September–November 2023 diversion of Haverhill Line service over the Lowell Line. By November 2023, the new station was 40% complete. The southern portion of the new station, including 320 feet (98 m) of each platform, was expected to open in July 2024; the remaining portion was expected to open in October 2024. In June 2024, this was delayed to a partial opening in late September and full opening in December. The first portion will reopen on September 30, 2024.
563: 144: 681:
By late 2019, the total project budget was $ 49.9 million: $ 7.3 million for design and $ 42.5 million for construction. By May 2020, the MBTA expected to begin construction in fall 2020, with completion in spring 2023. However, the project was put on hold in 2020 due to budgetary issues caused by the COVID-19 pandemic.
338: 260: 676:
at the southern end of each platform. The 1957-built station was originally to be demolished to make room for the elevators and staircases. The northern ramp to the outbound platform will be moved north of the adjacent rotary; the northern inbound ramp will be rebuilt at its present location south of
680:
Design of the station was then expected to be completed by the end of 2016, with the $ 25.8 million construction beginning in 2017. By October 2016, bidding was expected to begin that December. The MBTA designated $ 34 million in funding in 2016, but the projected cost rose to $ 54 million by 2018.
578:
station – later Winchester – was open by 1838. By the 1840s, service on the line was suitable for commuting to Boston. Elimination of the grade crossing at Winchester was considered in 1903 and 1906, and again in 1915. The 1915 proposal called for the tracks to be lowered by 4 feet (1.2 m) and
586:
In the early 1950s, the B&M began planning a project to raise the tracks of the New Hampshire Main Line and the southern end of the Woburn Branch for a mile through Winchester, eliminating troublesome grade crossings downtown. Construction began in 1955; boxy two-story brick stations opened at
684:
The station was closed effective January 8, 2021 due to deterioration. On January 11, the MBTA reinstated funding for the project due to the closure. The MBTA received a demolition permit on January 25. Demolition of the ramps was completed in June 2021. A $ 47.6 million construction contract was
671:
freight trains to pass. A new interlocking may be built south of the station, which will allow greater flexibility during construction and allow the retirement of the former Woburn Branch interlocking north of the station after completion. Although early designs called for replacement of existing
618:
On July 7, 2015, the Winchester Department of Public Works discovered a hole in the inbound platform, which prompted the closure of the northern 500 feet (150 m) of the platform and one ramp due to concrete deterioration. One ramp and the remaining section of the platform remained open for
614:
Winchester Center station had not been substantially renovated since the viaduct was completed in 1957. In September 2008, the MBTA approved $ 1.4 million in platform and ramps repairs, as well as electrical and lighting work, at the station. The work was completed in 2010; the MBTA intended to
688:
A formal groundbreaking ceremony was held on June 30, 2022. Construction was 25% complete by December 2022 and 30% complete by June 2023, with completion expected in April 2024. Work was delayed by plumbing code compliance issues, supply chain issues, and reduced work windows due to a
685:
approved on October 27, 2021. The 28-month construction phase began in December 2021. Site preparation began in March 2022. Demolition of the remaining platforms and ramps took place in May and June 2022. Some demolition and utility work lasted through the remainder of 2022.
662:
After several iterations, a new 15% design was reached in December 2015. The rebuilt station will have 724-foot (221 m)-long high-level platforms; although shorter than the 800-foot (240 m) MBTA standard, they will still be able to platform 9 cars. A
1651: 650:
of the 15% design were not sufficient for state accessibility requirements, and that full-length high-level platforms would be required. The town objected to simply changing the design to accommodate these platforms.
548:
are being added during renovations taking place from December 2021 to December 2024. The first portion of the rebuilt station will open on September 30, 2024, with the remaining portion in late 2024 or early 2025.
1656: 1502: 1066: 1090: 1025: 1661: 1189: 1560: 646:
was then chosen as the contractor for final design in June 2012. Funding issues prevented this design work from beginning until 2013. It was later determined that the
630:
and the inner Lowell Line, making stops including Winchester Center. This routing was resumed in April 2021, with the trains no longer making the intermediate stops.
