. October 10, 1965. p. 260 – via Newspapers.com.
594:. October 6, 1853. p. 4 – via Newspapers.com.
883:"System-Wide Accessibility Initiatives—November 2023"
625:"Development of the business section of West Medford"
361:
310:
235:
424:
223:
207:
198:
190:
185:
177:
169:
164:
138:
130:
119:
109:
72:
57:
52:
29:
869:Plan for Accessible Transit Infrastructure (PATI)
749:"2020/2021 Reduced Service Schedule: Lowell Line"
47:An outbound train arrives at West Medford in 2012
555:Central Transportation Planning Staff (2019).
559:. Massachusetts Bay Transportation Authority.
8:
662:"West Medford Keepsake Survives Rock Hounds"
940:Railway stations in Medford, Massachusetts
421:
304:
293:
229:
41:
26:
930:Former Boston and Maine Railroad stations
607:"A Pioneer Railroad and How it was Built"
456:, and is located at West Medford Square.
366:
358:
320:
307:
245:
232:
668:. p. 6 – via Newspapers.com.
547:
515:Until December 2020, a small number of
766:"Haverhill Line 2021 Spring Schedule"
143:
7:
831:"Lowell Line Spring/Summer Schedule"
573:The Boston Almanac for the Year 1838
725:"Lowell Line: Fall/Winter Schedule"
703:. Arcadia Publishing. p. 104.
697:Sammarco, Anthony Mitchell (1999).
814:"Lowell Line Fall/Winter Schedule"
790:"Lowell Line 2021 Spring Schedule"
605:Mann, Moses Whitcher (July 1909).
480:) was built on land acquired from
25:
660:Harrington, Joe (April 1, 1963).
629:Medford Historical Society Papers
478:oldest railroads in North America
901:
311:
236:
142:
211:628 (weekday average boardings)
1:
588:"Boston and Lowell Railroad"
468:West Medford station in 1909
680:"West Medford–Then and Now"
611:Medford Historical Register
557:"2018 Commuter Rail Counts"
956:
700:Images of America: Medford
474:Boston and Lowell Railroad
713:– via Google Books.
592:Boston Evening Transcript
494:Boston and Maine Railroad
431:
420:
416:
412:
363:Boston and Maine Railroad
292:
288:
284:
228:
219:
215:
203:
40:
570:Dickinson, S.N. (1838).
114:New Hampshire Main Line
469:
450:Medford, Massachusetts
67:Medford, Massachusetts
910:at Wikimedia Commons
737:on November 30, 2020.
631:. Vol. 29. 1926.
496:(B&M) opened its
467:
908:West Medford station
482:Peter Chardon Brooks
442:West Medford station
386:Boston – Concord, NH
94:42.4218°N 71.13332°W
915:MBTA – West Medford
519:trains ran via the
90: /
53:General information
802:on April 23, 2021.
510:Dearborn, Michigan
472:When the original
470:
446:MBTA Commuter Rail
367:Following station
359:Preceding station
321:Following station
308:Preceding station
246:Following station
233:Preceding station
99:42.4218; -71.13332
906:Media related to
778:on April 5, 2021.
506:Henry Ford Museum
439:
438:
435:
434:
408:
407:
404:
403:
280:
279:
186:Other information
16:(Redirected from
947:
905:
890:
889:
887:
879:
873:
872:
866:
858:
852:
851:
844:
838:
837:
835:
827:
821:
820:
818:
810:
804:
803:
801:
794:
786:
780:
779:
777:
770:
762:
756:
755:
753:
745:
739:
738:
736:
729:
721:
715:
714:
694:
688:
687:
676:
670:
669:
657:
651:
650:
639:
633:
632:
621:
615:
614:
602:
596:
595:
584:
578:
577:
567:
561:
560:
552:
452:. It serves the
422:
393:Medford Hillside
315:
305:
294:
240:
230:
157:
146:
145:
105:
104:
102:
101:
100:
95:
91:
88:
87:
86:
83:
45:
27:
21:
955:
954:
950:
949:
948:
946:
945:
944:
920:
919:
899:
894:
893:
885:
881:
880:
876:
864:
860:
859:
855:
846:
845:
841:
833:
829:
828:
824:
816:
812:
811:
807:
799:
792:
788:
787:
783:
775:
768:
764:
763:
759:
751:
747:
746:
742:
734:
727:
723:
722:
718:
711:
696:
695:
691:
678:
677:
673:
659:
658:
654:
641:
640:
636:
623:
622:
618:
604:
603:
599:
586:
585:
581:
569:
568:
564:
554:
553:
549:
544:
462:
427:
400:
380:
354:
344:
343:Limited service
334:
299:
298:Former services
276:
259:
155:
98:
96:
92:
89:
84:
81:
79:
77:
76:
65:
48:
36:
35:
34:
23:
22:
15:
12:
11:
5:
953:
951:
943:
942:
937:
932:
922:
921:
918:
917:
898:
897:External links
895:
892:
891:
874:
853:
839:
822:
805:
781:
757:
740:
716:
709:
689:
671:
652:
634:
616:
597:
579:
562:
546:
545:
543:
540:
521:Wildcat Branch
517:Haverhill Line
512:in the 1950s.
