331:
self-sufficient in power generation (in 2010, around 84% of the country's power needs were imported, mostly from Eskom in South Africa, and Eskom has indicated a phased reduction in power supply starting in 2008). The colliery expansion will see production levels increase from just under 1 million tonnes per annum to 2.8 million tons per annum. The project began with feasibility studies and designs in 2007, construction on site began in
September 2010, and first coal from the expanded mine and plant is expected in November 2011. The project budget is some P1.47 billion. The colliery currently employs around 320 people (mostly drawn from the nearby town of Palapye) and after the expansion will provide
347:
controlled using a formal
Environmental Management System. All required environmental permitting is in place and EIAs are publicly accessible on the Expansion Project website*. Use of water in a water scarce country is reduced by performing dry screening in the plant, storm water is captured and re-used, and replenishable surface water from the North-South carrier is used. Care was taken during design to construct a plant with a small footprint and the plant will be placed on previously disturbed ground. Energy saving initiatives (energy efficient motors, lighting and
145:
138:
352:
of some 170 square kilometers, mining is conducted below surface, and current land-use owners' rights to farm and graze cattle on tribal land have not been affected. No forced relocation of people living within the mining area has occurred. The colliery operates a small game park of some 1700 hectares in the area around the mine village, and this is used for conservation and to provide people of the area with recreation and environmental education.
458:
22:
356:
average height of 8.5 meters (28 ft), an average CV of around 23.5 MJ/kg (air-dry) and is located at an average depth of 80 meters (260 ft) below surface. Production over a recent 7-year stretch averaged 877,000 tonnes per year. Overall coalfield resources within the mining lease area estimated at 5 billion tonnes of coal.
351:
etc.) have been incorporated into the design. The mine does not produce any discards, does not deposit fines on a slimes dam (these are dispatched to BPC to be burnt in the power station) and does not discharge any effluent water into the environment. While the colliery has mining rights over an area
338:
The expanded mine consists of increasing the number of continuous miner sections from two to four, constructing a new crushing and screening plant to replace the existing plant, and upgrading or constructing new offices and workshops. New houses will be constructed to house the expanded workforce. A
355:
The coalfield is composed of four main seams, only one of which, the No. 1 Seam, is currently being mined, below surface, using bord and pillar mining methods and continuous miners. No pillar extraction occurs, and the mine design is conservative to prevent surface subsidence. The No. 1 Seam has an
326:
In
January 2008, a small wash plant was commissioned with a production capacity of 120 tonnes per hour. The purpose of this plant was to supply higher quality coal to local and regional consumers. The project received support from the Botswana government, as it aimed to stimulate the local economy,
330:
A major expansion to the colliery is planned for 2010 and 2011. The primary purpose of the expansion is to supply coal to the adjacent
Botswana Power Corporation B phase 1 power station (600 MW) that is under construction in 2010 and 2011. The power station is required to allow Botswana to become
346:
While any coal mine has a negative environmental impact, and the coal burnt in a power station results in carbon dioxide emissions, the colliery has taken steps to make the negative environmental impact as low as possible: the colliery received ISO 14001 certification in 2010, and activities are
189:
327:
produce a cleaner form of coal compared to run-of-mine coal, and offer an alternative to the unsustainable use of wood for cooking and heating.
379:
435:
137:
484:
39:
105:
86:
479:
58:
43:
359:
In 2021, it was announced that the mine will develop a new open cast coal mine with Basil Read to increase output by 35%.
65:
289:. The coalfield is composed of four main seams, only one of which, the No. 1 Seam, is currently being mined, using
72:
32:
54:
315:
290:
282:
332:
348:
340:
343:
water pipeline some 15 km away near
Palapye in order to supply surface water to the mine.
79:
417:
473:
463:
436:"Basil Read and local Botswana company to develop Motheo coal mine for Morupule"
311:
297:
266:
21:
453:
421:
204:
191:
457:
286:
278:
274:
245:
405:
270:
169:
310:, operations have expanded considerably since then to supply regional
307:
304:
300:
318:. Morupule was granted an extension to its mining lease in 1980.
229:
380:"Botswana's state-owned coal miner aims to boost output by 35%"
15:
406:"A History of Coal and the Morupule Colliery, 1973-2005"
251:
241:
236:
225:
220:
183:
175:
165:
126:
46:. Unsourced material may be challenged and removed.