1170: 78: 1614: 45: 341: 337: 263: 259: 1279: 1437: 1423: 619:
service. The MBTA planned to make temporary repairs before the end of the year. Further repairs were made in 2017 to support the platforms and ramps.
1374: 1357: 654: 1510: 1330: 1304: 1145: 1007: 351: 1525: 1454: 1073: 1049: 1468: 1389: 696:
with 56 residential units is planned to replace the MBTA-owned and town-owned surface parking lots on the south side of Waterfield Street.
1097: 606: 1485: 1207: 1130: 1390:"MBTA Construction Services Contract No. J66CN01: Winchester Center Station Accessibility Improvements: Construction Contract Award" 1032: 949: 925: 768: 356: 1600: 1260: 540:
in downtown Winchester, was closed effective January 8, 2021 due to structural deterioration. Winchester Center station was not
477: 438: 395: 1225: 740: 1568: 1542: 1615:"MBTA Advances Nearly 1,000 Units of Housing Through Collaborative Agreements, Including Significant Affordable Housing" 693: 430: 466: 387: 1636: 1583: 1474:. Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. December 6, 2022. pp. 6–7. 1548:. Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. November 27, 2023. p. 7. 571: 1406: 1243: 1174: 529: 420: 66: 1412:. Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. December 2021. p. 7. 610:
One of the ramps to the inbound platform in January 2013, showing water damage to concrete and metal structures
1491:. Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. June 5, 2023. p. 6. 785: 545: 902: 598:
diverged from the main line just north of the Winchester Center platforms. A short stub is still in place.
595: 50:
Construction at Winchester Center station in December 2023, with the 1957-built station structure at right
580: 989: 673: 17: 1503:"Delays hurt, but MBTA hopes to keep Winchester Center Commuter Rail Station project on schedule" 668: 647: 643: 525: 1249:. Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. p. 7. 963: 638:
The MBTA is making renovations to the station which will repair water damage and make it fully
921: 764: 736: 588: 562: 453: 374: 293: 891: 873: 855: 837: 819: 801: 1190:"Winchester Commuter Rail station is falling apart, but MBTA funding is still up in the air" 273: 677:
the rotary, with the possibility of an additional ramp north of the rotary in the future.
942: 714: 664: 627: 623: 364: 278: 151: 1645: 471: 458: 407: 379: 298: 124: 1264: 615:
renovate the station before the 5-year life of the platform patches was reached.
1603:(Press release). Massachusetts Bay Transportation Authority. September 17, 2024. 533: 446: 403: 286: 113: 574:
opened between its namesake cities in 1835; local stops were added soon after.
1631: 1031:. Massachusetts Bay Transportation Authority. November 2, 2020. Archived from 639: 541: 1263:. Massachusetts Bay Transportation Authority. January 7, 2021. Archived from 93: 80: 1443:. Massachusetts Bay Transportation Authority. June 14, 2022. pp. 10–14. 1426:(Press release). Massachusetts Bay Transportation Authority. March 22, 2022. 1358:"Winchester Center Station Demolition Work & Accessibility Improvements" 1584:"Winchester Center Station Accessibility Improvements: Construction Update" 1526:"Winchester Center Station Accessibility Improvements: Construction Update" 1457:(Press release). Massachusetts Bay Transportation Authority. June 30, 2022. 1438:"Winchester Center Station Accessibility Improvements: Construction Update" 1377:(Press release). Massachusetts Bay Transportation Authority. June 11, 2021. 1096:. Massachusetts Bay Transportation Authority. April 5, 2021. Archived from 1072:. Massachusetts Bay Transportation Authority. April 5, 2021. Archived from 1617:(Press release). Massachusetts Bay Transportation Authority. May 17, 2024. 1173:. Massachusetts Bay Transportation Authority. October 2016. Archived from 147: 1455:"MBTA Celebrates Winchester Center Commuter Rail Station Groundbreaking" 918:
A Field Guide to Southern New England Railroad Depots and Freight Houses
579:
the streets to be raised by 17 feet (5.2 m). The B&M installed
537: 1131:"MBTA Winchester Center Station Renovation Project: 15% Design Report" 1331:"MBTA gets demo permit for Winchester Center Commuter Rail Station" 1280:"Winchester Center commuter rail closed due to structural problems" 653: 605: 561: 1213:. Massachusetts Bay Transportation Authority. November 21, 2019. 1055:. Massachusetts Bay Transportation Authority. December 14, 2020. 966:. Massachusetts Bay Transportation Authority. 11 September 2008 1652:
MBTA Commuter Rail stations in Middlesex County, Massachusetts
1601:"MBTA Announces Partial Opening of Winchester Center Station" 1424:"Winchester Center Station Construction Prep Begins March 28" 583:
at the station in 1942 in an effort to reduce parking needs.
