Knowledge (XXG)

National Grid (India)

Source 📝

22: 171:
standalone systems, with each electrified island in the archipelago having its own generation and distribution system. Power stations cater independently to the power requirements of an area. The Electricity Department of Andaman and Nicobar (EDA&N) and the Lakshadweep Electricity Department (LED) are responsible for generation, transmission and distribution systems in these territories.
179:
The inter regional total transmission capacity (TTC) is 105,050 MW as on 30 June 2021. However the available transmission capacity (ATC) on daily basis is not exceeding 35% of TTC and the actual usage is around 25%. Due to inter regional transmission constraints, the cost of power purchases by every
170:
located far away from the mainland. Due to the geography and topography of these islands, including separation by sea over great distances, there is no single power grid for all the electrified islands in the archipelago. The power generation and distribution systems of these territories is served by
141:
The first interconnection of regional grids was established in October 1991 when the North Eastern and Eastern grids were interconnected. The Western Grid was interconnected with the aforementioned grids in March 2003. The Northern grid was also interconnected in August 2006, forming a Central Grid
227:
with asynchronous transmission links between the National Grid and the electricity grids of these countries. India is planning to build a minimum of 125 GW of wind capacity for Nepal 10 GW of hydro capacity for Nepal 20 GW of nuclear capacity and an undetermined amount of solar capacity by 2050
130:
India began utilizing grid management on a regional basis in the 1960s. Individual State grids were interconnected to form 5 regional grids covering mainland India. The grids were the Northern, Eastern, Western, North Eastern and Southern Grids. These regional links were established to enable
142:
synchronously connected operating at one frequency. The sole remaining regional grid, the Southern Grid, was synchronously interconnected to the Central Grid on 31 December 2013 with the commissioning of the 765
131:
transmission of surplus electricity between States in each region. In the 1990s, the Indian government began planning for a national grid. Regional grids were initially interconnected by asynchronous
742: 501: 208:. As of April 2017, there are 12 cross-border interconnections between India and Nepal. India became a net exporter of electricity for the first time in the 2016-17 fiscal year. 365: 421: 312: 680: 107: 446: 82:
regulates grid frequency by requiring States to pay more when they draw power at low frequencies. There are also synchronous interconnections to
49:
and ensuring that electricity generated anywhere in India can be used to satisfy demand elsewhere. The National Grid is owned, and maintained by
184:
has introduced a policy for nationwide single merit order power purchases from Power exchanges to avoid costly power purchases by the Discoms.
512: 747: 60: 192:
India began cross-border electricity trade in the mid-1980s. India established 33 kV and 132 kV interconnections in radial mode from
396: 138:
links facilitating limited exchange of regulated power. The links were subsequently upgraded to high capacity synchronous links.
261: 53: 200:
to Bhutan and Nepal respectively. The first interconnection with Bangladesh was commissioned in December 2013, connecting
237: 216: 159: 135: 132: 287: 71: 337: 242: 220: 181: 567: 537: 57: 50: 454: 99: 46: 78:. The permissible range of the frequency band is 49.5-50.5 Hz, effective 17 September 2012. The 654: 79: 727: 612: 34: 21: 224: 205: 25:
The 5 regional power grids in India, which were interconnected to establish the National Grid.
212: 155: 265: 591: 736: 701: 197: 42: 633: 366:"BIMSTEC needs a 'power tool'; here's why it is time for a green energy revolution" 63:. It is one of the largest operational synchronous grids in the world with 417.68 167: 163: 201: 115: 87: 422:"Indian power system becomes largest operating synchronous grid in the world" 338:"Grid Security – Need For Tightening of Frequency Band & Other Measures" 103: 146:
Raichur-Solapur transmission line, thereby establishing the National Grid.
111: 110:) has also been proposed. A proposed interconnection between Myanmar and 119: 91: 83: 476: 193: 95: 75: 38: 20: 545: 143: 64: 313:"CERC plans to further narrow frequency band for national grid" 215:
with synchronous transmission links while exporting power to
166:
are not connected to the National Grid. Both territories are
67:
of installed power generation capacity as of 31 May 2023.
681:"India becomes net exporter of power for the first time" 658: 288:"All India Installed Capacity of Utility Power Stations" 391: 389: 387: 228:
with full financial ownership in the hands of Nepal.
743:
Electric power transmission infrastructure in India
211:Presently, India is importing electricity from 180:region in Power Exchanges is not always equal. 8: 451:Department of Electricity, UT of Lakshadweep 345:Central Electricity Regulatory Commission 16:Electricity transmission network in India 253: 728:Cross Border Electricity Import/Export 568:"Inter Regional Transmission Capacity" 655:"Merit Order Despatch of Electricity" 502:"Power for All - Andaman and Nicobar" 7: 175:Inter regional transmission capacity 108:India–Sri Lanka HVDC Interconnection 702:"Cross Border Trade of Electricity" 114:would facilitate the creation of a 481:Andaman and Nicobar Administration 61:Power System Operation Corporation 14: 35:electricity transmission network 401:Power Grid Corporation of India 311:Bhaskar, Utpal (30 July 2013). 188:Cross border transmission links 70:India's grid is connected as a 54:Power Grid Corporation of India 613:"NLDC Daily Reports – 2017-18" 86:, and asynchronous links with 1: 118:and enable trading among all 592:"Monthly ATC Inter Regional" 150:Territories outside the grid 748:Wide area synchronous grids 238:Electricity sector in India 160:Andaman and Nicobar Islands 764: 72:wide area synchronous grid 243:Availability-based tariff 538:"DEPARTMENT AT A GLANCE" 262:"Areas of national grid" 100:undersea interconnection 74:nominally running at 50 542:electricity.and.nic.in 26: 397:"One Nation-One Grid" 370:The Financial Express 24: 33:is the high-voltage 518:on 13 February 2020 477:"Power Department" 447:"Renewable Energy" 426:The Times of India 268:on 20 October 2016 27: 634:"IEX Area Prices" 548:on 10 August 2020 509:Ministry of Power 156:union territories 755: 716: 715: 713: 711: 706: 698: 692: 691: 689: 687: 677: 671: 670: 668: 666: 657:. Archived from 651: 645: 644: 642: 640: 630: 624: 623: 621: 619: 609: 603: 602: 600: 598: 588: 582: 581: 579: 577: 572: 564: 558: 557: 555: 553: 544:. Archived from 534: 528: 527: 525: 523: 517: 511:. Archived from 506: 498: 492: 491: 489: 487: 473: 467: 466: 464: 462: 453:. Archived from 443: 437: 436: 434: 432: 418: 412: 411: 409: 407: 393: 382: 381: 379: 377: 372:. 