Electricity generated from Stage 1 turbines is injected into the nearby Deep Stream and
Waipori hydro schemes. This utilised the existing 33kV transmission line and avoided the cost of additional transmission infrastructure. Electricity from Stage 1 and the hydro schemes is then injected into either
318:
The wind farm generated its first electricity on 21 February 2011, with the first two turbines being commissioned. All twelve stage one turbines were completed and generating electricity by the end of March 2011.
307:
Construction of stage 1 of the wind farm, consisting of twelve turbines, began in
September 2010. Vestas V90-3MW turbines were chosen for the wind farm, having previously been used for stage 3 of
327:
The wind farm will be contained within 17.23 km (6.65 sq mi) of land at an elevation of 600 to 730 metres above sea level and about 50 kilometres west of
289:. Stage one of the wind farm, generating 36 MW, was commissioned in March 2011, and an additional 160 MW is consented to be commissioned in further stages.
579:
339:
Stage 2 at
Mahinerangi is proposed for up to 100 wind turbines producing 160MW and an annual output of over 600GWh. Resource consents were granted in 2009.
700:
70:
455:
695:
367:
Stage 2 and beyond is too large to inject into the
Waipori/Deep Stream system. Instead, it will inject into Transpower's Halfway Bush-
349:
680:
665:
649:
511:
484:
547:
428:
418:
357:
621:
118:
633:
398:
304:
Resource consent was granted in 2007 and later confirmed after an appeal to the
Environment Court.
390:
235:
600:
552:
361:
308:
274:
54:
404:
293:
247:
149:
27:
689:
433:
312:
533:
368:
353:
412:
331:. Most of the land in the proposed site is pasture grazed by sheep and cattle.
286:
380:
85:
72:
161:
259:
371:
110 kV line, which passes a short distance south of the wind farm.
328:
278:
296:. It was the second major wind farm to be built in the South Island.
227:
580:"Mahinerangi Wind Farm Project Community Meeting Progress Booklet"
282:
58:
32:
Four of the twelve turbines at
Mahinerangi Wind Farm, 2 April 2011
557:
138:
534:"TrustPower Welcomes Mahinerangi Wind Farm Decision"
315:, and trucked through Dunedin to their final site.
246:
234:
202:
194:
186:
178:
170:
160:
155:
145:
134:
117:
109:
101:
64:
49:
41:
20:
456:"DUNEDIN'S NEWEST WIND FARM OPEN TO THE PUBLIC"
348:Dunedin's local distribution network, or into
8:
548:"Mahinerangi wind farm passes court hurdle"
17:
450:
448:
506:
504:
502:
601:"Mahinerangi Windfarm up and in action"
479:
477:
475:
473:
444:
292:The wind farm is owned and operated by
182:15 m/s (54 km/h; 34 mph)
603:. Channel 9 Dunedin. 21 February 2011
7:
273:is a wind farm on the north side of
198:600–730 m (1,970–2,400 ft)
190:17.23 km (6.65 sq mi)
681:Upland Landscape Protection Society
311:in 2007. Turbines were shipped to
14:
701:Buildings and structures in Otago
411:
397:
383:
26:
666:"Mahinerangi Wind Farm Stage 2"
650:"Mahinerangi Wind Farm Stage 1"
512:"Mahinerangi Wind Farm Stage 2"
485:"Mahinerangi Wind Farm Stage 1"
1:
364:110 kV line at Berwick.
277:, around 50 km west of
248:Annual net output
717:
179:Rated wind speed
696:Wind farms in New Zealand
429:Wind power in New Zealand
256:
211:
207:
37:
25:
224:Make and model
419:Renewable energy portal
236:Nameplate capacity
174:90 m (295 ft)
110:Construction began
252:101 GWh (stage 1)
216:Units operational
135:Construction cost
86:45.76056°S 169.90500°E
624:Mahinerangi Wind Farm
271:Mahinerangi Wind Farm
203:Power generation
21:Mahinerangi Wind Farm
536:. Scoop. 2007-10-01.