1637:
MBTA – Winchester Center Station Accessibility Improvements
642:. The station design was advanced to 15% in December 2011; 898:. October 21, 1953. p. 14 – via Newspapers.com. 862:. November 11, 1915. p. 2 – via Newspapers.com. 1363:. Massachusetts Bay Transportation Authority. p. 28. 880:. January 21, 1942. p. 7 – via Newspapers.com. 1208:"Winchester Center Station Improvements Public Meeting" 826:. March 17, 1903. p. 7 – via Newspapers.com. 808:. March 17, 1906. p. 9 – via Newspapers.com. 844:. June 30, 1915. p. 3 – via Newspapers.com. 1657:
Buildings and structures in Winchester, Massachusetts
1543:"System-Wide Accessibility Initiatives—November 2023" 1469:"System-Wide Accessibility Initiatives—December 2022" 1407:"System-Wide Accessibility Initiatives—December 2021" 1244:"System-Wide Accessibility Initiatives—November 2020" 763:. Boston Street Railway Association. pp. 55–57. 419: 335: 257: 1305:"Winchester Center station project gets green light" 1278:
Ellement, John R.; Sennott, Adam (January 8, 2021).
874:"Bicycle Racks at Winchester for B.& M. Patrons" 759:Humphrey, Thomas J. & Clark, Norton D. (1985). 504: 245: 229: 220: 212: 204: 196: 191: 183: 178: 170: 162: 157: 138: 130: 119: 109: 72: 60: 55: 32: 1486:"System-Wide Accessibility Initiatives—June 2023" 1050:"2020/2021 Reduced Service Schedule: Lowell Line" 943:"Changes to Transit Service in the MBTA district" 892:"Winchester Overpass Cost Boosted to $ 6,000,000" 658:Construction of the new station in September 2022 1375:"Demolition Work Complete at Winchester Station" 1171:"Future Construction Contract Bid Solicitations" 990:"Winchester Center MBTA stop partially closed" 713:Central Transportation Planning Staff (2019). 27:Train station in Winchester, Massachusetts, US 1589:. Massachusetts Bay Transportation Authority. 1531:. Massachusetts Bay Transportation Authority. 1395:. Massachusetts Bay Transportation Authority. 1133:. Massachusetts Bay Transportation Authority. 964:"Agenda for September 11, 2008 Board Meeting" 717:. Massachusetts Bay Transportation Authority. 8: 1124: 1122: 1120: 1118: 1116: 1114: 1112: 1110: 983: 981: 761:Boston's Commuter Rail: The First 150 Years 754: 752: 501: 329: 318: 251: 44: 29: 1662:Former Boston and Maine Railroad stations 566:Circa-1910 postcard of Winchester station 424: 416: 345: 332: 267: 254: 735:. Branch Line Press. pp. 229–231. 705: 622:Until December 2020, a small number of 1242:Brelsford, Laura (November 30, 2020). 733:The Rail Lines of Southern New England 1561:"Winchester MBTA project wrapping up" 1067:"Haverhill Line 2021 Spring Schedule" 726: 724: 544:prior to the closure, but accessible 143: 7: 1509:. September 28, 2023. Archived from 1146:"MBTA commuter rail project ongoing" 1129:Jacobs Engineering (December 2015). 