Neville Bonner Bridge

Source đź“ť

33: 353: 858: 307:
was partially closed so that pieces of the bridge could be placed above the road. Close to the banks piles were dug 30 metres into the ground to support the structure, while in the river a depth of 35 metres was reached. The final 10-metre, 20-tonne span was placed on the morning of 27 February 2023.
286:
Up to 10,000 people are expected to use the bridge every day. Cyclists will not be permitted to use the bridge. The cost for the bridge's construction was estimated in 2019 to be around $ 100 million. Prior to the official opening in 2024, a preview event for approximately 500 pedestrians was held on
707: 493: 324:
is 320 metres (1,050 feet) long. The maximum mast height is 75 metres (246 feet). The clearance for river vessels is 11.4 to 12.7 metres (37 to 42 feet) from high water level to the bridge deck. This is the same height as the
336:
It features two arches, each 60 metres long and weighing 90 tonnes. The walkway is suspended from the arches which reach a height of 30 metres above the river. The majority of the load is placed on the central pier. A piled
527: 700: 483: 638: 341:
foundation at Southbank is used to tie back the arches. The bridge has been designed to withstand wind speeds greater than 220 km per hour and to resist a 1 in 2000-year flood event.
832: 889: 675: 519: 398: 283:, is an arch and single mast cable-stayed bridge with continuous shading supported by one mid-river pier. A large observation deck is located in the centre of the bridge. 455: 320:. The “lightweight yet dramatic” design incorporates 1,000 tonnes of fabricated structural steel, engineered to create an “elegant and efficient outcome”. The 1023: 740: 580: 557: 1028: 882: 630: 1033: 1018: 875: 824: 1043: 1038: 671: 1008: 661: 300: 250: 799: 394: 898: 862: 366: 920: 330: 1013: 975: 451: 429: 371: 763: 296: 605: 935: 910: 326: 732: 549: 970: 960: 273: 867: 269: 102: 980: 945: 666: 304: 254: 794: 321: 317: 280: 195: 117: 32: 965: 955: 358: 581:"Neville Bonner Bridge first walk welcomes 500 pedestrians for preview experience / GRIMSHAW" 303:. Construction on the bridge had begun by March 2020. During construction in June 2021, the 985: 182:
11.4 metres (37 ft) - 12.7 metres (42 ft) from high water level to the bridge deck
950: 925: 789: 940: 488: 265: 258: 242: 92: 54: 484:"Bridge over Brisbane River takes shape even as casino owner may be in troubled water" 1002: 915: 348: 238: 199: 68: 631:"Neville Bonner Bridge to connect two iconic places, now under construction" 177: 72: 421: 857: 701:"Piling commences for Brisbane's first river bridge in more than 10 years" 662:"Riverside Expressway to close for weekend work on Neville Bonner Bridge" 338: 246: 87: 64: 520:"'Iconic and remarkable': Queen's Wharf Brisbane to open for Christmas" 825:"Future climate risks considered when designing Neville Bonner Bridge" 249:, Australia, connecting the incomplete Queen's Wharf precinct in the 422:"Brisbane's Neville Bonner Bridge opens to the public from Thursday" 127: 871: 395:"Revised designs for 'dramatic' Queen's Wharf bridge released" 16:
Footbridge spanning the Brisbane River in Brisbane, Australia
606:"First walk on pedestrian-only Neville Bonner Bridge" 452:"Next Phase of Queen's Wharf Bridge Design Submitted" 261:. The bridge opened to the public on 28 August 2024. 223: 215: 205: 191: 186: 176: 168: 157: 149: 141: 133: 123: 113: 108: 98: 86: 78: 60: 50: 42: 23: 637:. Destination Brisbane Consortium. 16 March 2020. 733:"Superstructure takes shape for Brisbane bridge" 268:, a Queensland politician and Australia's first 764:"Brisbane's newest pedestrian bridge complete" 883: 550:"Final Neville Bonner Bridge Design Unveiled" 316:The bridge was designed by Neil Stonell from 8: 454:. Brisbane Development. 10 September 2017. 890: 876: 868: 20: 426:Australian Broadcasting Corporation (ABC) 397:. Architecture Media. 20 September 2017. 389: 387: 383: 819: 817: 695: 693: 279:The design concept for the bridge, by 762:Sutherland, Isla (28 February 2023). 