331:
self-sufficient in power generation (in 2010, around 84% of the country's power needs were imported, mostly from Eskom in South Africa, and Eskom has indicated a phased reduction in power supply starting in 2008). The colliery expansion will see production levels increase from just under 1 million tonnes per annum to 2.8 million tons per annum. The project began with feasibility studies and designs in 2007, construction on site began in September 2010, and first coal from the expanded mine and plant is expected in November 2011. The project budget is some P1.47 billion. The colliery currently employs around 320 people (mostly drawn from the nearby town of Palapye) and after the expansion will provide
347:
controlled using a formal Environmental Management System. All required environmental permitting is in place and EIAs are publicly accessible on the Expansion Project website*. Use of water in a water scarce country is reduced by performing dry screening in the plant, storm water is captured and re-used, and replenishable surface water from the North-South carrier is used. Care was taken during design to construct a plant with a small footprint and the plant will be placed on previously disturbed ground. Energy saving initiatives (energy efficient motors, lighting and
145: 138: 352:
of some 170 square kilometers, mining is conducted below surface, and current land-use owners' rights to farm and graze cattle on tribal land have not been affected. No forced relocation of people living within the mining area has occurred. The colliery operates a small game park of some 1700 hectares in the area around the mine village, and this is used for conservation and to provide people of the area with recreation and environmental education.
458: 22: 356:
average height of 8.5 meters (28 ft), an average CV of around 23.5 MJ/kg (air-dry) and is located at an average depth of 80 meters (260 ft) below surface. Production over a recent 7-year stretch averaged 877,000 tonnes per year. Overall coalfield resources within the mining lease area estimated at 5 billion tonnes of coal.
351:
etc.) have been incorporated into the design. The mine does not produce any discards, does not deposit fines on a slimes dam (these are dispatched to BPC to be burnt in the power station) and does not discharge any effluent water into the environment. While the colliery has mining rights over an area
338:
The expanded mine consists of increasing the number of continuous miner sections from two to four, constructing a new crushing and screening plant to replace the existing plant, and upgrading or constructing new offices and workshops. New houses will be constructed to house the expanded workforce. A
355:
The coalfield is composed of four main seams, only one of which, the No. 1 Seam, is currently being mined, below surface, using bord and pillar mining methods and continuous miners. No pillar extraction occurs, and the mine design is conservative to prevent surface subsidence. The No. 1 Seam has an
326:
In January 2008, a small wash plant was commissioned with a production capacity of 120 tonnes per hour. The purpose of this plant was to supply higher quality coal to local and regional consumers. The project received support from the Botswana government, as it aimed to stimulate the local economy,
330:
A major expansion to the colliery is planned for 2010 and 2011. The primary purpose of the expansion is to supply coal to the adjacent Botswana Power Corporation B phase 1 power station (600 MW) that is under construction in 2010 and 2011. The power station is required to allow Botswana to become
346:
While any coal mine has a negative environmental impact, and the coal burnt in a power station results in carbon dioxide emissions, the colliery has taken steps to make the negative environmental impact as low as possible: the colliery received ISO 14001 certification in 2010, and activities are
189: 327:
produce a cleaner form of coal compared to run-of-mine coal, and offer an alternative to the unsustainable use of wood for cooking and heating.
379: 435: 137: 484: 39: 105: 86: 479: 58: 43: 359:
In 2021, it was announced that the mine will develop a new open cast coal mine with Basil Read to increase output by 35%.
65: 289:. The coalfield is composed of four main seams, only one of which, the No. 1 Seam, is currently being mined, using 72: 32: 54: 315: 290: 282: 332: 348: 340: 343:
water pipeline some 15 km away near Palapye in order to supply surface water to the mine.
79: 417: 473: 463: 436:"Basil Read and local Botswana company to develop Motheo coal mine for Morupule" 311: 297: 266: 21: 453: 421: 204: 191: 457: 286: 278: 274: 245: 405: 270: 169: 310:, operations have expanded considerably since then to supply regional 307: 304: 300: 318:. Morupule was granted an extension to its mining lease in 1980. 229: 380:"Botswana's state-owned coal miner aims to boost output by 35%" 15: 406:"A History of Coal and the Morupule Colliery, 1973-2005" 251: 241: 236: 225: 220: 183: 175: 165: 126: 46:. Unsourced material may be challenged and removed. 339:connecting pipeline has been constructed to the 8: 121: 120: 374: 372: 144: 106:Learn how and when to remove this message 368: 314:and industries, especially the nearby 7: 399: 397: 44:adding citations to reliable sources 14: 456: 143: 136: 20: 31:needs additional citations for 404:Machete, Mosadiotsile (2012). 296:Founded in 1971 to supply the 291:bord and pillar mining methods 1: 281:, a partnership between the 501: 410:Botswana Notes and Records 298:Bamangwato Concessions Ltd 232:(877,000 tonnes per annum) 485:Surface mines in Botswana 131: 118:Mine in Palapye, Botswana 277:, owned and operated by 205:22.511772°S 27.021825°E 480:Coal mines in Botswana 438:. International Mining 335:to around 480 people. 316:Morupule Power Station 283:government of Botswana 210:-22.511772; 27.021825 333:permanent employment 157:Location in Botswana 40:improve this article 349:solar water heating 341:North-South Carrier 252:Year of acquisition 201: /  123: 55:"Morupule Colliery" 263:Morupule Colliery 259: 258: 151:Morupule Colliery 122:Morupule Colliery 116: 115: 108: 90: 492: 466: 461: 460: 448: 447: 445: 443: 432: 426: 425: 401: 392: 391: 389: 387: 376: 216: 215: 213: 212: 211: 206: 202: 199: 198: 197: 194: 147: 146: 140: 124: 111: 104: 100: 97: 91: 89: 48: 24: 16: 500: 499: 495: 494: 493: 491: 490: 489: 470: 469: 462: 455: 452: 451: 441: 439: 434: 433: 429: 403: 402: 395: 385: 383: 378: 377: 370: 365: 324: 209: 207: 203: 200: 195: 192: 190: 188: 187: 161: 160: 159: 158: 155: 154: 153: 152: 148: 119: 112: 101: 95: 92: 49: 47: 37: 25: 12: 11: 5: 498: 496: 488: 487: 482: 472: 471: 468: 467: 450: 449: 427: 393: 367: 366: 364: 361: 323: 320: 257: 256: 253: 249: 248: 243: 239: 238: 234: 233: 227: 223: 222: 218: 217: 185: 181: 180: 177: 173: 172: 167: 163: 162: 156: 150: 149: 142: 141: 135: 134: 133: 132: 129: 128: 117: 114: 113: 28: 26: 19: 13: 10: 9: 6: 4: 3: 2: 497: 486: 483: 481: 478: 477: 475: 465: 464:Energy portal 459: 454: 437: 431: 428: 423: 419: 415: 411: 407: 400: 398: 394: 381: 375: 373: 369: 362: 360: 357: 353: 350: 344: 342: 336: 334: 328: 321: 319: 317: 313: 309: 306: 302: 299: 294: 292: 288: 284: 280: 276: 272: 268: 264: 254: 250: 247: 244: 240: 235: 231: 228: 224: 219: 214: 186: 182: 178: 174: 171: 168: 164: 139: 130: 125: 110: 107: 99: 88: 85: 81: 78: 74: 71: 67: 64: 60: 57: –  56: 52: 51:Find sources: 45: 41: 35: 34: 29:This article 27: 23: 18: 17: 440:. Retrieved 430: 413: 409: 384:. Retrieved 358: 354: 345: 337: 329: 325: 312:power plants 295: 262: 260: 102: 96:January 2022 93: 83: 76: 69: 62: 50: 38:Please help 33:verification 30: 269:located in 208: / 184:Coordinates 474:Categories 442:25 January 386:25 January 363:References 221:Production 196:27°01′19″E 193:22°30′42″S 66:newspapers 422:0525-5090 416:: 45–59. 382:. Reuters 322:Expansion 267:coal mine 287:De Beers 279:Debswana 275:Botswana 246:Debswana 226:Products 179:Botswana 166:Location 127:Location 271:Palapye 242:Company 176:Country 170:Palapye 80:scholar 420:  305:nickel 301:copper 82:  75:  68:  61:  53:  265:is a 237:Owner 87:JSTOR 73:books 444:2022 418:ISSN 388:2022 308:mine 303:and 285:and 261:The 255:2000 230:Coal 59:news 42:by 476:: 414:44 412:. 408:. 396:^ 371:^ 293:. 273:, 446:. 424:. 390:. 109:) 103:( 98:) 94:( 84:· 77:· 70:· 63:· 36:.

Index


verification
improve this article
adding citations to reliable sources
"Morupule Colliery"
news
newspapers
books
scholar
JSTOR
Learn how and when to remove this message
Morupule Colliery is located in Botswana
Palapye
22°30′42″S 27°01′19″E / 22.511772°S 27.021825°E / -22.511772; 27.021825
Coal
Debswana
coal mine
Palapye
Botswana
Debswana
government of Botswana
De Beers
bord and pillar mining methods
Bamangwato Concessions Ltd
copper
nickel
mine
power plants
Morupule Power Station
permanent employment

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.