September–November 2023 diversion of
Haverhill Line service over the Lowell Line. By November 2023, the new station was 40% complete. The southern portion of the new station, including 320 feet (98 m) of each platform, was expected to open in July 2024; the remaining portion was expected to open in October 2024. In June 2024, this was delayed to a partial opening in late September and full opening in December. The first portion will reopen on September 30, 2024.
563:
144:
681:
By late 2019, the total project budget was $ 49.9 million: $ 7.3 million for design and $ 42.5 million for construction. By May 2020, the MBTA expected to begin construction in fall 2020, with completion in spring 2023. However, the project was put on hold in 2020 due to budgetary issues caused by the COVID-19 pandemic.
338:
260:
676:
at the southern end of each platform. The 1957-built station was originally to be demolished to make room for the elevators and staircases. The northern ramp to the outbound platform will be moved north of the adjacent rotary; the northern inbound ramp will be rebuilt at its present location south of
680:
Design of the station was then expected to be completed by the end of 2016, with the $ 25.8 million construction beginning in 2017. By
October 2016, bidding was expected to begin that December. The MBTA designated $ 34 million in funding in 2016, but the projected cost rose to $ 54 million by 2018.
578:
station – later
Winchester – was open by 1838. By the 1840s, service on the line was suitable for commuting to Boston. Elimination of the grade crossing at Winchester was considered in 1903 and 1906, and again in 1915. The 1915 proposal called for the tracks to be lowered by 4 feet (1.2 m) and
586:
In the early 1950s, the B&M began planning a project to raise the tracks of the New
Hampshire Main Line and the southern end of the Woburn Branch for a mile through Winchester, eliminating troublesome grade crossings downtown. Construction began in 1955; boxy two-story brick stations opened at
684:
The station was closed effective
January 8, 2021 due to deterioration. On January 11, the MBTA reinstated funding for the project due to the closure. The MBTA received a demolition permit on January 25. Demolition of the ramps was completed in June 2021. A $ 47.6 million construction contract was
671:
freight trains to pass. A new interlocking may be built south of the station, which will allow greater flexibility during construction and allow the retirement of the former Woburn Branch interlocking north of the station after completion. Although early designs called for replacement of existing
618:
On July 7, 2015, the
Winchester Department of Public Works discovered a hole in the inbound platform, which prompted the closure of the northern 500 feet (150 m) of the platform and one ramp due to concrete deterioration. One ramp and the remaining section of the platform remained open for
614:
Winchester Center station had not been substantially renovated since the viaduct was completed in 1957. In
September 2008, the MBTA approved $ 1.4 million in platform and ramps repairs, as well as electrical and lighting work, at the station. The work was completed in 2010; the MBTA intended to
688:
A formal groundbreaking ceremony was held on June 30, 2022. Construction was 25% complete by
December 2022 and 30% complete by June 2023, with completion expected in April 2024. Work was delayed by plumbing code compliance issues, supply chain issues, and reduced work windows due to a
685:
approved on
October 27, 2021. The 28-month construction phase began in December 2021. Site preparation began in March 2022. Demolition of the remaining platforms and ramps took place in May and June 2022. Some demolition and utility work lasted through the remainder of 2022.
662:
After several iterations, a new 15% design was reached in
December 2015. The rebuilt station will have 724-foot (221 m)-long high-level platforms; although shorter than the 800-foot (240 m) MBTA standard, they will still be able to platform 9 cars. A
1651:
650:
of the 15% design were not sufficient for state accessibility requirements, and that full-length high-level platforms would be required. The town objected to simply changing the design to accommodate these platforms.
548:
are being added during renovations taking place from December 2021 to December 2024. The first portion of the rebuilt station will open on September 30, 2024, with the remaining portion in late 2024 or early 2025.
1656:
1502:
1066:
1090:
1025:
1661:
1189:
1560:
646:
was then chosen as the contractor for final design in June 2012. Funding issues prevented this design work from beginning until 2013. It was later determined that the
630:
and the inner Lowell Line, making stops including Winchester Center. This routing was resumed in April 2021, with the trains no longer making the intermediate stops.
