irrigated. Evaluation of the project six years later showed that the project had been completed on time and on budget to a satisfactory standard. The project was a good example of cooperation between the two countries. The power generation objective was satisfied but the fish development scheme had failed and the irrigation project was proceeding at a slower rate than expected. However, initial results of the cultivation of rice on the irrigated land were encouraging.
555: 541: 52: 284:
The Nangbeto Dam serves part of Togo's needs for electricity and is subject to interruptions in supply when the water level is low, which may happen for periods of several months. As a result, a further dam on the Mono River further downstream at Adjaralla is being constructed, starting in 2016. The
280:
The objectives of the dam were to satisfy the medium-term requirements of Benin and Togo for power, and to provide a large water reserve, amounting to 1.7 billion cubic metres. It was expected that 1000 to 1500 tonnes of fish would be produced each year and that 43,000 hectares of land would be
300:
Voith Hydro, a German manufacturer and installer of hydromechanical and electricity hardware was selected to rehabilitate and modernize the two 32.5 megawatt turbines. The contractor will work on one generator at a time, in order to maintain output from the turbine that is not under
297:, the electric grid operator in Togo and Benin advertised for a company to undertake the rehabilitation of this power station which had not undergone any major overhaul since commercial commissioning in 1987. 269:
as well as creating fisheries and supplying water for irrigation. The dam's 65.6 megawatts (88,000 hp) power station was commissioned in June 1987. The project was financed by the
588: 598: 340: 499: 418: 285:
fish production scheme involved in this project and other environmental issues are being planned at an earlier stage in its development.
44: 396: 472: 93: 445: 583: 593: 365: 274: 560: 578: 301:
repair/rehabilitation. The work expected to last until the fourth quarter of 2022, cost US$ 25 million.
254: 81: 230: 422: 31: 246: 572: 532: 262: 217: 421:. United Nations Environment Programme: Dams and Development Project. Archived from 546: 318: 554: 369: 223: 522: 270: 250: 108: 95: 540: 261:. It was constructed between 1984 and 1987 for the purpose of providing 473:"Togo: Voith Hydro to rehabilitate Nangbeto hydroelectric power plant" 500:"Voith wins modernization order for 65-MW Nangbeto hydropower plant" 266: 446:"Benin: Prequalification bids sought for Nangbeto rehabilitation" 258: 71: 397:"Multinational: Nangbeto Hydroelectric Dam (Benin/Togo)" 229: 216: 208: 190: 185: 177: 169: 164: 156: 148: 140: 132: 124: 87: 77: 67: 24: 399:. African Development Bank Group. 15 January 2014 444:African Energy Newsletter (23 November 2017). 8: 366:"Hydroelectric Power Plants in West Africa" 30: 21: 319:"Nangbeto Hydroelectric Power Plant Togo" 471:Jean Marie Takouleu (19 February 2019). 589:Energy infrastructure completed in 1987 310: 391: 389: 387: 7: 599:Hydroelectric power stations in Togo 341:"Nangbeto Hydroelectric Dam Project" 51: 222:2 x 32.8 MW (44,000 hp) 14: 498:Hydro Review (13 February 2019). 553: 539: 525: 277:at a cost of US$ 98.22 million. 204: m (1,390,000 acre⋅ft) 59:Location of Nangbeto Dam in Togo 50: 43: 368:. Indust Cards. Archived from 295:Communauté Electrique du Bénin 1: 235:65.6 MW (88,000 hp) 128:Power, irrigation, fisheries 16:Dam in Plateaux Region, Togo 321:. Global Energy Observatory 615: 452:. Hastings, United Kingdom 346:. African Development Bank 181:443 m (1,453 ft) 38: 29: 275:African Development Bank 561:Renewable energy portal 265:power to both Togo and 231:Installed capacity 173:52 m (171 ft) 141:Construction began 109:7.4237222°N 1.4349500°E 584:Dams completed in 1987 157:Construction cost 19:Dam in Plateaux Region 594:Plateaux Region, Togo 