308:
37:
313:
282:
The one train per week freight service, introduced in 1963, was scheduled so that locomotives did not stable at
Willunga overnight and consequently, tenders were called for demolition of the employee's barracks and other engine facilities.
358:
392:
377:
67:
387:
351:
382:
344:
213:
276:
286:
The stop is now unused as the entire
Willunga line was dismantled in 1972. The station building and platform remain.
275:
A station-master was appointed in 1915. A 60 feet turntable was installed during construction, but was removed to
261:
203:
132:
112:
102:
52:
218:
269:
226:
122:
307:
328:
324:
320:
265:
36:
371:
82:
69:
312:
295:
Australian
Railway Historical Society Bulletin No 336, October 1965
279:
in 1941–2. The triangle, later in use, was built around 1930.
332:
202:
16:
Former railway station in South
Australia, Australia
190:
171:
156:
151:
143:
138:
128:
118:
108:
98:
61:
48:
43:
23:
352:
147:turntable (until 1941); triangle (after 1930)
8:
393:South Australia building and structure stubs
378:Disused railway stations in South Australia
359:
345:
196:
35:
20:
207:
199:
7:
388:South Australia rail transport stubs
304:
302:
331:. You can help Knowledge (XXG) by
14:
311:
306:
383:Australia railway station stubs
260:is a closed railway station in
1:
268:. It was the terminus of the
409:
301:
251:
247:
243:
204:South Australian Railways
195:
186:
160:20 January 1915
133:South Australian Railways
113:South Australian Railways
103:South Australian Railways
34:
27:Willunga railway station
83:35.26767°S 138.55199°E
319:This article about a
270:Willunga railway line
227:Willunga railway line
123:Willunga railway line
88:-35.26767; 138.55199
79: /
44:General information
208:Following station
200:Preceding station
340:
339:
255:
254:
239:
238:
55:, South Australia
400:
361:
354:
347:
315:
310:
303:
197:
182:
180:
167:
165:
94:
93:
91:
90:
89:
84:
80:
77:
76:
75:
72:
39:
21:
408:
407:
403:
402:
401:
399:
398:
397:
368:
367:
366:
365:
325:South Australia
321:railway station
299:
292:
266:South Australia
221:
178:
176:
163:
161:
129:Train operators
87:
85:
81:
78:
73:
70:
68:
66:
65:
56:
30:
29:
28:
17:
12:
11:
5:
406:
404:
396:
395:
390:
385:
380:
370:
369:
364:
363:
356:
349:
341:
338:
337:
316:
297:
296:
291:
288:
253:
252:
249:
248:
245:
244:
241:
240:
237:
236:
231:
229:
224:
222:
216:
210:
209:
206:
201:
193:
192:
188:
187:
184:
183:
173:
169:
168:
158:
154:
153:
149:
148:
145:
144:Structure type
141:
140:
136:
135:
130:
126:
125:
120:
116:
115:
110:
106:
105:
100:
96:
95:
63:
59:
58:
50:
46:
45:
41:
40:
32:
31:
26:
25:
24:
15:
13:
10:
9:
6:
4:
3:
2:
405:
394:
391:
389:
386:
384:
381:
379:
376:
375:
373:
362:
357:
355:
350:
348:
343:
342:
336:
334:
330:
326:
322:
317:
314:
309:
305:
300:
294:
293:
289:
287:
284:
280:
278:
273:
271:
267:
263:
259:
250:
246:
242:
235:
232:
230:
228:
225:
223:
220:
215:
212:
211:
205:
198:
194:
189:
185:
174:
170:
159:
155:
150:
146:
142:
137:
134:
131:
127:
124:
121:
117:
114:
111:
107:
104:
101:
97:
92:
64:
60:
54:
51:
47:
42:
38:
33:
22:
19:
333:expanding it
318:
298:
285:
281:
274:
257:
256:
233:
139:Construction
18:
109:Operated by
86: /
74:138°33′07″E
62:Coordinates
372:Categories
290:References
164:1915-01-20
71:35°16′04″S
57:Australia
262:Willunga
258:Willunga
234:Terminus
219:Adelaide
217:towards
191:Services
99:Owned by
53:Willunga
49:Location
214:Taringa
177: (
162: (
152:History
119:Line(s)
277:Marino
172:Closed
157:Opened
327:is a
329:stub
179:1969
175:1969
323:in
374::
272:.
264:,
360:e
353:t
346:v
335:.
181:)
166:)
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.