678:from the original on 14 November 2021 530:from the original on 28 February 2023 513: 511: 496:from the original on 30 November 2021 477: 475: 473: 37:Bridge under construction in May 2022 7: 660:O'Flaherty, Antonia (18 June 2021). 458:from the original on 7 November 2017 401:from the original on 7 November 2017 739:. Hemming Group. 30 November 2021. 672:Australian Broadcasting Corporation 432:from the original on 29 August 2024 1024:Brisbane central business district 835:from the original on 23 April 2023 802:from the original on 8 August 2021 743:from the original on 23 April 2023 713:from the original on 11 March 2021 641:from the original on 19 March 2022 301:Brisbane central business district 251:Brisbane central business district 211:Fitzgerald Constructions Australia 14: 1029:Cable-stayed bridges in Australia 856: 560:from the original on 1 June 2023 518:Moore, Tony (27 February 2023). 351: 31: 1034:Pedestrian bridges in Australia 1019:Bridges over the Brisbane River 899:Bridges over the Brisbane River 737:Bridge Design & Engineering 482:Read, Cloe (29 November 2021). 367:Bridges over the Brisbane River 333:. The bridge is fully shaded. 420:McKay, Jack (28 August 2024). 158: 1: 145:Mast: 75 metres (246 ft) 911:Sir Leo Hielscher (Gateway) 372:List of bridges in Brisbane 1060: 1044:South Brisbane, Queensland 1039:Steel bridges in Australia 635:queenswharfbrisbane.com.au 295:The bridge is part of the 137:320 metres (1,050 ft) 1009:Bridges completed in 2024 906: 30: 901:(downstream to upstream) 153:145 metres (476 ft) 274:Parliament of Australia 579:Architects, Grimshaw. 235:Neville Bonner Bridge 976:Indooroopilly Railway 865:at Wikimedia Commons 863:Neville Bonner Bridge 192:Engineering design by 103:Queensland Government 25:Neville Bonner Bridge 831:. 28 November 2021. 770:. Architecture Media 554:Brisbane Development 331:Captain Cook Bridges 305:Riverside Expressway 255:South Bank Parklands 82:Queen’s Wharf Bridge 1014:Bridges in Brisbane 795:Grimshaw Architects 706:. 14 October 2020. 322:cable-stayed bridge 318:Grimshaw Architects 299:development in the 281:Grimshaw Architects 196:Grimshaw Architects 118:Cable-stayed bridge 287:2 September 2023. 264:It is named after 216:Construction start 994: 993: 861:Media related to 359:Queensland portal 231: 230: 1051: 961:Eleanor Schonell 892: 885: 878: 869: 860: 845: 844: 842: 840: 821: 812: 811: 809: 807: 786: 780: 779: 777: 775: 759: 753: 752: 750: 748: 729: 723: 722: 720: 718: 712: 705: 697: 688: 687: 685: 683: 657: 651: 650: 648: 646: 627: 621: 620: 618: 616: 602: 596: 595: 593: 591: 576: 570: 569: 567: 565: 556:. 31 July 2019. 546: 540: 539: 537: 535: 515: 506: 505: 503: 501: 479: 468: 467: 465: 463: 448: 442: 441: 439: 437: 417: 411: 410: 408: 406: 391: 361: 356: 355: 354: 208: 160: 35: 21: 1059: 1058: 1054: 1053: 1052: 1050: 1049: 1048: 999: 998: 995: 990: 902: 896: 854: 849: 848: 838: 836: 823: 822: 815: 805: 803: 788: 787: 783: 773: 771: 761: 760: 756: 746: 744: 731: 730: 726: 716: 714: 710: 703: 699: 698: 691: 681: 679: 659: 658: 654: 644: 642: 629: 628: 624: 614: 612: 610:Build Australia 604: 603: 599: 589: 587: 585:grimshaw.global 578: 577: 573: 563: 561: 548: 547: 543: 533: 531: 517: 516: 509: 499: 497: 481: 480: 471: 461: 459: 450: 449: 445: 435: 433: 419: 418: 414: 404: 402: 393: 392: 385: 380: 357: 352: 350: 347: 314: 293: 206: 198: 178:Clearance below 109:Characteristics 38: 26: 17: 12: 11: 5: 1057: 1055: 1047: 1046: 1041: 1036: 1031: 1026: 1021: 1016: 1011: 1001: 1000: 992: 991: 989: 988: 983: 978: 973: 968: 963: 958: 953: 948: 943: 938: 933: 931:Neville Bonner 928: 923: 918: 913: 907: 904: 903: 897: 895: 894: 887: 880: 872: 853: 852:External links 850: 847: 846: 813: 781: 768:ArchitectureAU 754: 724: 689: 652: 622: 597: 571: 541: 524:Brisbane Times 507: 489:Brisbane Times 469: 443: 412: 382: 381: 379: 376: 375: 374: 369: 363: 362: 346: 343: 313: 310: 292: 289: 272:member of the 266:Neville Bonner 259:South Brisbane 243:Brisbane River 229: 228: 227:28 August 