110: 425:
On 2 April 2024, the Major Transport Infrastructure Authority merged with Victorian Health Building Authority to form Victorian Infrastructure Delivery Authority (VIDA). The Regional Rail Revival and Melbourne Airport Rail projects were also transferred to the Level Crossing Removal Project, and the
391:
Prior to the 2017 Victorian Budget, the Andrews government announced that the Ballarat Line Upgrade would be augmented by improvements to each of Victoria's regional passenger rail lines, to be collectively branded as the Regional Rail Revival. Then, in April, the government announced that the MMRA
587:. Construction is expected to begin in 2022 along a preferred route via Sunshine in the city's west, with funding from state and federal governments as well as the private sector. An expression of interest process closed in late 2018 and a detailed business case will be completed by RPV in 2019. 350:(DEDJTR). Responsibility for the Rail Office of the "Moving Victoria" program was transferred to DEDJTR from DTPLI and during this process, the Office was renamed and reconstituted as MMRA, reporting to the newly created Coordinator General, Major Transport Infrastructure Program. 40: 525:
is the collective branding for a series of major maintenance and development works overseen by RPV on the regional Victorian rail network. The first works to be announced were the Ballarat Line Upgrade, a $ 518 million package of works including several new
388:. Planning for the upgrade project was carried out on this basis, with Evan Tattersall describing extension of suburban services as a "long-term aspiration" that could be completed following the opening of the Metro Tunnel. 632: 686: 1266: 260:
team, and RPV was replaced by Metro Tunnel Project. The Metro Tunnel Project continued to be a project team within the new Victorian Infrastructure Delivery Authority, which had replaced MITA on the same day.
661: 347: 778: 330:
works required to formally commence the Metro Tunnel project. The funding was brought forward from a promise made at the 2014 election for $ 300 million towards the project in the first budget of the new
1204: 1112: 949: 343: 918: 1235: 1143: 422:
and the Department of Transport, RPV was abolished as an independent administrative office and incorporated into the new Major Transport Infrastructure Authority as a project team.
249:'s regional rail services. In January 2019, it was renamed to RPV to reflect its expanded scope. It also ceased to be an independent office and became a project team within the 809: 380:
announced that the Ballarat Line Upgrade would be managed by a dedicated project team established within the MMRA, noting the potential for the projects to together result in
496:
RPV is responsible for the delivery of the Metro Tunnel project, including property acquisitions, planning approvals and ensuring positive social outcomes. It appointed a
697: 1301: 1326: 1316: 1258: 887: 652: 842: 770: 1336: 1196: 747: 353:
On 10 March 2015, Evan Tattersall was appointed as the chief executive officer of the MMRA. Previously, Tattersall had been involved in the delivery of the
361:. Many of the original staff of the MMRA transferred from other rail infrastructure projects in Melbourne, or from international projects such as London's 1104: 1331: 419: 332: 296: 941: 275:
For much of the history of the Victorian railway network, construction work was carried out by the Construction Branch of the vertically integrated
165: 910: 613:, at the same time as investigating a dedicated high-speed alignment to Geelong. This work was later announced as part of the state government's 1321: 1053: 979: 245:, the office was later expanded in its responsibilities to include the management and planning of a number of major infrastructure programs on 1227: 287:, pioneered a new approach to construction management, where the MURLA employed only a small staff and most work was outsourced to a private 404:, who observed that a single rail construction authority would be able to coordinate projects and efficiently manage specialised resources. 482: 250: 155: 1135: 1043:"ORDER ESTABLISHING THE MAJOR TRANSPORT INFRASTRUCTURE AUTHORITY AS AN ADMINISTRATIVE OFFICE AND ABOLISHING FIVE ADMINISTRATIVE OFFICES" 1173: 401: 800: 723: 606: 385: 369: 626: 558: 470: 446: 310:'s recommendation of a new north–south rail connection. It was realigned and rebranded as the Melbourne Rail Link under premier 1005: 358: 257: 879: 478: 283:
railway line, which began construction in 1971. The Melbourne Underground Rail Loop Authority (MURLA), established by the
610: 242: 834: 578: 393: 230: 127: 739: 474: 408: 307: 279:(VR). The first major rail infrastructure project in Melbourne to be delivered by an independent entity was the 566: 557:
includes duplication and stabling facilities, as well as the eventual replacement of the rail bridge over the
546: 458: 339: 319: 315: 602: 554: 550: 531: 381: 322:. The establishment of the MMRA was announced in February 2015 with a commitment of $ 40 million. Premier 292: 218: 214: 489:– and will increase the capacity of the inner Melbourne network by releasing train paths in the existing 522: 517: 486: 462: 373: 226: 256:
On 2 April 2024, the Regional Rail Revival and Melbourne Airport Rail projects were transferred to the
562: 538: 493:
underground railway. The tunnel is expected to be structurally complete by 2024 and to open in 2025.
