Knowledge (XXG)

James River Freeway

Source πŸ“

578:
Freeway going east now travels over the bridge and around a loop. Traffic coming from Republic Road wanting to enter JRF going east simply takes the existing on-ramp. Traffic wanting to exit from eastbound JRF to get to North Glenstone or W. Republic Road will take the new exit to get to the new part of the interchange. Traffic from westbound JRF exiting to N. Glenstone or W. Republic Rd. will use the existing exit ramp and traffic entering westbound JRF from Glenstone or Republic will use the existing on-ramp. The stoplight for this part of the interchange will remain. The project was completed in December 2008. By October of 2021, There will be a roundabout on the south side of the interchange. Roads entering/exiting the roundabout include Republic Rd/Glenstone Ave, Nature Center Way (JRF outer road), and the ramp to US 60 East. There are currently two ramps to eastbound US 60, one supporting traffic from E. Republic Road and the other from S. Glenstone Ave. The ramp supporting E. Republic Road will be demolished, and the other ramp will be restructured and widened to support left-turning traffic from E. Republic Road and connect to the new roundabout. US 60 will be receiving a new through travel lane in each direction with this project. The entire project was completed in summer 2022.
587:
from vehicles stopping because of a train passing or because they are required to (buses or trucks carrying hazardous materials). The current highway, James River Freeway, curves and then travels down a steep grade to the interchange with US 65 then crosses James River before going up a steep grade and curve before heading east towards Rogersville, MO. Completed in October 2012, a large project replaced the two eastern loops with
36: 963: 927: 806: 888: 841: 875: 801: 789: 737: 715: 881: 795: 749: 384: 366: 206: 196: 1019: 996: 969: 894: 847: 743: 245: 186: 535:
for US 65 on the east side of the city by providing a direct path from Interstate 44 on the west side of Springfield with US 60, a major east–west road on the south side of the state east of the city (much traffic had had to travel to US 65 and head south to US 60). This section, completed in 2002, was designated as Route 360.
681: 226: 494:
As Springfield began to expand to the south, traffic began to grow rapidly on Route M (known locally as Republic Road) causing significant traffic problems. A proposal for a new highway on the south side (I-44 is on the north, and US 65, also a freeway, is on the east) had been around for some
534:
The final section connected Interstate 44 with US 60. Route MM had long served as a bypass on the west side of the city, running through the former town of Brookline but as a two-lane road inadequate for its traffic. The final section served to connect these two roads, also provide traffic relief
516:
The second section was a relatively short section connecting Kansas Expressway and Campbell Avenue. Shortly after the road was opened, US 60 was rerouted so that it turned south on Kansas Expressway (previously, a city street), then joined the James River Freeway, continuing on east past Glenstone
586:
The current cloverleaf interchange has been the source of many accidents due to the growth of the cities of Ozark, Nixa, and Branson to the south. Also, the railroad crossing, which crosses not only the freeway itself, but the ramp from east 60 to south 65, has also resulted in numerous accidents
577:
Due to continued development on the city's south side, MODOT and the City of Springfield shared in the reconstruction of the Glenstone Ave. and James River Freeway interchange. Part of the interchange was moved to the south and west of the original interchange. Traffic wanting to enter James River
525:
The third section connected US 60 with Kansas Expressway. At the same time it was opened, West Bypass (which previously ended at Sunshine Street to the north, then US 60) was extended south and provided access to west Battlefield Road. US 60 was re-routed down the new stretch of freeway at this
503:
The first section connected US 160 (Campbell Avenue) with US 65. It took over a slightly reworked Glenstone Avenue which had been around previously and built not-quite to freeway standards. When the original highway had turned, an interchange was built and Glenstone Avenue turned west to become
555:
Project description by SMCOG: An extension of James River Freeway to loop north of Willard then curve to the East and intersect Highway 13 near the north side of the Green County line and extend to Highway 65 near Fair Grove to create economic development and provide access from the north to the
548:
A study to extend the James River Freeway is on the Missouri Department of Transportation (MoDOT) July 2024 Tier 1 - High Priority Unfunded Road and Bridge Needs list and the Southwest Missouri Council of Governments (SMCOG) 2024 Greene County Transportation Needs List. The Ozark Transportation
630:
Just north of this interchange, a safer underpass was created for E. Bradford Parkway to remove the at-grade intersection with National Avenue. Both of these projects were funded through a partnership between MODOT, the City of Springfield, and Cox Health Systems.
