Knowledge

Main Line for Europe

Source 📝

265: 25: 156: 358: 56: 1450: 932: 1300: 106:
The project was planned to be completed by 2020, however the entire project has not been delivered on time, with only some of the sections running. It will link 34 million people in five European countries. The overall length of the route from Paris to Budapest is 1,592 km (989 mi).
261:
project. Despite some protests, a 2011 statewide referendum upheld the majority support and thus the political decision to rebuild the station and let the Magistrale for Europe project proceed.
1553: 1222: 1172: 1248: 1353: 389:
near Linz was already upgraded until October 2012 to provide a maximum speed of 230 km/h (143 mph). Between Linz and Vienna a new parallel high-speed railway line (
1093: 1706: 300:
is being upgraded to separate slower traffic (freight and short-distance trains) from high speed trains, which will be able to reach 230 km/h (143 mph). From
1485: 273: 1546: 1438: 794: 525: 277: 1539: 1480: 248: 216: 1688: 1654: 288:), which Wendlingen- Ulm section is completed at the end of 2022 and provides a maximum speed of 250 km/h (155 mph) between Stuttgart and 1601: 1475: 1176: 413: 1666: 1647: 546: 281: 1619: 814: 1416: 1505: 624: 330: 1431: 183:
opened in July 2016. The new railway line provides a maximum speed up to 320 km/h (199 mph) and reduced the travel time from
1733: 1470: 200: 1728: 1028: 989: 80: 1520: 1562: 1502: 1498: 665: 606: 338: 326: 1683: 1678: 1613: 1424: 1583: 1197: 1595: 1577: 1495: 647: 417: 244: 224: 1490: 297: 1661: 1642: 789: 255:
is currently being rebuilt (scheduled for completion in 2025) as a through station in the course of the controversial
1354:"Z Viedne do Bratislavy za 40 minĂşt, sÄžubujĂş rakĂşske Ĺželeznice. SlovĂĄci musia opraviĹĽ mosty z čias cisĂĄra Ferdinanda" 950: 264: 1625: 1607: 1515: 1510: 1061: 945: 409: 366: 301: 132: 560: 293: 955: 382: 1701: 309: 1589: 1066: 305: 252: 1454: 322: 1274: 164: 1672: 168: 1157: 1146: 285: 100: 784: 773: 208: 188: 401: 393:) for a maximum speed of 250 km/h (155 mph) is to be completed in 2015, including the 1223:"New Wendlingen-Ulm line: pacesetter for rail transport throughout Germany goes into operation" 1024: 985: 405: 394: 386: 184: 1018: 979: 1382: 155: 1531: 346: 84: 38:
Please help update this article to reflect recent events or newly available information.
357: 116: 55: 1722: 937: 314: 257: 334: 927: 212: 180: 176: 92: 1249:"ÖBB-Spatenstich: Weststrecke zwischen Linz und Marchtrenk wird viergleisig" 1098: 1020:
The Hidden Wealth of Cities: Creating, Financing, and Managing Public Spaces
140: 124: 370: 144: 96: 231:
is built for a maximum speed of 200 km/h (124 mph), while the
1465: 1326: 421: 342: 236: 136: 1449: 378: 312:. Plans for the reconstruction of the Munich main station similar to 128: 1121: 329:, providing a maximum speed of 160 km/h (99 mph), and the 239:
SĂźd is for 250 km/h (155 mph). The second part of the new
931: 1411: 1173:"Finanzierungsvereinbarung fĂźr 2. Phase der LGV Est unterzeichnet" 356: 263: 154: 88: 1301:"Streckenausbau Wien − Bratislava. Bauabschnitt NiederĂśsterreich" 984:. Heidelberg: Springer Science & Business Media. p. 72. 374: 172: 99:. It was listed as TEN project No. 17 (Paris—Bratislava) by the 1535: 1420: 289: 143:
connections between Munich and Budapest in addition to direct
120: 18: 369:
line is to be extended to reduce travel time between Munich,
243:(Rastatt SĂźd to Bruchsal) is to be completed by 2014. At the 1094:"Ces projets français rĂŠalisĂŠs grâce aux aides europĂŠennes" 1275:"Vier Gleise fĂźr ein Halleluja: LĂźckenschluss Weststrecke" 1023:. Washington, D.C.: World Bank Publications. p. 98. 147:
connection between Vienna and Paris since December 2021.