787:The Boston Almanac for the Year 1838 672:ramps, the new 15% design added two 1026:"Lowell Line: Fall/Winter Schedule" 838:"Winchester Grade Crossing Hearing" 1091:"Lowell Line 2021 Spring Schedule" 920:. Branch Line Press. p. 260. 802:"Grade Crossing Hearing Postponed" 25: 18:Winchester station (Massachusetts) 1356:Rae, Nathan (February 23, 2021). 1224:Brelsford, Laura (May 26, 2020). 1144:LaRoche, Ryan (29 January 2016). 950:Boston Street Railway Association 166:237 spaces (town permit required) 1388:Rae, Nathan (October 27, 2021). 1188:Manzhos, Mariya (June 7, 2018). 988:Berkowitz, Bram (15 July 2015). 901: 336: 258: 142: 1524:Rae, Nathan (October 4, 2023). 856:"Exhibit of Work by Winchester" 591:and Winchester Center in 1957. 233:456 (weekday average boardings) 1: 1582:Rae, Nathan (June 25, 2024). 208:January 8, 2021 (temporarily) 1008:"Train station temp repairs" 694:transit oriented development 536:. The station, located on a 200:reopening September 30, 2024 715:"2018 Commuter Rail Counts" 216:December 2021–December 2024 1678: 1226:"SWA Initiatives—May 2020" 731:Karr, Ronald Dale (1995). 667:may be installed to allow 572:Boston and Lowell Railroad 916:Roy, John H. Jr. (2007). 532:, normally served by the 530:Winchester, Massachusetts 522:Winchester Center station 511: 500: 496: 492: 452: 450: 445: 443: 421:Boston and Maine Railroad 373: 368:limited service, pre-2020 317: 313: 309: 250: 241: 237: 225: 67:Winchester, Massachusetts 43: 1632:MBTA – Winchester Center 784:Dickinson, S.N. (1838). 524:is a temporarily closed 1194:Wicked Local Winchester 994:Wicked Local Winchester 114:New Hampshire Main Line 659: 611: 567: 1507:Daily Times Chronicle 1335:Daily Times Chronicle 1309:Daily Times Chronicle 1150:Daily Times Chronicle 1038:on November 30, 2020. 1012:Daily Times Chronicle 657: 609: 565: 1261:"Lowell Line Alerts" 1177:on October 14, 2016. 820:"On Grade Crossings" 546:high-level platforms 447:Boston – Concord, NH 431:Winchester Highlands 1513:on October 2, 2023. 1267:on January 8, 2021. 941:Belcher, Jonathan. 674:redundant elevators 648:mini-high platforms 626:trains ran via the 94:42.4516°N 71.1378°W 90: /  56:General information 1337:. January 26, 2021 1311:. January 12, 2021 1103:on April 23, 2021. 669:CSX Transportation 660: 644:Jacobs Engineering 612: 568: 526:MBTA Commuter Rail 425:Following station 417:Preceding station 346:Following station 333:Preceding station 268:Following station 255:Preceding station 171:Bicycle facilities 64:29 Waterfield Road 1571:on June 21, 2024. 1079:on April 5, 2021. 