564:
The freeway will not be extended west of I-44 to connect it to the airport. Instead MoDOT and the city of Springfield shared in the upgrade of the I-44 and Chestnut Expressway interchange. A new road was built that connects the new terminal with
549:
Organization (OTO) submitted the requests for a study through their Technical Committee with final approval by the OTO Board of Directors in a May 2024 meeting. The estimated funding needed for a study is 1.5 million dollars.
508:(east of the interchange) now became Glenstone Avenue. Republic Road also crosses over the same interchange and continues east. At this point, Route M was routed down the freeway and Republic Road became a city street. 313: 467:(now part of Republic). Exit markers for the highway mark the road as the James River Freeway and have no control cities, only "To Route 60" eastbound and "To I-44" westbound. 552:
Project description by MoDOT: Corridor location and environmental study for new north corridor in the Springfield Metropolitan area to increase economic growth and improve safety.
623:
A construction project was completed in July 2010 to improve traffic flow near the Cox Health buildings in southern Springfield by converting the interchange into a six-lane
1414: 1169: 1409: 973: 611:, at a public meeting on November 29, 2007. So far interchanges have been constructed in Rogersville as well as at the J/NN intersection. An interchange at 1083: 1237: 334: 308: 1181: 1404: 770: 1364: 1342: 1285: 1222: 300: 159: 819: 53: 1193: 938: 344: 119: 1099: 100: 72: 1338: 591:. The northbound US 65 bridge over US 60, as well as the westbound US 60 bridge over James River were replaced. The railroad 339: 1194:"U.S. Route 60 (James River Freeway)/Glenstone Avenue Interchange Project - COMPLETED | Missouri Department of Transportation" 556:
already growing job market in the region. Create space for a 1,000 acre site that would have both interstate access and rail.
526:
time and US 160 was rerouted down West Bypass, joining the freeway for a few miles before turning off again at Campbell Ave.
57: 79: 858: 624: 326: 627:(DDI). It was the second DDI to appear in Springfield (the first being the Interstate 44/Kansas Expressway interchange). 1307: 349: 318: 86: 898: 809: 463:
is designated as Route 360. Other than its endpoints, there is only one interchange on the route: Route MM in
440: 199: 46: 1022: 999: 934: 752: 684: 436: 420: 412: 248: 229: 189: 68: 1134: 1182:
https://www.modot.org/sites/default/files/documents/J8P3032B_Section%202_Glenstone%20Interchange_reduced_0.pdf
640: 1399: 424: 1238:"Public Meeting Thursday (Nov. 29): Upgrading Route 60 To a Freeway Between Springfield and Rogersville" 827: 813: 760: 692: 608: 479: 475: 408: 252: 427:, which passes near the highway at the freeway's eastern terminus. A total of four highways (and one 612: 566: 1365:"Diverging diamond interchange at Kansas Expwy & James River Freeway receives first major test" 464: 416: 1372: 1043: 980: 764: 756: 719: 702: 471: 460: 387: 369: 233: 93: 607:
