Nenskra Hydropower Plant Project

Source 📝

45: 277:
water intake located on the left bank of the reservoir creating a 130 m high asphalt faced-rockfill dam. The dam will be raised about 5 km off the village of Tita up the narrow gorge of the Nenskra river creating a live storage of 3,176 million m. From the reservoir, water is to be supplied into the headrace tunnel. To improve the energy scheme, three low-pressure dams will be constructed in the Nakra river valley. Out of the created reservoir, 45.5 m/sec additional water is to be discharged into the Nenskra reservoir through a transfer tunnel allowing the Nenskra HPP to produce 1,219 GWh yearly.
73: 80: 52: 474:
sensitive area. The local cemetery and agricultural fields of the village of Nakra are regularly flooded by mud-flows. These mudflows have the potential of blocking the Nakra river, creating flooding upstream. Yet according to a review of the Nenskra Environmental and Social Impact Assessment (ESIA),
276:
Water flow of 47.0 m/sec will be transferred through a 15.1 km long and 4.5 m wide headrace tunnel to the turbines. In the close proximity with the HPP powerhouse, the headrace tunnel will branch into three separate penstocks to connect to the turbines. Water is transferred to a tunnel through a
232:
from the right side. It is 42 km long with the watershed area of 623 km. The river originates on elevation of 2915 m above the sea level and is nourished by glaciers, snow, rain, and ground waters. Its water regime is characterized with flood in spring and summer and shallowness in winter.
461:
The dam construction will also include constructions of bypass and access roads, high voltage transmission lines and substations. These construction may increase landslides. An indirect result of this project is also the increased chance of flooding because of the mudflows. These mudflows have the
236:
In winter, when less water is available from rivers and domestic energy consumption rises, Georgia experiences a deficit in electricity supplies, and imports energy from neighbouring countries. Nenskra HPP is one of the four proposed power schemes with a large regulation capacity, intended to meet
457:
The project site was originally proposed to be included within the European system of protected areas as the ‘Svaneti 1’ Emerald site. In January 2016 the Georgian government attempted to exclude all territories to form part of the planned Nenskra project, without providing any evidence that the
292:
are to be a 125–130 high and 870 long dam on the upper Nenskra river to create a live storage of 176 million m and a reservoir area at supply level of 2.7 km. The dam will capture the flows of the Nenskra river and the adjacent Nakra river upstream of the existing Khudoni HPP reservoir,
367:
The 2015 ESIA report has been prepared by Gamma Consulting Limited, a Georgian consultant, based on field investigations undertaken in 2011 and 2014 and following the public consultations held in May 2015. The Environmental Permit was issued by the Environmental Authorities in October 2015.
445:
mountains with their own language, laws and traditions. The traditions, culture, and identity of the Svans' is rooted in their mountain location. For generations, they have lived in isolation and self-dependence and their livelihoods depend on forestry, grazing and subsistence agriculture.
458:
Nenskra and Nakra valleys are less important in terms of biodiversity than the rest of the Svaneti region. This resulted in a complaint to the Berne Convention on the Conservation of European Wildlife and Natural Habitats for a violation of a number of articles of the convention.
378:
Based on the research made JSC Nenskra Hydro has prepared The Environmental and Social Impact management Plan. The plan aims at implementing mitigation measures during the construction and operation in compliance with Georgian legislative requirements and international standards.
371:
Several International Financial Institutions (the Lenders) have been approached to finance the Project. To ensure compliance with their Environmental and Social (E&S) policies, the Lenders recommended that a number of Supplementary E&S Studies be undertaken.
454:" nature preservation point of view, not all of these larger like Enguri and smaller rivers like Nenskra and Nakra should be used for hydropower generation." Prof. Dr. Frank Schrader, International Consultant on Hydropower, in his review of the Nenskra ESIA. 402:
The Nenskra HPP Project will create jobs for the local population both during the construction and operation. 100% of unskilled labor will be represented by residents of the Nenskra and Nakra valleys. 75% of partly unskilled labor will be provided by
334:
To defend from the probable maximum flood, the diversion tunnel dimensions are designed to deal with probable maximum discharge of 1 101 m/sec that is 3.67 times as much as expected discharge of 300 m/sec with the rate of once in 10000 years.
414:
In 2016, the project company conducted a study to identify the needs of the local residents. With the study findings and needs of the population in view, the project company launched a community investment program with the following goals:
323:
Water will be supplied from the intake of the headrace tunnel to the end of the penstock. The penstock starts from the surge, which then transfers into the turbine tunnels. Waste water will be discharged into the Nenskra river by tailrace.
