Knowledge (XXG)

Williams Junction station

Source 📝

552: 481: 253: 155: 55: 219: 431:
In 2017, the Grand Canyon Railway announced they would be discontinuing their shuttle that connected this station with their station and hotel in Williams, forcing the station to close on January 1, 2018. To accommodate passengers requiring a connection to the Grand Canyon, Amtrak introduced a new
410:
route (trains 42 and 47). Both Williams stations closed on April 30, 1969 following the Santa Fe's discontinuation of passenger services to the Grand Canyon and Phoenix via the Peavine. The station building at Williams Junction remained standing for a few years following its closure, but was
422:
route to connect with Grand Canyon Railway services. The new station opened on August 2, 1999. Unlike its predecessor, the modern Williams Junction had no station building or facilities, and no access for private motor vehicles. Passengers could only access the Williams Junction station using an
397:
as the connection point between main line transcontinental services and Santa Fe trains to and from the Grand Canyon (trains 14 and 15). The station officially opened on December 18, 1960. Williams Depot remained open for the
427:
shuttle operated by the Grand Canyon Railway. The collection and drop-off point was the Grand Canyon Railway Hotel adjacent to the refurbished Williams Depot, now the southern terminus of the Grand Canyon line.
1038: 1018: 1023: 1003: 1008: 569: 834: 882: 89: 1043: 783: 1028: 594: 1033: 1048: 407: 378: 875: 742: 695: 672: 641: 512: 411:
eventually demolished. The spur from the Southern Transcon and the line through downtown Williams were retained for freight services.
809: 969: 868: 842: 271: 1013: 664: 943: 504: 457: 977: 896: 532: 551: 480: 948: 354: 418:
as a privately operated tourist venture in 1989, Amtrak introduced a stop at Williams Junction on their
393:. With the new route bypassing the town of Williams completely, Williams Junction replaced the downtown 293: 415: 362: 158: 127: 709: 17: 633: 465: 758: 923: 738: 668: 637: 508: 433: 390: 389:
built to avoid the sharp curves and steep gradients of the existing line between Williams and
386: 350: 288: 75: 964: 933: 623: 403: 399: 374: 928: 382: 345: 280: 266: 938: 918: 424: 394: 31: 997: 340: 358: 124: 688: 732: 658: 627: 498: 54: 860: 104: 91: 902: 835:"Southwest Chief Flagstaff Service Change, effective January 1st, 2018" 891: 838: 794: 762: 689:"Condensed Schedules of Passenger Service, effective July 15th, 1968" 601: 337: 256: 252: 27:
Former train station in Williams Junction, Coconino County, Arizona
864: 570:"Heading to Grand Canyon? Well-traveled train station closes" 810:"Grand Canyon Railway to discontinue Amtrak shuttle service" 357:. The station primarily served passengers travelling to the 1039:
Railway stations in the United States closed in the 2010s
595:"Amtrak Fact Sheet, Fiscal Year 2017, State of Arizona" 533:"It's Last Trip for Santa Fe's 'Williams Junction Run'" 349:
route, located three miles (4.8 km) southeast of
1019:
Former Atchison, Topeka and Santa Fe Railway stations
250: 1024:
Railway stations in the United States opened in 1960
1004:
Buildings and structures in Coconino County, Arizona
373:
The first station at Williams Junction was built by