175:
has been in use since 2007 whilst the second section to
420:. East of Vienna, a southeastern branch-off leads via 1060:
Florian Fuchs and Claudia Henzler (24 October 2019).
431: 404:
terminal station was demolished and replaced by new
1635: 1570: 251:which was built for 250 km/h (155 mph). 268:Demolition works on Stuttgart Hauptbahnhof, 2010 167:high-speed railway. Its first section as far as 345:border including a new third track serving the 119:trains, which ceased operations in 2009. Today 1055: 1053: 1051: 1049: 1047: 981:Railway Development: Impacts on Urban Dynamics 486:a portion (Appenweier-Karlsruhe) is in use now 1547: 1432: 59:Planned high-speed rail link Paris—Bratislava 8: 1377: 1375: 1327:"Marchegger Ostbahn schon 2025 zweigleisig" 274:Stuttgart–Augsburg new and upgraded railway 115:Parts of the route were formerly served by 1554: 1540: 1532: 1439: 1425: 1417: 1062:"Im Schneckentempo zur Schnellfahrstrecke" 973: 971: 381:to one hour each. The section between the 1087: 1085: 292:and 200 km/h (124 mph) on the 54: 1147:"TEN-T priority axes and projects 2005" 967: 526:Stuttgart–Wendlingen high-speed railway 449: 446: 443: 440: 437: 434: 83:(TEN-T) project for the creation of a 1012: 1010: 1008: 249:Mannheim–Stuttgart high-speed railway 123:rail connections exist from Paris to 16:Paris-Bratislava railway upgrade plan 7: 414:Bratislava-PetrĹžalka railway station 321:Trains from MĂźnchen Ost shall reach 1602:Scandinavian–Mediterranean Corridor 163:The French part of the line is the 103:in 1995, and is already under way. 912:242 min (4:02) (ø 216 km/h) 858:614 min (10:14) (ø 155 km/h) 675:Freilassing–Salzburg upgrade 2009 634:Freilassing–Salzburg upgrade 2009 14: 1092:Charles Gautier (24 March 2017). 909:317 min (5:17) (ø 166 km/h) 893:488 min (8:08) (ø 173 km/h) 876:468 min (7:40) (ø 178 km/h) 855:722 min (12:02) (ø 132 km/h) 547:Wendlingen–Ulm high-speed railway 282:Wendlingen–Ulm high-speed railway 272:In Stuttgart, the line joins the 199:In Germany, the line follows the 81:Trans-European Transport Networks 1620:North Sea–Mediterranean Corridor 1563:Trans-European Transport Network 1448: 1154:Trans-European Transport Network 930: 906:484 min (8:04) (ø 108 km/h) 881:Paris–Bratislava (southern line) 873:598 min (9:58) (ø 140 km/h) 863:Paris–Bratislava (northern line) 790:Bratislava–Marchegg railway line 217:Mannheim–Karlsruhe–Basel railway 23: 1383:"Wien–Bratislava in 40 Minuten" 1162:(14.4 MB, axis No 17, p44) 600:(northern line, 155.3 km) 408:. From here, trains run on the 135:(ÖBB) currently provide direct 1198:"Neubaustrecke Wendlingen–Ulm" 1: 1516:Vienna–Bratislava/Hegyeshalom 978:Bruinsma, Frank, ed. (2007). 