312:
The Nenskra headrace tunnel follows the left bank of the Nenskra valley and is about 15.1 km long by 4.5 m wide. The tunnel connects to the surface penstock upstream of the Powerhouse at a level around 600 m above valley floor level.
272:
of 93 MW capacity each and with 280 MW total installed capacity. Generated power will be transmitted to a Gas Insulated Substation (GIS Substation) and through the transmission line will be connected to the country's power grid.
382:
Disclosure of the report has started in March 2017. During the disclosure period JSC Nenskra Hydro should introduce the relevant report data to the general public of Georgia, Nenskra and Nakra valleys communities, NGOs,
841: 308:
The Nakra transfer tunnel connects the Nakra valley with the Nenskra valley and is approximately 12.5 km long by 3.5 m in diameter and will divert water from behind the Nakra weir and into the Nenskra reservoir.
44: 446:
Approximately 28 households will be affected by the project's land acquisition phase, either through permanent loss of land or temporary loss of access to pastures near the dam and reservoir sites.
280:
The powerhouse of Nenskra HPP is planned on the left bank of the Nenskra river on the edge of village Chuberi. The power unit will consist of the HPP powerhouse and near-located GIS substation.
213:
The plant has a projected capacity of 280 MW, and a projected average annual energy production of 1.2 TWh. It is being developed by JSC Nenskra Hydro, founded in 2015 as a joint venture between
831: 347:
will capture the flow slowly and gradually (layer by layer). The dam will operate in the natural regime of the river through a bottom outlet to keep the water at the level of 1 370 m.
533:
Independent International Panel of Experts (IPOE) is monitoring all designs and activities, to ensure dam safety and its compliance with the environmental and social standards.
260:
Nenskra HPP is being implemented based on BOT (Build-operate-transfer) model that stipulates transfer of the ownership to Georgia 36 years after the HPP is commissioned.
488: 233:
Flood rate is the highest in autumn. In winter the river experiences flood icing, anchor ice, ice apron. Average annual discharge of the Nenskra river is 40.1 m/sec.
678: 375:
In 2017 the supplementary studies-based report consisting of ten volumes was disclosed to the general public. The report is available at JSC Nenskra Hydro web-site.
836: 542: 123: 72: 562: 396: 504: 583: 754: 772: 360:
In 2015, the Nenskra Hydropower Project submitted the final Environmental & Social Impact Assessment Report (ESIA) to the
608: 804: 632: 530:
The company has announced "international tender" to select Engineering, Procurement and Construction (EPC) Contractor.
198:(also known as Nenskra HPP) is a proposed hydroelectric power station to be located on the southern slopes of the 496: 703: 679:"Nenskra Hydropower Project Environmental and Social Impact Assessment Report Disclosure Process Continues" 500: 492: 422:
develop and reinforce the village areas through encouraging of agricultural business and collective farms
519:, a sole multi-purpose dam management company in Korea and international engineering companies, such as 245:
Nenskra HPP will be constructed in the Nenskra and Nakra valleys on the southern slopes of the Central
220:
The project has faced significant opposition from representatives of all communities in Upper Svaneti.
408: 300:
is 8.7 m high and 44 m long located on the Nakra river and is built for impoundment and diversion.
250: 730: 384: 361: 246: 199: 207: 103: 633:"GEO: Nenskra Hydropower Project - Vol. 2: Draft Environmental and Social Impact Assessment" 476: 269: 17: 419:
create jobs for the local population through support and strengthening of local business
331:
type electromechanical plants, each with installed capacity of 93MW will be installed.
524: 328: 825: 520: 237:
the government's strategy to reduce dependency on imported power during the winter.
320:
will include the HPP powerhouse, tailrace for discharged water and GIS substation.
229: 437:
Some 400 families live in close by villages (Chuberi and Nakra). The majority are
317: 138: 125: 467: 428:
contribute to market and touristic business in the Nenskra and Nakra valleys
404: 344: 487:
The project involves the following international financial institutions:
479:
and potential adverse impacts on locals have not been properly evaluated.
425:
increase involvement of the population into economic and social activities
442: 516: 471: 463: 399:, JSC Nenskra investment was among the 2015 direct investments Top 10. 254: 214: 203: 59:
Location of Nenskra Hydropower Plant Project in Samegrelo-Zemo Svaneti
462:
potential of blocking the Nakra river, creating flooding upstream.
438: 755:"Nenskra Hydropower Project, Volume 3: Social Impact Assessment" 653: 364:(GoG) as part of the national environmental permitting process. 297: 584:"Partnership Fund Launches Construction Works for Nenskra HPP" 289: 842:
Proposed renewable energy power stations in Georgia (country)
731:"Nenskra hydropower plant - Key Facts [Updated 2019]" 725: 723: 356:
Environmental and Social Impact Assessment Reports (ESIA)
179: 563:"Nenskra Hydropower Plant - Project Summary Information" 79: 51: 805:"Project Briefing, Nenskra hydropower project, Georgia" 803:
Kochladze, Manana; Chipashvili, David (December 2017).