3 January 2017 362: 356: 355: 353: 351: 342: 334: 328: 327: 325: 323: 308: 302: 301: 299: 297: 292: 284: 278: 277: 275: 273: 264:. Archived from 258: 80:Union Government 56:and operated by 763: 762: 758: 757: 756: 754: 753: 752: 733: 732: 724: 719: 709: 707: 704: 700: 699: 695: 685: 683: 679: 678: 674: 664: 662: 661:on 15 June 2021 653: 652: 648: 638: 636: 632: 631: 627: 617: 615: 611: 610: 606: 596: 594: 590: 589: 585: 575: 573: 570: 566: 565: 561: 551: 549: 536: 535: 531: 521: 519: 515: 504: 500: 499: 495: 485: 483: 475: 474: 470: 460: 458: 445: 444: 440: 430: 428: 420: 419: 415: 405: 403: 395: 394: 385: 375: 373: 364: 363: 359: 349: 347: 340: 336: 335: 331: 321: 319: 310: 309: 305: 295: 293: 290: 286: 285: 281: 271: 269: 260: 259: 255: 251: 234: 190: 177: 152: 128: 17: 12: 11: 5: 761: 759: 751: 750: 745: 735: 734: 731: 730: 723: 722:External links 720: 718: 717: 693: 672: 646: 625: 604: 583: 559: 529: 493: 468: 457:on 9 July 2016 438: 413: 383: 357: 329: 303: 279: 252: 250: 247: 246: 245: 240: 233: 230: 189: 186: 176: 173: 151: 148: 127: 124: 43:power stations 15: 13: 10: 9: 6: 4: 3: 2: 760: 749: 746: 744: 741: 740: 738: 729: 726: 725: 721: 703: 697: 694: 682: 676: 673: 660: 656: 650: 647: 635: 629: 626: 614: 608: 605: 593: 587: 584: 569: 563: 560: 547: 543: 539: 533: 530: 514: 510: 503: 497: 494: 482: 478: 472: 469: 456: 452: 448: 442: 439: 427: 423: 417: 414: 402: 398: 392: 390: 388: 384: 371: 367: 361: 358: 346: 339: 333: 330: 318: 314: 307: 304: 289: 283: 280: 267: 263: 257: 254: 248: 244: 241: 239: 236: 235: 231: 229: 226: 222: 218: 214: 209: 207: 203: 199: 198:Uttar Pradesh 195: 187: 185: 183: 174: 172: 169: 165: 161: 157: 149: 147: 145: 139: 137: 134: 125: 123: 121: 117: 113: 109: 105: 101: 97: 93: 89: 85: 81: 77: 73: 68: 66: 62: 59: 55: 52: 48: 44: 41:, connecting 40: 36: 32: 31:National Grid 23: 19: 708:. Retrieved 696: 684:. Retrieved 675: 663:. Retrieved 659:the original 649: 637:. Retrieved 628: 616:. Retrieved 607: 595:. Retrieved 586: 574:. Retrieved 562: 550:. Retrieved 546:the original 541: 532: 520:. Retrieved 513:the original 508: 496: 484:. Retrieved 480: 471: 459:. Retrieved 455:the original 450: 441: 429:. Retrieved 425: 416: 404:. Retrieved 400: 374:. Retrieved 369: 360: 348:. Retrieved 344: 332: 320:. Retrieved 316: 306: 294:. Retrieved 282: 270:. Retrieved 266:the original 256: 210: 191: 178: 168:archipelagos 153: 140: 136:back-to-back 129: 69: 30: 28: 18: 164:Lakshadweep 58:state-owned 51:state-owned 47:substations 737:Categories 552:2 December 522:2 December 486:2 December 461:2 December 431:2 December 406:2 December 350:2 December 322:2 December 272:19 October 249:References 221:Bangladesh 202:Berhampore 116:power pool 88:Bangladesh 45:and major 206:Bheramara 122:nations. 104:Sri Lanka 317:Livemint 232:See also 112:Thailand 710:2 April 686:2 April 665:12 July 296:10 July 225:Myanmar 126:History 120:BIMSTEC 92:Myanmar 639:2 July 618:2 July 597:2 July 576:2 July 376:27 May 213:Bhutan 94:, and 84:Bhutan 705:(PDF) 571:(PDF) 516:(PDF) 505:(PDF) 341:(PDF) 291:(PDF) 217:Nepal 204:with 194:Bihar 98:. An 96:Nepal 39:India 712:2017 688:2017 667:2017 641:2017 620:2017 599:2017 578:2017 554:2016 524:2016 488:2016 463:2016 433:2016 408:2016 378:2017 352:2016 324:2016 298:2020 274:2016 223:and 196:and 162:and 154:The 133:HVDC 29:The 182:MoP 158:of 102:to 37:in 739:: 540:. 507:. 479:. 449:. 424:. 399:. 386:^ 368:. 343:. 315:. 219:, 144:kV 90:, 76:Hz 65:GW 714:. 690:. 669:. 643:. 622:. 601:. 580:. 556:. 526:. 490:. 465:. 435:. 410:. 380:. 354:. 326:. 300:. 276:. 106:(

Index


electricity transmission network
India
power stations
substations
state-owned
Power Grid Corporation of India
state-owned
Power System Operation Corporation
GW
wide area synchronous grid
Hz
Union Government
Bhutan
Bangladesh
Myanmar
Nepal
undersea interconnection
Sri Lanka
India–Sri Lanka HVDC Interconnection
Thailand
power pool
BIMSTEC
HVDC
back-to-back
kV
union territories
Andaman and Nicobar Islands
Lakshadweep
archipelagos

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.