666:Rosenheim–Freilassing upgrade 201:Appenweier–Strasbourg railway 1202:bahnprojekt-stuttgart-ulm.de 707:Wels–Linz (Linz–Marchtrenk) 625:MĂźhldorf–Freilassing upgrade 475:Baudrecourt–Vendenheim 2016 418:Vienna International Airport 416:, including a connection to 331:MĂźhldorf–Freilassing railway 245:Bruchsal Rollenberg junction 1175:(in German). Archived from 1017:Kaw, Jon Kher, ed. (2020). 702:Attnang-Puchheim–Wels 2011 657:? min (ø ? km/h) 654:? min (ø ? km/h) 304:trains may run directly to 187:to the largely refurbished 1750: 951:High-speed rail in Germany 686:Salzburg–Attnang-Puchheim 641:(southern line, 153.5 km) 339:Rosenheim–Salzburg railway 1734:High-speed rail in Europe 1697: 1584:North Sea–Baltic Corridor 1461: 946:High-speed rail in France 837: 808:40 min (ø 111 km/h) 766:181 min (ø 87 km/h) 749:25 min (ø 106 km/h) 732:44 min (ø 177 km/h) 729:48 min (ø 163 km/h) 697:60 min (ø 127 km/h) 696: 693: 691: 682: 679: 656: 653: 651: 639:Munich–Rosenheim–Salzburg 638: 616:62 min (ø 148 km/h) 615: 613:87 min (ø 106 km/h) 612: 610: 597: 593:18 min (ø 203 km/h) 574:26 min (ø 198 km/h) 571:41 min (ø 126 km/h) 538:28 min (ø 174 km/h) 537: 534: 532: 518: 514:35 min (ø 154 km/h) 494:25 min (ø 194 km/h) 469: 467:110 min (ø 260 km/h) 466: 464:237 min (ø 121 km/h) 463: 457: 454: 361:Vienna main station, 2012 133:Austrian Federal Railways 32:This article needs to be 1729:High-speed railway lines 1596:Orient/East–Med Corridor 1578:Baltic–Adriatic Corridor 956:High-speed rail in Italy 833:55 min (ø 87 km/h) 805:57 min (ø 68 km/h) 746:41 min (ø 64 km/h) 694:64 min (ø 119 km/h) 648:Munich–Rosenheim upgrade 598:Munich–MĂźhldorf–Salzburg 535:54 min (ø 104 km/h) 511:35 min (ø 154 km/h) 491:40 min (ø 122 km/h) 191:to less than two hours. 1702:Trans-European Networks 607:Munich–MĂźhldorf upgrade 590:37 min (ø 99 km/h) 508:61 min (ø 89 km/h) 327:Munich–MĂźhldorf railway 298:Munich–Augsburg railway 95:, with a branch-off to 1590:Mediterranean Corridor 1307:(in German). June 2020 1122:"Main Line for Europe" 461:Paris–Baudrecourt 2007 400:In Vienna, the former 362: 302:MĂźnchen-Pasing station 269: 253:Stuttgart Hauptbahnhof 160: 60: 1626:Rhine–Danube Corridor 1608:Rhine–Alpine Corridor 1471:Strasbourg–Appenweier 1455:Magistrale for Europe 1305:infrastruktur.oebb.at 1126:MainLineforEurope.org 721:Doubling to 4 tracks 360: 323:Salzburg Hauptbahnhof 318:have been abandoned. 