571: 687:(STUK) granted a licence for the Olkiluoto 3 reactor to increase its power output to more than 60 percent to a full 4,300 MW of thermal capacity. On 30 September 2022, the reactor achieved its design output power. In October 2022, damage was discovered in the feedwater pumps and unit 3 was shut down for an investigation, delaying the end of commissioning testing. On 28 October, it was announced that cracks a few centimetres long had been found in all four of the feedwater pump impellers. The feedwater pumps are larger than in other nuclear reactors. In January 2023, it was announced that new more robust impellers will be installed in all four feedwater pumps, and test operation at full power should restart in February. 42: 723:, the Finnish nuclear safety regulator. The first problems that surfaced were irregularities in the foundation concrete, and caused a delay of months. Later, it was found that subcontractors had provided heavy forgings that were not up to project standards and which had to be re-cast. An apparent problem constructing the reactor's unique double-containment structure also caused delays, as the welders had not been given proper instructions. 1324: 4740: 4752: 1441: 4764: 4687: 1363: 582: 3427:
TVO's current capital expenditure assumptions and the effect of the settlement agreement estimates its total investment to be around € 5.5 billion (US$ 6.42 billion); on top of this AREVA had losses of € 5.5 billion, for a total of € 11 billion (US$ 12.4 billion) compared with the initial estimate
827:
between 87.2% and 96%. OL3 is expected to produce an additional 12,000–13,000 GWh annually. Even taking into account all OL3 construction delays the long-term target for operational production cost (not including investments and subsidies) for all three plants is 33 €/MWh. Production cost for the OL3
819:
announced that Areva and TVO had reached an agreement. A day later, TVO confirmed that Areva would pay it €450 million in compensation over the delays and lost income. The agreement would settle all legal actions between the two companies. With the settlement, TVO disclosed its total investment to be
755:
Areva was not used to STUK's regulatory approach with an early focus on the quality of structures and components. Manufacturing information and a quality control plan must be approved by both the licensee and STUK before manufacturing of the most important components is allowed to start. Inspections
699:
The first licence application for the third unit was made in December 2000 and the date of the unit's entry into service was estimated to be 2010. However, since the start of construction, several delays to the schedule have been announced. In July 2012, TVO announced that the unit would not go into
553:
In 2017, unit 2 was upgraded and modernized, increasing the output further to 890 MW from the beginning of 2018. A similar upgrade to unit 1 was performed in 2018. The extended maintenance was also made to prepare for a license renewal application. The license extension was granted in September
707:
In February 2014, TVO said that it could not give an estimate of the plant's startup date because it was still waiting for the Areva-Siemens consortium to provide it with an updated overall schedule for the project." Later the same month it was reported that Areva was shutting down construction due
549:
The original power of the reactors was 660 MW. They were uprated to 710 MW in 1983–1984, to 840 MW in 1995–1998, and further to 860 MW in 2005–2006. Major upgrades were carried out to the units in 2010 and 2011, including replacement of turbines and generators, isolation valves,
1331:
On 14 February 2008, TVO submitted an environmental impact assessment of unit four to the Ministry of Employment and Economy. On 21 April 2010, the government of Finland decided to grant a decision-in-principle to Teollisuuden Voima for the fourth reactor in Olkiluoto. The decision was approved by
715:
In July 2019, TVO announced that regular electricity generation is expected to start in July 2020. The delay was caused by slower than expected modification works. In August 2020, TVO announced that regular electricity generation was delayed to February 2022 due to slow progress in system testing,
1558:
Finnish power company Teollisuuden Voima (TVO) operates and owns two nuclear power stations on the island of Olkiluoto which supply about one-sixth of Finland's energy consumption and represent about 22% of all power generated in the country. This year, TVO is about to open its third plant on the
690:
The plant started regular electricity production on 16 April 2023 after test production and commercial operation on 1 May 2023. Unusual for nuclear reactors in Scandinavia, OL3 reduced production in May 2023 due to negative market prices during the spring thaw when hydropower was unable to absorb
1314:
The first annual maintenance outage started on 2 March 2024, and was expected to take 37 days. The outage was delayed from the original plan due to the shutdown process and inspections of the fuel elements taking longer than expected, and technical problems identified during the maintenance. The
679:
occurred on 14 January 2022, delaying connection to the national grid to February 2022. The electricity production of Olkiluoto's third nuclear power plant unit started on Saturday, 12 March 2022, at 12.01 p.m. In May 2022, foreign material detached from the steam guide plates was found in the
1452:
An incident occurred at unit 2 on 10 December 2020 at 12:22. Because of valve repair work, excessively hot water flowed to the reactor water clean-up system filters. The hot water dissolved materials from the filters. When the clean-up system was restarted, the dissolved materials flowed to the
856:
The construction workforce includes about 3,800 employees from 500 companies. 80% of the workers are foreigners, mostly from eastern European countries. In 2012 it was reported that one Bulgarian contracting firm is owned by the mafia, and that Bulgarian workers have been required to pay weekly
804:
The main contractor, Areva, is building the unit for a fixed price of €3 billion, so in principle, any construction costs above that price fall on Areva. In July 2012, those overruns were estimated at more than €2 billion, and in December 2012, Areva estimated that the full cost of building the
1472:
On 3 June 2024 at 11:41, electricity production of unit 3 was briefly interrupted due to a turbine malfunction. An immediate investigation found the cause to be a failure in the differential pressure measurement of the generator's sealing oil and hydrogen coolant. The unit returned to normal
751:
The project started very slowly because Areva was not adequately prepared. When the construction permit was given in 2005, parts of the detailed design were not yet available. Areva did not recognize how much additional work was needed to complete it. The construction started to proceed in a
546:. Unit 1 was constructed by Atomirakennus and unit 2 by Jukola and Työyhtymä. Unit 1 achieved its initial criticality in July 1978 and it started commercial operations in October 1979. Unit 2 achieved its initial criticality in October 1979 and it started commercial operations in July 1982. 840:
wrote, "Olkiluoto has become an example of all that can go wrong in economic terms with new reactors," and that Areva and the TVO "are in bitter dispute over who will bear the cost overruns and there is a real risk now that the utility will default." The project has also been criticized by
700:
service before 2015, five years after the original estimate. In a statement, the operator said it was "not pleased with the situation" although solutions to various problems were being found and work was "progressing", and that it was waiting for a new launch date from Areva and Siemens.
513:
type reactor (unit 3) with a capacity of 1,600 MW. This makes unit 3 currently the most powerful nuclear power plant unit in Europe and the third most powerful globally. Construction of unit 3 began in 2005. Commercial operation, originally scheduled for May 2009, began on 1 May 2023.
663:, the construction phase of the project would create a total of about 30,000 person-years of employment directly and indirectly; that the highest number of on-site employees has been almost 4,400; and that the operation phase would create 150 to 200 permanent jobs. A 90 MW 2133: 2667: 1448:
In April 2014, a turbine steam condenser of unit 1 had a small seawater leak, at a rate of two litres per hour. According to the operator, the leak forced to limit the plant output down to 300 MW, but was not serious and was to be repaired in a day.
703:
At the end of 2013, TVO said that the Areva-Siemens consortium plans to reduce workers and subcontractors on the construction site and says that it expects the contractor to provide details about the expected impact on the project's schedule.
730:
that it was difficult to deliver nuclear power plant projects on schedule because builders were not used to working to the exacting standards required on nuclear construction sites, since so few new reactors had been built in recent years.
1461:, closed containment isolation valves, and started the containment spray system. The operators followed procedures and declared a site area emergency at 12:32. The event caused a full-scale emergency response at the power plant and at the 2438: 4611: 4316: 796:. However, as of 2019, the construction of the EPR in France is ten years behind schedule. Taishan 1 in China became the first EPR to start power generation on 29 June 2018, and the second one (Taishan 2) came online in 2019. 2529: 542:. The units' architecture was designed by ASEA-Atom. The reactor pressure vessels were constructed by Uddcomb Sweden AB, and reactor internal parts, mechanical components by Finnatom. The electrical equipment was supplied by 674:
asking permission to start up Unit 3 and to move forward with initial testing of the unit. This was granted on 16 December 2021. First criticality of the OL3 EPR plant unit was reached on 21 December 2021. An unplanned
3927: 1242:
Turbine refurbishment takes longer than expected, causing another delay of at least three months. Reactor start expected in January 2022, production of electricity in February 2022 and commercial production in June 2022.
812:
In October 2013, TVO's demand for compensation from Areva had risen to €1.8 billion, and Areva's from TVO to €2.6 billion. In December 2013, Areva increased its demand to €2.7 billion. On 10 March 2018 French newspaper
517:
A decision-in-principle for a fourth reactor to be built at the site was granted by the Finnish parliament in July 2010, but in June 2015 TVO decided that it would not apply for a construction license for Olkiluoto 4.
4371: 3695: 2611: 4637: 1457:. This caused the radiation levels in the steam line to momentarily rise to 3–4 times higher than normal. The increase of the radiation level activated safety systems, which operated as planned and triggered reactor 561:
program, published in January 2024, investigates options to extend the lifetime by 10 or 20 years at the current power or uprating to 970 MW (in 2028 at the earliest) in addition to the 10 or 20-year extension.
1065:
Areva announced it expected construction completion and commissioning to start in mid-2016, with operation expected to start in 2018. TVO stated they were surprised that commissioning was expected to take so long.
615:
Construction started in 2005, and the start of commercial operation was planned for 2010. This has been pushed back several times only starting regular production in 2023, 18 years after the start of construction.
648:. However, in 2009, Siemens sold its one-third share of Areva NP to Areva, which became the main contractor. Siemens remained on the project as the subcontractor with the main responsibility for constructing the 2752: 2784: 2659: 4799: 4581: 852:
which would pave the way for a new wave of identical reactors across Europe that were safe, affordable, and delivered on time. The delays and cost overruns have had knock-on effects in other countries.
1354:
In June 2015, TVO decided not to apply for a construction permit for the Olkiluoto 4 unit because of delays with unit 3, however saying they are prepared to file for a new decision-in-principle later.
1351:
stated that the rejection didn't spell the end for the OL4 project, and that TVO would have the opportunity to apply for a construction license before the decision-in-principle expires in June 2015.
4122: 3958: 4794: 2430: 4603: 3539: 4312: 4152: 1584: 4456: 2274: 1553: 1444:
A sign near the Olkiluoto nuclear power plant says: "NUCLEAR POWER PLANT AREA. Moving and staying in the area without a proper permit is prohibited under threat of a fine. (Police Act § 52)"
745:
was responsible for the construction management. Many experienced subcontractors had left the business, and Areva had to find new subcontractors and to coach them in nuclear manufacturing.
3871: 2134:"The Environmental Impact Assessment (EIA) program for the possible extension of the operational lifespan and power increase of Olkiluoto 1 and Olkiluoto 2 plant units has been completed" 777:
Construction of the turbine succeeded better under the responsibility of Siemens. Installations of the main turbine equipment were completed about one year behind the original schedule.