1170:
78:
1614:
45:
341:
337:
263:
259:
1279:
1437:
1423:
619:
service. The MBTA planned to make temporary repairs before the end of the year. Further repairs were made in 2017 to support the platforms and ramps.
1374:
1357:
654:
1510:
1330:
1304:
1145:
1007:
351:
1525:
1454:
1073:
1049:
1468:
1389:
696:
with 56 residential units is planned to replace the MBTA-owned and town-owned surface parking lots on the south side of Waterfield Street.
1097:
606:
1485:
1207:
1130:
1390:"MBTA Construction Services Contract No. J66CN01: Winchester Center Station Accessibility Improvements: Construction Contract Award"
1032:
949:
925:
768:
356:
1600:
1260:
540:
in downtown Winchester, was closed effective January 8, 2021 due to structural deterioration. Winchester Center station was not
477:
438:
395:
1225:
740:
1568:
1542:
1615:"MBTA Advances Nearly 1,000 Units of Housing Through Collaborative Agreements, Including Significant Affordable Housing"
693:
430:
466:
387:
1636:
1583:
1474:. Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. December 6, 2022. pp. 6–7.
1548:. Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. November 27, 2023. p. 7.
571:
1406:
1243:
1174:
529:
420:
66:
1412:. Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. December 2021. p. 7.
610:
One of the ramps to the inbound platform in January 2013, showing water damage to concrete and metal structures
1491:. Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. June 5, 2023. p. 6.
785:
545:
902:
598:
diverged from the main line just north of the Winchester Center platforms. A short stub is still in place.
595:
50:
Construction at Winchester Center station in December 2023, with the 1957-built station structure at right
580:
989:
673:
17:
1503:"Delays hurt, but MBTA hopes to keep Winchester Center Commuter Rail Station project on schedule"
668:
647:
643:
525:
1249:. Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. p. 7.
963:
638:
The MBTA is making renovations to the station which will repair water damage and make it fully
921:
764:
736:
588:
562:
453:
374:
293:
891:
873:
855:
837:
819:
801:
1190:"Winchester Commuter Rail station is falling apart, but MBTA funding is still up in the air"
273:
677:
the rotary, with the possibility of an additional ramp north of the rotary in the future.
942:
714:
664:
627:
623:
364:
278:
151:
1645:
471:
458:
407:
379:
298:
124:
1264:
615:
renovate the station before the 5-year life of the platform patches was reached.
1603:(Press release). Massachusetts Bay Transportation Authority. September 17, 2024.
533:
446:
403:
286:
113:
574:
opened between its namesake cities in 1835; local stops were added soon after.
1631:
1031:. Massachusetts Bay Transportation Authority. November 2, 2020. Archived from
639:
541:
1263:. Massachusetts Bay Transportation Authority. January 7, 2021. Archived from
93:
80:
1443:. Massachusetts Bay Transportation Authority. June 14, 2022. pp. 10–14.
1426:(Press release). Massachusetts Bay Transportation Authority. March 22, 2022.
1358:"Winchester Center Station Demolition Work & Accessibility Improvements"
1584:"Winchester Center Station Accessibility Improvements: Construction Update"
1526:"Winchester Center Station Accessibility Improvements: Construction Update"
1457:(Press release). Massachusetts Bay Transportation Authority. June 30, 2022.
1438:"Winchester Center Station Accessibility Improvements: Construction Update"
1377:(Press release). Massachusetts Bay Transportation Authority. June 11, 2021.
1096:. Massachusetts Bay Transportation Authority. April 5, 2021. Archived from
1072:. Massachusetts Bay Transportation Authority. April 5, 2021. Archived from
1617:(Press release). Massachusetts Bay Transportation Authority. May 17, 2024.