MoDOT discussed the possibility of upgrading US 60 east of the US 65 freeway, to as far east as
1100:
https://www.modot.org/sites/default/files/documents/High-Priority%20Unfunded%20Needs%202024.pdf
1142: 1107: 1074: 1007: 1003: 902: 851: 444: 1026: 942: 483: 1155: 1120: 688: 495:
time. By the early 1990s, the road was under construction. It opened in four sections:
1259: 912: 906: 592: 428: 911:
Eastern end of US-160 / Route 13 concurrency. Access to Downtown Springfield and
1393: 505: 271: 588: 17: 35: 1315: 1368: 1135:
https://www.smcog.org/_files/ugd/5e5d4a_876f000a351448278ad12fb8141201b8.pdf
946: 1308:"Traffic Changes In Springfield: National Avenue & James River Freeway" 1260:"Route 60 at Route 125 Interchange | Missouri Department of Transportation" 281: 455:
The four-mile (6.4 km) portion of the James River Freeway between
404: 1286:"Traffic Changes Coming: National Avenue & James River Freeway" 1218: 993: 959: 871: 837: 785: 595:
was removed by building four bridges over Galloway Creek and the
1082: 596: 456: 1339:"Kansas Exp./James River Freeway Diverging Diamond Interchange" 769:
Eastern terminus of Route 360, US-60 joins freeway. Access to
423:(US 65) in southeastern Springfield. It is named for the 29: 1033:
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
1219:"US 60/US 65 Interchange Springfield, Missouri" 470:
The control cities between US 60 and US 65 are
1070: 1065: 1288:(Press release). Missouri Department of Transportation 1240:(Press release). Missouri Department of Transportation 1011: 978: 910: 856: 817: 861:, converted from existing interchange August 18, 2013 291: 277: 267: 262: 239: 220: 215: 176: 165: 152: 136: 60:. Unsourced material may be challenged and removed. 1236:Springfield District Office (November 28, 2007). 979:Western end of US 65 Business overlap. Access to 517:where the road originally joined the freeway. 818:Western end of US-160 concurrency. Access to 8: 1284:Springfield District Office (July 8, 2010). 645: 358: 1415:Transportation in Greene County, Missouri 1087: 1084:Template:Attached KML/James River Freeway 933:Diverging diamond interchange. Access to 120:Learn how and when to remove this message 459:and the interchange with US 60 and 1410:Transportation in Springfield, Missouri 1091: 976:(Glenstone Avenue) / Republic Road 171:Route 360: 4 mi (6.4 km) 1151: 1140: 1116: 1105: 147:James River Freeway highlighted in red 133: 1343:Missouri Department of Transportation 1223:Missouri Department of Transportation 1016: 1012:Eastern end of US 65 Business overlap 987: 953: 924: 918: 865: 857:Western end of Route 13 concurrency; 831: 779: 733: 727: 712: 706: 678: 672: 407:located largely on the south side of 301:United States Numbered Highway System 7: 820:Springfield-Branson National Airport 58:adding citations to reliable sources 1337:Southwest District (October 2012). 771:Wilson's Creek National Battlefield 478:eastbound. At US 65, they are 939:Ozarks Technical Community College 657: 25: 1363:Brewer, Chris (August 19, 2013). 