454: 1042: 971: 505: 426:
RPV project team was replaced by the Metro Tunnel Project to focus on testing and commissioning.
354: 327: 276: 1078: 176: 326:, making the announcement, described the authority's initial task as managing the planning and 719: 617:, in additional to the possible high-speed electrification of the Geelong and Ballarat lines. 614: 596: 584: 39: 17: 660:. Department of Economic Development, Jobs, Transport and Resources. July 2017. p. 254. 1165: 808:. Department of Economic Development, Jobs, Transport and Resources. June 2015. p. 10. 217:, Australia, responsible for the management of certain major infrastructure projects on the 453:
in the city's inner south-east. Currently under construction, the tunnels will connect the
397: 542: 323: 311: 1310: 527: 466: 377: 440: 302:
The Metro Tunnel project was first proposed in 2008 by the state government led by
270: 222: 1001: 450: 303: 291:
by contract. The administrative costs of MURLA were jointly met by the VR, the
497: 288: 583:
RPV is responsible for planning, procurement and delivery of a rail line to
501: 490: 362: 342:
perspective, the creation of the MMRA was part of the reorganisation of the
280: 445:
The Metro Tunnel is a pair of 9 km (5.6 mi) rail tunnels between
299:
from their annual budgets, separately to the costs of the project itself.
1296: 911:"What do we get from $ 518m? A long term look at Ballarat's rail service" 376:
were announced. In November of that year, Minister for Public Transport
633:
List of Victoria Government Infrastructure Plans, Proposals and Studies
569:
will also receive lengths of duplication and signalling improvements.
1259:"Geelong to Melbourne in 45 minutes under Labor's regional rail plan" 412: 246: 549:, and works to increase permissible track speed between Bendigo and 601:
From April 2018, RPV became responsible for planning and managing
415:, following problems with the latter's management of the program. 314:
in 2014, but reverted to closely match its original form when the
1291: 1136:"Rail project the chance to leave 'a great legacy' for Melbourne" 348:
Department of Economic Development, Jobs, Transport and Resources
530:
on the Ballarat corridor, new stabling facilities for trains at
771:"Melbourne Metro rail tunnel project revived by Daniel Andrews" 1197:"Global interest for Melbourne Airport rail link construction" 864:
Smith, Kevin (July 2016). "Relieving city centre congestion".
392:
would be renamed Rail Projects Victoria, and begin work on a
880:"Ballarat Line Upgrade To Be Delivered By Australia's Best" 407:
In mid-2018, it was reported that RPV would take over the
344:
Department of Transport, Planning and Local Infrastructure
835:"Melbourne Metro Rail, level crossing upgrade CEOs named" 1105:"Melbourne Metro a year ahead of schedule, Premier says" 418:
On 1 January 2019, with the division of DEDJTR into the
400:
line to Geelong. The reorganisation was welcomed by the
1228:"Victoria mulls Melbourne - Geelong high-speed options" 1027:
Hunt, Peter (13 June 2018). "Rail upgrades off track".