4238: 4290: 3661: 2827: 2519: 845:
because "instructions have not been observed in the welding of pipes and the supervision of welding." STUK has also noted that there have been delays in submitting proper paperwork.
632:
to construct a new nuclear reactor, making Finland the first Western European country in 15 years to order one. The construction of the unit began in 2005. Olkiluoto 3 was the first
4804: 4705:
European Pressurised Reactor at Olkiluoto 3, Finland – Brief Interim Review of the Porosity and Durability Properties of the In Situ Cast Concrete at the Olkiluoto EPR Construction
2217: 3292: 3919: 3643: 3569: 1343:
In September 2014, with unit 3 still unfinished, the Finnish government rejected TVO's request for time extension of the unit 4 decision-in-principle. Economic Affairs Minister
3348: 2333: 805:
reactor would be about €8.5 billion, well over the previous estimate of €6.4 billion. Because of the delays, TVO and Areva both sought compensation from each other through the
3048: 4508: 4367: 3691: 3599: 2607: 4633: 1682: 4096: 2585: 2248: 1939: 1909: 759:
The large size of the reactor and the application of new technologies brought major challenges. Some manufacturing technologies had not been used before. For instance, new
4809: 3141: 3751: 2308: 4018: 3233: 3781: 4264: 4070: 2744: 2637: 4659: 4548: 2774: 2693: 1412:, which heats the cooling water (at 13 °C) is utilized for small-scale agriculture before being pumped back to the sea. The power plant hosts the northernmost 748:
The original schedule, four years from construction start to grid connection, was too ambitious for a first-of-a-kind plant that is larger than any earlier reactor.
738:
Many nuclear power plants were constructed in Europe in the 1970s and 1980s. After that there was a long break in the construction, and experienced experts retired.
4819: 4426: 2925: 2719: 2497: 4573: 2951: 3322: 2471: 1757: 1384:
for the final disposal of spent nuclear fuel, the first such repository in the world. It is currently under construction at the Olkiluoto plant by the company
3174: 2374: 4486: 4118: 3950: 531: 4703: 3200: 3111: 1977: 1057:
Areva shutting down construction due to dispute over compensations and unfinished automation planning. Operation estimated to be delayed until 2018–2020.
4784: 1559:
island, Olkiluoto 3 (OL3), which will have a nameplate capacity of 1,600MWe and will be capable of meeting about 14% of the country's electricity demand.
3841: 3531: 570: 4144: 1576: 557:
In 2023, TVO announced it is considering seeking another license extension of at least 10 years and a power uprate of 80 MW to 970 MW. The
4448: 1469:, which means that it was an exceptional event with no safety significance. The reactor was restarted on 19 December, nine days after the incident. 2270: 1545: 93: 4789: 3465: 3863: 3811: 4691: 4607: 3621: 1462: 684: 671: 427: 4230: 1845: 1041:
Areva estimates that the full cost of building the reactor will be about €8.5 billion, or almost three times the delivery price of €3 billion
2865: 1347:
referred to the long delay of the 3rd reactor and to unsatisfactory assurances by TVO that the 4th unit would ever be built. Nevertheless PM
820:
around €5.5 billion. Areva had accumulated losses of €5.5 billion. The total cost of the project, therefore, is estimated to be €11 billion.
4286: 3411: 1465:. There was no radioactive release to the environment, and the workers were not exposed to radiation. The event was categorized as 0 on the 1218:
Areva announces new schedule: fuel loading in March 2021, connection to power grid in October 2021, commercial production in February 2022.
4182: 3669: 3494: 2831: 1519: 1371: 3490: 1881: 4714: 4512: 2209: 828:
reactor alone is estimated at 49 €/MWh, as OL1-2 had a production cost of app. 18 €/MWh during 2016-2020, prior to OL3 entering service.
3284: 1943: 1913: 1488: 741:
Areva did not have experience in construction of nuclear power plants. In all the earlier projects in which Areva supplied the reactor,
3717: 3561: 4604:"The unit 2 at Olkiluoto will be shut down to a cold state so that the cause of the fault can be determined – the situation is stable" 806: 3344: 2341: 1635: 719:
The delays have been due to various problems with planning, supervision, and workmanship, and have been the subject of an inquiry by
3040: 1611: 1466: 861:, wages have been unpaid, employees have been told not to join a union and that employers also reneged on social security payments. 3591: 41: 4092: 2887: 2581: 2244: 2107: 3743: 2297: 1483: 781: 558: 3225: 1999: 550:
electrical switchgear and seawater pumps. The upgrades increased the net electrical output by 20 MW to 880 MW each.
3773: 3512: 1947: 1917: 1790: 1074:
The operational automation systems began to be delivered and installed. Commercial operation is estimated for December 2018.
4260: 4066: 3440: 3133: 2187: 2633: 1251:
TVO applied for and was granted permission for startup, with production of electricity revised to start late January 2022.
4010: 3639: 1493: 664: 535: 4730: 4540: 2689: 1712: 1279:
Foreign material found in the turbine steam reheater, and the plant was shut down for about three months of repair work.
4393: 1049:
TVO said that it is "preparing for the possibility" that the third unit at Olkiluoto may not start operating until 2016
4418: 2917: 2715: 2493: 1186:
TVO indicated that the January 2020 deadline for production is expected to be pushed back by two months due to delays.
3441:"Finnish Nuclear Producer Teollisuuden Voima Upgraded To 'BBB-' From 'BB+' On OL3 Plant Commissioning; Outlook Stable" 789: 605: 475: 2955: 742: 653: 3314: 1749: 2463: 1381: 837: 3166: 2660:"TVO – The investigation is still ongoing regarding the damages in the internals of Olkiluoto 3's feedwater pumps" 2366: 4768: 4422: 4014: 3777: 3747: 3044: 2921: 2370: 2213: 1753: 1333: 597: 252: 4478: 4342: 4208: 3196: 3103: 1969: 1505: 3013: 1210:
Areva announces new schedule: connection to power grid in November 2020, commercial production in March 2021.
3833: 3625: 2396: 4716:
Reactor at Olkiluoto 3, Finland – Review of the Finnish Radiation Nuclear Safety Authority (STUK) Assessment
4707:
Reactor at Olkiluoto 3, Finland – Review of the Finnish Radiation Nuclear Safety Authority (STUK) Assessment
3345:"Le Monde: Areva to pay hundreds of millions in compensation for delayed OL3 Nuclear Power Plant in Finland" 3262: 2857: 2828:"Licensing of Olkiluoto 3: Preliminary safety assessment on the application for a fifth nuclear power plant" 2559: 609: 1102:
to take financial responsibility for the completion of the project because its project partner, the French
3897: 3381: 2984: 2085: 2055: 1655: 1327:
Final disposal capsule for waste nuclear fuel as shown at the Olkiluoto Nuclear Power Plant Visitor Centre
849: 770:
and some reactor internal parts, had to be re-manufactured once or twice to achieve the specified quality.
594: 4044: 3988: 2159: 1819: 1337: 716:
technical problems found in the testing, and delivery time of spare parts to replace faulty components.
633: 590: 527: 510: 502: 369: 256: 247: 166: 3665: 842: 720: 1170:
STUK issued a statement stating that the power plant is safe and can be granted an operating license.
3803: 2304: 2172:
The OL3 reactor pressure vessel was manufactured at Japan Steel Works and Mitsubishi Heavy Industries
2029: 1511: 1409: 1260: 4313:"Fuel loading at OL3, a historical event in many respects, successfully brought to finishing line!" 3010:"Olkiluoto kolmoselle viimein aikataulu: säännöllinen sähköntuotanto alkaa helmikuussa vuonna 2022" 1841: 1500: 1421: 543: 471: 3981:"Plant supplier informs that regular electricity production of Olkiluoto 3 EPR starts in May 2019" 1162:
The completion is delayed to January 2020 due to commissioning tests taking longer than expected.
4722: 4577: 3404: 3377: 2524: 2404: 2081: 1877: 1580: 1454: 1393: 734:
In 2010, Jukka Laaksonen, Director General of STUK at that time, analyzed reasons for the delay:
660: 636:
to have begun construction. At the start of construction, the main contractor was Areva NP (now
629: 625: 479: 376: 215: 204: 4511:[The truth about the grapes at Olkiluoto] (in Finnish). 13 February 2013. Archived from 4174: 4119:"Radiation and Nuclear Safety Authority (STUK): Operating licence can be granted to Olkiluoto 3" 4205:"Olkiluodon uudessa ydinvoimalassa jälleen viivästys: Projekti arviolta kuusi viikkoa myöhässä" 3498: 3374:"TVO confirms a settlement agreement signed on OL3 EPR project completion and related disputes" 1870: 958:
Siemens withdraws from the joint venture with Areva, leaving the latter as the main contractor
4814: 3565: 3229: 3074: 2337: 2026:"Olkiluodon ydinvoimalaitoksella modernisointeja, tehonkorotuksia ja tasaista sähköntuotantoa" 652:. Areva later sold its majority stake in Framatome, its nuclear reactor and fuel business, to 601: 3894:"TVO submits OL3 Operating License application to the Ministry of Employment and the Economy" 2298:"The World Nuclear Industry Status Report 2010–2011: Nuclear Power in a Post-Fukushima World" 3258: 459: 451: 680:
turbine steam reheater, and the plant was shut down for about three months of repair work.
2861: 1639: 1632: 1615: 1348: 1014: 824: 773:
TVO's key persons did not have experience from management of a large construction project.
483: 389: 283: 4145:"The Government granted an operating licence to the nuclear power plant unit Olkiluoto 3" 2078:"Finnish Government approves extension of operating licences for OL1 and OL2 plant units" 2003: 1608: 1154:
The completion is delayed to September 2019 due to delays in the hot functional testing.
823:
Between 2013 and 2017 OL1 and OL2 produced between 13,385 GWh and 14,740 GWh per year at
726:
In 2009, Petteri Tiippana, the director of STUK's nuclear power plant division, told the
1546:"Hitachi ABB Power Grids to deploy 90MW battery storage system at Finnish nuclear plant" 1138:
TVO and Areva come to agreement on delays. Areva will pay €450 million in compensation.
4744: 3721: 3535: 2895: 2779: 1344: 491: 399: 4778: 4756: 780:
After the construction of the unit started in 2005, Areva began constructing EPRs in
574: 1323: 763:
techniques were used in the reactor pressure vessel. Many large components, such as
1782: 708:
to the dispute over compensations and unfinished automation planning. According to
649: 3864:"TVO innoissaan: Olkiluodon kolmosreaktorissa alettu testata tärkeää järjestelmää" 3516: 4339:"Olkiluoto kolmonen viivästyy taas – turbiinin huolto kestää odotettua pidempään" 2195: 1473:
production on the following night. The incident had no impact on nuclear safety.