267: 158: 73:Magistrale europĂŠenne 69:Magistrale fĂźr Europa 65:Magistrale for Europe 58: 1673:Motorways of the Sea 1521:Hegyeshalom–Budapest 1412:Main Line for Europe 561:Ulm–Augsburg railway 480:Strasbourg–Karlsruhe 310:MĂźnchen Hauptbahnhof 294:Ulm–Augsburg railway 284:lines replacing the 278:Stuttgart–Wendlingen 77:Main Line for Europe 1476:Appenweier–Bruchsal 1158:European Commission 1067:SĂźddeutsche Zeitung 815:Parndorf–Bratislava 499:Karlsruhe–Stuttgart 341:leading across the 286:Fils Valley Railway 159:Paris Gare de l'Est 101:European Commission 1689:Combined transport 1486:Stuttgart–Augsburg 1481:Bruchsal–Stuttgart 785:Marchegger Ostbahn 363: 349:commuter network. 337:the MoE joins the 270: 247:the MoE joins the 189:Gare de Strasbourg 165:LGV Est europĂŠenne 161: 85:high-speed railway 61: 1716: 1715: 1658: 1650: 1614:Atlantic Corridor 1529: 1528: 1352:Ĺ nĂ­dl, VladimĂ­r. 1253:Presseinfos - ÖBB 1229:. 9 December 2022 916: 915: 737:St.PĂślten-Vienna 450:Planned duration 406:Wien Hauptbahnhof 395:Wienerwald Tunnel 387:Wels Hauptbahnhof 325:via the upgraded 185:Gare de Paris-Est 53: 52: 1741: 1707:Executive Agency 1667:Inland waterways 1653: 1645: 1556: 1549: 1542: 1533: 1496:Munich–Rosenheim 1466:Paris–Strasbourg 1453: 1452: 1441: 1434: 1427: 1418: 1399: 1398: 1396: 1394: 1379: 1370: 1369: 1367: 1365: 1349: 1343: 1342: 1340: 1338: 1323: 1317: 1316: 1314: 1312: 1297: 1291: 1290: 1288: 1286: 1271: 1265: 1264: 1262: 1260: 1245: 1239: 1238: 1236: 1234: 1227:deutschebahn.com 1219: 1213: 1212: 1210: 1208: 1194: 1188: 1187: 1185: 1184: 1169: 1163: 1161: 1151: 1143: 1137: 1136: 1134: 1132: 1118: 1112: 1111: 1109: 1107: 1089: 1080: 1079: 1077: 1075: 1057: 1042: 1041: 1039: 1037: 1014: 1003: 1002: 1000: 998: 975: 940: 935: 934: 818:(southern line) 798: 778:(northern line) 756:Vienna–Budapest 715:Linz–St. PĂślten 455:Paris–Strasbourg 447:Recent duration 444:Duration before 432: 383:Attnang-Puchheim 365:In Austria, the 308:without passing 48: 45: 39: 27: 26: 19: 1749: 1748: 1744: 1743: 1742: 1740: 1739: 1738: 1719: 1718: 1717: 1712: 1693: 1636:Infrastructures 1631: 1566: 1560: 1530: 1525: 1511:Salzburg–Vienna 1503:Munich–MĂźhldorf 1491:Augsburg–Munich 1457: 1447: 1445: 1408: 1403: 1402: 1392: 1390: 1381: 1380: 1373: 1363: 1361: 1351: 1350: 1346: 1336: 1334: 1325: 1324: 1320: 1310: 1308: 1299: 1298: 1294: 1284: 1282: 1273: 1272: 1268: 1258: 1256: 1247: 1246: 1242: 1232: 1230: 1221: 1220: 1216: 1206: 1204: 1196: 1195: 1191: 1182: 1180: 1171: 1170: 1166: 1149: 1145: 1144: 1140: 1130: 1128: 1120: 1119: 1115: 1105: 1103: 1091: 1090: 1083: 1073: 1071: 1059: 1058: 1045: 1035: 1033: 1031: 1016: 1015: 1006: 996: 994: 992: 977: 976: 969: 964: 936: 929: 926: 920: 919: 918: 817: 792: 788: 777: 