519: 518: 515: 514: 488: 487: 484: 483: 305: 304: 179:Other information 99:42.4516; -71.1378 36:Winchester Center 16:(Redirected from 1669: 1619: 1618: 1611: 1605: 1604: 1597: 1591: 1590: 1588: 1579: 1573: 1572: 1567:. Archived from 1559:Larouche, Ryan. 1556: 1550: 1549: 1547: 1539: 1533: 1532: 1530: 1521: 1515: 1514: 1499: 1493: 1492: 1490: 1482: 1476: 1475: 1473: 1465: 1459: 1458: 1451: 1445: 1444: 1442: 1434: 1428: 1427: 1420: 1414: 1413: 1411: 1403: 1397: 1396: 1394: 1385: 1379: 1378: 1371: 1365: 1364: 1362: 1353: 1347: 1346: 1344: 1342: 1327: 1321: 1320: 1318: 1316: 1301: 1295: 1294: 1292: 1290: 1275: 1269: 1268: 1257: 1251: 1250: 1248: 1239: 1233: 1232: 1230: 1221: 1215: 1214: 1212: 1204: 1198: 1197: 1185: 1179: 1178: 1167: 1161: 1160: 1158: 1156: 1141: 1135: 1134: 1126: 1105: 1104: 1102: 1095: 1087: 1081: 1080: 1078: 1071: 1063: 1057: 1056: 1054: 1046: 1040: 1039: 1037: 1030: 1022: 1016: 1015: 1014:. July 28, 2017. 1004: 998: 997: 985: 976: 975: 973: 971: 960: 954: 953: 947: 938: 932: 931: 913: 907: 906: 905: 899: 888: 882: 881: 870: 864: 863: 852: 846: 845: 834: 828: 827: 816: 810: 809: 798: 792: 791: 781: 775: 774: 756: 747: 746: 728: 719: 718: 710: 594:Until 1981, the 502: 352:Anderson/​Woburn 340: 330: 319: 262: 252: 146: 145: 105: 104: 102: 101: 100: 95: 91: 88: 87: 86: 83: 48: 30: 21: 1677: 1676: 1672: 1671: 1670: 1668: 1667: 1666: 1642: 1641: 1628: 1623: 1622: 1613: 1612: 1608: 1599: 1598: 1594: 1586: 1581: 1580: 1576: 1558: 1557: 1553: 1545: 1541: 1540: 1536: 1528: 1523: 1522: 1518: 1501: 1500: 1496: 1488: 1484: 1483: 1479: 1471: 1467: 1466: 1462: 1453: 1452: 1448: 1440: 1436: 1435: 1431: 1422: 1421: 1417: 1409: 1405: 1404: 1400: 1392: 1387: 1386: 1382: 1373: 1372: 1368: 1360: 1355: 1354: 1350: 1340: 1338: 1329: 1328: 1324: 1314: 1312: 1303: 1302: 1298: 1288: 1286: 1277: 1276: 1272: 1259: 1258: 1254: 1246: 1241: 1240: 1236: 1231:. pp. 7–8. 1228: 1223: 1222: 1218: 1210: 1206: 1205: 1201: 1187: 1186: 1182: 1169: 1168: 1164: 1154: 1152: 1143: 1142: 1138: 1128: 1127: 1108: 1100: 1093: 1089: 1088: 1084: 1076: 1069: 1065: 1064: 1060: 1052: 1048: 1047: 1043: 1035: 1028: 1024: 1023: 1019: 1006: 1005: 1001: 987: 986: 979: 969: 967: 962: 961: 957: 945: 940: 939: 935: 928: 915: 914: 910: 900: 890: 889: 885: 872: 871: 867: 854: 853: 849: 836: 835: 831: 818: 817: 813: 800: 799: 795: 783: 782: 778: 771: 758: 757: 750: 743: 730: 729: 722: 712: 711: 707: 702: 636: 604: 560: 555: 507: 480: 474: 461: 441: 435: 410: 398: 392: 382: 369: 359: 324: 323:Former services 301: 281: 98: 96: 92: 89: 84: 81: 79: 77: 76: 65: 51: 39: 38: 37: 28: 23: 22: 15: 12: 11: 5: 1675: 1673: 1665: 1664: 1659: 1654: 1644: 1643: 1640: 1639: 1634: 1627: 1626:External links 1624: 1621: 1620: 1606: 1592: 1574: 1565:Middlesex East 1551: 1534: 1516: 1494: 1477: 1460: 1446: 1429: 1415: 1398: 1380: 1366: 1348: 1322: 1296: 1270: 1252: 1234: 1216: 1199: 1180: 1162: 1136: 1106: 1082: 1058: 1041: 1017: 999: 977: 955: 933: 926: 908: 883: 865: 847: 829: 811: 793: 776: 769: 748: 741: 720: 704: 703: 701: 698: 665:gauntlet