242:Planned: 200 MW
119:Commission date
91:-45.76056; 169.90500
195:Site elevation
171:Rotor diameter
82: /
582:. 15 December 2010
560:. 22 December 2008
391:New Zealand portal
668:. Tilt Renewables
652:. Tilt Renewables
553:Otago Daily Times
514:. Tilt Renewables
487:. Tilt Renewables
309:Tararua Wind Farm
267:
266:
708:
677:
675:
673:
661:
659:
657:
637:
631:
625:
619:
613:
612:
610:
608:
597:
591:
590:
588:
587:
576:
570:
569:
567:
565:
544:
538:
537:
530:
524:
523:
521:
519:
508:
497:
496:
494:
492:
481:
468:
467:
465:
463:
452:
421:
416:
415:
407:
402:
401:
393:
388:
387:
386:
275:Lake Mahinerangi
260:edit on Wikidata
130:
128:
97:
96:
94:
93:
92:
87:
83:
80:
79:
78:
75:
55:Lake Mahinerangi
30:
18:
716:
715:
711:
710:
709:
707:
706:
705:
686:
685:
671:
669:
664:
655:
653:
648:
645:
640:
632:
628:
620:
616:
606:
604:
599:
598:
594:
585:
583:
578:
577:
573:
563:
561:
546:
545:
541:
532:
531:
527:
517:
515:
510:
509:
500:
490:
488:
483:
482:
471:
461:
459:
454:
453:
446:
442:
425:
424:
417:
410:
403:
396:
389:
384:
382:
377:
345:
337:
325:
302:
263:
241:
156:Wind farm
126:
124:
90:
88:
84:
81:
76:
73:
71:
69:
68:
33:
12:
11:
5:
714:
712:
704:
703:
698:
688:
687:
684:
683:
678:
662:
644:
643:External links
641:
639:
638:
636:- AEE Volume I
626:
614:
592:
571:
539:
525:
498:
469:
443:
441:
438:
437:
436:
431:
423:
422:
408:
405:Weather portal
394:
379:
378:
376:
373:
344:
341:
336:
333:
324:
321:
301:
298:
294:Mercury NZ Ltd
265:
264:
257:
254:
253:
250:
244:
243:
238:
232:
231:
225:
221:
220:
217:
213:
212:
209:
208:
205:
204:
200:
199:
196:
192:
191:
188:
187:Site area
184:
183:
180:
176:
175:
172:
168:
167:
164:
158:
157:
153:
152:
150:Mercury NZ Ltd
147:
143:
142:
136:
132:
131:
121:
115:
114:
113:September 2010
111:
107:
106:
103:
99:
98:
66:
62:
61:
51:
47:
46:
43:
39:
38:
35:
34:
31:
23:
22:
13:
10:
9:
6:
4:
3:
2:
713:
702:
699:
697:
694:
693:
691:
682:
679:
667:
663:
651:
647:
646:
642:
635:
630:
627:
623:
618:
615:
602:
596:
593:
581:
575:
572:
559:
555:
554:
549:
543:
540:
535:
529:
526:
513:
507:
505:
503:
499:
486:
480:
478:
476:
474:
470:
457:
451:
449:
445:
439:
435:
434:Project Hayes
432:
430:
427:
426:
420:
414:
409:
406:
400:
395:
392:
381:
374:
372:
370:
365:
363:
359:
355:
351:
342:
340:
334:
332:
330:
322:
320:
316:
314:
313:Port Chalmers
310:
305:
299:
297:
295:
290:
288:
284:
280:
276:
272:
261:
255:
251:
249:
245:
239:
237:
233:
229:
226:
223:
222:
218:
215:
214:
210:
206:
201:
197:
193:
189:
185:
181:
177:
173:
169:
165:
163:
159:
154:
151:
148:
144:
140:
137:
133:
122:
120:
116:
112:
108:
104:
100:
95:
67:
63:
60:
56:
52:
48:
44:
40:
36:
29:
24:
19:
16:
670:. Retrieved
654:. Retrieved
629:
617:
605:. Retrieved
595:
584:. Retrieved
574:
562:. Retrieved
551:
542:
528:
516:. Retrieved
489:. Retrieved
460:. Retrieved
458:. TrustPower
366:
354:Halfway Bush
346:
343:Transmission
338:
326:
317:
306:
303:
291:
270:
268:
15:
607:21 February
287:New Zealand
105:Operational
89: /
77:169°54′18″E
65:Coordinates
45:New Zealand
690:Categories
634:TrustPower
622:TrustPower
586:2011-01-23
564:19 October
440:References
350:Transpower
240:36 MW
141:75 million
127:March 2011
123:March 2011
74:45°45′38″S
358:Balclutha
230:: V90-3MW
53:north of
375:See also
369:Roxburgh
323:Location
146:Owner(s)
50:Location
672:24 June
656:24 June
518:24 June
491:24 June
462:5 April
335:Stage 2
329:Dunedin
300:History
279:Dunedin
166:Onshore
125: (
42:Country
228:Vestas
102:Status
283:Otago
281:, in
258:[
59:Otago
674:2018
658:2018
609:2011
566:2011
558:NZPA
520:2018
493:2018
464:2011
362:Gore
269:The
162:Type
139:NZ$
352:'s
692::
556:.
550:.
501:^
472:^
447:^
285:,
219:12
57:,
676:.
660:.
611:.
589:.
568:.
522:.
495:.
466:.
360:-
356:-
262:]
129:)
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.