1173:. Massachusetts Bay Transportation Authority. October 2016. Archived from
147:
1455:"MBTA Celebrates Winchester Center Commuter Rail Station Groundbreaking"
918:
A Field Guide to Southern New England Railroad Depots and Freight Houses
579:
the streets to be raised by 17 feet (5.2 m). The B&M installed
537:
1131:"MBTA Winchester Center Station Renovation Project: 15% Design Report"
1331:"MBTA gets demo permit for Winchester Center Commuter Rail Station"
1280:"Winchester Center commuter rail closed due to structural problems"
653:
605:
561:
1213:. Massachusetts Bay Transportation Authority. November 21, 2019.
1055:. Massachusetts Bay Transportation Authority. December 14, 2020.
966:. Massachusetts Bay Transportation Authority. 11 September 2008
1652:
MBTA Commuter Rail stations in Middlesex County, Massachusetts
1601:"MBTA Announces Partial Opening of Winchester Center Station"
1424:"Winchester Center Station Construction Prep Begins March 28"
583:
at the station in 1942 in an effort to reduce parking needs.
1637:
MBTA – Winchester Center Station Accessibility Improvements
642:. The station design was advanced to 15% in December 2011;
898:. October 21, 1953. p. 14 – via Newspapers.com.
862:. November 11, 1915. p. 2 – via Newspapers.com.
1363:. Massachusetts Bay Transportation Authority. p. 28.
880:. January 21, 1942. p. 7 – via Newspapers.com.
1208:"Winchester Center Station Improvements Public Meeting"
826:. March 17, 1903. p. 7 – via Newspapers.com.
808:. March 17, 1906. p. 9 – via Newspapers.com.
844:. June 30, 1915. p. 3 – via Newspapers.com.
1657:
Buildings and structures in Winchester, Massachusetts
1543:"System-Wide Accessibility Initiatives—November 2023"
1469:"System-Wide Accessibility Initiatives—December 2022"
1407:"System-Wide Accessibility Initiatives—December 2021"
1244:"System-Wide Accessibility Initiatives—November 2020"
763:. Boston Street Railway Association. pp. 55–57.
419:
335:
257:
1305:"Winchester Center station project gets green light"
1278:
Ellement, John R.; Sennott, Adam (January 8, 2021).
874:"Bicycle Racks at Winchester for B.& M. Patrons"
759:Humphrey, Thomas J. & Clark, Norton D. (1985).
504:
245:
229:
220:
212:
204:
196:
191:
183:
178:
170:
162:
157:
138:
130:
119:
109:
72:
60:
55:
32:
1486:"System-Wide Accessibility Initiatives—June 2023"
1050:"2020/2021 Reduced Service Schedule: Lowell Line"
943:"Changes to Transit Service in the MBTA district"
892:"Winchester Overpass Cost Boosted to $ 6,000,000"
658:Construction of the new station in September 2022
1375:"Demolition Work Complete at Winchester Station"
1171:"Future Construction Contract Bid Solicitations"
990:"Winchester Center MBTA stop partially closed"
713:Central Transportation Planning Staff (2019).
27:Train station in Winchester, Massachusetts, US
1589:. Massachusetts Bay Transportation Authority.
1531:. Massachusetts Bay Transportation Authority.
1395:. Massachusetts Bay Transportation Authority.
1133:. Massachusetts Bay Transportation Authority.
964:"Agenda for September 11, 2008 Board Meeting"
717:. Massachusetts Bay Transportation Authority.
8:
1124:
1122:
1120:
1118:
1116:
1114:
1112:
1110:
983:
981:
761:Boston's Commuter Rail: The First 150 Years
754:
752:
501:
329:
318:
251:
44:
29:
1662:Former Boston and Maine Railroad stations
566:Circa-1910 postcard of Winchester station
424:
416:
345:
332:
267:
254:
735:. Branch Line Press. pp. 229–231.
705:
622:Until December 2020, a small number of
1242:Brelsford, Laura (November 30, 2020).