track 635: 634:Reconstruction 632: 628:Wildcat Branch 624:Haverhill Line 603: 600: 559: 556: 554: 551: 517: 516: 513: 512: 509: 508: 505: 498: 497: 494: 493: 490: 489: 486: 485: 482: 481: 475: 469: 463: 462: 456: 451: 449: 444: 442: 436: 433: 427: 426: 423: 418: 414: 413: 411: 406: 401: 399: 393: 390: 384: 383: 377: 372: 370: 367: 365:Haverhill Line 362: 360: 354: 348: 347: 344: 334: 326: 325: 322: 315: 314: 311: 310: 307: 306: 303: 302: 296: 291: 289: 284: 282: 276: 270: 269: 266: 256: 248: 247: 243: 242: 239: 238: 235: 234: 231: 227: 226: 223: 222: 218: 217: 214: 210: 209: 206: 202: 201: 198: 194: 193: 189: 188: 185: 181: 180: 176: 175: 172: 168: 167: 164: 160: 159: 155: 154: 140: 136: 135: 132: 128: 127: 125:side platforms 121: 117: 116: 111: 107: 106: 74: 70: 69: 62: 58: 57: 53: 52: 49: 41: 40: 35: 34: 33: 26: 24: 14: 13: 10: 9: 6: 4: 3: 2: 1674: 1663: 1660: 1658: 1655: 1653: 1650: 1649: 1647: 1638: 1635: 1633: 1630: 1629: 1625: 1616: 1610: 1607: 1602: 1596: 1593: 1585: 1578: 1575: 1570: 1566: 1562: 1555: 1552: 1544: 1538: 1535: 1527: 1520: 1517: 1512: 1508: 1504: 1498: 1495: 1487: 1481: 1478: 1470: 1464: 1461: 1456: 1450: 1447: 1439: 1433: 1430: 1425: 1419: 1416: 1408: 1402: 1399: 1391: 1384: 1381: 1376: 1370: 1367: 1359: 1352: 1349: 1336: 1332: 1326: 1323: 1310: 1306: 1300: 1297: 1285: 1281: 1274: 1271: 1266: 1262: 1256: 1253: 1245: 1238: 1235: 1227: 1220: 1217: 1209: 1203: 1200: 1195: 1191: 1184: 1181: 1176: 1172: 1166: 1163: 1151: 1147: 1140: 1137: 1132: 1125: 1123: 1121: 1119: 1117: 1115: 1113: 1111: 1107: 1099: 1092: 1086: 1083: 1075: 1068: 1062: 1059: 1051: 1045: 1042: 1034: 1027: 1021: 1018: 1013: 1009: 1003: 1000: 995: 991: 984: 982: 978: 965: 959: 956: 951: 944: 937: 934: 929: 927:9780942147087 923: 919: 912: 909: 904: 897: 893: 887: 884: 879: 875: 869: 866: 861: 857: 851: 848: 843: 839: 833: 830: 825: 821: 815: 812: 807: 803: 797: 794: 790:. p. 49. 789: 788: 780: 777: 772: 770:9780685412947 766: 762: 755: 753: 749: 744: 738: 734: 727: 725: 721: 716: 709: 706: 699: 697: 695: 690: 686: 682: 678: 675: 670: 666: 656: 652: 649: 645: 641: 633: 631: 629: 625: 620: 616: 608: 601: 599: 597: 596:Woburn Branch 592: 590: 584: 582: 577: 573: 564: 558:Early history 557: 552: 550: 547: 543: 539: 535: 531: 527: 523: 510: 503: 499: 495: 491: 479: 473: 468: 465: 464: 460: 455: 448: 440: 432: 429: 428: 422: 415: 412: 409: 408:Woburn Branch 405: 402: 400: 397: 389: 386: 385: 381: 380:North Station 376: 371: 366: 363: 361: 358: 353: 350: 349: 343: 339: 331: 328: 327: 321: 320: 316: 312: 308: 300: 299:North Station 295: 292: 290: 288: 285: 283: 280: 275: 272: 271: 265: 261: 253: 249: 244: 240: 236: 232: 228: 224: 219: 215: 211: 207: 203: 199: 195: 190: 186: 182: 177: 173: 169: 165: 161: 156: 153: 149: 141: 137: 133: 129: 126: 122: 118: 115: 112: 108: 