Nanticoke Solar Facility

Source 📝

300: 314: 287:
OPG established Nanticoke Solar LP as a joint venture with First Nations to build and operate a new solar facility on the site. The Nanticoke Solar Facility is Ontario Power Generation's first solar facility. Contracts were let in 2016 and construction began in 2018. The 192,000-panel solar farm was
288:
completed in March 2019 but demolition of the old Nanticoke GS structures continued even after construction was completed. The last sections of the former Nanticoke GS were demolished on August 22, 2019.
444: 685: 524: 690: 276:
in 1924. Following the phase-out of coal power in the province, Ontario Power Generation announced in July 2015 that it would not be converting the facility to
284:
and that remaining equipment would be sold or repurposed elsewhere. The two smokestacks were imploded using controlled demolition on February 28, 2018.
272:
volunteer militia routed a band of American marauders who had been pillaging area farms and terrorizing the country in 1813. The site was designated a
58: 705: 700: 452: 251: 268:
The Nanticoke Solar Facility and its predecessor, the Nanticoke Generating Station, is built on the site of the "Battle of Nanticoke" where the
607: 429: 554: 581: 680: 273: 332: 327: 532: 247: 498: 263: 228: 663: 353: 212: 243: 424: 695: 632: 269: 232: 113: 475: 216: 182: 42: 499:"Ontario's Nanticoke, North America's Former Largest Coal Plant, To Reopen As Solar Farm" 400: 378: 305: 674: 319: 239: 146: 476:"Watch as OPG demolishes 2 huge smokestacks at the Nanticoke generating station" 281: 295: 73: 60: 313: 197: 445:"OPG rejects natural gas, biomass option for Nanticoke Generating Station" 188: 277: 220: 46: 224: 354:"Former coal-fired power plant in Ontario becomes solar facility" 582:"Ontario utility completes 44-MW solar park on Lake Erie shores" 238:
The facility is owned and operated by Nanticoke Solar LP, a
231:, which operated from 1972 to 2013 and was the largest 181: 160: 152: 142: 137: 129: 112: 97: 89: 52: 38: 30: 21: 608:"Solar takes over at Nanticoke Generating Station" 525:"Six Nations thrilled with solar project approval" 8: 686:Buildings and structures in Haldimand County 639:. Ontario Power Generation. August 22, 2019 555:"Nanticoke Solar project closer to reality" 227:. It is located on the site of the defunct 425:Nanticoke National Historic Site of Canada 18: 352:Ruiz Leotaud, Valentina (April 1, 2019). 633:"Nanticoke powerhouse safely demolished" 523:Marion, Michael-Allan (March 11, 2016). 691:Energy infrastructure completed in 2019 381:. Ontario Power Generation. p. 185 344: 252:Mississaugas of the Credit First Nation 250:Development Corporation (15%), and the 474:Craggs, Samantha (28 February 2018). 7: 430:Canadian Register of Historic Places 606:Sonnenberg, Monte (April 1, 2019). 443:Sonnenberg, Monte (July 15, 2015). 16:44 MW solar power station in Canada 14: 497:Tencer, Daniel (March 14, 2016). 333:Science and technology in Canada 328:List of power stations in Canada 312: 298: 274:National Historic Site of Canada 706:Solar power stations in Ontario 580:Shumkov, Ivan (April 3, 2019). 701:2019 establishments in Ontario 612:Norfolk & Tillsonburg News 248:Six Nations of the Grand River 1: 264:Nanticoke Generating Station 229:Nanticoke Generating Station 722: 261: 194: 169: 165: 26: 681:Ontario Power Generation 244:Ontario Power Generation 209:Nanticoke Solar Facility 156:158 hectares (390 acres) 22:Nanticoke Solar Facility 183:Nameplate capacity 98:Construction began 559:The Hamilton Spectator 233:coal-fired power plant 174:Units operational 161:Power generation 74:42.80000°N 80.05028°W 401:"Nanticoke Solar LP" 379:"2020 Annual Report" 114:Commission date 529:Brantford Expositor 235:in North America. 