774:Vienna–Marchegg 640: 599: 579:Augsburg–Munich 430: 410:Eastern Railway 367:Western Railway 355: 347:Salzburg S-Bahn 276:(including the 197: 153: 113: 49: 43: 40: 37: 28: 24: 17: 12: 11: 5: 1747: 1745: 1737: 1736: 1731: 1721: 1720: 1714: 1713: 1711: 1710: 1704: 1698: 1695: 1694: 1692: 1691: 1686: 1681: 1676: 1669: 1664: 1659: 1651: 1639: 1637: 1633: 1632: 1630: 1629: 1623: 1617: 1611: 1605: 1599: 1593: 1587: 1581: 1574: 1572: 1568: 1567: 1561: 1559: 1558: 1551: 1544: 1536: 1527: 1526: 1524: 1523: 1518: 1513: 1508: 1493: 1488: 1483: 1478: 1473: 1468: 1462: 1459: 1458: 1446: 1444: 1443: 1436: 1429: 1421: 1415: 1414: 1407: 1406:External links 1404: 1401: 1400: 1387:bmvit INFOTHEK 1371: 1344: 1318: 1292: 1266: 1240: 1214: 1189: 1164: 1138: 1113: 1081: 1043: 1029: 1004: 990: 966: 965: 963: 960: 959: 958: 953: 948: 942: 941: 925: 922: 914: 913: 910: 907: 904: 902: 899: 895: 894: 891: 889: 887: 885: 882: 878: 877: 874: 871: 869: 867: 864: 860: 859: 856: 853: 851: 849: 846: 845:Paris–Budapest 842: 841: 835: 834: 831: 829: 827: 822: 819: 810: 809: 806: 803: 800: 782: 779: 770: 769: 767: 764: 762: 760: 757: 753: 752: 750: 747: 744: 741: 738: 734: 733: 730: 727: 725: 719: 716: 712: 711: 704: 703: 699: 698: 695: 692: 690: 684: 681: 677: 676: 673: 669: 668: 663: 659: 658: 655: 652: 650: 645: 642: 636: 635: 632: 628: 627: 622: 618: 617: 614: 611: 609: 604: 601: 595: 594: 591: 588: 586: 583: 580: 576: 575: 572: 569: 567: 558: 555: 551: 550: 544: 540: 539: 536: 533: 531: 523: 520: 519:Stuttgart–Ulm 516: 515: 512: 509: 506: 503: 500: 496: 495: 492: 489: 487: 484: 481: 477: 476: 472: 471: 468: 465: 462: 459: 456: 452: 451: 448: 445: 442: 439: 436: 429: 426: 354: 351: 196: 193: 152: 149: 127:or at longest 117:Orient Express 112: 109: 51: 50: 31: 29: 22: 15: 13: 10: 9: 6: 4: 3: 2: 1746: 1735: 1732: 1730: 1727: 1726: 1724: 1708: 1705: 1703: 1700: 1699: 1696: 1690: 1687: 1685: 1682: 1680: 1677: 1674: 1670: 1668: 1665: 1663: 1660: 1656: 1652: 1649: 1644: 1641: 1640: 1638: 1634: 1627: 1624: 1621: 1618: 1615: 1612: 1609: 1606: 1603: 1600: 1597: 1594: 1591: 1588: 1585: 1582: 1579: 1576: 1575: 1573: 1569: 1564: 1557: 1552: 1550: 1545: 1543: 1538: 1537: 1534: 1522: 1519: 1517: 1514: 1512: 1509: 1507: 1504: 1500: 1497: 1494: 1492: 1489: 1487: 1484: 1482: 1479: 1477: 1474: 1472: 1469: 1467: 1464: 1463: 1460: 1456: 1451: 1442: 1437: 1435: 1430: 1428: 1423: 1422: 1419: 1413: 1410: 1409: 1405: 1388: 1384: 1378: 1376: 1372: 1359: 1355: 1348: 1345: 1332: 1328: 1322: 1319: 1306: 1302: 1296: 1293: 1280: 1276: 1270: 1267: 1254: 1250: 1244: 1241: 1228: 1224: 1218: 1215: 1203: 1199: 1193: 1190: 1179:on 