436: 331:(KeNHA) and Everstrong Capital the "United States infrastructure investment manager", to build this 440 kilometres (273 mi) expressway at a budgeted price of US$ 3.6 billion. Funding is expected to be sourced from "pension funds, international investors, development agencies and Kenyan private investors". 265:
to conduct a feasibility study on the commercial and technical viability of the Nairobi–Mombasa Expressway. The PwC report indicated the highway was viable if the highway operator collected a toll that would be used to retire the private capital used to develop the expressway. Starting about that
306:
In August 2017, KeNHA signed a binding agreement with Betchel International, an American civil engineering and construction company to design, construct, and operate the proposed expressway. The expressway will be developed in 10 sections and is designed to have 19 interchanges. Construction was
225:
The planned expressway is a dual-carriage motorway with initially four lanes, expandable to six lanes in the future. The road will be capable of supporting sustained traffic speeds of up to 120 kilometres (75 mi) per hour and will have controlled access.
252:
The expressway is expected to improve roadway safety between the two cities. It is also expected to reduce logistics costs along the Mombasa-Nairobi transportation corridor. The construction phase is expected to create an estimated 500 construction jobs.
492: 213:. The highway passes through nine Kenya counties to end in the city of Mombasa at the Changamwe Roundabout, a total distance of about 525 kilometres (326 mi). The coordinates of this road at 229:
The expressway is intended to serve as "a central part of the national and regional transport system, helping promote trade and development in Kenya" and the regional neighbors of
307:
expected to start in July 2018. Completion of the first section was expected in October 2019, and the entire expressway was expected to open in 2024. In April 2019, the
193:
along the Nairobi–Nakuru Highway, approximately 20 kilometres (12 mi), northwest of Nairobi City centre. It continues in a general southeasterly direction, through
181:, the largest seaport of the country. The new highway is expected to cut travel times between the two cities from the current 6 to 10 hours to approximately four hours. 662: 366: 607: 523: 291: 464: 850: 295: 578: 636: 408: 690: 771: 328: 271: 238: 552: 815: 733: 835: 31: 279: 290:
The cost of constructing this expressway is budgeted at US$ 2.1 billion. Part of the funding is expected from the
206: 35: 820: 845: 830: 825: 810: 340: 840: 667: 612: 469: 371: 308: 311:
newspaper reported that construction was expected to start in the second half of calendar year 2019.
267: 738: 345: 142: 743: 413: 695: 640: 583: 17: 804: 198: 190: 528: 320: 210: 194: 174: 497: 441: 324: 246: 786: 773: 747: 217:
are: 02°25'04.0"S, 37°57'39.0"E (Latitude:-2.417778; Longitude:37.960833).
437:"Distance Between Central Nairobi, Kenya and Gitaru, Kiambu County, Kenya" 637:"Construction of Nairobi-Mombasa high-speed express way to start in 2018" 699: 275: 242: 214: 178: 170: 104: 82: 734:"A Famed Fig Tree's Days Are Numbered as a New Highway Plows Through" 327:
to the United States, witnessed the signing of an agreement between