1002:"PTUA welcomes study into high speed rail for Geelong" 1004:. Public Transport Users Association. 27 April 2018. 942:"$ 1.4 billion regional rail revival in state budget" 629:– another DEDJTR infrastructure administrative office 696:. Department of Transport. p. 4. Archived from 253:'s Major Transport Infrastructure Authority (MITA). 195: 171: 161: 151: 137: 120: 104: 96: 88: 70: 51: 46: 740:"Work Begins On The Melbourne Metro Rail Project" 372:in 2016, a series of major upgrade works for the 718:. Melbourne University Publishing. p. 191. 534:, and several station upgrades along the route. 8: 32: 469:. The project includes five new stations – 368:At the same time as the publication of the 130:, Minister for Transport and Infrastructure 1134:Chalkley-Rhoden, Stephanie (18 May 2017). 687:"Melbourne Underground Rail Loop Handbook" 420:Department of Jobs, Precincts and Regions 297:Melbourne and Metropolitan Board of Works 285:Melbourne Underground Rail Loop Act 1970 166:Major Transport Infrastructure Authority 1327:Government agencies established in 2015 1317:Government agencies of Victoria (state) 644: 508:to construct the tunnels in late 2017. 1302:MMRA at Victorian Government Directory 31: 1207:from the original on 18 December 2018 1195:Ilanbey, Sumeyya (13 December 2018). 815:from the original on 27 November 2022 750:from the original on 23 February 2018 357:and the redevelopment of Melbourne's 7: 1337:Public utilities established in 2015 1052:. No. S 580. 21 December 2018. 449:in Melbourne's inner north-west and 251:Department of Transport and Planning 156:Department of Transport and Planning 1115:from the original on 8 January 2023 1059:from the original on 4 January 2019 972:"Planning For Fast Rail To Geelong" 802:Annual Report 2014 – 15: Volume One 66:(as Melbourne Metro Rail Authority) 1238:from the original on 26 April 2018 1176:from the original on 12 March 2018 1172:. Melbourne Metro Rail Authority. 1146:from the original on 23 March 2018 1008:from the original on 29 April 2018 982:from the original on 26 April 2018 952:from the original on 26 April 2018 890:from the original on 13 March 2018 845:from the original on 3 August 2020 781:from the original on 13 March 2018 716:The railways of Victoria 1854-2004 667:from the original on 21 March 2018 402:Public Transport Users Association 25: 1103:Jacks, Timna (20 February 2018). 940:Tomazin, Farrah (29 April 2017). 909:Wrigley, Brendan (3 March 2017). 370:Regional Network Development Plan 1332:2015 establishments in Australia 1257:Jacks, Timna (15 October 2018). 921:from the original on 4 July 2017 769:Carey, Adam (16 February 2015). 627:Level Crossing Removal Authority 233:. Originally established as the 109: 108: 38: 1269:from the original on 9 May 2019 541:upgrade works include improved 1226:Carter, Mark (26 April 2018). 