733:The Rail Lines of Southern New England
1561:"Winchester MBTA project wrapping up"
1067:"Haverhill Line 2021 Spring Schedule"
726:
724:
544:prior to the closure, but accessible
143:
7:
1509:. September 28, 2023. Archived from
1146:"MBTA commuter rail project ongoing"
1129:Jacobs Engineering (December 2015).
787:The Boston Almanac for the Year 1838
672:ramps, the new 15% design added two
1026:"Lowell Line: Fall/Winter Schedule"
838:"Winchester Grade Crossing Hearing"
1091:"Lowell Line 2021 Spring Schedule"
920:. Branch Line Press. p. 260.
802:"Grade Crossing Hearing Postponed"
25:
18:Winchester station (Massachusetts)
1356:Rae, Nathan (February 23, 2021).
1224:Brelsford, Laura (May 26, 2020).
1144:LaRoche, Ryan (29 January 2016).
950:Boston Street Railway Association
166:237 spaces (town permit required)
1388:Rae, Nathan (October 27, 2021).
1188:Manzhos, Mariya (June 7, 2018).
988:Berkowitz, Bram (15 July 2015).
901:
336:
258:
142:
1524:Rae, Nathan (October 4, 2023).
856:"Exhibit of Work by Winchester"
591:and Winchester Center in 1957.
233:456 (weekday average boardings)
1:
1582:Rae, Nathan (June 25, 2024).
208:January 8, 2021 (temporarily)
1008:"Train station temp repairs"
694:transit oriented development
536:. The station, located on a
200:reopening September 30, 2024
715:"2018 Commuter Rail Counts"
216:December 2021–December 2024
1678:
1226:"SWA Initiatives—May 2020"
731:Karr, Ronald Dale (1995).
667:may be installed to allow
572:Boston and Lowell Railroad
916:Roy, John H. Jr. (2007).
532:, normally served by the
530:Winchester, Massachusetts
522:Winchester Center station
511:
500:
496:
492:
452:
450:
445:
443:
421:Boston and Maine Railroad
373:
368:limited service, pre-2020
317:
313:
309:
250:
241:
237:
225:
67:Winchester, Massachusetts
43:
1632:MBTA – Winchester Center
784:Dickinson, S.N. (1838).
524:is a temporarily closed
1194:Wicked Local Winchester
994:Wicked Local Winchester
114:New Hampshire Main Line
659:
611:
567:
1507:Daily Times Chronicle
1335:Daily Times Chronicle
1309:Daily Times Chronicle
1150:Daily Times Chronicle
1038:on November 30, 2020.
1012:Daily Times Chronicle
657:
609:
565:
1261:"Lowell Line Alerts"
1177:on October 14, 2016.
820:"On Grade Crossings"
546:high-level platforms
447:Boston – Concord, NH
431:Winchester Highlands
1513:on October 2, 2023.
1267:on January 8, 2021.
941:Belcher, Jonathan.
674:redundant elevators
648:mini-high platforms
626:trains ran via the
94:42.4516°N 71.1378°W
90: /
56:General information
1337:. January 26, 2021
1311:. January 12, 2021
1103:on April 23, 2021.
669:CSX Transportation
660:
644:Jacobs Engineering
612:
568:
526:MBTA Commuter Rail
425:Following station
417:Preceding station
346:Following station
333:Preceding station
268:Following station
255:Preceding station
171:Bicycle facilities
64:29 Waterfield Road
1571:on June 21, 2024.
1079:on April 5, 2021.
519:
518:
515:
514:
488:
487:
484:
483:
305:
304:
179:Other information
99:42.4516; -71.1378
36:Winchester Center
16:(Redirected from
1669:
1619:
1618:
1611:
1605:
1604:
1597:
1591:
1590:
1588:
1579:
1573:
1572:
1567:. Archived from
1559:Larouche, Ryan.