2024 225: 221: 220: 217: 213: 212: 209: 207:Constructed by 203: 202: 193: 189: 188: 184: 183: 180: 174: 173: 170: 169:Piers in water 166: 165: 162: 155: 154: 151: 147: 146: 143: 139: 138: 135: 131: 130: 125: 121: 120: 115: 111: 110: 106: 105: 100: 96: 95: 93:Neville Bonner 90: 84: 83: 80: 76: 75: 62: 58: 57: 55:Brisbane River 52: 48: 47: 44: 40: 39: 36: 28: 27: 24: 15: 13: 10: 9: 6: 4: 3: 2: 1056: 1045: 1042: 1040: 1037: 1035: 1032: 1030: 1027: 1025: 1022: 1020: 1017: 1015: 1012: 1010: 1007: 1006: 1004: 997: 987: 984: 982: 981:Walter Taylor 979: 977: 974: 972: 969: 967: 964: 962: 959: 957: 954: 952: 949: 947: 946:William Jolly 944: 942: 939: 937: 934: 932: 929: 927: 924: 922: 919: 917: 914: 912: 909: 908: 905: 900: 893: 888: 886: 881: 879: 874: 873: 870: 866: 864: 859: 851: 834: 830: 826: 820: 818: 814: 801: 797: 796: 791: 785: 782: 769: 765: 758: 755: 742: 738: 734: 728: 725: 709: 702: 696: 694: 690: 677: 673: 669: 668: 663: 656: 653: 640: 636: 632: 626: 623: 611: 607: 601: 598: 586: 582: 575: 572: 559: 555: 551: 545: 542: 529: 525: 521: 514: 512: 508: 495: 491: 490: 485: 478: 476: 474: 470: 457: 453: 447: 444: 431: 427: 423: 416: 413: 400: 396: 390: 388: 384: 377: 373: 370: 368: 365: 364: 360: 349: 344: 342: 340: 334: 332: 328: 323: 319: 311: 309: 306: 302: 298: 297:Queen's Wharf 290: 288: 284: 282: 277: 275: 271: 267: 262: 260: 256: 252: 248: 244: 241:spanning the 240: 236: 226: 222: 218: 214: 210: 204: 201: 197: 194: 190: 185: 181: 179: 175: 171: 167: 163: 156: 152: 148: 144: 140: 136: 132: 129: 126: 122: 119: 116: 112: 107: 104: 101: 97: 94: 91: 89: 85: 81: 79:Other name(s) 77: 74: 70: 66: 63: 59: 56: 53: 49: 45: 41: 34: 29: 22: 19: 996: 930: 921:Captain Cook 855: 837:. Retrieved 828: 804:. Retrieved 793: 784: 772:. Retrieved 767: 757: 745:. Retrieved 736: 727: 715:. Retrieved 680:. Retrieved 665: 655: 643:. Retrieved 634: 625: 613:. Retrieved 609: 600: 588:. Retrieved 584: 574: 562:. Retrieved 553: 544: 532:. Retrieved 523: 498:. Retrieved 487: 460:. Retrieved 446: 434:. Retrieved 425: 415: 403:. Retrieved 335: 315: 294: 285: 278: 263: 234: 232: 150:Longest span 134:Total length 18: 790:"StackPath" 717:13 November 682:13 November 645:14 November 46:Pedestrians 1003:Categories 966:Jack Pesch 956:Go Between 500:1 December 462:7 November 405:7 November 378:References 270:Indigenous 239:footbridge 219:March 2020 69:Queensland 986:Centenary 436:29 August 88:Named for 73:Australia 951:Merivale 936:Victoria 926:Goodwill 839:23 April 833:Archived 806:8 August 800:Archived 774:17 March 747:23 April 741:Archived 708:Archived 676:Archived 667:ABC News 639:Archived 558:Archived 528:Archived 494:Archived 456:Archived 430:Archived 399:Archived 345:See also 339:abutment 327:Victoria 247:Brisbane 161:of spans 124:Material 65:Brisbane 941:Kurilpa 615:25 July 590:25 July 534:1 March 291:History 253:to the 187:History 51:Crosses 43:Carries 971:Albert 564:1 June 312:Design 224:Opened 142:Height 114:Design 61:Locale 916:Story 711:(PDF) 704:(PDF) 237:is a 128:Steel 99:Owner 841:2023 808:2021 776:2023 749:2023 719:2021 684:2021 647:2021 617:2024 592:2024 566:2023 536:2023 502:2021 464:2017 438:2024 407:2017 329:and 233:The 829:WSP 257:in 245:in 200:WSP 159:No. 1005:: 827:. 816:^ 798:. 792:. 766:. 735:. 692:^ 674:. 670:. 664:. 633:. 608:. 583:. 552:. 526:. 522:. 510:^ 492:. 486:. 472:^ 428:. 424:. 386:^ 276:. 71:, 67:, 891:e 884:t 877:v 843:. 810:. 778:. 751:. 721:. 686:. 649:. 619:. 594:. 568:. 538:. 504:. 466:. 440:. 409:. 172:1 164:2

Index


Brisbane River
Brisbane
Queensland
Australia
Named for
Neville Bonner
Queensland Government
Cable-stayed bridge
Steel
Clearance below
Grimshaw Architects
WSP
footbridge
Brisbane River
Brisbane
Brisbane central business district
South Bank Parklands
South Brisbane
Neville Bonner
Indigenous
Parliament of Australia
Grimshaw Architects
Queen's Wharf
Brisbane central business district
Riverside Expressway
Grimshaw Architects
cable-stayed bridge
Victoria
Captain Cook Bridges

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