812:west / Route FF β€“ 1017: 994: 967: 961: 925: 892: 886: 879: 873: 845: 839: 804: 799: 793: 787: 747: 741: 735: 713: 679: 382: 364: 243: 224: 204: 194: 184: 34: 1314:. July 15, 2010. Archived from 905:south (Campbell Avenue) β€“ 419:and its eastern terminus is at 403:is a 14-mile-long (23 km) 45:needs additional citations for 504:Republic Road. The new south 1: 1405:Freeways in the United States 983:and Springfield Nature Center 859:diverging diamond interchange 697:Western terminus of Route 360 652: 625:diverging diamond interchange 431:) are routed on the highway: 411:. Its western terminus is at 327:Missouri State Highway System 759:(W. Sunshine Street) β€“ 573:Glenstone Avenue interchange 169:14 mi (23 km) 615:will be completed by 2023. 447:, and Business US 65. 1431: 1032: 990: 956: 935:Missouri State University 932: 921: 868: 854:north (Kansas Expressway) 834: 826: 782: 776: 768: 730: 723: 709: 701: 696: 675: 669: 664: 661: 656: 651: 648: 357: 296: 287: 258: 157: 145: 1088:KML is not from Wikidata 1039:     639:The entire route is in 1025:continues east toward 1312:Douglas County Herald 718:Route MM β€“ 560:West of Interstate 44 409:Springfield, Missouri 69:"James River Freeway" 1170:Major Projects MoDOT 949:, and Mercy Hospital 619:National Avenue area 54:improve this article 1375:on October 22, 2013 544:North Corridor Loop 401:James River Freeway 139:James River Freeway 27:Highway in Missouri 981:Evangel University 947:Cox South Hospital 18:Missouri Route 360 1341:(Press release). 1150:Missing or empty 1115:Missing or empty 1054: 1053: 582:US 60 & US 65 451:Route description 398: 397: 394: 393: 153:Route information 130: 129: 122: 104: 16:(Redirected from 1422: 1385: 1384: 1382: 1380: 1371:. Archived from 1360: 1354: 1353: 1351: 1349: 1334: 1328: 1327: 1325: 1323: 1318:on July 10, 2011 1304: 1298: 1297: 1295: 1293: 1281: 1275: 1274: 1272: 1270: 1256: 1250: 1249: 1247: 1245: 1233: 1227: 1226: 1215: 1209: 1208: 1206: 1204: 1190: 1184: 1179: 1173: 1166: 1160: 1159: 1153: 1148: 1146: 1138: 1131: 1125: 1124: 1118: 1113: 1111: 1103: 1096: 1078: 1047: 1040: 1021: 1020: 998: 997: 972: 971: 970: 965: 964: 943:Drury University 929: 928: 897: 896: 895: 890: 889: 884: 883: 882: 877: 876: 850: 849: 848: 843: 842: 808: 807: 803: 802: 798: 797: 796: 791: 790: 751: 750: 746: 745: 744: 739: 738: 717: 716: 683: 682: 659: 654: 646: 415:(I-44) north of 390: 386: 385: 372: 368: 367: 359: 247: 246: 228: 227: 208: 207: 198: 197: 188: 187: 134: 125: 118: 114: 111: 105: 103: 62: 38: 30: 21: 1430: 1429: 1425: 1424: 1423: 1421: 1420: 1419: 1390: 1389: 1388: 1378: 1376: 1362: 1361: 1357: 1347: 1345: 1336: 1335: 1331: 1321: 1319: 1306: 1305: 1301: 1291: 1289: 1283: 1282: 1278: 1268: 1266: 1258: 1257: 1253: 1243: 1241: 1235: 1234: 1230: 1217: 1216: 1212: 1202: 1200: 1192: 1191: 1187: 1180: 1176: 1167: 1163: 1149: 1139: 1133: 1132: 1128: 1114: 1104: 1098: 1097: 1093: 1089: 1086: 1081: 1080: 1079: 1063: 1059: 1050: 1042: 1038: 1034: 1018: 995: 974:US 65 Bus. 968: 966: 962: 960: 930:National