339:connecting pipeline has been constructed to the
8:
121:
120:
374:
372:
144:
106:Learn how and when to remove this message
368:
314:and industries, especially the nearby
7:
399:
397:
44:adding citations to reliable sources
14:
456:
143:
136:
20:
31:needs additional citations for
404:Machete, Mosadiotsile (2012).
296:Founded in 1971 to supply the
291:bord and pillar mining methods
1:
281:, a partnership between the
501:
410:Botswana Notes and Records
298:Bamangwato Concessions Ltd
232:(877,000 tonnes per annum)
485:Surface mines in Botswana
131:
118:Mine in Palapye, Botswana
277:, owned and operated by
205:22.511772°S 27.021825°E
480:Coal mines in Botswana
438:. International Mining
335:to around 480 people.
316:Morupule Power Station
283:government of Botswana
210:-22.511772; 27.021825
333:permanent employment
157:Location in Botswana
40:improve this article
349:solar water heating
341:North-South Carrier
252:Year of acquisition
201: /
123:
55:"Morupule Colliery"
263:Morupule Colliery
259:
258:
151:Morupule Colliery
122:Morupule Colliery
116:
115:
108:
90:
492:
466:
461:
460:
448:
447:
445:
443:
432:
426:
425:
401:
392:
391:
389:
387:
376:
216:
215:
213:
212:
211:
206:
202:
199:
198:
197:
194:
147:
146:
140:
124:
111:
104:
100:
97:
91:
89:
48:
24:
16:
500:
499:
495:
494:
493:
491:
490:
489:
470:
469:
462:
455:
452:
451:
441:
439:
434:
433:
429:
403:
402:
395:
385:
383:
378:
377:
370:
365:
324:
209:
207:
203:
200:
195:
192:
190:
188:
187:
161:
160:
159:
158:
155:
154:
153:
152:
148:
119:
112:
101:
95:
92:
49:
47:
37:
25:
12:
11:
5:
498:
496:
488:
487:
482:
472:
471:
468:
467:
450:
449:
427:
393:
367:
366:
364:
361:
323:
320:
257:
256:
253:
249:
248:
243:
239:
238:
234:
233:
227:
223:
222:
218:
217:
185:
181:
180:
177:
173:
172:
167:
163:
162:
156:
150:
149:
142:
141:
135:
134:
133:
132:
129:
128:
117:
114:
113:
28:
26:
19:
13:
10:
9:
6:
4:
3:
2:
497:
486:
483:
481:
478:
477:
475:
465:
464:Energy portal
459:
454:
437:
431:
428:
423:
419:
415:
411:
407:
400:
398:
394:
381:
375:
373:
369:
362:
360:
357:
353:
350:
344:
342:
336:
334:
328:
321:
319:
317:
313:
309:
306:
302:
299:
294:
292:
288:
284:
280:
276:
272:
268:
264:
254:
250:
247:
244:
240:
235:
231:
228:
224:
219:
214:
186:
182:
178:
174:
171:
168:
164:
139:
130:
125:
110:
107:
99:
88:
85:
81:
78:
74:
71:
67:
64:
60:
57: –
56:
52:
51:Find sources:
45:
41:
35:
34:
29:This article
27:
23:
18:
17:
440:. Retrieved
430:
413:
409:
384:. Retrieved
358:
354:
345:
337:
329:
325:
312:power plants
295:
262:
260:
102:
96:January 2022
93:
83:
76:
69:
62:
50:
38:Please help
33:verification
30:
269:located in
208: /
184:Coordinates
474:Categories
442:25 January
386:25 January
363:References
221:Production
196:27°01′19″E
193:22°30′42″S
66:newspapers
422:0525-5090
416:: 45–59.
382:. Reuters
322:Expansion
267:coal mine
287:De Beers
279:Debswana
275:Botswana
246:Debswana
226:Products
179:Botswana
166:Location
127:Location
271:Palapye
242:Company
176:Country
170:Palapye
80:scholar
420:
305:nickel
301:copper
82:
75:
68:
61:
53:
265:is a
237:Owner
87:JSTOR
73:books
444:2022
418:ISSN
388:2022
308:mine
303:and
285:and
261:The
255:2000
230:Coal
59:news
42:by
476::
414:44
412:.
408:.
396:^
371:^
293:.
273:,
446:.
424:.
390:.
109:)
103:(
98:)
94:(
84:·
77:·
70:·
63:·
36:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.