234: 230: 202: 166: 123: 262: 94: 524:"State invites bids for expansion of Nairobi-Mombasa highway" 367:"Mombasa-Nairobi expressway to be complete within six years" 409:"Nairobi-Mombasa expressway work starts in January – KeNHA" 762: 663:"US company lobbies Kenya for Sh300 billion road contract" 282:(PPP) to design, fund, construct and operate the highway. 691:"Kenya, US investment manager sign $ 3.6bn highway deal" 465:"Sh300 Billion Mombasa Mega Highway To Bypass Nairobi" 608:"Kenya, US firm to hold talks on Sh300 billion road" 555:. London, United Kingdom: Roadtraffic-Technology.com 133: 119: 114: 100: 88: 78: 73: 63: 55: 50: 45: 493:"The Nairobi–Mombasa Expressway at Kibwezi, Kenya" 261:In February 2015, the Kenyan government hired 8: 763:Website of Kenya National Highways Authority 553:"Nairobi-Mombasa Highway Expansion Project" 165:, is a proposed four-lane toll highway in 551:Roadtraffic Technology (January 2021). 357: 296:Overseas Private Investment Corporation 292:Export–Import Bank of the United States 732:Dahir, Abdi Latif (November 8, 2020). 577:Muchira, Njiraini (7 September 2017). 572: 570: 517: 515: 402: 400: 398: 396: 394: 392: 390: 42: 579:"Kenya sets the stage for expressway" 522:Njoroge, Kiarie (22 September 2016). 7: 274:(KeNHA), began detailed talks with 365:Marete, Gitonga (14 August 2017). 25: 851:Buildings and structures in Kenya 407:Amadala, Victor (9 August 2017). 329:Kenya National Highways Authority 272:Kenya National Highways Authority 239:Democratic Republic of the Congo 661:Neville Otuki (20 March 2018). 635:Macharia, Ken (7 August 2017). 606:Munda, Constant (4 July 2018). 59:326 mi (525 km) 1: 708:. Nairobi, Kenya. 23 May 2024 177:and largest city of Kenya to 155:Mombasa–Nairobi Expressway 69:Expected completion in 2026 867: 280:public-private partnership 159:Nairobi–Mombasa Expressway 46:Mombasa–Nairobi Expressway 29: 18:Nairobi–Mombasa Expressway 138: 129: 110: 169:. The highway will link 30:Not to be confused with 319:In May 2024, president 205:to rejoin the existing 163:Nairobi–Mombasa Highway 341:List of roads in Kenya 32:JKIA–Westlands Highway 668:Business Daily Africa 613:Business Daily Africa 470:Business Daily Africa 372:Business Daily Africa 276:Bechtel International 816:Transport in Nairobi 787:2.41778°S 37.96083°E 207:Nairobi–Mombasa Road 161:, also known as the 36:Nairobi–Mombasa Road 836:Taita-Taveta County 783: /  268:government of Kenya 189:The road starts at 143:Transport in Kenya 90:Major intersections 792:-2.41778; 37.96083 739:The New York Times 346:Transport in Kenya 286:Construction costs 266:time as well, the 67:Designated in 2019 294:and the US-based 151: 150: 51:Route information 16:(Redirected from 858: 798: 797: 795: 794: 793: 788: 784: 781: 780: 779: 776: 751: 718: 717: 715: 713: 703: 687: 681: 680: 678: 676: 671:. Nairobi, Kenya 658: 652: 651: 649: 647: 632: 626: 625: 623: 621: 603: 597: 596: 594: 592: 574: 565: 564: 562: 560: 548: 542: 541: 539: 537: 519: 510: 509: 507: 505: 489: 483: 482: 480: 478: 473:. Nairobi, Kenya 460: 454: 453: 451: 449: 433: 427: 426: 424: 422: 404: 385: 384: 382: 380: 362: 209:, just north of 91: 43: 21: 866: 865: 861: 860: 859: 857: 856: 855: 821:Machakos County 801: 800: 791: 789: 785: 782: 777: 774: 772: 770: 769: 768: 759: 754: 731: 727: 725:Further reading 722: 721: 711: 709: 706:The EastAfrican 696:The EastAfrican 693: 689: 688: 684: 674: 672: 660: 659: 655: 645: 643: 641:98.4 Capital FM 634: 633: 629: 619: 617: 605: 604: 600: 590: 588: 584:The EastAfrican 576: 575: 568: 558: 556: 550: 549: 545: 535: 533: 521: 520: 513: 503: 501: 491: 490: 486: 476: 474: 462: 461: 457: 447: 445: 435: 434: 430: 420: 418: 406: 405: 388: 378: 376: 364: 363: 359: 354: 337: 317: 304: 288: 259: 223: 187: 89: 74:Major junctions 68: 39: 28: 23: 22: 15: 12: 11: 5: 864: 862: 854: 853: 848: 846:Mombasa County 843: 838: 833: 831:Makueni County 828: 826:Kajiado County 823: 818: 813: 