103: 75: 71: 68: 63: 59: 54: 47: 42: 31: 19: 1609: 1595: 1577: 1569:the original 1564: 1554: 1537: 1519: 1511:the original 1506: 1497: 1480: 1463: 1449: 1432: 1418: 1401: 1383: 1369: 1351: 1339:. Retrieved 1334: 1325: 1313:. Retrieved 1308: 1299: 1287:. Retrieved 1284:Boston Globe 1283: 1273: 1265:the original 1255: 1237: 1219: 1202: 1193: 1183: 1175:the original 1165: 1153:. Retrieved 1149: 1139: 1098:the original 1085: 1074:the original 1061: 1044: 1033:the original 1020: 1011: 1002: 993: 968:. Retrieved 958: 936: 917: 911: 896:Boston Globe 895: 886: 878:Boston Globe 877: 868: 860:Boston Globe 859: 850: 842:Boston Globe 841: 832: 824:Boston Globe 823: 814: 806:Boston Globe 805: 796: 786: 779: 760: 732: 708: 692:As of 2024, 691: 687: 683: 679: 661: 637: 621: 617: 613: 593: 585: 576:Woburn Gates 575: 569: 521: 520: 467:Cross Street 434:via mainline 388:Cross Street 158:Construction 1341:February 3, 1315:January 13, 1155:24 February 602:Repair work 534:Lowell Line 528:station in 478:Concord, NH 472:Woburn Loop 439:Concord, NH 404:Lowell Line 391:closed 1981 287:Lowell Line 139:Connections 97: / 73:Coordinates 1646:Categories 1289:January 9, 742:0942147022 700:References 640:accessible 581:bike racks 542:accessible 221:Passengers 85:71°08′16″W 82:42°27′06″N 589:Wedgemere 454:Wedgemere 375:Wedgemere 357:Haverhill 294:Wedgemere 184:Fare zone 174:27 spaces 120:Platforms 970:3 August 506:Location 274:Mishawum 246:Services 148:MBTA bus 61:Location 553:History 538:viaduct 476:toward 457:toward 437:toward 394:toward 378:toward 355:toward 297:toward 277:toward 213:Rebuilt 197:Opening 192:History 163:Parking 110:Line(s) 924:  767:  739:  459:Boston 396:Woburn 279:Lowell 205:Closed 131:Tracks 1587:(PDF) 1546:(PDF) 1529:(PDF) 1489:(PDF) 1472:(PDF) 1441:(PDF) 1410:(PDF) 1393:(PDF) 1361:(PDF) 1247:(PDF) 1229:(PDF) 1211:(PDF) 1101:(PDF) 1094:(PDF) 1077:(PDF) 1070:(PDF) 1053:(PDF) 1036:(PDF) 1029:(PDF) 946:(PDF) 1343:2021 1317:2021 1291:2021 1157:2016 972:2008 922:ISBN 765:ISBN 737:ISBN 570:The 470:via 342:MBTA 264:MBTA 230:2018 152:134 1648:: 1563:. 1505:. 1333:. 1307:. 1282:. 1192:. 1148:. 1109:^ 1010:. 992:. 980:^ 948:. 894:. 876:. 858:. 840:. 822:. 804:. 751:^ 723:^ 150:: 123:2 1345:. 1319:. 1293:. 1196:. 1159:. 996:. 974:. 952:. 930:. 773:. 745:. 187:1 134:2 20:)

Index

Winchester station (Massachusetts)

Winchester, Massachusetts
42°27′06″N 71°08′16″W / 42.4516°N 71.1378°W / 42.4516; -71.1378
New Hampshire Main Line
side platforms
MBTA bus
134

MBTA
Mishawum
Lowell
Lowell Line
Wedgemere
North Station

MBTA
Anderson/​Woburn
Haverhill
Haverhill Line
Wedgemere
North Station
Cross Street
Woburn
Lowell Line
Woburn Branch
Boston and Maine Railroad
Winchester Highlands
Concord, NH
Boston – Concord, NH

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