258:Level Crossing Removal Project 235:Melbourne Metro Rail Authority 100:Melbourne, Victoria, Australia 18:Melbourne Metro Rail Authority 1: 1322:Transport in Victoria (state) 1297:Regional Rail Revival website 1232:International Railway Journal 866:International Railway Journal 243:Melbourne Metro Rail Project 213:) was a project team of the 1050:Victoria Government Gazette 579:Melbourne Airport rail link 573:Melbourne Airport rail link 394:Melbourne Airport rail link 271:Metro Tunnel § History 1353: 594: 576: 515: 438: 268: 409:Murray Basin Rail Project 308:Eddington Transport Study 200: 37: 1079:"Rail Projects Victoria" 1166:"Regional Rail Revival" 340:machinery of government 320:2014 Victorian election 189:/rail-projects-victoria 359:Southern Cross station 293:Melbourne City Council 265:Organisational history 231:Melbourne Airport Rail 219:Victorian rail network 215:Government of Victoria 207:Rail Projects Victoria 138:Project team executive 76:; 5 months ago 33:Rail Projects Victoria 1170:Ballarat Line Upgrade 654:Annual Report 2016-17 523:Regional Rail Revival 518:Regional Rail Revival 512:Regional Rail Revival 227:Regional Rail Revival 57:; 9 years ago 55:16 February 2015 47:Project team overview 1292:Metro Tunnel website 1083:Victoria's Big Build 746:. 16 February 2015. 714:Lee, Robert (2007). 318:government lost the 144:Evan Tattersall, CEO 121:Minister responsible 976:Premier of Victoria 886:. 9 November 2016. 884:Premier of Victoria 744:Premier of Victoria 34: 355:Regional Rail Link 328:site investigation 277:Victorian Railways 241:), to deliver the 978:. 26 April 2018. 868:. pp. 44–45. 841:. 10 March 2015. 694:City Loop history 615:Western Rail Plan 597:Western Rail Plan 591:Western Rail Plan 585:Melbourne Airport 567:Warrnambool lines 346:(DTPLI) into the 204: 203: 152:Parent department 74:2 April 2024 27:Government agency 16:(Redirected from 1344: 1279: 1278: 1276: 1274: 1254: 1248: 1247: 1245: 1243: 1223: 1217: 1216: 1214: 1212: 1192: 1186: 1185: 1183: 1181: 1162: 1156: 1155: 1153: 1151: 1131: 1125: 1124: 1122: 1120: 1100: 1094: 1093: 1091: 1089: 1075: 1069: 1068: 1066: 1064: 1058: 1047: 1039: 1033: 1032: 1029:The Weekly Times 1024: 1018: 1017: 1015: 1013: 998: 992: 991: 989: 987: 968: 962: 961: 959: 957: 937: 931: 930: 928: 926: 906: 900: 899: 897: 895: 876: 870: 869: 861: 855: 854: 852: 850: 831: 825: 824: 822: 820: 814: 807: 797: 791: 790: 788: 786: 766: 760: 759: 757: 755: 736: 730: 729: 711: 705: 704: 703:on 28 June 2009. 702: 691: 683: 677: 676: 674: 672: 666: 659: 649: 447:South Kensington 306:, following the 191: 188: 186: 184: 182: 180: 178: 162:Parent authority 116: 112: 111: 84: 82: 77: 65: 63: 58: 42: 35: 21: 1352: 1351: 1347: 1346: 1345: 1343: 1342: 1341: 1307: 1306: 1288: 1283: 1282: 1272: 1270: 1256: 1255: 1251: 1241: 1239: 1225: 1224: 1220: 1210: 1208: 1194: 1193: 1189: 1179: 1177: 1164: 1163: 1159: 1149: 1147: 1133: 1132: 1128: 1118: 1116: 1102: 1101: 1097: 1087: 1085: 1077: 1076: 1072: 1062: 1060: 1056: 1045: 1041: 1040: 1036: 1026: 1025: 1021: 1011: 1009: 1000: 999: 995: 985: 983: 970: 969: 965: 955: 953: 939: 938: 934: 924: 922: 908: 907: 903: 893: 891: 878: 877: 873: 863: 862: 858: 848: 846: 833: 832: 828: 818: 816: 812: 805: 799: 798: 794: 784: 782: 768: 