811:Roads in Kenya 803: 802: 766: 765: 758: 757:External links 755: 753: 752: 728: 726: 723: 720: 719: 682: 653: 627: 598: 566: 543: 511: 484: 455: 428: 386: 356: 355: 353: 350: 349: 348: 343: 336: 333: 316: 313: 309:Business Daily 303: 300: 287: 284: 270:, through the 258: 255: 222: 219: 186: 183: 149: 148: 147: 146: 136: 135: 134:Highway system 131: 130: 127: 126: 121: 117: 116: 112: 111: 108: 107: 102: 98: 97: 92: 86: 85: 80: 76: 75: 71: 70: 65: 61: 60: 57: 53: 52: 48: 47: 26: 24: 14: 13: 10: 9: 6: 4: 3: 2: 863: 852: 849: 847: 844: 842: 839: 837: 834: 832: 829: 827: 824: 822: 819: 817: 814: 812: 809: 808: 806: 799: 796: 764: 761: 760: 756: 749: 745: 741: 740: 735: 730: 729: 724: 707: 701: 697: 692: 686: 683: 670: 669: 664: 657: 654: 642: 638: 631: 628: 615: 614: 609: 602: 599: 586: 585: 580: 573: 571: 567: 554: 547: 544: 531: 530: 525: 518: 516: 512: 500: 499: 494: 488: 485: 472: 471: 466: 463:Edwin Okoth. 459: 456: 444: 443: 438: 432: 429: 416: 415: 410: 403: 401: 399: 397: 395: 393: 391: 387: 374: 373: 368: 361: 358: 351: 347: 344: 342: 339: 338: 334: 332: 330: 326: 323:, while on a 322: 314: 312: 310: 301: 299: 297: 293: 285: 283: 281: 277: 273: 269: 264: 256: 254: 250: 248: 244: 240: 236: 232: 227: 220: 218: 216: 212: 208: 204: 201:, Kisaju and 200: 199:Ongata Rongai 196: 192: 184: 182: 180: 176: 172: 168: 164: 160: 156: 145: 144: 140: 139: 137: 132: 128: 125: 122: 118: 113: 109: 106: 103: 101:East end 99: 96: 93: 87: 84: 81: 79:West end 77: 72: 66: 62: 58: 54: 49: 44: 41: 37: 33: 27:Road in Kenya 19: 841:Kwale County 767: 737: 710:. Retrieved 705: 685: 673:. Retrieved 666: 656: 646:10 September 644:. Retrieved 630: 618:. Retrieved 611: 601: 591:10 September 589:. Retrieved 582: 557:. Retrieved 546: 536:10 September 534:. Retrieved 529:Daily Nation 527: 502:. Retrieved 496: 487: 475:. Retrieved 468: 458: 446:. Retrieved 440: 431: 421:10 September 419:. Retrieved 412: 377:. Retrieved 370: 360: 321:William Ruto 318: 315:Developments 305: 289: 260: 251: 228: 224: 188: 162: 158: 154: 152: 141: 40: 790: / 639:. Nairobi: 559:15 February 498:Google Maps 442:Google Maps 325:state visit 247:South Sudan 805:Categories 778:37°57′39″E 775:02°25′04″S 352:References 748:0362-4331 616:. Nairobi 587:. Nairobi 532:. Nairobi 417:. Nairobi 379:10 August 375:. Nairobi 302:Timetable 698:Quoting 675:20 March 414:The Star 335:See also 237:and the 221:Overview 185:Location 115:Location 700:Reuters 504:5 April 495:(Map). 477:5 April 439:(Map). 257:History 243:Burundi 215:Kibwezi 179:Mombasa 175:capital 171:Nairobi 120:Country 105:Mombasa 83:Nairobi 64:History 746:  712:24 May 620:5 July 448:24 May 235:Rwanda 231:Uganda 203:Isinya 191:Gitaru 173:, the 56:Length 278:on a 211:Konza 195:Ngong 167:Kenya 124:Kenya 744:ISSN 714:2024 677:2018 648:2017 622:2018 593:2017 561:2021 538:2017 506:2019 479:2019 450:2024 423:2017 381:2017 245:and 153:The 263:PwC 157:or 95:Voi 34:or 807:: 742:. 736:. 704:. 665:. 610:. 581:. 569:^ 526:. 514:^ 467:. 411:. 389:^ 369:. 298:. 249:. 241:, 233:, 197:, 750:. 716:. 702:) 694:( 679:. 650:. 624:. 595:. 563:. 540:. 508:. 481:. 452:. 425:. 383:. 38:. 20:)

Index

Nairobi–Mombasa Expressway
JKIA–Westlands Highway
Nairobi–Mombasa Road
Nairobi
Voi
Mombasa
Kenya
Transport in Kenya
Kenya
Nairobi
capital
Mombasa
Gitaru
Ngong
Ongata Rongai
Isinya
Nairobi–Mombasa Road
Konza
Kibwezi
Uganda
Rwanda
Democratic Republic of the Congo
Burundi
South Sudan
PwC
government of Kenya
Kenya National Highways Authority
Bechtel International
public-private partnership
Export–Import Bank of the United States

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.