213:solar power station 79:42.80000; -80.05028 70: /  405:Six Nations Future 133:Nanticoke Solar LP 535:on March 13, 2016 205: 204: 713: 667: 666: 664:Official website 649: 648: 646: 644: 629: 623: 622: 620: 618: 603: 597: 596: 594: 592: 577: 571: 570: 568: 566: 561:. March 11, 2016 551: 545: 544: 542: 540: 531:. Archived from 520: 514: 513: 511: 509: 494: 488: 487: 485: 483: 471: 465: 464: 462: 460: 455:on July 23, 2015 451:. Archived from 440: 434: 422: 416: 415: 413: 411: 397: 391: 390: 388: 386: 375: 369: 368: 366: 364: 349: 322: 317: 316: 308: 303: 302: 301: 198:edit on Wikidata 138:Solar farm 125: 123: 108: 106: 85: 84: 82: 81: 80: 75: 71: 68: 67: 66: 63: 19: 721: 720: 716: 715: 714: 712: 711: 710: 671: 670: 662: 661: 658: 653: 652: 642: 640: 631: 630: 626: 616: 614: 605: 604: 600: 590: 588: 579: 578: 574: 564: 562: 553: 552: 548: 538: 536: 522: 521: 517: 507: 505: 503:HuffPost Canada 496: 495: 491: 481: 479: 478:. CBC Hamiltion 473: 472: 468: 458: 456: 449:Simcoe Reformer 442: 441: 437: 423: 419: 409: 407: 399: 398: 394: 384: 382: 377: 376: 372: 362: 360: 351: 350: 346: 341: 318: 311: 304: 299: 297: 294: 266: 260: 201: 121: 119: 104: 102: 78: 76: 72: 69: 64: 61: 59: 57: 56: 17: 12: 11: 5: 719: 717: 709: 708: 703: 698: 696:Joint ventures 693: 688: 683: 673: 672: 669: 668: 657: 656:External links 654: 651: 650: 637:Media Releases 624: 598: 586:Renewables Now 572: 546: 515: 489: 466: 435: 417: 392: 370: 343: 342: 340: 337: 336: 335: 330: 324: 323: 309: 306:Ontario portal 293: 290: 262:Main article: 259: 256: 203: 202: 195: 192: 191: 185: 179: 178: 175: 171: 170: 167: 166: 163: 162: 158: 157: 154: 153:Site area 150: 149: 144: 140: 139: 135: 134: 131: 127: 126: 116: 110: 109: 99: 95: 94: 91: 87: 86: 54: 50: 49: 40: 36: 35: 32: 28: 27: 24: 23: 15: 13: 10: 9: 6: 4: 3: 2: 718: 707: 704: 702: 699: 697: 694: 692: 689: 687: 684: 682: 679: 678: 676: 665: 660: 659: 655: 638: 634: 628: 625: 617:September 12, 613: 609: 602: 599: 587: 583: 576: 573: 560: 556: 550: 547: 534: 530: 526: 519: 516: 504: 500: 493: 490: 477: 470: 467: 454: 450: 446: 439: 436: 432: 431: 426: 421: 418: 406: 402: 396: 393: 380: 374: 371: 359: 355: 348: 345: 338: 334: 331: 329: 326: 325: 321: 320:Energy portal 315: 310: 307: 296: 291: 289: 285: 283: 279: 275: 271: 265: 257: 255: 253: 249: 245: 241: 240:joint venture 236: 234: 230: 226: 222: 218: 214: 210: 199: 193: 190: 186: 184: 180: 176: 173: 172: 168: 164: 159: 155: 151: 148: 147:Flat-panel PV 145: 141: 136: 132: 128: 117: 115: 111: 100: 96: 92: 88: 83: 55: 51: 48: 44: 41: 37: 33: 29: 25: 20: 643:September 5, 641:. Retrieved 636: 627: 615:. Retrieved 611: 601: 591:September 5, 589:. Retrieved 585: 575: 565:September 5, 563:. Retrieved 558: 549: 539:September 5, 537:. Retrieved 533:the original 528: 518: 508:September 5, 506:. Retrieved 502: 492: 480:. Retrieved 469: 459:September 5, 457:. Retrieved 453:the original 448: 438: 428: 420: 410:September 5, 408:. Retrieved 404: 395: 383:. Retrieved 373: 361:. Retrieved 357: 347: 286: 267: 237: 208: 206: 282:natural gas 246:(80%), the 211:is a 44 MW 93:Operational 77: / 53:Coordinates 675:Categories 385:August 13, 358:MINING.com 339:References 217:Nanticoke 62:42°48′0″N 43:Nanticoke 363:April 3, 292:See also 130:Owner(s) 65:80°3′1″W 39:Location 482:1 March 278:biomass 270:Norfolk 258:History 221:Ontario 177:192,431 120: ( 103: ( 47:Ontario 31:Country 254:(5%). 225:Canada 90:Status 34:Canada 196:[ 645:2019 619:2021 593:2021 567:2021 541:2021 510:2021 484:2018 461:2021 412:2021 387:2021 365:2019 207:The 143:Type 122:2019 118:2019 105:2018 101:2018 433:. 280:or 242:of 215:in 187:44 677:: 635:. 610:. 584:. 557:. 527:. 501:. 447:. 427:. 403:. 356:. 223:, 219:, 189:MW 45:, 647:. 621:. 595:. 569:. 543:. 512:. 486:. 463:. 414:. 389:. 367:. 200:] 124:) 107:)

Index

Nanticoke
Ontario
42°48′0″N 80°3′1″W / 42.80000°N 80.05028°W / 42.80000; -80.05028
Commission date
Flat-panel PV
Nameplate capacity
MW
edit on Wikidata
solar power station
Nanticoke
Ontario
Canada
Nanticoke Generating Station
coal-fired power plant
joint venture
Ontario Power Generation
Six Nations of the Grand River
Mississaugas of the Credit First Nation
Nanticoke Generating Station
Norfolk
National Historic Site of Canada
biomass
natural gas
Ontario portal
icon
Energy portal
List of power stations in Canada
Science and technology in Canada
"Former coal-fired power plant in Ontario becomes solar facility"
"2020 Annual Report"

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.