767: 763: 753: 751: 738: 737: 733: 726: 713: 712: 708: 700: 689: 685: 684: 680: 670: 668: 664: 657: 651: 650: 646: 641: 623: 603:electrification 599: 593: 581: 575: 520: 514: 443: 437: 432: 398:high-speed rail 384:of the line to 382:electrification 273: 267: 175: 147: 133: 114: 80: 78: 75: 61: 59: 56: 28: 23: 22: 15: 12: 11: 5: 1350: 1348: 1340: 1339: 1334: 1329: 1324: 1319: 1309: 1308: 1305: 1304: 1299: 1294: 1287: 1286:External links 1284: 1281: 1280: 1249: 1218: 1187: 1157: 1126: 1095: 1070: 1034: 1019: 993: 963: 932: 901: 871: 856: 826: 792: 761: 731: 724: 706: 678: 643: 642: 640: 637: 636: 635: 630: 622: 619: 595:Main article: 592: 589: 577:Main article: 574: 571: 555:Gippsland line 528:crossing loops 516:Main article: 513: 510: 463:Pakenham lines 439:Main article: 436: 433: 431: 428: 324:Daniel Andrews 312:Denis Napthine 266: 263: 202: 201: 198: 197: 193: 192: 173: 169: 168: 163: 159: 158: 153: 149: 148: 146: 145: 141: 139: 135: 134: 132: 131: 124: 122: 118: 117: 106: 102: 101: 98: 94: 93: 90: 86: 85: 72: 68: 67: 53: 49: 48: 44: 43: 26: 24: 14: 13: 10: 9: 6: 4: 3: 2: 1349: 1338: 1335: 1333: 1330: 1328: 1325: 1323: 1320: 1318: 1315: 1314: 1312: 1303: 1300: 1298: 1295: 1293: 1290: 1289: 1285: 1268: 1264: 1260: 1253: 1250: 1237: 1233: 1229: 1222: 1219: 1206: 1202: 1198: 1191: 1188: 1175: 1171: 1167: 1161: 1158: 1145: 1141: 1137: 1130: 1127: 1114: 1110: 1106: 1099: 1096: 1084: 1080: 1074: 1071: 1055: 1051: 1044: 1038: 1035: 1030: 1023: 1020: 1007: 1003: 997: 994: 981: 977: 973: 967: 964: 951: 947: 943: 936: 933: 920: 916: 912: 905: 902: 889: 885: 881: 875: 872: 867: 860: 857: 844: 840: 836: 830: 827: 811: 804: 803: 796: 793: 780: 776: 772: 765: 762: 749: 745: 741: 735: 732: 727: 725:9780522851342 721: 717: 710: 707: 699: 695: 688: 682: 679: 663: 656: 655: 648: 645: 638: 634: 631: 628: 625: 624: 620: 618: 616: 612: 608: 604: 598: 590: 588: 586: 580: 572: 570: 568: 564: 560: 556: 552: 548: 544: 540: 535: 533: 529: 524: 519: 511: 509: 507: 503: 499: 494: 492: 488: 484: 480: 479:State Library 476: 472: 468: 467:Melbourne CBD 464: 460: 456: 452: 448: 442: 434: 429: 427: 423: 421: 416: 414: 410: 405: 403: 399: 395: 389: 387: 383: 379: 378:Jacinta Allan 375: 374:Ballarat line 371: 366: 364: 360: 356: 351: 349: 345: 341: 336: 334: 329: 325: 321: 317: 313: 309: 305: 300: 298: 294: 290: 286: 282: 278: 272: 264: 262: 259: 254: 252: 248: 244: 240: 236: 232: 228: 224: 220: 216: 212: 208: 199: 194: 190: 174: 170: 167: 164: 160: 157: 154: 150: 143: 142: 140: 136: 129: 128:Danny Pearson 126: 125: 123: 119: 107: 103: 99: 95: 91: 87: 73: 69: 54: 50: 45: 41: 36: 30: 19: 1271:. Retrieved 1262: 1252: 1240:. Retrieved 1231: 1221: 1209:. Retrieved 1200: 1190: 1178:. Retrieved 1169: 1160: 1148:. Retrieved 1139: 1129: 1117:. Retrieved 1108: 1098: 1086:. Retrieved 1082: 1073: 1061:. Retrieved 1049: 1037: 1031:. p. 6. 