1556:
1550:
1549:
1547:
1539:
1533:
1532:
1530:
1521:
1515:
1514:
1499:
1493:
1492:
1490:
1482:
1476:
1475:
1473:
1465:
1459:
1458:
1451:
1445:
1444:
1442:
1434:
1428:
1427:
1420:
1414:
1413:
1411:
1403:
1397:
1396:
1394:
1385:
1379:
1378:
1371:
1365:
1364:
1362:
1353:
1347:
1346:
1344:
1342:
1327:
1321:
1320:
1318:
1316:
1301:
1295:
1294:
1292:
1290:
1275:
1269:
1268:
1257:
1251:
1250:
1248:
1239:
1233:
1232:
1230:
1221:
1215:
1214:
1212:
1204:
1198:
1197:
1185:
1179:
1178:
1167:
1161:
1160:
1158:
1156:
1141:
1135:
1134:
1126:
1105:
1104:
1102:
1095:
1087:
1081:
1080:
1078:
1071:
1063:
1057:
1056:
1054:
1046:
1040:
1039:
1037:
1030:
1022:
1016:
1015:
1014:. July 28, 2017.
1004:
998:
997:
985:
976:
975:
973:
971:
960:
954:
953:
947:
938:
932:
931:
913:
907:
906:
905:
899:
888:
882:
881:
870:
864:
863:
852:
846:
845:
834:
828:
827:
816:
810:
809:
798:
792:
791:
781:
775:
774:
756:
747:
746:
728:
719:
718:
710:
594:Until 1981, the
502:
352:Anderson/​Woburn
340:
330:
319:
262:
252:
146:
145:
105:
104:
102:
101:
100:
95:
91:
88:
87:
86:
83:
48:
30:
21:
1677:
1676:
1672:
1671:
1670:
1668:
1667:
1666:
1642:
1641:
1628:
1623:
1622:
1613:
1612:
1608:
1599:
1598:
1594:
1586:
1581:
1580:
1576:
1558:
1557:
1553:
1545:
1541:
1540:
1536:
1528:
1523:
1522:
1518:
1501:
1500:
1496:
1488:
1484:
1483:
1479:
1471:
1467:
1466:
1462:
1453:
1452:
1448:
1440:
1436:
1435:
1431:
1422:
1421:
1417:
1409:
1405:
1404:
1400:
1392:
1387:
1386:
1382:
1373:
1372:
1368:
1360:
1355:
1354:
1350:
1340:
1338:
1329:
1328:
1324:
1314:
1312:
1303:
1302:
1298:
1288:
1286:
1277:
1276:
1272:
1259:
1258:
1254:
1246:
1241:
1240:
1236:
1231:. pp. 7–8.
1228:
1223:
1222:
1218:
1210:
1206:
1205:
1201:
1187:
1186:
1182:
1169:
1168:
1164:
1154:
1152:
1143:
1142:
1138:
1128:
1127:
1108:
1100:
1093:
1089:
1088:
1084:
1076:
1069:
1065:
1064:
1060:
1052:
1048:
1047:
1043:
1035:
1028:
1024:
1023:
1019:
1006:
1005:
1001:
987:
986:
979:
969:
967:
962:
961:
957:
945:
940:
939:
935:
928:
915:
914:
910:
900:
890:
889:
885:
872:
871:
867:
854:
853:
849:
836:
835:
831:
818:
817:
813:
800:
799:
795:
783:
782:
778:
771:
758:
757:
750:
743:
730:
729:
722:
712:
711:
707:
702:
636:
604:
560:
555:
507:
480:
474:
461:
441:
435:
410:
398:
392:
382:
369:
359:
324:
323:Former services
301:
281:
98:
96:
92:
89:
84:
81:
79:
77:
76:
65:
51:
39:
38:
37:
28:
23:
22:
15:
12:
11:
5:
1675:
1673:
1665:
1664:
1659:
1654:
1644:
1643:
1640:
1639:
1634:
1627:
1626:External links
1624:
1621:
1620:
1606:
1592:
1574:
1565:Middlesex East
1551:
1534:
1516:
1494:
1477:
1460:
1446:
1429:
1415:
1398:
1380:
1366:
1348:
1322:
1296:
1270:
1252:
1234:
1216:
1199:
1180:
1162:
1136:
1106:
1082:
1058:
1041:
1017:
999:
977:
955:
933:
926:
908:
883:
865:
847:
829:
811:
793:
776:
769:
748:
741:
720:
704:
703:
701:
698:
665:gauntlet track
635:
634:Reconstruction
632:
628:Wildcat Branch
624:Haverhill Line
603:
600:
559:
556:
554:
551:
517:
516:
513:
512:
509:
508:
505:
498:
497:
494:
493:
490:
489:
486:
485:
482:
481:
475:
469:
463:
462:
456:
451:
449:
444:
442:
436:
433:
427:
426:
423:
418:
414:
413:
411:
406:
401:
399:
393:
390:
384:
383:
377:
372:
370:
367:
365:Haverhill Line
362:
360:
354:
348:
347:
344:
334:
326:
325:
322:
315:
314:
311:
310:
307:
306:
303:
302:
296:
291:
289:
284:
282:
276:
270:
269:
266:
256:
248:
247:
243:
242:
239:
238:
235:
234:
231:
227:
226:
223:
222:
218:
217:
214:
210:
209:
206:
202:
201:
198:
194:
193:
189:
188:
185:
181:
180:
176:
175:
172:
168:
167:
164:
160:
159:
155:
154:
140:
136:
135:
132:
128:
127:
125:side platforms
121:
117:
116:
111:
107:
106:
74:
70:
69:
62:
58:
57:
53:
52:
49:
41:
40:
35:
34:
33:
26:
24:
14:
13:
10:
9:
6:
4:
3:
2:
1674:
1663:
1660:
1658:
1655:
1653:
1650:
1649:
1647:
1638:
1635:
1633:
1630:
1629:
1625:
1616:
1610:
1607:
1602:
1596:
1593:
1585:
1578:
1575:
1570:
1566:
1562:
1555:
1552:
1544:
1538:
1535:
1527:
1520:
1517:
1512:
1508:
1504:
1498:
1495:
1487:
1481:
1478:
1470:
1464:
1461:
1456:
1450:
1447:
1439:
1433:
1430:
1425:
1419:
1416:
1408:
1402:
1399:
1391:
1384:
1381:
1376:
1370:
1367:
1359:
1352:
1349:
1336:
1332:
1326:
1323:
1310:
1306:
1300:
1297:
1285:
1281:
1274:
1271:
1266:
1262:
1256:
1253:
1245:
1238:
1235:
1227:
1220:
1217:
1209:
1203:
1200:
1195:
1191:
1184:
1181:
1176:
1172:
1166:
1163:
1151:
1147:
1140:
1137:
1132:
1125:
1123:
1121:
1119:
1117:
1115:
1113:
1111:
1107:
1099:
1092:
1086:
1083:
1075:
1068:
1062:
1059:
1051:
1045:
1042:
1034:
1027:
1021:
1018:
1013:
1009:
1003:
1000:
995:
991:
984:
982:
978:
965:
959:
956:
951:
944:
937:
934:
929:
927:9780942147087
923:
919:
912:
909:
904:
897:
893:
887:
884:
879:
875:
869:
866:
861:
857:
851:
848:
843:
839:
833:
830:
825:
821:
815:
812:
807:
803:
797:
794:
790:. p. 49.