489:
European Bank for Reconstruction and Development (EBRD)
268:
The Nenskra HPP powerhouse will house three vertical
483:
Involvement of International Financial Institutions
167: 159: 154: 117: 109: 99: 32: 607:Kochladze, Manana; Chipashvili, David (May 2019). 832:Hydroelectric power stations in Georgia (country) 704:"Top 10 Companies Who Invest the Most in Georgia" 798: 796: 503:(KDB), Italian Export Credit Agency (SACE) and 343:According to the previously drawn up plan the 257:. Construction is scheduled to start in 2020. 8: 543:List of power stations in Georgia (country) 87:Nenskra Hydropower Plant Project (Georgia) 29: 293:exploiting the available head of 725 m. 554: 407:, out of whom 50% will be residents of 627: 625: 450:Geological & Environmental Impacts 837:Proposed hydroelectric power stations 397:National Statistics Office of Georgia 7: 609:"Nenskra hydropower project: update" 570:Asian Infrastructure Investment Bank 515:The Project is being implemented by 505:Asian Infrastructure Investment Bank 760:. JSC Nenskra Hydro. February 2017. 288:The main structures of the Nenskra 773:"Review of Nenskra HEP ESIA Study" 441:, an ethnic subgroup of Georgia's 228:The Nenskra river joins the river 62:Show map of Samegrelo-Zemo Svaneti 25: 327:During the operation, 3 units of 391:Economical impact of the project 215:Korea Water Resource Corporation 78: 71: 50: 43: 33:Nenskra Hydropower Plant Project 771:Schrader, Frank (13 May 2015). 1: 814:. Green Alternative Georgia. 284:Nenskra Dam & Nakra Weir 858: 217:and JSC Partnership Fund. 200:Central Caucasus mountains 196:Nenskra Hydro Power Plant 172: 37: 18:Nenskra hydro power plant 588:Georgia Today on the Web 497:European Investment Bank 387:and other stakeholders. 168:Nenskra Hydropower Plant 702:Cbw, Cbw (2016-03-10). 501:Korean Development Bank 27:Dam in Zhoneti, Georgia 640:Asian Development Bank 511:Project implementation 493:Asian Development Bank 385:Government of Georgia 362:Government of Georgia 139:43.04722°N 42.38056°E 677:nuca (2017-06-19). 654:"Reports | Nenskra" 251:Mestia Municipality 135: /  90:Show map of Georgia 264:Nenskra Powerhouse 247:Caucasus mountains 224:General Background 144:43.04722; 42.38056 395:According to the 193: 192: 16:(Redirected from 849: 816: 815: 809: 800: 791: 790: 788: 786: 777: 768: 762: 761: 759: 751: 745: 744: 742: 741: 727: 718: 717: 715: 714: 699: 693: 692: 690: 689: 674: 668: 667: 665: 664: 650: 644: 643: 637: 629: 620: 619: 613: 604: 598: 597: 595: 594: 580: 574: 573: 572:. 19 March 2019. 567: 559: 477:geologic hazards 189: 188: 185: 183: 181: 150: 149: 147: 146: 145: 140: 136: 133: 132: 131: 128: 113:Zhoneti, Georgia 91: 82: 81: 75: 63: 54: 53: 47: 30: 21: 857: 856: 852: 851: 850: 848: 847: 846: 822: 821: 820: 819: 807: 802: 801: 794: 784: 782: 775: 770: 769: 765: 757: 753: 752: 748: 739: 737: 729: 728: 721: 712: 710: 701: 700: 696: 687: 685: 676: 675: 671: 662: 660: 652: 651: 647: 635: 631: 630: 623: 611: 606: 605: 601: 592: 590: 582: 581: 577: 565: 561: 560: 556: 551: 539: 513: 485: 452: 435: 393: 358: 353: 341: 306: 286: 270:Pelton turbines 266: 243: 226: 178: 177: 176: 143: 141: 137: 134: 129: 126: 124: 122: 121: 95: 94: 93: 92: 89: 88: 85: 84: 83: 66: 65: 64: 61: 60: 57: 56: 55: 28: 23: 22: 15: 12: 11: 5: 855: 853: 845: 844: 839: 834: 824: 823: 818: 817: 792: 763: 746: 719: 694: 669: 645: 621: 599: 575: 553: 552: 550: 547: 546: 545: 538: 535: 527:and Lombardi. 