1652:"Olkiluoto 3 starts full electricity production a day early – but 14 years late" 764: 709: 4287:"STUK: The third nuclear reactor of Olkiluoto received the fuel loading permit" 3647: 1440: 1315:
outage lasted 74 days, and the plant resumed electricity production on 16 May.
886:
TVO applies to the Finnish cabinet for a decision-in-principle on the new unit
3953:[Nuclear power: How Siemens could become a nuclear enterprise again]. 2608:"Olkiluoto 3:n syöttövesipumppujen sisäosien vaurioiden selvitystyöt jatkuvat" 2520:"The start of OL3 EPR's regular electricity production postponed to September" 1720: 1405: 539: 3692:"Tekniikka & Talous: Siemens voi päästä irti Olkiluodon korvausvastuista" 108: 95: 4751: 2271:"14 years late, Finland's new reactor, Olkiluoto 3, starts generating power" 1620: 637: 366: 81: 3285:"Olkiluoto-kiista kovenee: Areva nosti korvausvaatimuksensa 2,6 miljardiin" 4686: 1332:
the parliament on 1 July 2010. If constructed, the fourth unit would be a
4634:"The Olkiluoto 2 plant unit was reconnected to the Finnish national grid" 4449:"Stubb: Nuclear reactor project still possible despite cabinet rejection" 2807:"Finnish nuclear plant throttles production as electricity price plunges" 2555: 1683:"TVO confirms acceptance of Olkiluoto 3 EPR and start of warranty period" 1515:, a 2010 documentary about the construction of a Finnish waste depository 1425: 1413: 815: 506: 487: 382: 77: 17: 3532:"Finnish plant demonstrates nuclear power industry's perennial problems" 1025:
installation of heavy components of the primary cooling system complete
436: 2891: 2552:"Long-delayed nuclear reactor approved to exceed 60% energy production" 1716: 1416:
in the world, a 0.1 ha experimental plot that yields 850 kg Zilga
1099: 767: 760: 670:
On 8 December 2021, the company submitted its application to Finland's
645: 467: 67: 490:
in western Finland, about 20 kilometres (12 mi) from the town of
4368:"The Olkiluoto 3 EPR plant unit's electricity production has started" 3592:"Paper: Workers at Olkiluoto forced to pay protection money to mafia" 1429: 1417: 1389: 1385: 1090:
TVO submits operating license application to the Finnish government
785: 530:, each producing 890 MW of electricity. The main contractor was 4660:"TVO - Electricity production at Olkiluoto 3 will resume next night" 4338: 4204: 3951:"Kernenergie: Wie Siemens doch wieder zum Atomkonzern werden könnte" 3009: 1362: 1178:
The Finnish Government granted an operating license to the reactor.
1006:
installation of the reactor pressure vessel in the reactor building
4526: 2002:. Nuclear Engineering International. 9 January 2012. Archived from 417: 4231:"Olkiluoto 3 nuke delayed yet again, now 12 years behind schedule" 4175:"UPDATE 2-Fresh setback for Finland's delayed Olkiluoto 3 reactor" 2408: 2191: 1458: 1439: 1361: 1322: 1103: 858: 793: 676: 641: 580: 569: 273: 2551: 934:
lifting and installation of the bottom part of containment liner
3515:. Nuclear Engineering International. 11 May 2009. Archived from 2464:"STUK has granted permission to start the OL3 reactor – stuk-en" 2052:"The third best production year ever for Olkiluoto 2 plant unit" 1523:, a 2013 documentary about the urgent need for safe depositories 495: 360: 268: 3893: 3373: 2980: 2806: 2077: 2051: 1651: 1033:
delay in start of production to no earlier than 2015 announced
482:(TVO), and is located on Olkiluoto Island, on the shore of the 4544: 4482: 4452: 4067:"Olkiluoto EPR prepares for fuel loading – World Nuclear News" 4040: 3980: 3867: 3837: 3807: 3595: 3562:"TVO: Arevalta vaadittu suomalaisten sopimusten noudattamista" 3318: 3288: 3078: 2981:"OL3 EPR's regular electricity generation starts in July 2020" 2811: 2155: 1815: 1786: 727: 581: 3718:"Lauvergeon Leaves Areva on 'Good' Track-Record, Besson Says" 2775:"Olkiluoto's third unit started regular production on Sunday" 4698: 3949:
Kläsgen, Michael; Büschemann, Karl-Heinz (25 October 2016).
1295:
The plant began regular electricity production at 02:00 AM.
1234:
Finished loading of all 241 fuel assemblies to the reactor.
910:
TVO submits construction application to the Finnish cabinet
870:
Main milestones of the project and other surrounding events
4541:"Fault at Olkiluoto: Seawater leaks into nuclear condenser" 2745:"Regular electricity production has started at Olkiluoto 3" 1114:
The completion is delayed to May 2019 as announced by TVO.
4574:"More information on the plant disturbance at Olkiluoto 2" 3259:"Areva Again Raises Estimate of Cost of Olkiluoto Reactor" 3134:"EDF warns of added costs of Flamanville EPR weld repairs" 2296:
Schneider, Mycle; Froggatt, Antony; Thomas, Steve (2011).
2025: 942:
reactor building containment liner rises to level +12.5 m
918:
the Finnish cabinet approves the construction application
902:
the Finnish parliament approves the decision-in-principle
3410:. Paris, Budapest: A Mycle Schneider Consulting Project. 2945: 2943: 1816:"TVO will not now apply for construction license for OL4" 1677: 1675: 1673: 2739: 2737: 2582:"Feedwater pump damage delays Finnish EPR commissioning" 2245:"Olkiluoto 3 test production to continue until December" 4800:
Nuclear power stations using pressurized water reactors
3403:
Schneider, Mycle; Froggatt, Antony (1 September 2019).
3226:"Suomenkin uusi ydinvoimala maksaa 8,5 miljardia euroa" 1871:"Nuclear power plant units Olkiluoto 1 and Olkiluoto 2" 1202:
Further delays: updated schedule expected in December.
1194:
Areva delays another 4 months to startup in July 2020.
966:
reactor pressure vessel and vessel head arrive on site
3315:"Claim for Olkiluoto 3 delays explodes to 2.7 billion" 3075:"New UK nuclear stations unlikely to be ready on time" 2718:. Nuclear Engineering International. 25 January 2023. 2692:. Nuclear Engineering International. 1 November 2022. 2210:"Olkiluoto 3 begins instrumentation and control tests" 1082:
Testing of the operational automation systems begins.
494:
and about 50 kilometres (31 mi) from the city of
4728: 3644:
Ministry of Economic Affairs and Employment (Finland)
2888:"Areva-Siemens to cut staff at Olkiluoto 3 site -TVO" 2334:"Siemens to give up nuclear joint venture with Areva" 712:, the estimated opening was delayed until 2018–2020. 3041:"Olkiluoto pipe welding 'deficient', says regulator" 2108:"TVO eyes extended, expanded use of Olkiluoto units" 1706: 1704: 1106:
Group, is being broken up by the French government.
848:
Olkiluoto 3 was supposed to be the first reactor of
554:
2018 and allows the reactors to operate until 2038.
4795:
Nuclear power stations using boiling water reactors
2182: 2180: 1783:"Finland's Olkiluoto 3 nuclear plant delayed again" 1609:
Europe's biggest nuclear reactor reaches full power
1420:annually. Another use is a pond for growing crabs, 756:
with hold points are made during the manufacturing.