Avenue 926: 893: 891: 887: 885: 880: 878: 874: 872: 846: 844: 840: 838: 805: 800: 794: 792: 788: 786: 748: 742: 740: 736: 734: 714: 680: 637: 621: 605: 584: 575: 562: 546: 541: 532: 523: 514: 501: 492: 453: 383: 381: 365: 363: 244: 225: 216:Major junctions 205: 195: 185: 178: 172: 148: 141: 140: 126: 115: 109: 106: 63: 61: 51: 39: 28: 23: 22: 15: 12: 11: 5: 1428: 1426: 1418: 1417: 1412: 1407: 1402: 1392: 1391: 1387: 1386: 1355: 1329: 1299: 1276: 1251: 1228: 1210: 1185: 1174: 1161: 1126: 1090: 1062: 1061: 1060: 1058: 1055: 1052: 1051: 1049: 1048: 1035: 1030: 1029: 1014: 1013: 1010: 992: 989: 985: 984: 977: 958: 955: 951: 950: 931: 923: 920: 916: 915: 913:Bass Pro Shops 909: 870: 867: 863: 862: 855: 836: 833: 830: 824: 823: 816: 784: 781: 778: 774: 773: 767: 757:Route 413 732: 729: 725: 724: 722: 711: 708: 705: 699: 698: 695: 677: 674: 671: 667: 666: 663: 660: 655: 650: 636: 633: 620: 617: 604: 601: 593:grade crossing 583: 580: 574: 571: 561: 558: 545: 542: 540: 537: 531: 528: 522: 519: 513: 510: 500: 497: 491: 488: 482:westbound and 474:westbound and 461:Route 413 452: 449: 433:Route 360 429:business route 396: 395: 392: 391: 388:Route 364 378: 376:Route 360 373: 370:Route 350 355: 354: 353: 352: 347: 342: 337: 331: 330: 322: 321: 316: 311: 305: 304: 294: 293: 292:Highway system 289: 288: 285: 284: 279: 275: 274: 269: 265: 264: 260: 259: 256: 255: 241: 237: 236: 222: 218: 217: 213: 212: 211: 210: 209:Route 360 202: 192: 180: 174: 173: 170: 167: 163: 162: 158:Maintained by 155: 154: 150: 149: 146: 143: 142: 138: 137: 128: 127: 42: 40: 33: 26: 24: 14: 13: 10: 9: 6: 4: 3: 2: 1427: 1416: 1413: 1411: 1408: 1406: 1403: 1401: 1400:U.S. Route 60 1398: 1397: 1395: 1374: 1370: 1366: 1359: 1356: 1344: 1340: 1333: 1330: 1317: 1313: 1309: 1303: 1300: 1287: 1280: 1277: 1265: 1264:www.modot.org 1261: 1255: 1252: 1239: 1232: 1229: 1224: 1220: 1214: 1211: 1199: 1198:www.modot.org 1195: 1189: 1186: 1183: 1178: 1175: 1171: 1165: 1162: 1157: 1144: 1136: 1130: 1127: 1122: 1109: 1101: 1095: 1092: 1085: 1076: 1072: 1068: 1067: 1056: 1045: 1037: 1036: 1031: 1028: 1024: 1015: 1009: 1005: 1001: 986: 982: 975: 952: 948: 944: 940: 936: 917: 914: 908: 904: 903:Route 13 900: 864: 860: 853: 852:Route 13 829: 825: 821: 815: 811: 775: 772: 766: 762: 758: 754: 726: 721: 704: 700: 694: 690: 686: 668: 647: 644: 642: 641:Greene County 634: 632: 628: 626: 618: 616: 614: 610: 603:East of US 65 602: 600: 598: 594: 590: 589:flyover ramps 581: 579: 572: 570: 568: 559: 557: 553: 550: 543: 538: 536: 529: 527: 520: 518: 511: 509: 507: 498: 496: 489: 487: 485: 481: 477: 473: 468: 466: 462: 458: 450: 448: 446: 445:Route 13 442: 438: 434: 430: 426: 422: 421:U.S. Route 65 418: 414: 413:Interstate 44 410: 406: 402: 389: 379: 377: 374: 371: 361: 360: 356: 351: 348: 346: 343: 341: 338: 336: 333: 332: 329: 328: 324: 323: 320: 317: 315: 312: 310: 307: 306: 303: 302: 298: 297: 295: 290: 286: 283: 280: 276: 273: 272:United States 270: 266: 261: 257: 254: 250: 242: 240:East end 238: 235: 231: 223: 221:West end 219: 214: 203: 201: 