498:Medford branch
490:grade crossing
461:
458:
437:
436:
433:
432:
429:
428:
425:
418:
417:
414:
413:
410:
409:
406:
405:
402:
401:
395:
390:
388:
383:
381:
375:
369:
368:
365:
360:
356:
355:
352:
347:
345:
342:
340:Haverhill Line
337:
335:
329:
323:
322:
319:
309:
301:
300:
297:
290:
289:
286:
285:
282:
281:
278:
277:
274:
269:
267:
262:
260:
254:
248:
247:
244:
234:
226:
225:
221:
220:
217:
216:
213:
212:
209:
205:
204:
201:
200:
196:
195:
192:
188:
187:
183:
182:
179:
175:
174:
171:
167:
166:
162:
161:
140:
136:
135:
132:
128:
127:
125:side platforms
121:
117:
116:
111:
107:
106:
74:
70:
69:
59:
55:
54:
50:
49:
46:
38:
37:
32:
31:
30:
24:
14:
13:
10:
9:
6:
4:
3:
2:
952:
941:
938:
936:
933:
931:
928:
927:
925:
916:
913:
912:
911:
909:
904:
896:
884:
878:
875:
870:
863:
857:
854:
849:
843:
840:
832:
826:
823:
815:
809:
806:
798:
791:
785:
782:
774:
767:
761:
758:
750:
744:
741:
733:
726:
720:
717:
712:
710:9780738538549
706:
702:
701:
693:
690:
685:
681:
675:
672:
667:
663:
656:
653:
648:
644:
638:
635:
630:
626:
620:
617:
612:
608:
601:
598:
593:
589:
583:
580:
576:. p. 49.
575:
574:
566:
563:
558:
551:
548:
541:
539:
537:
536:Beverly Depot
532:
530:
526:
522:
518:
513:
511:
507:
501:
499:
495:
491:
487:
486:Medford Gates
483:
479:
475:
466:
459:
457:
455:
451:
447:
443:
430:
423:
419:
415:
411:
399:
394:
391:
389:
387:
384:
382:
379:
374:
371:
370:
364:
357:
351:
350:North Station
348:
346:
341:
338:
336:
333:
328:
325:
324:
318:
314:
306:
303:
302:
296:
295:
291:
287:
283:
273:
272:North Station
270:
268:
266:
263:
261:
258:
253:
250:
249:
243:
239:
231:
227:
222:
218:
214:
210:
206:
202:
197:
193:
189:
184:
180:
176:
172:
168:
163:
160:
153:
149:
141:
137:
133:
129:
126:
122:
118:
115:
112:
108:
103:
75:
71:
68:
64:
60:
56:
51:
44:
39:
28:
19:
900:
877:
868:
856:
842:
825:
808:
797:the original
784:
773:the original
760:
743:
732:the original
719:
699:
692:
684:Boston Globe
683:
674:
666:Boston Globe
665:
655:
647:Boston Globe
646:
637:
628:
619:
610:
600:
591:
582:
572:
565:
550:
533:
514:
502:
485:
471:
441:
440:
165:Construction
33:West Medford
18:West Medford
454:Lowell Line
448:station in
378:Concord, NH
265:Lowell Line
139:Connections
97: /
73:Coordinates
63:High Street
924:Categories
542:References
529:flag stops
199:Passengers
178:Accessible
85:71°08′00″W
82:42°25′18″N
643:"Medford"
525:Wedgemere
373:Wedgemere
332:Haverhill
327:Wedgemere
252:Wedgemere
191:Fare zone
173:30 spaces
120:Platforms
426:Location
353:Terminus
275:Terminus
224:Services
148:MBTA bus
58:Location
460:History
396:toward
376:toward
330:toward
255:toward
170:Parking
110:Line(s)
707:
492:. The
444:is an
398:Boston
257:Lowell
156:
131:Tracks
886:(PDF)
865:(PDF)
834:(PDF)
817:(PDF)
800:(PDF)
793:(PDF)
776:(PDF)
769:(PDF)
752:(PDF)
735:(PDF)
728:(PDF)
527:were
705:ISBN
317:MBTA
242:MBTA
208:2018
61:481
508:in
926::
867:.
682:.
664:.
645:.
627:.
609:.
590:.
194:1A
181:No
159:95
152:94
150::
123:2
154:,
134:2
20:)
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.