423: 413: 408: 398: 388: 375: 318: 289: 279: 263: 242: 234: 229: 221: 211: 200: 165: 132: 124: 87: 73: 63: 55: 34: 4479:"TVO ei aio hakea rakentamislupaa Olkiluoto 4:lle" 4413: 4411: 4362: 4360: 3920:"How Siemens could become a nuclear company again" 2156:"OL3 Reactor Pressure Vessel Arrived in Olkiluoto" 1713:"Finnish parliament agrees plans for two reactors" 974:main control room lifting in Safeguard Building 2 4699:Radiation and Nuclear Safety Authority in Finland 3368: 3366: 3253: 3251: 3068: 3066: 3035: 3033: 3031: 2361: 2359: 1865: 1863: 1810: 1808: 1271:Electricity production started on 12 March 2022. 1226:STUK grants fuel loading permit for the reactor. 3834:"Projektijohtaja: OL3 aikataulu TVO:n hanskassa" 3491:"The Myth of the European "Nuclear Renaissance"" 3220: 3218: 2851: 2849: 2431:"TVO Requests Permission To Fire Up Olkiluoto 3" 1777: 1775: 1744: 1742: 1740: 1738: 1571: 1569: 1567: 4568: 4566: 4261:"Further delay in commissioning of Finnish EPR" 3405:"The World Nuclear Industry Status Report 2019" 2239: 2237: 2235: 1633:EPR development. An evolutionary design process 1340:with a power output of 1,000 to 1,800 MW. 4093:"Start-up of Finnish EPR put back four months" 2634:"Cracks found in all four OL3 feedwater pumps" 1577:"Olkiluoto 3 at full power for the first time" 1287:The reactor achieved its design output power. 4805:Nuclear power stations with proposed reactors 3428:cost in 2003 of "around € 3 billion". (p. 66) 2858:"Areva's atomic reactor faces further delays" 1904: 1902: 1388:, owned by the nuclear power plant operators 894:decision-in-principle by the Finnish cabinet 8: 3744:"TVO prepares for further Olkiluoto 3 delay" 3466:"TVO Credit Investor Presentation June-2021" 982:polar crane installation, dome installation 4149:Ministry of Economic Affairs and Employment 4011:"Hot functional tests begin at Finnish EPR" 3097: 3095: 3004: 3002: 1604: 1602: 4041:"Fuel for Olkiluoto 3 EPR is in Olkiluoto" 2690:"Investigation of damage continues at OL3" 2494:"Grid connection of Finnish EPR postponed" 600:. It has a nameplate capacity of 1600 MW. 577:visit to Olkiluoto NPP on 26 November 2020 31: 4810:Nuclear power stations using EPR reactors 3774:"Olkiluoto 3 startup pushed back to 2018" 2954:(in Finnish). Kauppalehti. Archived from 2716:"New impellers for OL3's feedwater pumps" 4636:. Teollisuuden Voima. 20 December 2020. 3104:"Lessons Learned from Olkiluoto 3 Plant" 2000:"2011 sees record outage at Olkiluoto 2" 868: 27:Nuclear power plant in Eurajoki, Finland 4735: 2636:. World Nuclear News. 28 October 2022. 2584:. World Nuclear News. 19 October 2022. 2496:. World Nuclear News. 27 January 2022. 1539: 1537: 1533: 428:Related media on Commons 4608:Radiation and Nuclear Safety Authority 4263:. World Nuclear News. 28 August 2020. 3804:"Olkiluodon työmaalla jälleen vipinää" 3167:"New delay in start-up of Finnish EPR" 2088:from the original on 20 September 2018 1587:from the original on 30 September 2022 1463:Radiation and Nuclear Safety Authority 1303:The plant began commercial operation. 685:Radiation and Nuclear Safety Authority 672:Radiation and Nuclear Safety Authority 538:. Turbine generators were supplied by 4820:Buildings and structures in Satakunta 4640:from the original on 20 December 2020 4614:from the original on 12 December 2020 4584:from the original on 13 December 2020 4429:from the original on 21 February 2008 4419:"Environmental study for Olkiluoto 4" 4394:"Olkiluoto 3 annual outage completed" 4241:from the original on 23 February 2020 4047:from the original on 12 February 2018 3784:from the original on 4 September 2014 3602:from the original on 13 November 2013 3417:from the original on 15 December 2019 3236:from the original on 15 December 2012 3177:from the original on 29 November 2018 3161: 3159: 3114:from the original on 22 November 2019 3102:Laaksonen, Jukka (1 September 2010). 2975: 2973: 2952:"Areva ajaa Olkiluodon työmaata alas" 2928:from the original on 28 February 2014 2830:. STUK. 27 April 2009. Archived from 2670:from the original on 21 November 2022 2562:from the original on 6 September 2022 2474:from the original on 16 December 2021 2458: 2456: 478:. The plant is owned and operated by 46:Olkiluoto Nuclear Power Plant in 2015 7: 4211:from the original on 9 November 2019 4125:from the original on 3 November 2020 4095:. World Nuclear News. 14 June 2018. 3991:from the original on 10 October 2017 3961:from the original on 1 November 2016 3930:from the original on 1 November 2016 3926:. Berlin, Germany. 26 October 2016. 3874:from the original on 1 February 2016 3844:from the original on 1 February 2016 3814:from the original on 1 February 2016 3495:Physicians for Social Responsibility 3325:from the original on 17 January 2014 3295:from the original on 3 December 2013 3144:from the original on 9 December 2019 3051:from the original on 20 October 2012 2918:"Finnish EPR passes integrity tests" 2722:from the original on 29 January 2023 2696:from the original on 8 November 2022 2640:from the original on 31 October 2022 2614:from the original on 3 November 2022 2588:from the original on 23 October 2022 2500:from the original on 29 January 2022 2441:from the original on 8 December 2021 2247:. World Nuclear News. 16 June 2022. 2058:from the original on 2 February 2020 1980:from the original on 27 October 2018 1760:from the original on 24 October 2017 1520:Journey to the Safest Place on Earth 1378:Onkalo spent nuclear fuel repository 1372:Onkalo spent nuclear fuel repository 1358:Onkalo spent nuclear fuel repository 1017:leaves her position as CEO of Areva 505:(BWRs), each with a capacity of 890 501:The Olkiluoto plant consists of two 4527:"a dead link with an unknown title" 4509:"Totuus Olkiluodon viinirypäleistä" 4345:from the original on 21 August 2021 4267:from the original on 29 August 2020 3073:Jones, Meirion (25 November 2009). 3016:from the original on 16 August 2022 3012:(in Finnish). Yle. 28 August 2020. 2194:. 27 September 2007. Archived from 2188:"Chronology of Olkiluoto 3 project" 2162:from the original on 29 August 2013 2032:from the original on 8 January 2018 1944:International Nuclear Safety Center 1914:International Nuclear Safety Center 1556:from the original on 16 June 2021. 1489:List of nuclear reactors in Finland 4723:Status of Nuclear Power in Finland 4489:from the original on 24 April 2016 4374:from the original on 12 March 2022 4319:from the original on 16 April 2021 4293:from the original on 26 March 2021 3900:from the original on 13 March 2018 3572:from the original on 16 March 2013 3384:from the original on 11 March 2018 3351:from the original on 12 March 2018 3347:. Metropolitan.fi. 10 March 2018. 2894:. 10 December 2013. Archived from 2868:from the original on 21 April 2023 2787:from the original on 17 April 2023 2755:from the original on 16 April 2023 2532:from the original on 29 April 2022 2377:from the original on 8 August 2012 2277:from the original on 17 April 2023 1887:from the original on 26 March 2017 1848:from the original on 16 April 2023 1822:from the original on 24 March 2016 1658:from the original on 16 April 2023 950:fuel building APC shell completed 807:International Court of Arbitration 752:controlled manner two years later. 25: 4785:Nuclear power stations in Finland 4551:from the original on 7 March 2016 4459:from the original on 18 June 2018 4185:from the original on 18 June 2019 4155:from the original on 8 March 2019 4099:from the original on 3 April 2019 4073:from the original on 12 June 2018 3754:from the original on 1 March 2014 3698:from the original on 24 June 2018 3646:. 26 January 2012. Archived from 3640:"Nuclear power plant Olkiluoto 3" 3542:from the original on 23 July 2012 3203:from the original on 30 June 2020 2987:from the original on 17 July 2019 2950:Paula Nikula (28 February 2014). 2340:. 27 January 2009. Archived from 2251:from the original on 16 June 2022 2220:from the original on 11 June 2016 1793:from the original on 23 July 2012 1750:"Olkiluoto 3 delayed beyond 2014" 1130:Fuel for the reactor is on site. 171:Unit 1: 10 October 1979 145:Unit 2: 1 November 1975 136:Unit 1: 1 February 1974 4762: 4750: 4738: 4685: 3530:Katz, Alan (11 September 2007). 2401:Power Reactor Information System 2367:"Siemens quits the nuclear game" 2314:from the original on 2 June 2019 1974:Power Reactor Information System 1544:Colthorpe, Andy (16 June 2021). 1146:Hot functional tests completed. 990:steam generators arrive on site 608:manufactured the unit's 526-ton 230:Nuclear power station 154:Unit 3: 12 August 2005 40: 4021:from the original on 4 May 2018 3668:. 27 April 2009. Archived from 1818:(Press release). 24 June 2015. 1711:Kinnunen, Terhi (1 July 2010). 1484:Flamanville Nuclear Power Plant 1122:Hot functional testing begins. 559:environmental impact assessment 536:Westinghouse Electric Sweden AB 474:, the other being the two-unit 189:Unit 3: 16 April 2023 4790:Radioactive waste repositories 3957:(in German). Munich, Germany. 2856:Boxell, James (16 July 2012). 526:Units 1 and 2 consists of two 180:Unit 2: 10 July 1982 1: 4692:Olkiluoto Nuclear Power Plant 3497:. 