209:Commission date 114:7.4237222; 1.4349500 425:on 21 November 2016 191:Total capacity 105: /  450:Africa-Energy.com 239: 238: 165:Dam and spillways 160:US$ 98.22 million 149:Opening date 606: 563: 558: 557: 549: 544: 543: 535: 530: 529: 528: 515: 514: 512: 510: 495: 489: 488: 486: 484: 468: 462: 461: 459: 457: 441: 435: 434: 432: 430: 415: 409: 408: 406: 404: 393: 382: 381: 379: 377: 362: 356: 355: 353: 351: 345: 337: 331: 330: 328: 326: 315: 200: 199: 120: 119: 117: 116: 115: 110: 106: 103: 102: 101: 98: 54: 53: 47: 34: 22: 614: 613: 609: 608: 607: 605: 604: 603: 569: 568: 567: 566: 559: 552: 545: 538: 531: 526: 524: 519: 518: 508: 506: 504:HydroReview.com 497: 496: 492: 482: 480: 479:. Paris, France 470: 469: 465: 455: 453: 443: 442: 438: 428: 426: 417: 416: 412: 402: 400: 395: 394: 385: 375: 373: 372:on 19 July 2009 364: 363: 359: 349: 347: 343: 339: 338: 334: 324: 322: 317: 316: 312: 307: 291: 255:Plateaux Region 197: 195: 113: 111: 107: 104: 99: 96: 94: 92: 91: 82:Plateaux Region 63: 62: 61: 60: 57: 56: 55: 20: 17: 12: 11: 5: 612: 610: 602: 601: 596: 591: 586: 581: 571: 570: 565: 564: 550: 536: 521: 520: 517: 516: 490: 477:Afrik21.africa 463: 436: 410: 383: 357: 332: 309: 308: 306: 303: 290: 289:Rehabilitation 287: 247:embankment dam 237: 236: 233: 227: 226: 220: 214: 213: 210: 206: 205: 192: 188: 187: 183: 182: 179: 175: 174: 171: 167: 166: 162: 161: 158: 154: 153: 150: 146: 145: 142: 138: 137: 134: 130: 129: 126: 122: 121: 89: 85: 84: 79: 75: 74: 69: 65: 64: 58: 49: 48: 42: 41: 40: 39: 36: 35: 27: 26: 18: 15: 13: 10: 9: 6: 4: 3: 2: 611: 600: 597: 595: 592: 590: 587: 585: 582: 580: 577: 576: 574: 562: 556: 551: 548: 542: 537: 534: 533:Africa portal 523: 505: 501: 494: 491: 478: 474: 467: 464: 451: 447: 440: 437: 424: 420: 414: 411: 398: 392: 390: 388: 384: 371: 367: 361: 358: 342: 336: 333: 320: 314: 311: 304: 302: 298: 296: 288: 286: 282: 278: 276: 272: 268: 264: 263:hydroelectric 260: 256: 252: 248: 244: 234: 232: 228: 225: 221: 219: 215: 211: 207: 203: 193: 189: 184: 180: 176: 172: 168: 163: 159: 155: 151: 147: 143: 139: 135: 131: 127: 123: 118: 90: 86: 83: 80: 76: 73: 70: 66: 46: 37: 33: 28: 23: 579:Dams in Togo 547:Water portal 507:. Retrieved 503: 493: 481:. Retrieved 476: 466: 454:. Retrieved 449: 439: 427:. Retrieved 423:the original 413: 401:. Retrieved 374:. Retrieved 370:the original 360: 348:. Retrieved 335: 323:. Retrieved 313: 299: 294: 292: 283: 279: 243:Nangbeto Dam 242: 240: 201: 97:7°25′25.40″N 25:Nangbeto Dam 429:21 November 403:21 November 224:Kaplan-type 136:Operational 112: / 100:1°26′5.82″E 88:Coordinates 573:Categories 305:References 271:World Bank 251:Mono River 293:In 2017, 186:Reservoir 376:25 March 350:25 March 325:25 March 218:Turbines 78:Location 253:in the 249:on the 125:Purpose 68:Country 509:10 May 483:10 May 456:10 May 419:"Togo" 245:is an 178:Length 170:Height 133:Status 344:(PDF) 267:Benin 194:1,710 511:2022 485:2022 458:2022 431:2016 405:2016 378:2014 352:2014 327:2014 273:and 259:Togo 241:The 212:1987 152:1987 144:1984 72:Togo 257:of 575:: 502:. 475:. 448:. 386:^ 198:10 513:. 487:. 460:. 433:. 407:. 380:. 354:. 329:. 202:^ 196:×

Index


Nangbeto Dam is located in Togo
Togo
Plateaux Region
7°25′25.40″N 1°26′5.82″E / 7.4237222°N 1.4349500°E / 7.4237222; 1.4349500
Turbines
Kaplan-type
Installed capacity
embankment dam
Mono River
Plateaux Region
Togo
hydroelectric
Benin
World Bank
African Development Bank
"Nangbeto Hydroelectric Power Plant Togo"
"Nangbeto Hydroelectric Dam Project"
"Hydroelectric Power Plants in West Africa"
the original



"Multinational: Nangbeto Hydroelectric Dam (Benin/Togo)"
"Togo"
the original
"Benin: Prequalification bids sought for Nangbeto rehabilitation"
"Togo: Voith Hydro to rehabilitate Nangbeto hydroelectric power plant"
"Voith wins modernization order for 65-MW Nangbeto hydropower plant"
Africa portal

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.