957: 911: 458:"Grand Canyon First Train Over New Williams Cutoff" 316: 238: 212: 203: 193: 183: 178: 170: 165: 149: 141: 133: 120: 83: 69: 64: 41: 710:"Williams Junction disused station building, 1973" 526: 524: 402:service between Williams Junction and Phoenix via 451: 449: 876: 563: 561: 414:Following the successful regeneration of the 8: 385:: a new 44-mile (71 km) stretch of the 1009:Transportation in Coconino County, Arizona 883: 869: 861: 313: 244: 145:3 (two main line tracks, one passing loop) 137:2 (ground level paving serving two tracks) 53: 38: 30:For the Grand Canyon Railway station, see 492: 490: 260: 247: 416:former Santa Fe line to the Grand Canyon 788:schedule, effective November 5th, 2017" 445: 379:Atchison, Topeka & Santa Fe Railway 187:December 18, 1960 (first station) 696:Atchison, Topeka and Santa Fe Railway 199:January 1, 2018 (second station) 154: 7: 808:Howell, Wendy (September 26, 2017). 568:Fonseca, Felicia (January 4, 2018). 189:August 2, 1999 (second station) 1044:Rail junctions in the United States 456:Hoyt, William (December 18, 1960). 197:April 30, 1969 (first station) 59:Williams Junction station platform 25: 18:Williams Junction (Amtrak station) 1029:Former Amtrak stations in Arizona 531:Pearson, Helen (April 29, 1969). 550: 479: 432:Thruway bus service to and from 251: 218: 217: 153: 1034:Railway stations closed in 2018 539:. Flagstaff, Arizona. p. 2 381:as part of construction of the 1049:1960 establishments in Arizona 737:. Voyageur Press. p. 53. 1: 759:"Williams Junction, Arizona" 731:Glischinski, Steve (1997). 660:The Railroad and the Canyon 547:– via Newspapers.com. 476:– via Newspapers.com. 1065: 665:Pelican Publishing Company 29: 334:Williams Junction station 323: 312: 308: 304: 243: 234: 230: 226: 208: 52: 505:Indiana University Press 222: 20.1% (Amtrak) 657:Gerber, Rudy J (1995). 500:Amtrak in the Heartland 497:Sanders, Craig (2006). 841:. 2018. Archived from 355:Kaibab National Forest 105:35.24306°N 112.13472°W 537:The Arizona Daily Sun 462:The Arizona Daily Sun 45:Williams Junction, AZ 845:on February 15, 2018 574:The Arizona Republic 363:Grand Canyon Railway 159:Grand Canyon Railway 128:Seligman Subdivision 110:35.24306; -112.13472 101: /  65:General information 634:Arcadia Publishing 466:Flagstaff, Arizona 261:Following station 248:Preceding station 1014:Williams, Arizona 991: 990: 983:Williams Junction 744:978-0-7603-0380-1 674:978-1-4556-1086-0 643:978-0-7385-4832-6 624:Trimble, Marshall 514:978-0-253-02793-1 387:Southern Transcon 351:Williams, Arizona 331: 330: 327: 326: 300: 299: 166:Other information 76:Williams, Arizona 16:(Redirected from 1056: 905: 899: 894: 885: 878: 871: 862: 855: 854: 852: 850: 831: 825: 824: 822: 820: 805: 799: 798: 792: 780: 774: 773: 771: 769: 755: 749: 748: 734:Santa Fe Railway 728: 722: 721: 719: 717: 706: 700: 699: 693: 685: 679: 678: 654: 648: 647: 620: 614: 613: 611: 609: 599: 591: 585: 584: 582: 580: 565: 556: 555: 554: 548: 546: 544: 528: 519: 518: 494: 485: 484: 483: 477: 475: 473: 453: 400:Hassayampa Flyer 375:Morrison-Knudsen 314: 255: 245: 221: 220: 157: 156: 116: 115: 113: 112: 111: 106: 102: 99: 98: 97: 94: 57: 39: 21: 1064: 1063: 1059: 1058: 1057: 1055: 1054: 1053: 994: 993: 992: 987: 958:Former stations 953: 912:Active stations 907: 903: 897: 892: 889: 859: 858: 848: 846: 833: 832: 828: 818: 816: 807: 806: 802: 790: 786:Southwest Chief 782: 781: 777: 767: 765: 757: 756: 752: 745: 730: 729: 725: 715: 713: 708: 707: 703: 691: 687: 686: 682: 675: 656: 655: 651: 644: 622: 621: 617: 607: 605: 604:. November 2017 597: 593: 592: 588: 578: 576: 567: 566: 559: 549: 542: 540: 530: 529: 522: 515: 507:. p. 134. 496: 495: 488: 478: 471: 469: 455: 454: 447: 442: 420:Southwest Chief 383:Crookton Cutoff 371: 346:Southwest Chief 319: 296: 281:Southwest Chief 274: 239:Former services 198: 188: 109: 107: 103: 100: 95: 92: 90: 88: 87: 78: 74: 60: 48: 47: 46: 35: 28: 23: 22: 15: 12: 11: 5: 1062: 1060: 1052: 1051: 1046: 1041: 1036: 1031: 1026: 1021: 1016: 1011: 1006: 996: 995: 989: 988: 986: 985: 980: 975: 972: 967: 961: 959: 955: 954: 952: 951: 946: 941: 936: 931: 926: 921: 915: 913: 909: 908: 890: 888: 887: 880: 873: 865: 857: 856: 826: 800: 775: 750: 743: 723: 712:. Trainweb.org 701: 680: 673: 667:. p. 99. 