20 May 2009. Archived from 1494:Hanhikivi Nuclear Power Plant 448:Olkiluoto Nuclear Power Plant 418:Olkiluoto nuclear power plant 35:Olkiluoto Nuclear Power Plant 2397:"OL3 – koko Suomen projekti" 1366:Onkalo pilot repository cave 606:Mitsubishi Heavy Industries 476:Loviisa Nuclear Power Plant 400:Annual net output 344:1 × 1,600 MW 302:1 × 4,300 MW 293:2 × 2,500 MW 4836: 4121:. STUK. 25 February 2019. 3662:"Licensing of Olkiluoto 3" 1408:, an output common to all 1382:deep geological repository 1369: 456:Olkiluodon ydinvoimalaitos 59:Olkiluodon ydinvoimalaitos 3513:"Leaked Olkiluoto letter" 1453:reactor core, where they 598:pressurized water reactor 486:, in the municipality of 433: 335:2 × 890 MW 327: 323: 51: 39: 4043:. TVO. 8 February 2018. 3924:Clean Energy Wire (CLEW) 3197:"PRIS – Reactor Details" 1506:Nuclear power in Finland 667:was scheduled for 2022. 356:Make and model 4341:. Yle. 20 August 2021. 4289:. STUK. 26 March 2021. 3624:. Areva. Archived from 3622:"OLKILUOTO 3 – FINLAND" 3263:The Wall Street Journal 2158:. TVO. 4 January 2009. 2054:. TVO. 2 January 2019. 2028:. TVO. 3 January 2018. 1638:4 December 2016 at the 857:protection fees to the 683:In September 2022, the 628:gave its permission to 610:reactor pressure vessel 464:Olkiluoto kärnkraftverk 404:14,400 GW·h (2021) 377:Nameplate capacity 311:Combined: 9,300 MW 133:Construction began 4370:. TVO. 12 March 2022. 4315:. TVO. 16 April 2021. 3896:. TVO. 14 April 2016. 1445: 1367: 1328: 926:start of construction 640:), a joint venture of 624:In February 2005, the 586: 578: 503:boiling water reactors 463: 455: 332:Units operational 205:Teollisuuden Voima Oyj 4718:, R3123-A2, July 2005 4709:, R3123-A2, July 2005 4694:at Wikimedia Commons 4455:. 25 September 2014. 2983:. TVO. 17 July 2019. 2373:. 19 September 2011. 2198:on 27 September 2007. 2136:. TVO. 9 January 2024 2084:. 20 September 2018. 1614:15 April 2023 at the 1583:. 30 September 2022. 1443: 1365: 1326: 1263:on 21 December 2021. 1259:The reactor achieved 743:Électricité de France 654:Électricité de France 584: 573: 319:Power generation 290:Thermal capacity 264:Reactor supplier 109:61.23694°N 21.44083°E 4610:. 10 December 2020. 4580:. 13 December 2020. 4515:on 13 February 2013. 4425:. 15 February 2008. 4237:. 20 December 2019. 4017:. 19 December 2017. 3840:. 14 December 2015. 3780:. 1 September 2014. 3750:. 11 February 2013. 3232:. 13 December 2012. 3173:. 29 November 2018. 2924:. 17 February 2014. 2558:. 6 September 2022. 2411:on 19 September 2012 2305:Worldwatch Institute 1529:Notes and references 1410:thermal power plants 472:nuclear power plants 390:Capacity factor 167:Commission date 4207:. 8 November 2019. 3955:Süddeutsche Zeitung 3870:. 13 January 2016. 3810:. 4 December 2015. 3694:. 27 January 2009. 3672:on 26 February 2012 3628:on 18 January 2017. 3321:. 4 December 2013. 3291:. 29 October 2013. 3047:. 16 October 2009. 2834:on 26 February 2012 2610:(in Finnish). TVO. 2437:. 8 December 2021. 2216:. 14 January 2016. 2006:on 4 September 2012 1550:Energy Storage News 1501:Nuclear engineering 998:EPR dome installed 871: 695:Construction delays 585:Olkiluoto 3 in 2009 409:External links 280:Cooling source 105: /  82:Region of Satakunta 4769:Nuclear technology 4578:Teollisuuden Voima 4423:World Nuclear News 4396:. TVO. 16 May 2024 4015:World Nuclear News 3987:. 9 October 2017. 3778:World Nuclear News 3748:World Nuclear News 3598:. 5 October 2012. 3265:. 13 December 2012 3171:World Nuclear News 3140:. 9 October 2019. 3138:World Nuclear News 3045:World Nuclear News 2922:World Nuclear News 2898:on 1 February 2014 2371:World Nuclear News 2344:on 20 October 2012 2214:World Nuclear News 2112:World Nuclear News 1950:on 3 December 2017 1920:on 3 December 2017 1878:Teollisuuden Voima 1754:World Nuclear News 1455:became radioactive 1446: 1368: 1329: 1284:30 September 2022 869: 626:Finnish government 587: 579: 480:Teollisuuden Voima 114:61.23694; 21.44083 4690:Media related to 4547:. 14 April 2014. 4181:. 10 April 2019. 3566:Helsingin Sanomat 3380:. 11 March 2018. 3230:Helsingin Sanomat 3108:Power Engineering 2783:. 17 April 2023. 2751:. 16 April 2023. 2528:. 29 April 2022. 2338:Helsingin Sanomat 2273:. 18 April 2023. 2114:. 10 October 2023 1654:. 15 April 2023. 1307: 1306: 915:17 February 2005 602:Japan Steel Works 444: 443: 243:Reactor type 16:(Redirected from 4827: 4767: 4766: 4765: 4755: 4754: 4743: 4742: 4741: 4734: 4689: 4675: 4674: 4672: 4670: 4656: 4650: 4649: 4647: 4645: 4630: 4624: 4623: 4621: 4619: 4600: 4594: 4593: 4591: 4589: 4570: 4561: 4560: 4558: 4556: 4537: 4531: 4530: 4523: 4517: 4516: 4505: 4499: 4498: 4496: 4494: 4485:. 24 June 2015. 4475: 4469: 4468: 4466: 4464: 4445: 4439: 4438: 4436: 4434: 4415: 4406: 4405: 4403: 4401: 4390: 4384: 4383: 4381: 4379: 4364: 4355: 4354: 4352: 4350: 4335: 4329: 4328: 4326: 4324: 4309: 4303: 4302: 4300: 4298: 4283: 4277: 4276: 4274: 4272: 4257: 4251: 4250: 4248: 4246: 4227: 4221: 4220: 4218: 4216: 4201: 4195: 4194: 4192: 4190: 4171: 4165: 4164: 4162: 4160: 4151:. 7 March 2019. 4141: 4135: 4134: 4132: 4130: 4115: 4109: 4108: 4106: 4104: 4089: 4083: 4082: 4080: 4078: 4063: 4057: 4056: 4054: 4052: 4037: 4031: 4030: 4028: 4026: 4007: 4001: 4000: 3998: 3996: 3977: 3971: 3970: 3968: 3966: 3946: 3940: 3939: 3937: 3935: 3916: 3910: 3909: 3907: 3905: 3890: 3884: 3883: 3881: 3879: 3860: 3854: 3853: 3851: 3849: 3830: 3824: 3823: 3821: 3819: 3800: 3794: 3793: 3791: 3789: 3770: 3764: 3763: 3761: 3759: 3740: 3734: 3733: 3731: 3729: 3714: 3708: 3707: 3705: 3703: 3688: 3682: 3681: 3679: 3677: 3658: 3652: 3651: 3650:on 4 March 2016. 3636: 3630: 3629: 3618: 3612: 3611: 3609: 3607: 3588: 3582: 3581: 3579: 3577: 3558: 3552: 3551: 3549: 3547: 3527: 3521: 3520: 3519:on 13 June 2011. 3509: 3503: 3502: 3501:on 28 July 2013. 3487: 3481: 3480: 3478: 3476: 3470: 3462: 3456: 3455: 3453: 3451: 3437: 3431: 3430: 3424: 3422: 3416: 3409: 3400: 3394: 3393: 3391: 3389: 3370: 3361: 3360: 3358: 3356: 3341: 3335: 3334: 3332: 3330: 3311: 3305: 3304: 3302: 3300: 3281: 3275: 3274: 3272: 3270: 3255: 3246: 3245: 3243: 3241: 3222: 3213: 3212: 3210: 3208: 3193: 3187: 3186: 3184: 3182: 3163: 3154: 3153: 3151: 3149: 3130: 3124: 3123: 3121: 3119: 3099: 3090: 3089: 3087: 3085: 3070: 3061: 3060: 3058: 3056: 3037: 3026: 3025: 3023: 3021: 3006: 2997: 2996: 2994: 2992: 2977: 2968: 2967: 2965: 2963: 2947: 2938: 2937: 2935: 2933: 2914: 2908: 2907: 2905: 2903: 2884: 2878: 2877: 2875: 2873: 2853: 2844: 2843: 2841: 2839: 2824: 2818: 2817: 2803: 2797: 2796: 2794: 2792: 2771: 2765: 2764: 2762: 2760: 2741: 2732: 2731: 2729: 2727: 2712: 2706: 2705: 2703: 2701: 2686: 2680: 2679: 2677: 2675: 2656: 2650: 2649: 2647: 2645: 2630: 2624: 2623: 2621: 2619: 2604: 2598: 2597: 2595: 2593: 2578: 2572: 2571: 2569: 2567: 2548: 2542: 2541: 2539: 2537: 2516: 2510: 2509: 2507: 2505: 2490: 2484: 2483: 2481: 2479: 2460: 2451: 2450: 2448: 2446: 2427: 2421: 2420: 2418: 2416: 2407:. Archived from 2393: 2387: 2386: 2384: 2382: 2363: 2354: 2353: 2351: 2349: 2330: 2324: 2323: 2321: 2319: 2313: 2302: 2293: 2287: 2286: 2284: 2282: 2267: 2261: 2260: 2258: 2256: 2241: 2230: 2229: 2227: 2225: 2206: 2200: 2199: 2184: 2175: 2174: 2169: 2167: 2152: 2146: 2145: 2143: 2141: 2130: 2124: 2123: 2121: 2119: 2104: 2098: 2097: 2095: 2093: 2074: 2068: 2067: 2065: 2063: 2048: 2042: 2041: 2039: 2037: 2022: 2016: 2015: 2013: 2011: 1996: 1990: 1989: 1987: 1985: 1966: 1960: 1959: 1957: 1955: 1946:. Archived from 1936: 1930: 1929: 1927: 1925: 1916:. Archived from 1906: 1897: 1896: 1894: 1892: 1886: 1880:. January 2008. 1875: 1867: 1858: 1857: 1855: 1853: 1838: 1832: 1831: 1829: 1827: 1812: 1803: 1802: 1800: 1798: 1789:. 16 July 2012. 1779: 1770: 1769: 1767: 1765: 1756:. 17 July 2012. 