525:Mott MacDonald 512: 509: 484: 481: 451: 448: 434: 433:Social Impacts 431: 430: 429: 426: 423: 420: 392: 389: 357: 354: 352: 349: 340: 337: 329:Pelton turbine 305: 302: 285: 282: 265: 262: 242: 239: 225: 222: 191: 190: 170: 169: 165: 164: 161: 157: 156: 152: 151: 119: 115: 114: 111: 107: 106: 101: 97: 96: 86: 77: 76: 70: 69: 68: 67: 58: 49: 48: 42: 41: 40: 39: 38: 35: 34: 26: 24: 14: 13: 10: 9: 6: 4: 3: 2: 854: 843: 840: 838: 835: 833: 830: 829: 827: 813: 806: 799: 797: 793: 781: 774: 767: 764: 756: 750: 747: 736: 732: 726: 724: 720: 709: 705: 698: 695: 684: 680: 673: 670: 659: 655: 649: 646: 642:. March 2017. 641: 634: 628: 626: 622: 617: 610: 603: 600: 589: 585: 579: 576: 571: 564: 558: 555: 548: 544: 541: 540: 536: 534: 531: 528: 526: 522: 518: 510: 508: 506: 502: 498: 494: 490: 482: 480: 478: 473: 469: 465: 459: 455: 449: 447: 444: 440: 432: 427: 424: 421: 418: 417: 416: 412: 410: 406: 400: 398: 390: 388: 386: 380: 376: 373: 369: 365: 363: 355: 350: 348: 346: 338: 336: 332: 330: 325: 321: 319: 314: 310: 303: 301: 299: 294: 291: 283: 281: 278: 274: 271: 263: 261: 258: 256: 252: 248: 240: 238: 234: 231: 223: 221: 218: 216: 211: 209: 205: 201: 197: 187: 175: 171: 166: 162: 158: 153: 148: 120: 116: 112: 108: 105: 102: 98: 74: 46: 36: 31: 19: 811: 783:. Retrieved 779: 766: 749: 738:. Retrieved 734: 711:. Retrieved 707: 697: 686:. Retrieved 682: 672: 661:. Retrieved 657: 648: 639: 615: 602: 591:. Retrieved 587: 578: 569: 557: 532: 529: 514: 486: 460: 456: 453: 436: 413: 401: 394: 381: 377: 374: 370: 366: 359: 342: 333: 326: 322: 315: 311: 307: 295: 287: 279: 275: 267: 259: 244: 235: 227: 219: 212: 195: 194: 173: 241:Description 142: / 118:Coordinates 826:Categories 740:2019-06-23 713:2019-06-23 688:2019-06-23 663:2019-06-23 658:nenskra.ge 593:2019-06-23 549:References 468:landslides 318:power unit 296:The Nakra 130:42°22′50″E 127:43°02′50″N 812:Bankwatch 780:Bankwatch 735:Bankwatch 616:Bankwatch 472:mud-flows 405:Georgians 345:reservoir 339:Reservoir 155:Reservoir 537:See also 507:(AIIB). 443:Caucasus 110:Location 785:10 July 517:K-water 499:(EIB), 495:(ADB), 464:Svaneti 351:Impacts 304:Tunnels 255:Svaneti 208:Georgia 204:Svaneti 180:nenskra 174:Website 163:Zhoneti 160:Creates 104:Georgia 100:Country 708:CBW.ge 683:CBW.ge 521:Stucky 409:Mestia 230:Enguri 808:(PDF) 776:(PDF) 758:(PDF) 636:(PDF) 612:(PDF) 566:(PDF) 466:is a 439:Svans 787:2019 475:the 470:and 316:The 298:Weir 290:dam 249:in 202:in 184:/en 182:.ge 828:: 810:. 795:^ 778:. 733:. 722:^ 706:. 681:. 656:. 638:. 624:^ 614:. 586:. 568:. 523:, 491:, 411:. 253:, 210:. 206:, 789:. 743:. 716:. 691:. 666:. 618:. 596:. 186:/ 20:)

Index

Nenskra hydro power plant
Nenskra Hydropower Plant Project is located in Samegrelo-Zemo Svaneti
Nenskra Hydropower Plant Project is located in Georgia
Georgia
43°02′50″N 42°22′50″E / 43.04722°N 42.38056°E / 43.04722; 42.38056
nenskra.ge/en/
Central Caucasus mountains
Svaneti
Georgia
Korea Water Resource Corporation
Enguri
Caucasus mountains
Mestia Municipality
Svaneti
Pelton turbines
dam
Weir
power unit
Pelton turbine
reservoir
Government of Georgia
Government of Georgia
National Statistics Office of Georgia
Georgians
Mestia
Svans
Caucasus
Svaneti
landslides
mud-flows

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.