2010-05-24 1178: 1174: 1168: 1165: 1159: 1155: 1148: 1142: 1139: 1127: 1123: 1117: 1114: 1101: 1100: 1095: 1088: 1086: 1082: 1069: 1068: 1063: 1056: 1054: 1052: 1050: 1048: 1044: 1032: 1030:9781464814938 1026: 1022: 1021: 1013: 1011: 1009: 1005: 993: 991:9783790819724 987: 983: 982: 974: 972: 968: 961: 957: 954: 952: 949: 947: 944: 943: 939: 938:Trains portal 933: 928: 923: 921: 911: 908: 905: 903: 900: 897: 896: 892: 890: 888: 886: 883: 880: 879: 875: 872: 870: 868: 865: 862: 861: 857: 854: 852: 850: 847: 844: 843: 840: 836: 832: 830: 828: 826: 823: 820: 816: 812: 811: 807: 804: 801: 796: 791: 786: 783: 780: 775: 772: 771: 768: 765: 763: 761: 758: 755: 754: 751: 748: 745: 742: 739: 736: 735: 731: 728: 726: 724: 720: 717: 714: 713: 710: 706: 705: 701: 700: 689: 685: 680:Salzburg–Linz 678: 674: 671: 670: 667: 664: 661: 660: 649: 646: 643: 637: 633: 630: 629: 626: 623: 620: 619: 608: 605: 602: 596: 592: 589: 587: 584: 581: 578: 577: 573: 570: 568: 566: 562: 559: 556: 554:Ulm–Augsburg 553: 552: 548: 545: 542: 541: 530: 527: 524: 521: 517: 513: 510: 507: 504: 501: 498: 497: 493: 490: 488: 485: 482: 479: 478: 474: 473: 460: 453: 433: 427: 425: 424:to Budapest. 423: 419: 415: 411: 407: 403: 398: 396: 392: 391:Neue Westbahn 388: 385:rail hub and 384: 380: 376: 372: 368: 359: 352: 350: 348: 344: 340: 336: 332: 328: 324: 319: 317: 316: 311: 307: 303: 299: 295: 291: 287: 283: 279: 275: 266: 262: 260: 259: 254: 250: 246: 242: 238: 234: 230: 226: 222: 218: 215:and then the 214: 210: 206: 202: 194: 192: 190: 186: 182: 178: 174: 170: 166: 157: 150: 148: 146: 142: 138: 134: 130: 126: 122: 118: 110: 108: 104: 102: 98: 94: 90: 87:line between 86: 82: 78: 74: 70: 66: 57: 47: 35: 30: 21: 20: 1655:Conventional 1391:. Retrieved 1386: 1362:. Retrieved 1357: 1347: 1335:. Retrieved 1330: 1321: 1309:. Retrieved 1304: 1295: 1283:. Retrieved 1278: 1269: 1257:. Retrieved 1252: 1243: 1231:. Retrieved 1226: 1217: 1205:. Retrieved 1201: 1192: 1181:. Retrieved 1177:the original 1167: 1153: 1141: 1129:. Retrieved 1125: 1116: 1104:. Retrieved 1097: 1072:. Retrieved 1065: 1034:. Retrieved 1019: 995:. Retrieved 980: 917: 898:Paris–Munich 884:1409 km 866:1394 km 848:1592 km 838: 824: 787:upgrade 2025 759:263 km 722: 718:130 km 708: 687: 564: 528: 399: 390: 364: 320: 315:Stuttgart 21 313: 271: 258:Stuttgart 21 256: 241:Rheintalbahn 240: 233:Rheintalbahn 232: 228: 221:Rheintalbahn 220: 209:Rhine Bridge 204: 198: 162: 114: 105: 76: 72: 68: 64: 62: 41: 33: 1389:(in German) 1360:(in Slovak) 1333:(in German) 1281:(in German) 1255:(in German) 1102:(in French) 1070:(in German) 901:875 km 821:80 