1746: 1733: 1732: 1730: 1728: 1719:. Archived from 1708: 1699: 1698: 1696: 1694: 1679: 1668: 1667: 1665: 1663: 1648: 1642: 1630: 1624: 1606: 1597: 1596: 1594: 1592: 1573: 1562: 1561: 1541: 891:17 January 2002 872: 865:Project timeline 825:capacity factors 595:third generation 534:, now a part of 437:edit on Wikidata 196: 194: 187: 185: 178: 176: 161: 159: 152: 150: 143: 141: 120: 119: 117: 116: 115: 110: 106: 103: 102: 101: 98: 44: 32: 21: 4835: 4834: 4830: 4829: 4828: 4826: 4825: 4824: 4775: 4774: 4773: 4763: 4761: 4749: 4739: 4737: 4729: 4683: 4678: 4668: 4666: 4658: 4657: 4653: 4643: 4641: 4632: 4631: 4627: 4617: 4615: 4602: 4601: 4597: 4587: 4585: 4572: 4571: 4564: 4554: 4552: 4539: 4538: 4534: 4525: 4524: 4520: 4507: 4506: 4502: 4492: 4490: 4477: 4476: 4472: 4462: 4460: 4447: 4446: 4442: 4432: 4430: 4417: 4416: 4409: 4399: 4397: 4392: 4391: 4387: 4377: 4375: 4366: 4365: 4358: 4348: 4346: 4337: 4336: 4332: 4322: 4320: 4311: 4310: 4306: 4296: 4294: 4285: 4284: 4280: 4270: 4268: 4259: 4258: 4254: 4244: 4242: 4229: 4228: 4224: 4214: 4212: 4203: 4202: 4198: 4188: 4186: 4173: 4172: 4168: 4158: 4156: 4143: 4142: 4138: 4128: 4126: 4117: 4116: 4112: 4102: 4100: 4091: 4090: 4086: 4076: 4074: 4065: 4064: 4060: 4050: 4048: 4039: 4038: 4034: 4024: 4022: 4009: 4008: 4004: 3994: 3992: 3979: 3978: 3974: 3964: 3962: 3948: 3947: 3943: 3933: 3931: 3918: 3917: 3913: 3903: 3901: 3892: 3891: 3887: 3877: 3875: 3862: 3861: 3857: 3847: 3845: 3832: 3831: 3827: 3817: 3815: 3802: 3801: 3797: 3787: 3785: 3772: 3771: 3767: 3757: 3755: 3742: 3741: 3737: 3727: 3725: 3716: 3715: 3711: 3701: 3699: 3690: 3689: 3685: 3675: 3673: 3660: 3659: 3655: 3638: 3637: 3633: 3620: 3619: 3615: 3605: 3603: 3590: 3589: 3585: 3575: 3573: 3568:. 10 May 2012. 3560: 3559: 3555: 3545: 3543: 3529: 3528: 3524: 3511: 3510: 3506: 3489: 3488: 3484: 3474: 3472: 3468: 3464: 3463: 3459: 3449: 3447: 3439: 3438: 3434: 3420: 3418: 3414: 3407: 3402: 3401: 3397: 3387: 3385: 3372: 3371: 3364: 3354: 3352: 3343: 3342: 3338: 3328: 3326: 3313: 3312: 3308: 3298: 3296: 3283: 3282: 3278: 3268: 3266: 3257: 3256: 3249: 3239: 3237: 3224: 3223: 3216: 3206: 3204: 3195: 3194: 3190: 3180: 3178: 3165: 3164: 3157: 3147: 3145: 3132: 3131: 3127: 3117: 3115: 3101: 3100: 3093: 3083: 3081: 3072: 3071: 3064: 3054: 3052: 3039: 3038: 3029: 3019: 3017: 3008: 3007: 3000: 2990: 2988: 2979: 2978: 2971: 2961: 2959: 2958:on 4 March 2014 2949: 2948: 2941: 2931: 2929: 2916: 2915: 2911: 2901: 2899: 2886: 2885: 2881: 2871: 2869: 2862:Financial Times 2855: 2854: 2847: 2837: 2835: 2826: 2825: 2821: 2805: 2804: 2800: 2790: 2788: 2773: 2772: 2768: 2758: 2756: 2743: 2742: 2735: 2725: 2723: 2714: 2713: 2709: 2699: 2697: 2688: 2687: 2683: 2673: 2671: 2658: 2657: 2653: 2643: 2641: 2632: 2631: 2627: 2617: 2615: 2606: 2605: 2601: 2591: 2589: 2580: 2579: 2575: 2565: 2563: 2550: 2549: 2545: 2535: 2533: 2518: 2517: 2513: 2503: 2501: 2492: 2491: 2487: 2477: 2475: 2462: 2461: 2454: 2444: 2442: 2429: 2428: 2424: 2414: 2412: 2395: 2394: 2390: 2380: 2378: 2365: 2364: 2357: 2347: 2345: 2332: 2331: 2327: 2317: 2315: 2311: 2300: 2295: 2294: 2290: 2280: 2278: 2269: 2268: 2264: 2254: 2252: 2243: 2242: 2233: 2223: 2221: 2208: 2207: 2203: 2186: 2185: 2178: 2165: 2163: 2154: 2153: 2149: 2139: 2137: 2132: 2131: 2127: 2117: 2115: 2106: 2105: 2101: 2091: 2089: 2076: 2075: 2071: 2061: 2059: 2050: 2049: 2045: 2035: 2033: 2024: 2023: 2019: 2009: 2007: 1998: 1997: 1993: 1983: 1981: 1968: 1967: 1963: 1953: 1951: 1938: 1937: 1933: 1923: 1921: 1908: 1907: 1900: 1890: 1888: 1884: 1873: 1869: 1868: 1861: 1851: 1849: 1840: 1839: 1835: 1825: 1823: 1814: 1813: 1806: 1796: 1794: 1781: 1780: 1773: 1763: 1761: 1748: 1747: 1736: 1726: 1724: 1723:on 3 March 2016 1710: 1709: 1702: 1692: 1690: 1689:. 20 April 2023 1681: 1680: 1671: 1661: 1659: 1650: 1649: 1645: 1640:Wayback Machine 1631: 1627: 1616:Wayback Machine 1607: 1600: 1590: 1588: 1575: 1574: 1565: 1543: 1542: 1535: 1531: 1526: 1479: 1438: 1402: 1374: 1360: 1321: 1312: 1062:September 2014 1015:Anne Lauvergeon 995:September 2009 907:8 January 2004 867: 834: 802: 697: 665:battery storage 622: 568: 524: 484:Gulf of Bothnia 440: 364: 347: 343: 338: 314: 309: 305: 300: 296: 284:Gulf of Bothnia 271: 250: 192: 190: 188: 183: 181: 179: 174: 172: 157: 155: 153: 148: 146: 144: 139: 137: 113: 111: 107: 104: 99: 96: 94: 92: 91: 47: 28: 23: 22: 15: 12: 11: 5: 4833: 4831: 4823: 4822: 4817: 4812: 4807: 4802: 4797: 4792: 4787: 4777: 4776: 4772: 4771: 4759: 4747: 4727: 4726: 4720: 4712: 4701: 4682: 4681:External links 4679: 4677: 4676: 4651: 4625: 4595: 4562: 4532: 4518: 4500: 4470: 4440: 4407: 4385: 4356: 4330: 4304: 4278: 4252: 4222: 4196: 4166: 4136: 4110: 4084: 4058: 4032: 4002: 3972: 3941: 3911: 3885: 3855: 3825: 3795: 3765: 3735: 3724:. 18 June 2011 3709: 3683: 3653: 3631: 3613: 3583: 3553: 3522: 3504: 3482: 3457: 3432: 3395: 3362: 3336: 3306: 3276: 3247: 3214: 3188: 3155: 3125: 3091: 3062: 3027: 2998: 2969: 2939: 2909: 2879: 2845: 2819: 2816:. 17 May 2023. 2798: 2780:Helsinki Times 2766: 2733: 2707: 2681: 2651: 2625: 2599: 2573: 2543: 2511: 2485: 2452: 2435:Nuclear Street 2422: 2388: 2355: 2325: 2307:. p. 60. 2288: 2262: 2231: 2201: 2176: 2147: 2125: 2099: 2069: 2043: 2017: 1991: 1961: 1931: 1898: 1859: 1833: 1804: 1771: 1734: 1700: 1669: 1643: 1625: 1598: 1563: 1532: 1530: 1527: 1525: 1524: 1516: 1508: 1503: 1498: 1497: 1496: 1486: 1480: 1478: 1475: 1437: 1434: 1401: 1398: 1370:Main article: 1359: 1356: 1345:Jan Vapaavuori 1320: 1317: 1311: 1308: 1305: 1304: 1301: 1297: 1296: 1293: 1292:16 April 2023 1289: 1288: 1285: 1281: 1280: 1277: 1273: 1272: 1269: 1265: 1264: 1257: 1256:December 2021 1253: 1252: 1249: 1248:December 2021 1245: 1244: 1240: 1236: 1235: 1232: 1228: 1227: 1224: 1220: 1219: 1216: 1212: 1211: 1208: 1207:December 2019 1204: 1203: 1200: 1199:November 2019 1196: 1195: 1192: 1188: 1187: 1184: 1180: 1179: 1176: 1172: 1171: 1168: 1167:February 2019 1164: 1163: 1160: 1159:November 2018 1156: 1155: 1152: 1148: 1147: 1144: 1140: 1139: 1136: 1132: 1131: 1128: 1127:February 2018 1124: 1123: 1120: 1119:December 2017 1116: 1115: 1112: 1108: 1107: 1096: 1092: 1091: 1088: 1084: 1083: 1080: 1076: 1075: 1072: 1071:December 2015 1068: 1067: 1063: 1059: 1058: 1055: 1054:February 2014 1051: 1050: 1047: 1046:February 2013 1043: 1042: 1039: 1038:December 2012 1035: 1034: 1031: 1027: 1026: 1023: 1022:November 2011 1019: 1018: 1012: 1008: 1007: 1004: 1000: 999: 996: 992: 991: 988: 984: 983: 980: 976: 975: 972: 968: 967: 964: 960: 959: 956: 952: 951: 948: 944: 943: 940: 936: 935: 932: 928: 927: 924: 920: 919: 916: 912: 911: 908: 904: 903: 900: 896: 895: 892: 888: 887: 884: 883:December 2000 880: 879: 876: 866: 863: 838:Stephen Thomas 833: 830: 801: 798: 775: 774: 771: 757: 753: 749: 746: 739: 696: 693: 621: 618: 567: 564: 523: 520: 442: 441: 434: 431: 430: 425: 421: 420: 415: 411: 410: 406: 405: 402: 396: 395: 392: 386: 385: 379: 373: 372: 363:-III, BWR-2500 357: 353: 352: 345: 336: 333: 329: 328: 325: 324: 321: 320: 316: 315: 312: 303: 294: 291: 287: 286: 281: 277: 276: 265: 261: 260: 244: 240: 239: 236: 232: 231: 227: 226: 223: 219: 218: 213: 209: 208: 202: 198: 197: 169: 163: 162: 134: 130: 129: 126: 122: 121: 89: 85: 84: 75: 71: 70: 65: 61: 60: 57: 53: 52: 49: 48: 45: 37: 36: 26: 24: 14: 13: 10: 9: 6: 4: 3: 2: 4832: 4821: 4818: 4816: 4813: 4811: 4808: 4806: 4803: 4801: 4798: 4796: 4793: 4791: 4788: 4786: 4783: 4782: 4780: 4770: 4760: 4758: 4753: 4748: 4746: 4736: 4732: 4724: 4721: 4719: 4717: 4713: 4711: 4710: 4706: 4702: 4700: 4697: 4696: 4695: 4693: 4688: 4680: 4665: 4661: 4655: 4652: 4639: 4635: 4629: 4626: 4613: 4609: 4605: 4599: 4596: 4583: 4579: 4575: 4569: 4567: 4563: 4550: 4546: 4542: 4536: 4533: 4528: 4522: 4519: 4514: 4510: 4504: 4501: 4488: 4484: 4480: 4474: 4471: 4458: 4454: 4450: 4444: 4441: 4428: 4424: 4420: 4414: 4412: 4408: 4395: 4389: 4386: 4373: 4369: 4363: 4361: 4357: 4344: 4340: 4334: 4331: 4318: 4314: 4308: 4305: 4292: 4288: 4282: 4279: 4266: 4262: 4256: 4253: 4240: 4236: 4232: 4226: 4223: 4210: 4206: 4200: 4197: 4184: 4180: 4176: 4170: 4167: 4154: 4150: 4146: 4140: 4137: 4124: 4120: 4114: 4111: 4098: 4094: 4088: 4085: 4072: 4068: 4062: 4059: 4046: 4042: 4036: 4033: 4020: 4016: 4012: 4006: 4003: 3990: 3986: 3982: 3976: 3973: 3960: 3956: 3952: 3945: 3942: 3929: 3925: 3921: 3915: 3912: 3899: 3895: 3889: 3886: 3873: 3869: 3865: 3859: 3856: 3843: 3839: 3835: 3829: 3826: 3813: 3809: 3805: 3799: 3796: 3783: 3779: 3775: 3769: 3766: 3753: 3749: 3745: 3739: 3736: 