1028: 1022: 1010:. Retrieved 996: 984:. Retrieved 975: 966: 954:. Retrieved 945: 935: 923:. Retrieved 914: 904: 892:. Retrieved 883: 874: 865: 859: 847:. Retrieved 839:The Mandarin 838: 829: 817:. Retrieved 801: 795: 783:. Retrieved 774: 764: 752:. Retrieved 743: 734: 715: 709: 698:the original 693: 681: 669:. Retrieved 653: 647: 611:Wyndham Vale 605:of lines to 600: 582: 539:Bendigo line 536: 521: 506:John Holland 495: 465:through the 455:Sunbury line 444: 441:Metro Tunnel 435:Metro Tunnel 424: 417: 406: 390: 367: 352: 337: 335:government. 301: 284: 274: 255: 238: 234: 223:Metro Tunnel 210: 206: 205: 97:Headquarters 92:Project team 29: 1273:18 December 1211:18 December 925:24 February 915:The Courier 894:24 February 849:24 February 819:23 February 785:23 February 754:23 February 451:South Yarra 304:John Brumby 115:(June 2018) 1311:Categories 639:References 559:Avon River 543:signalling 498:consortium 459:Cranbourne 289:consortium 269:See also: 221:, such as 81:2024-04-02 62:2015-02-16 1063:3 January 545:north of 502:Lendlease 491:City Loop 483:Town Hall 475:Parkville 363:Crossrail 281:City Loop 196:Footnotes 105:Employees 71:Dissolved 1267:Archived 1242:27 April 1236:Archived 1205:Archived 1180:12 March 1174:Archived 1150:12 March 1144:Archived 1140:ABC News 1119:12 March 1113:Archived 1054:Archived 1012:28 April 1006:Archived 986:25 April 980:Archived 956:12 March 950:Archived 919:Archived 888:Archived 843:Archived 810:Archived 779:Archived 748:Archived 671:12 March 662:Archived 621:See also 430:Projects 295:and the 177:bigbuild 1263:The Age 1201:The Age 1109:The Age 946:The Age 775:The Age 563:Geelong 547:Bendigo 500:led by 457:to the 338:From a 316:Liberal 172:Website 79: ( 60: ( 1088:30 May 722:  607:Melton 561:. The 553:. The 551:Echuca 532:Ararat 413:V/Line 396:and a 386:Melton 247:V/Line 185:/about 52:Formed 1057:(PDF) 1046:(PDF) 813:(PDF) 806:(PDF) 701:(PDF) 690:(PDF) 665:(PDF) 658:(PDF) 487:Anzac 471:Arden 411:from 333:Labor 187:/mtia 1275:2018 1244:2018 1213:2018 1182:2018 1152:2018 1121:2018 1090:2024 1065:2019 1014:2018 988:2018 958:2018 927:2018 896:2018 851:2018 821:2018 787:2018 756:2018 720:ISBN 673:2018 609:and 565:and 537:The 504:and 485:and 461:and 239:MMRA 229:and 181:.gov 179:.vic 113:363 89:Type 211:RPV 183:.au 1313:: 1265:. 1261:. 1234:. 1230:. 1203:. 1199:. 1168:. 1142:. 1138:. 1111:. 1107:. 1081:. 1048:. 974:. 948:. 944:. 917:. 913:. 882:. 837:. 777:. 773:. 742:. 692:. 481:, 477:, 473:, 365:. 225:, 1277:. 1246:. 1215:. 1184:. 1154:. 1123:. 1092:. 1067:. 1016:. 990:. 960:. 929:. 898:. 853:. 823:. 789:. 758:. 728:. 675:. 237:( 209:( 83:) 64:) 20:)

Index

Melbourne Metro Rail Authority

Danny Pearson
Department of Transport and Planning
Major Transport Infrastructure Authority
bigbuild.vic.gov.au/about/mtia/rail-projects-victoria
Government of Victoria
Victorian rail network
Metro Tunnel
Regional Rail Revival
Melbourne Airport Rail
Melbourne Metro Rail Project
V/Line
Department of Transport and Planning
Level Crossing Removal Project
Metro Tunnel § History
Victorian Railways
City Loop
consortium
Melbourne City Council
Melbourne and Metropolitan Board of Works
John Brumby
Eddington Transport Study
Denis Napthine
Liberal
2014 Victorian election
Daniel Andrews