km 793: [ 781:65 km 776:–Bratislava 740:44 km 683:127 km 557:85 km 543:60 km 458:476 km 335:Freilassing 306:MĂźnchen Ost 207:) from the 169:Baudrecourt 1723:Categories 1709:(TEN-T EA) 1648:high-speed 1331:noe.ORF.at 1279:Unsere ÖBB 1183:2011-07-16 962:References 582:61 km 502:90 km 483:81 km 402:SĂźdbahnhof 296:line. The 229:Europabahn 223:) down to 213:Appenweier 205:Europabahn 181:Strasbourg 177:Vendenheim 93:Bratislava 71:; French: 44:March 2022 1571:Corridors 1506:–Salzburg 1499:–Salzburg 1099:Le Figaro 723:2024–2030 438:Distance 333:line. In 141:EuroNight 125:Stuttgart 67:(German: 1684:Airports 1679:Seaports 1643:Railways 1628:(CORR 9) 1622:(CORR 8) 1616:(CORR 7) 1610:(CORR 6) 1604:(CORR 5) 1598:(CORR 4) 1592:(CORR 3) 1586:(CORR 2) 1580:(CORR 1) 1358:DennĂ­k N 924:See also 799:upgrade 563:upgrade 522:25.2 km 441:Opening 435:Section 412:line to 371:Salzburg 343:Austrian 225:Bruchsal 171:east of 145:Nightjet 111:Sections 97:Budapest 1565:(TEN-T) 1393:13 July 1364:13 July 1337:13 July 1311:13 July 1285:13 July 1259:13 July 1233:13 July 1207:13 July 1160:. 2005. 1131:13 July 1106:20 June 1074:20 June 1036:20 June 997:20 June 813:Vienna– 802:65 min 353:Austria 237:Rastatt 195:Germany 137:Railjet 34:updated 1027:  988:  839:total: 662:82 km 644:65 km 621:65 km 603:85 km 505:in use 379:Vienna 377:, and 227:. The 151:France 131:. The 129:Munich 1662:Roads 1150:(PDF) 797:] 743:2012 672:5 km 631:5 km 549:2022 428:Route 179:near 89:Paris 79:is a 75:) or 1395:2024 1366:2024 1339:2024 1313:2024 1287:2024 1261:2024 1235:2024 1209:2024 1133:2024 1108:2020 1076:2020 1038:2020 1025:ISBN 999:2020 986:ISBN 825:2013 709:2028 688:2013 585:2011 565:2025 529:2025 422:Győr 375:Linz 280:and 173:Metz 139:and 91:and 63:The 290:Ulm 235:to 211:to 121:TGV 1725:: 1501:/ 1385:. 1374:^ 1356:. 1329:. 1303:. 1277:. 1251:. 1225:. 1200:. 1156:. 1152:. 1124:. 1096:. 1084:^ 1064:. 1046:^ 1007:^ 970:^ 795:sk 470:- 397:. 373:, 1675:' 1671:' 1657:) 1646:( 1555:e 1548:t 1541:v 1440:e 1433:t 1426:v 1397:. 1368:. 1341:. 1315:. 1289:. 1263:. 1237:. 1211:. 1186:. 1135:. 1110:. 1078:. 1040:. 1001:. 219:( 203:( 46:) 42:( 36:.

Index


Trans-European Transport Networks
high-speed railway
Paris
Bratislava
Budapest
European Commission
Orient Express
TGV
Stuttgart
Munich
Austrian Federal Railways
Railjet
EuroNight
Nightjet

LGV Est europĂŠenne
Baudrecourt
Metz
Vendenheim
Strasbourg
Gare de Paris-Est
Gare de Strasbourg
Appenweier–Strasbourg railway
Rhine Bridge
Appenweier
Mannheim–Karlsruhe–Basel railway
Bruchsal
Rastatt
Bruchsal Rollenberg junction

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