3723: 3719: 3713: 3710: 3697: 3693: 3687: 3684: 3671: 3667: 3663: 3657: 3654: 3649: 3645: 3641: 3635: 3632: 3627: 3623: 3617: 3614: 3601: 3597: 3593: 3587: 3584: 3571: 3567: 3563: 3557: 3554: 3541: 3537: 3533: 3526: 3523: 3518: 3514: 3508: 3505: 3500: 3496: 3492: 3486: 3483: 3467: 3461: 3458: 3446: 3442: 3436: 3433: 3429: 3413: 3406: 3399: 3396: 3383: 3379: 3375: 3369: 3367: 3363: 3350: 3346: 3340: 3337: 3324: 3320: 3316: 3310: 3307: 3294: 3290: 3286: 3280: 3277: 3264: 3260: 3254: 3252: 3248: 3235: 3231: 3227: 3221: 3219: 3215: 3202: 3198: 3192: 3189: 3176: 3172: 3168: 3162: 3160: 3156: 3143: 3139: 3135: 3129: 3126: 3113: 3109: 3105: 3098: 3096: 3092: 3080: 3076: 3069: 3067: 3063: 3050: 3046: 3042: 3036: 3034: 3032: 3028: 3015: 3011: 3005: 3003: 2999: 2986: 2982: 2976: 2974: 2970: 2957: 2953: 2946: 2944: 2940: 2927: 2923: 2919: 2913: 2910: 2897: 2893: 2889: 2883: 2880: 2867: 2863: 2859: 2852: 2850: 2846: 2833: 2829: 2823: 2820: 2815: 2813: 2808: 2802: 2799: 2786: 2782: 2781: 2776: 2770: 2767: 2754: 2750: 2746: 2740: 2738: 2734: 2721: 2717: 2711: 2708: 2695: 2691: 2685: 2682: 2669: 2665: 2661: 2655: 2652: 2639: 2635: 2629: 2626: 2613: 2609: 2603: 2600: 2587: 2583: 2577: 2574: 2561: 2557: 2553: 2547: 2544: 2531: 2527: 2526: 2521: 2515: 2512: 2499: 2495: 2489: 2486: 2473: 2469: 2465: 2459: 2457: 2453: 2440: 2436: 2432: 2426: 2423: 2410: 2406: 2402: 2398: 2392: 2389: 2376: 2372: 2368: 2362: 2360: 2356: 2343: 2339: 2335: 2329: 2326: 2310: 2306: 2299: 2292: 2289: 2276: 2272: 2266: 2263: 2250: 2246: 2240: 2238: 2236: 2232: 2219: 2215: 2211: 2205: 2202: 2197: 2193: 2189: 2183: 2181: 2177: 2173: 2161: 2157: 2151: 2148: 2135: 2129: 2126: 2113: 2109: 2103: 2100: 2087: 2083: 2079: 2073: 2070: 2057: 2053: 2047: 2044: 2031: 2027: 2021: 2018: 2005: 2001: 1995: 1992: 1979: 1975: 1971: 1970:"Olkiluoto-2" 1965: 1962: 1949: 1945: 1941: 1935: 1932: 1919: 1915: 1911: 1905: 1903: 1899: 1883: 1879: 1872: 1866: 1864: 1860: 1847: 1843: 1842:"OL1 and OL2" 1837: 1834: 1821: 1817: 1811: 1809: 1805: 1792: 1788: 1784: 1778: 1776: 1772: 1759: 1755: 1751: 1745: 1743: 1741: 1739: 1735: 1722: 1718: 1714: 1707: 1705: 1701: 1688: 1684: 1678: 1676: 1674: 1670: 1657: 1653: 1647: 1644: 1641: 1637: 1634: 1629: 1626: 1623: 1622: 1617: 1613: 1610: 1605: 1603: 1599: 1586: 1582: 1578: 1572: 1570: 1568: 1564: 1560: 1555: 1551: 1547: 1540: 1538: 1534: 1528: 1522: 1521: 1517: 1514: 1513: 1512:Into Eternity 1509: 1507: 1504: 1502: 1499: 1495: 1492: 1491: 1490: 1487: 1485: 1482: 1481: 1476: 1474: 1470: 1468: 1464: 1460: 1456: 1450: 1442: 1435: 1433: 1431: 1427: 1423: 1419: 1415: 1411: 1407: 1399: 1397: 1395: 1391: 1387: 1383: 1379: 1373: 1364: 1357: 1355: 1352: 1350: 1346: 1341: 1339: 1335: 1325: 1318: 1316: 1309: 1302: 1299: 1298: 1294: 1291: 1290: 1286: 1283: 1282: 1278: 1275: 1274: 1270: 1267: 1266: 1262: 1258: 1255: 1254: 1250: 1247: 1246: 1241: 1238: 1237: 1233: 1230: 1229: 1225: 1222: 1221: 1217: 1214: 1213: 1209: 1206: 1205: 1201: 1198: 1197: 1193: 1190: 1189: 1185: 1182: 1181: 1177: 1174: 1173: 1169: 1166: 1165: 1161: 1158: 1157: 1153: 1150: 1149: 1145: 1142: 1141: 1137: 1134: 1133: 1129: 1126: 1125: 1121: 1118: 1117: 1113: 1111:October 2017 1110: 1109: 1105: 1101: 1098:TVO calls on 1097: 1095:October 2016 1094: 1093: 1089: 1086: 1085: 1081: 1079:January 2016 1078: 1077: 1073: 1070: 1069: 1064: 1061: 1060: 1056: 1053: 1052: 1048: 1045: 1044: 1040: 1037: 1036: 1032: 1029: 1028: 1024: 1021: 1020: 1016: 1013: 1010: 1009: 1005: 1002: 1001: 997: 994: 993: 989: 986: 985: 981: 978: 977: 973: 970: 969: 965: 963:January 2009 962: 961: 957: 955:January 2009 954: 953: 949: 946: 945: 941: 938: 937: 933: 930: 929: 925: 922: 921: 917: 914: 913: 909: 906: 905: 901: 898: 897: 893: 890: 889: 885: 882: 881: 877: 874: 873: 864: 862: 860: 854: 851: 850:3+ generation 846: 844: 839: 831: 829: 826: 821: 818: 817: 810: 808: 799: 797: 795: 791: 787: 783: 778: 772: 769: 766: 762: 758: 754: 750: 747: 744: 740: 737: 736: 735: 732: 729: 724: 722: 717: 713: 711: 705: 701: 694: 692: 688: 686: 681: 678: 673: 668: 666: 662: 659:According to 657: 655: 651: 647: 643: 639: 635: 631: 627: 619: 617: 613: 611: 607: 603: 599: 596: 592: 583: 576: 575:Rafael Grossi 572: 565: 563: 560: 555: 551: 547: 545: 541: 537: 533: 529: 522:Units 1 and 2 521: 519: 515: 512: 508: 504: 499: 497: 493: 489: 485: 481: 477: 473: 469: 465: 461: 457: 453: 449: 438: 432: 429: 426: 422: 419: 416: 412: 407: 403: 401: 397: 393: 391: 387: 384: 380: 378: 374: 371: 368: 362: 358: 355: 354: 351: 342: 334: 331: 330: 326: 322: 317: 310: 308: 299: 292: 288: 285: 282: 278: 275: 270: 266: 262: 258: 254: 249: 245: 241: 237: 233: 228: 224: 220: 217: 214: 210: 206: 203: 199: 170: 168: 164: 135: 131: 127: 123: 118: 90: 86: 83: 79: 76: 72: 69: 66: 62: 58: 56:Official name 54: 50: 43: 38: 33: 30: 19: 4715: 4708: 4704: 4684: 4667:. Retrieved 4663: 4654: 4642:. Retrieved 4628: 4616:. Retrieved 4598: 4586:. Retrieved 4553:. Retrieved 4535: 4521: 4513:the original 4503: 4491:. Retrieved 4473: 4461:. Retrieved 4443: 4431:. Retrieved 4398:. Retrieved 4388: 4376:. Retrieved 4347:. Retrieved 4333: 4321:. Retrieved 4307: 4295:. Retrieved 4281: 4269:. Retrieved 4255: 4243:. Retrieved 4234: 4225: 4213:. Retrieved 4199: 4187:. Retrieved 4178: 4169: 4157:. Retrieved 4148: 4139: 4127:. Retrieved 4113: 4101:. Retrieved 4087: 4075:. Retrieved 4061: 4049:. Retrieved 4035: 4023:. Retrieved 4005: 3993:. Retrieved 3984: 3975: 3963:. Retrieved 3954: 3944: 3932:. Retrieved 3923: 3914: 3902:. Retrieved 3888: 3876:. Retrieved 3858: 3846:. Retrieved 3828: 3816:. Retrieved 3798: 3786:. Retrieved 3768: 3756:. Retrieved 3738: 3726:. Retrieved 3712: 3700:. Retrieved 3686: 3674:. Retrieved 3670:the original 3656: 3648:the original 3634: 3626:the original 3616: 3604:. Retrieved 3586: 3574:. Retrieved 3556: 3544:. Retrieved 3525: 3517:the original 3507: 3499:the original 3485: 3473:. Retrieved 3460: 3448:. Retrieved 3445:spglobal.com 3444: 3435: 3426: 3419:. Retrieved 3398: 3386:. Retrieved 3353:. Retrieved 3339: 3327:. Retrieved 3309: 3297:. Retrieved 3279: 3267:. Retrieved 3238:. Retrieved 3205:. Retrieved 3191: 3179:. Retrieved 3170: 3146:. Retrieved 3137: 3128: 3116:. Retrieved 3107: 3082:. Retrieved 3053:. Retrieved 3018:. Retrieved 2989:. Retrieved 2960:. Retrieved 2956:the original 2930:. Retrieved 2912: 2900:. Retrieved 2896:the original 2882: 2870:. Retrieved 2836:. Retrieved 2832:the original 2822: 2810: 2801: 2789:. Retrieved 2778: 2769: 2757:. Retrieved 2748: 2724:. Retrieved 2710: 2698:. Retrieved 2684: 2672:. Retrieved 2663: 2654: 2642:. Retrieved 2628: 2616:. Retrieved 2602: 2590:. Retrieved 2576: 2564:. Retrieved 2546: 2534:. Retrieved 2523: 2514: 2502:. Retrieved 2488: 2476:. Retrieved 2467: 2443:. Retrieved 2434: 2425: 2413:. Retrieved 2409:the original 2400: 2391: 2379:. Retrieved 2346:. Retrieved 2342:the original 2328: 2316:. Retrieved 2291: 2279:. Retrieved 2265: 2253:. Retrieved 2222:. Retrieved 2204: 2196:the original 2171: 2164:. Retrieved 2150: 2138:. Retrieved 2128: 2116:. Retrieved 2111: 2102: 2092:20 September 2090:. Retrieved 2072: 2060:. Retrieved 2046: 2034:. Retrieved 2020: 2008:. Retrieved 2004:the original 1994: 1982:. Retrieved 1973: 1964: 1952:. Retrieved 1948:the original 1934: 1922:. Retrieved 1918:the original 1889:. Retrieved 1850:. Retrieved 1836: 1824:. Retrieved 1795:. Retrieved 1762:. Retrieved 1725:. Retrieved 1721:the original 1691:. Retrieved 1686: 1660:. Retrieved 1646: 1628: 1619: 1591:30 September 1589:. Retrieved 1557: 1549: 1518: 1510: 1471: 1451: 1447: 1403: 1377: 1375: 1353: 1342: 1330: 1313: 1239:August 2021 1215:August 2020 1143:30 May 2018 987:Autumn 2009 979:Summer 2009 899:24 May 2002 855: 847: 835: 822: 814: 811: 803: 779: 776: 733: 725: 718: 714: 706: 702: 698: 689: 682: 669: 658: 650:turbine hall 623: 614: 593:, a type of 589:Unit 3 is a 588: 556: 552: 548: 525: 516: 500: 466:) is one of 447: 445: 394:92.8% (2021) 349: 340: 306: 301: 297: 269:AB ASEA-ATOM 29: 4644:22 December 4618:14 December 4588:14 December 4463:29 November 4433:21 February 4245:22 