789:
788:
780:
777:
772:
770:9780685412947
766:
762:
755:
753:
749:
744:
738:
734:
727:
725:
721:
716:
709:
706:
699:
697:
695:
690:
686:
682:
678:
675:
670:
666:
656:
652:
649:
645:
641:
633:
631:
629:
625:
620:
616:
608:
601:
599:
597:
596:Woburn Branch
592:
590:
584:
582:
577:
573:
564:
558:Early history
557:
552:
550:
547:
543:
539:
535:
531:
527:
523:
510:
503:
499:
495:
491:
479:
473:
468:
465:
464:
460:
455:
448:
440:
432:
429:
428:
422:
415:
412:
409:
408:Woburn Branch
405:
402:
400:
397:
389:
386:
385:
381:
380:North Station
376:
371:
366:
363:
361:
358:
353:
350:
349:
343:
339:
331:
328:
327:
321:
320:
316:
312:
308:
300:
299:North Station
295:
292:
290:
288:
285:
283:
280:
275:
272:
271:
265:
261:
253:
249:
244:
240:
236:
232:
228:
224:
219:
215:
211:
207:
203:
199:
195:
190:
186:
182:
177:
173:
169:
165:
161:
156:
153:
149:
141:
137:
133:
129:
126:
122:
118:
115:
112:
108:
103:
75:
71:
68:
63:
59:
54:
47:
42:
31:
19:
1609:
1595:
1577:
1569:the original
1564:
1554:
1537:
1519:
1511:the original
1506:
1497:
1480:
1463:
1449:
1432:
1418:
1401:
1383:
1369:
1351:
1339:. Retrieved
1334:
1325:
1313:. Retrieved
1308:
1299:
1287:. Retrieved
1284:Boston Globe
1283:
1273:
1265:the original
1255:
1237:
1219:
1202:
1193:
1183:
1175:the original
1165:
1153:. Retrieved
1149:
1139:
1098:the original
1085:
1074:the original
1061:
1044:
1033:the original
1020:
1011:
1002:
993:
968:. Retrieved
958:
936:
917:
911:
896:Boston Globe
895:
886:
878:Boston Globe
877:
868:
860:Boston Globe
859:
850:
842:Boston Globe
841:
832:
824:Boston Globe
823:
814:
806:Boston Globe
805:
796:
786:
779:
760:
732:
708:
692:As of 2024,
691:
687:
683:
679:
661:
637:
621:
617:
613:
593:
585:
576:Woburn Gates
575:
569:
521:
520:
467:Cross Street
434:via mainline
388:Cross Street
158:Construction
1341:February 3,
1315:January 13,
1155:24 February
602:Repair work
534:Lowell Line
528:station in
478:Concord, NH
472:Woburn Loop
439:Concord, NH
404:Lowell Line
391:closed 1981
287:Lowell Line
139:Connections
97: /
73:Coordinates
1646:Categories
1289:January 9,
742:0942147022
700:References
640:accessible
581:bike racks
542:accessible
221:Passengers
85:71°08′16″W
82:42°27′06″N
589:Wedgemere
454:Wedgemere
375:Wedgemere
357:Haverhill
294:Wedgemere
184:Fare zone
174:27 spaces
120:Platforms
970:3 August
506:Location
274:Mishawum
246:Services
148:MBTA bus
61:Location
553:History
538:viaduct
476:toward
457:toward
437:toward
394:toward
378:toward
355:toward
297:toward
277:toward
213:Rebuilt
197:Opening
192:History
163:Parking
110:Line(s)
924:
767:
739:
459:Boston
396:Woburn
279:Lowell
205:Closed
131:Tracks
1587:(PDF)
1546:(PDF)
1529:(PDF)
1489:(PDF)
1472:(PDF)
1441:(PDF)
1410:(PDF)
1393:(PDF)
1361:(PDF)
1247:(PDF)
1229:(PDF)
1211:(PDF)
1101:(PDF)
1094:(PDF)
1077:(PDF)
1070:(PDF)
1053:(PDF)
1036:(PDF)
1029:(PDF)
946:(PDF)
1343:2021
1317:2021
1291:2021
1157:2016
972:2008
922:ISBN
765:ISBN
737:ISBN
570:The
470:via
342:MBTA
264:MBTA
230:2018
152:134
1648::
1563:.
1505:.
1333:.
1307:.
1282:.
1192:.
1148:.
1109:^
1010:.
992:.
980:^
948:.
894:.
876:.
858:.
840:.
822:.
804:.
751:^
723:^
150::
123:2
1345:.
1319:.
1293:.
1196:.
1159:.
996:.
974:.
952:.
930:.
773:.
745:.
187:1
134:2
20:)
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.