145:
111:
then a harbour engineer. In 2011 the lock which had fallen out of use was rehabilitated as part of the Metro
Colombo Urban Development Project.
165:
128:
Environmental
Screening Report for Construction of bank protection walls of Beira Lake and Rehabilitation of McCallum lock gates
130:
96:
to facilitate barge traffic between ships docked in the harbour and ports on the Kalani river. The bridge connected the
175:
170:
93:
78:
108:
134:
104:
86:
107:, Prime Minister of Ceylon, one of the designed engineers in involved in its design was
97:
159:
146:
100 Ton Locks and Bridge, McCallum Road by A.N.S. Kulasinghe & L.J. Weeraratne
127:
82:
90:
74:
49:
44:
36:
28:
21:
8:
18:
120:
89:. Built between 1951 and 1956 by the
7:
14:
100:to the D.R. Wijewardena Mawatha.
1:
55:; 68 years ago
192:
23:McCallum Lock Gates Bridge
166:Bridges completed in 1956
94:Public Works Department
109:A. N. S. Kulasinghe
105:Sir John Kotelawala
71:McCallum Lock Gates
176:Locks of Sri Lanka
171:Bridges in Colombo
133:2016-03-04 at the
67:
66:
183:
148:
143:
137:
125:
63:
61:
56:
19:
191:
190:
186:
185:
184:
182:
181:
180:
156:
155:
152:
151:
144:
140:
135:Wayback Machine
126:
122:
117:
87:Colombo Harbour
83:East Beira Lake
59:
57:
54:
32:vehicle traffic
24:
17:
12:
11:
5:
189:
187:
179:
178:
173:
168:
158:
157:
150:
149:
138:
119:
118:
116:
113:
77:over a set of
65:
64:
51:
47:
46:
42:
41:
38:
34:
33:
30:
26:
25:
22:
15:
13:
10:
9:
6:
4:
3:
2:
188:
177:
174:
172:
169:
167:
164:
163:
161:
154:
147:
142:
139:
136:
132:
129:
124:
121:
114:
112:
110:
106:
101:
99:
95:
92:
88:
84:
80:
76:
72:
52:
48:
43:
39:
37:Maintained by
35:
31:
27:
20:
153:
141:
123:
102:
70:
68:
81:connecting
73:comprise a
160:Categories
115:References
103:Opened by
79:lock gates
131:Archived
85:and the
40:Trailnet
91:Colombo
58: (
45:History
29:Carries
75:bridge
50:Opened
16:Bridge
98:Fort
69:The
60:1956
53:1956
162::
62:)
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.