649: 642: 615: 586: 557: 520: 513: 486: 444: 443: 441: 438: 425:Amtrak Thruway 395:Williams Depot 370: 367: 329: 328: 325: 324: 321: 320: 317: 310: 309: 306: 305: 302: 301: 298: 297: 291: 286: 284: 277: 275: 269: 263: 262: 259: 249: 241: 240: 236: 235: 232: 231: 228: 227: 224: 223: 214: 210: 209: 206: 205: 201: 200: 195: 191: 190: 185: 181: 180: 176: 175: 172: 168: 167: 163: 162: 151: 147: 146: 143: 139: 138: 135: 131: 130: 122: 118: 117: 85: 81: 80: 73:Old Depot Road 71: 67: 66: 62: 61: 58: 50: 49: 44: 43: 42: 32:Williams Depot 26: 24: 14: 13: 10: 9: 6: 4: 3: 2: 1061: 1050: 1047: 1045: 1042: 1040: 1037: 1035: 1032: 1030: 1027: 1025: 1022: 1020: 1017: 1015: 1012: 1010: 1007: 1005: 1002: 1001: 999: 984: 981: 979: 976: 973: 971: 968: 966: 963: 962: 960: 956: 950: 947: 945: 942: 940: 937: 935: 932: 930: 927: 925: 922: 920: 917: 916: 914: 910: 906: 900: 895: 886: 881: 879: 874: 872: 867: 866: 863: 844: 840: 836: 830: 827: 815: 814:Williams News 811: 804: 801: 796: 789: 787: 779: 776: 764: 760: 754: 751: 746: 740: 736: 735: 727: 724: 711: 705: 702: 697: 690: 684: 681: 676: 670: 666: 662: 661: 653: 650: 645: 639: 636:. p. 8. 635: 631: 630: 625: 619: 616: 603: 596: 590: 587: 575: 571: 564: 562: 558: 553: 538: 534: 527: 525: 521: 516: 510: 506: 502: 501: 493: 491: 487: 482: 467: 463: 459: 452: 450: 446: 439: 437: 435: 429: 426: 421: 417: 412: 409: 405: 401: 396: 392: 388: 384: 380: 376: 368: 366: 364: 360: 356: 352: 348: 347: 342: 341:train station 339: 335: 322: 315: 311: 307: 303: 295: 290: 287: 285: 283: 282: 278: 276: 273: 268: 265: 264: 258: 254: 246: 242: 237: 233: 229: 225: 215: 211: 207: 202: 196: 192: 186: 182: 177: 173: 169: 164: 160: 152: 148: 144: 140: 136: 132: 129: 126: 123: 119: 114: 86: 82: 79:United States 77: 72: 68: 63: 56: 51: 40: 37: 33: 19: 982: 849:February 14, 847:. Retrieved 843:the original 829: 819:November 24, 817:. Retrieved 813: 803: 785: 778: 768:November 24, 766:. Retrieved 753: 733: 726: 716:November 24, 714:. Retrieved 704: 683: 659: 652: 628: 618: 608:December 16, 606:. Retrieved 589: 577:. Retrieved 573: 541:. Retrieved 536: 499: 470:. Retrieved 461: 430: 419: 413: 372: 359:Grand Canyon 344: 333: 332: 279: 216:9,672  171:Station code 36: 543:November 8, 472:November 8, 468:. p. 1 272:Los Angeles 150:Connections 108: / 96:112°08′05″W 84:Coordinates 998:Categories 579:January 4, 440:References 204:Passengers 93:35°14′35″N 924:Flagstaff 434:Flagstaff 289:Flagstaff 134:Platforms 974:Seligman 965:Coolidge 934:Maricopa 898:stations 629:Ash Fork 626:(2008). 406:and the 404:Ash Fork 391:Ash Fork 377:for the 361:via the 318:Location 70:Location 970:Phoenix 944:Winslow 929:Kingman 904:Arizona 797:. 2017. 698:. 1968. 408:Peavine 369:History 353:in the 343:on the 336:was an 294:Chicago 292:toward 270:toward 267:Kingman 179:History 161:shuttle 121:Line(s) 939:Tucson 919:Benson 893:Amtrak 839:Amtrak 795:Amtrak 763:Amtrak 741:  671:  640:  602:Amtrak 511:  338:Amtrak 257:Amtrak 194:Closed 184:Opened 142:Tracks 978:Tempe 791:(PDF) 692:(PDF) 598:(PDF) 949:Yuma 851:2018 821:2017 770:2017 739:ISBN 718:2017 669:ISBN 638:ISBN 610:2017 581:2018 545:2021 509:ISBN 474:2021 213:2017 125:BNSF 901:in 174:WMJ 1000:: 837:. 812:. 793:. 761:. 694:. 663:. 632:. 600:. 572:. 560:^ 535:. 523:^ 503:. 489:^ 464:. 460:. 448:^ 436:. 365:. 884:e 877:t 870:v 853:. 823:. 784:" 772:. 747:. 720:. 677:. 646:. 612:. 583:. 517:. 34:. 20:)

Index

Williams Junction (Amtrak station)
Williams Depot

Williams, Arizona
35°14′35″N 112°08′05″W / 35.24306°N 112.13472°W / 35.24306; -112.13472
BNSF
Seligman Subdivision
Grand Canyon Railway

Amtrak
Kingman
Los Angeles
Southwest Chief
Flagstaff
Chicago
Amtrak
train station
Southwest Chief
Williams, Arizona
Kaibab National Forest
Grand Canyon
Grand Canyon Railway
Morrison-Knudsen
Atchison, Topeka & Santa Fe Railway
Crookton Cutoff
Southern Transcon
Ash Fork
Williams Depot
Hassayampa Flyer
Ash Fork

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.