December 4235:Yle Uutiset 4215:10 November 4129:25 February 4051:11 February 3788:2 September 3758:27 February 3471:. June 2021 3269:13 December 3240:13 December 3181:29 November 3148:23 November 3118:23 November 2962:28 February 2932:27 February 2674:21 November 2566:6 September 2478:16 December 1400:Agriculture 1300:1 May 2023 1268:March 2022 1261:criticality 1231:April 2021 1223:March 2021 1183:April 2019 1175:March 2019 1135:March 2018 1087:April 2016 782:Flamanville 765:pressurizer 710:Kauppalehti 359:Units 1–2: 341:(Units 1–2) 298:(Units 1–2) 267:Units 1–2: 246:Units 1–2: 225:1000 (2021) 212:Operator(s) 128:Operational 112: / 88:Coordinates 4779:Categories 4664:www.tvo.fi 3965:1 November 3934:1 November 3878:24 January 3848:24 January 3818:24 January 3606:4 December 3576:4 December 3329:18 January 3299:4 December 2902:18 January 2726:30 January 2700:8 November 2664:www.tvo.fi 2644:31 October 2618:3 November 2592:23 October 2504:29 January 2468:Tiedote-en 2445:9 December 2224:2 February 2140:20 January 2118:12 October 2062:2 February 2010:12 January 1467:INES scale 1406:waste heat 1310:Operations 1191:July 2019 1151:June 2018 1030:July 2012 1011:June 2011 1003:June 2010 939:June 2007 923:July 2005 540:Stal-Laval 509:, and one 274:Areva S.A. 193:2023-04-16 184:1982-07-10 175:1979-10-10 158:2005-08-12 149:1975-11-01 140:1974-02-01 100:21°26′27″E 97:61°14′13″N 4349:23 August 4271:28 August 3995:9 October 3728:10 August 3722:Bloomberg 3676:10 August 3546:10 August 3536:Bloomberg 3475:10 August 3450:10 August 3084:10 August 3055:10 August 3020:28 August 2872:10 August 2838:10 August 2415:10 August 2381:10 August 2348:10 August 2036:7 January 1797:10 August 1621:Arab News 1436:Incidents 1422:whitefish 1276:May 2022 971:May 2009 947:May 2008 931:May 2006 836:In 2009, 832:Criticism 788:, and in 691:surplus. 638:Framatome 544:Strömberg 532:ASEA-Atom 367:Framatome 222:Employees 18:Olkiluoto 4815:Eurajoki 4638:Archived 4612:Archived 4582:Archived 4555:16 April 4549:Archived 4493:15 April 4487:Archived 4457:Archived 4427:Archived 4378:12 March 4372:Archived 4343:Archived 4323:16 April 4317:Archived 4297:26 March 4291:Archived 4265:Archived 4239:Archived 4209:Archived 4183:Archived 4153:Archived 4123:Archived 4097:Archived 4071:Archived 4045:Archived 4025:16 April 4019:Archived 3989:Archived 3959:Archived 3928:Archived 3904:13 March 3898:Archived 3872:Archived 3842:Archived 3812:Archived 3782:Archived 3752:Archived 3696:Archived 3600:Archived 3570:Archived 3540:Archived 3421:11 April 3412:Archived 3388:12 March 3382:Archived 3355:12 March 3349:Archived 3323:Archived 3293:Archived 3234:Archived 3207:27 April 3201:Archived 3175:Archived 3142:Archived 3112:Archived 3049:Archived 3014:Archived 2985:Archived 2926:Archived 2866:Archived 2791:17 April 2785:Archived 2759:16 April 2753:Archived 2720:Archived 2694:Archived 2668:Archived 2638:Archived 2612:Archived 2586:Archived 2560:Archived 2556:Yle News 2530:Archived 2498:Archived 2472:Archived 2439:Archived 2375:Archived 2318:16 April 2309:Archived 2281:18 April 2275:Archived 2249:Archived 2218:Archived 2166:21 March 2160:Archived 2086:Archived 2056:Archived 2030:Archived 1984:16 April 1978:Archived 1976:. IAEA. 1954:13 March 1924:13 March 1891:16 April 1882:Archived 1852:16 April 1846:Archived 1826:15 April 1820:Archived 1791:Archived 1758:Archived 1662:16 April 1656:Archived 1636:Archived 1612:Archived 1585:Archived 1554:Archived 1477:See also 1426:sturgeon 1414:vineyard 816:Le Monde 768:forgings 488:Eurajoki 365:Unit 3: 350:(Unit 3) 307:(Unit 3) 272:Unit 3: 251:Unit 3: 235:Reactors 201:Owner(s) 78:Eurajoki 74:Location 4745:Finland 4731:Portals 4189:18 June 4179:Reuters 4159:7 March 4103:15 June 4077:10 June 3702:24 June 2991:17 July 2892:Reuters 2255:17 June 1940:"TVO 2" 1910:"TVO 1" 1844:. TVO. 1764:24 July 1717:Reuters 1100:Siemens 790:Taishan 761:welding 646:Siemens 620:History 470:'s two 468:Finland 460:Swedish 452:Finnish 424:Commons 414:Website 191: ( 182: ( 173: ( 156: ( 147: ( 138: ( 68:Finland 64:Country 4757:Energy 4669:4 June 4400:18 May 2536:12 May 1727:2 July 1430:caviar 1418:grapes 1390:Fortum 1386:Posiva 1319:Unit 4 878:Event 786:France 566:Unit 3 381:3,380 348:(net) 339:(net) 125:Status 3469:(PDF) 3415:(PDF) 3408:(PDF) 2312:(PDF) 2301:(PDF) 2192:Areva 1885:(PDF) 1874:(PDF) 1693:4 May 1459:scram 1380:is a 1349:Stubb 1336:or a 1104:Areva 875:Date 859:mafia 794:China 677:SCRAM 642:Areva 492:Rauma 435:[ 207:(TVO) 4671:2024 4646:2020 4620:2020 4590:2020 4557:2018 4495:2016 4465:2018 4435:2008 4402:2024 4380:2022 4351:2021 4325:2021 4299:2021 4273:2020 4247:2019 4217:2019 4191:2019 4161:2019 4131:2019 4105:2018 4079:2018 4053:2018 4027:2018 3997:2017 3967:2016 3936:2016 3906:2018 3880:2016 3850:2016 3820:2016 3790:2014 3760:2014 3730:2012 3704:2018 3678:2012 3666:STUK 3608:2013 3578:2013 3548:2012 3477:2023 3452:2023 3423:2023 3390:2018 3357:2018 3331:2014 3301:2013 3271:2012 3242:2012 3209:2020 3183:2018 3150:2019 3120:2019 3086:2012 3057:2012 3022:2020 2993:2019 2964:2014 2934:2014 2904:2014 2874:2012 2840:2012 2814:News 2793:2023 2761:2023 2728:2023 2702:2022 2676:2022 2646:2022 2620:2022 2594:2022 2568:2022 2538:2022 2506:2022 2480:2021 2447:2021 2417:2012 2383:2012 2350:2012 2320:2018 2283:2023 2257:2022 2226:2016 2168:2013 2142:2024 2120:2023 2094:2018 2064:2020 2038:2018 2012:2012 1986:2023 1956:2011 1926:2011 1893:2018 1854:2023 1828:2016 1799:2012 1766:2012 1729:2010 1695:2023 1664:2023 1593:2022 1428:for 1424:and 1404:The 1392:and 1376:The 843:STUK 800:Cost 721:STUK 644:and 604:and 528:BWRs 496:Pori 446:The 361:ASEA 4545:YLE 4483:YLE 4453:YLE 3985:TVO 3868:YLE 3838:YLE 3808:YLE 3596:YLE 3378:TVO 3319:YLE 3289:YLE 3079:BBC 2812:Yle 2749:TVO 2525:TVO 2405:TVO 2082:TVO 1787:BBC 1687:TVO 1581:TVO 1394:TVO 1338:BWR 1334:PWR 728:BBC 661:TVO 634:EPR 630:TVO 591:EPR 511:EPR 370:EPR 257:EPR 253:PWR 248:BWR 216:TVO 4781:: 4662:. 4606:. 4576:. 4565:^ 4543:. 4481:. 4451:. 4421:. 4410:^ 4359:^ 4233:. 4177:. 4147:. 4069:. 4013:. 3983:. 3922:. 3866:. 3836:. 3806:. 3776:. 3746:. 3720:. 3664:. 3642:. 3594:. 3564:. 3538:. 3534:. 3493:. 3443:. 3425:. 3376:. 3365:^ 3317:. 3287:. 3261:. 3250:^ 3228:. 3217:^ 3199:. 3169:. 3158:^ 3136:. 3110:. 3106:. 3094:^ 3077:. 3065:^ 3043:. 3030:^ 3001:^ 2972:^ 2942:^ 2920:. 2890:. 2864:. 2860:. 2848:^ 2809:. 2777:. 2747:. 2736:^ 2666:. 2662:. 2554:. 2522:. 2470:. 2466:. 2455:^ 2433:. 2403:. 2399:. 2369:. 2358:^ 2336:. 2303:. 2234:^ 2212:. 2190:. 2179:^ 2170:. 2110:. 2080:. 1972:. 1942:. 1912:. 1901:^ 1876:. 1862:^ 1807:^ 1785:. 1774:^ 1752:. 1737:^ 1715:. 1703:^ 1685:. 1672:^ 1618:– 1601:^ 1579:. 1566:^ 1552:. 1548:. 1536:^ 1432:. 1396:. 809:. 792:, 784:, 656:. 612:. 507:MW 498:. 462:: 458:, 454:: 383:MW 313:th 304:th 295:th 80:, 4733:: 4725:. 4673:. 4648:. 4622:. 4592:. 4559:. 4529:. 4497:. 4467:. 4437:. 4404:. 4382:. 4353:. 4327:. 4301:. 4275:. 4249:. 4219:. 4193:. 4163:. 4133:. 4107:. 4081:. 4055:. 4029:. 3999:. 3969:. 3938:. 3908:. 3882:. 3852:. 3822:. 3792:. 3762:. 3732:. 3706:. 3680:. 3610:. 3580:. 3550:. 3479:. 3454:. 3392:. 3359:. 3333:. 3303:. 3273:. 3244:. 3211:. 3185:. 3152:. 3122:. 3088:. 3059:. 3024:. 2995:. 2966:. 2936:. 2906:. 2876:. 2842:. 2795:. 2763:. 2730:. 2704:. 2678:. 2648:. 2622:. 2596:. 2570:. 2540:. 2508:. 2482:. 2449:. 2419:. 2385:. 2352:. 2322:. 2285:. 2259:. 2228:. 2144:. 2122:. 2096:. 2066:. 2040:. 2014:. 1988:. 1958:. 1928:. 1895:. 1856:. 1830:. 1801:. 1768:. 1731:. 1697:. 1666:. 1595:. 450:( 439:] 346:e 337:e 259:) 255:( 238:3 195:) 186:) 177:) 160:) 151:) 142:) 20:)

Index

Olkiluoto

Finland
Eurajoki
Region of Satakunta
61°14′13″N 21°26′27″E / 61.23694°N 21.44083°E / 61.23694; 21.44083
Commission date
Teollisuuden Voima Oyj
TVO
BWR
PWR
EPR
AB ASEA-ATOM
Areva S.A.
Gulf of Bothnia
ASEA
Framatome
EPR
Nameplate capacity
MW
Capacity factor
Annual net output
Olkiluoto nuclear power plant
Related media on Commons
edit on Wikidata
Finnish
Swedish
Finland
nuclear power plants
Loviisa Nuclear Power Plant

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.