193: 191: 183: 182: 181: 175: 168: 164: 161: 156: 151: 144: 135: 132: 124: 121: 113: 102: 99: 95: 92: 88: 85: 81: 78: 74: 71: β€“  70: 66: 65:Find sources: 59: 55: 49: 48: 43:This article 41: 37: 32: 31: 19: 1377:. Retrieved 1373:the original 1358: 1346:. Retrieved 1332: 1320:. Retrieved 1316:the original 1311: 1302: 1290:. Retrieved 1279: 1267:. Retrieved 1263: 1254: 1244:November 29, 1242:. Retrieved 1231: 1213: 1201:. Retrieved 1197: 1188: 1177: 1164: 1152:|title= 1129: 1117:|title= 1094: 1064: 1041:   901:east / 755:west / 662:Destinations 638: 629: 622: 606: 585: 576: 569:(Chestnut). 563: 554: 551: 547: 533: 524: 515: 502: 493: 469: 454: 432: 400: 399: 375: 350:Supplemental 325: 299: 131: 116: 107: 97: 90: 83: 76: 64: 52:Please help 47:verification 44: 1322:January 20, 1203:January 11, 1044:Concurrency 899:US 160 828:Springfield 814:Battlefield 810:US 160 761:Springfield 693:Springfield 609:Rogersville 486:eastbound. 480:Springfield 476:Rogersville 441:US 160 425:James River 253:Springfield 200:US 160 1394:Categories 1379:August 23, 1057:References 1023:US 60 1000:US 65 753:US 60 506:outer road 437:US 60 335:Interstate 249:US 65 190:US 60 80:newspapers 1369:KYTV (TV) 1292:March 24, 635:Exit list 613:Route 125 567:Route 266 530:Section 4 521:Section 3 512:Section 2 499:Section 1 465:Brookline 417:Brookline 177:Component 1348:April 8, 1143:cite web 1108:cite web 1066:KML file 1046:terminus 1002: β€“ 765:Republic 720:Republic 703:Republic 687: β€“ 649:Location 472:Republic 282:Missouri 263:Location 234:Republic 179:highways 110:May 2024 1008:Branson 1004:Sedalia 777:​ 670:​ 599:track. 490:History 405:freeway 319:Divided 314:Special 268:Country 94:scholar 1269:May 9, 1027:Cabool 539:Future 484:Cabool 166:Length 96:  89:  82:  75:  67:  991:22.18 988:13.78 957:19.76 954:12.28 922:17.51 919:10.88 869:15.77 835:13.42 689:Tulsa 665:Notes 345:State 278:State 232:near 160:MoDOT 101:JSTOR 87:books 1381:2013 1350:2014 1324:2012 1294:2014 1271:2019 1246:2007 1205:2023 1156:help 1121:help 1075:help 1071:edit 907:Nixa 866:9.80 832:8.34 783:9.22 780:5.73 731:5.70 728:3.54 710:2.86 707:1.78 685:I-44 676:0.00 673:0.00 597:BNSF 457:I-44 309:List 230:I-44 73:news 251:at 56:by 1396:: 1367:. 1310:. 1262:. 1221:. 1196:. 1147:: 1145:}} 1141:{{ 1112:: 1110:}} 1106:{{ 1073:β€’ 1006:, 945:, 941:, 937:, 763:, 691:, 658:km 653:mi 643:. 443:, 439:, 435:, 380:β†’ 362:← 340:US 1383:. 1352:. 1326:. 1296:. 1273:. 1248:. 1225:. 1207:. 1172:" 1168:" 1158:) 1154:( 1137:. 1123:) 1119:( 1102:. 1077:) 1069:( 822:. 123:) 117:( 112:) 108:( 98:Β· 91:Β· 84:Β· 77:Β· 50:. 20:)

Index

Missouri Route 360

verification
improve this article
adding citations to reliable sources
"James River Freeway"
news
newspapers
books
scholar
JSTOR
Learn how and when to remove this message
MoDOT
US 60
US 160
I-44
Republic
US 65
Springfield
United States
Missouri
United States Numbered Highway System
List
Special
Divided
Missouri State Highway System
Interstate
US
State
Supplemental

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