462:
25:
112:
The total production capacity of
Atlantic LNG's four trains is around 14.8 million tonnes per year. The capacity of the Train 1 is 3 million tonnes per year, and the capacity of each of Trains 2 and 3 is 3.3 million tonnes per year. Train 4, which cost $ 1.2 billion, has a production capacity of 5.2
103:
signed the
Memorandum of Understanding, and launched a feasibility study of the project. The Atlantic LNG company was formed in July 1995. general Construction of the first train started in 1996, and the train was officially opened on 13 March 1999. The first cargo was loaded in April 1999. Train 2
127:
In 2021, BP Trinidad and Tobago informed the government of
Trinidad and Tobago that due to gas production decline, there was insufficient gas to supply Train 1. The government decided despite spending US$ 250 million dollars on renovating the train to suspend operations for at least two years.
119:
Train 2 is supplied from BP land (50%) off the east coast of
Trinidad and from BG-operated land (50%) off the north coast (NCMA) through 24 inches (610 mm) diameter pipeline. Train 3 receives 75% of its supply from BP land and 25% from a mix of NCMA gas (as with Train 2) and east coast gas
104:
started up on 12 August 2002, Train 3 on 28 April 2003, and Train 4 in
December 2005. A feasibility study for the fifth train—Train X—was scheduled to be concluded by December 2007.
113:
million tonnes per year. The total storage capacity of
Atlantic LNG's facility is 524,000 cubic meters. The total investment of building four LNG trains was US$ 3.6 billion.
552:
527:
228:
116:
The Train 1 is supplied from the BP-operated fields in the east coast of
Trinidad through the NGC-Trinidad-and-Tobago-owned 36 inches (910 mm) diameter pipeline.
403:
547:
137:
92:
532:
542:
440:
246:
350:
314:
383:
415:
488:
149:
467:
537:
404:
Stabroek News:July 29th, 2021: Energy giant BP Trinidad alerts
Trinidad government on major gas shortfall
275:
60:
378:
345:
309:
88:
253:
68:
229:"Atlantic LNG restructuring agreement could open doors for Trinidad & Tobago's gas sector"
247:"Liquefied Natural Gas from Trinidad and Tobago: The Atlantic LNG Project. Working Paper #30"
257:
288:
100:
38:
Please help update this article to reflect recent events or newly available information.
339:
303:
521:
372:
121:
79:
per year production capacity, is among the world's largest LNG trains in operation.
419:
64:
457:
503:
490:
204:
141:
72:
208:
76:
63:(LNG) producing company operating a liquefied natural gas plant in
96:
256:, Program on Energy and Sustainable Development. Archived from
480:
18:
145:
441:"BP Offers Gazprom Stake in Atlantic LNG Project - Report"
87:
The
Atlantic LNG project was started by Cabot LNG (now
199:
National Gas
Company of Trinidad and Tobago (11.1%)
371:
338:
302:
207:newspaper reported, that BP has invited Russia's
167:National Gas Company of Trinidad and Tobago (10%)
71:. Atlantic LNG operates four liquefaction units (
8:
553:Energy infrastructure in Trinidad and Tobago
528:Oil and gas companies of Trinidad and Tobago
333:
331:
138:National Gas Company of Trinidad and Tobago
93:National Gas Company of Trinidad and Tobago
57:Atlantic LNG Company of Trinidad and Tobago
220:
386:from the original on 27 September 2007
353:from the original on 27 September 2007
317:from the original on 27 September 2007
284:
273:
240:
238:
245:Rob Shepherd, James Ball (May 2004).
7:
170:Chinese Investment Corporation (10%)
548:Natural gas in Trinidad and Tobago
14:
211:to take a stake in Atlantic LNG.
175:The stakes in Trains 2 and 3 are:
120:(ECMA) held 50% by BG and 50% by
460:
382:. NHST Media Group. 2005-02-01.
349:. NHST Media Group. 2006-12-06.
313:. NHST Media Group. 2007-02-05.
304:"Trinidad puts Train X on table"
75:). Train 4, with a 5.2 million
23:
91:) in 1992. In 1993, Cabot LNG,
443:. Downstream Today. 2007-08-23
418:. Atlantic LNG. Archived from
150:Chinese Investment Corporation
16:Company in Trinidad and Tobago
1:
136:Atlantic LNG is owned by the
533:Liquefied natural gas plants
543:BP buildings and structures
340:"Atlantic waits on Train 4"
140:(NGC Trinidad and Tobago),
569:
468:Trinidad and Tobago portal
373:"Atlantic LNG raises roof"
188:The stakes in Train 4 are:
156:The stakes in Train 1 are:
32:This article needs to be
283:Cite journal requires
504:10.18389°N 61.69361°W
61:liquefied natural gas
203:In August 2007, the
509:10.18389; -61.69361
500: /
254:Stanford University
231:. 13 December 2022.
69:Trinidad and Tobago
108:Technical features
481:Corporate website
53:
52:
560:
515:
514:
512:
511:
510:
505:
501:
498:
497:
496:
493:
470:
465:
464:
463:
452:
451:
449:
448:
437:
431:
430:
428:
427:
412:
406:
401:
395:
394:
392:
391:
375:
368:
362:
361:
359:
358:
342:
335:
326:
325:
323:
322:
306:
299:
293:
292:
286:
281:
279:
271:
269:
268:
262:
251:
242:
233:
232:
225:
48:
45:
39:
27:
26:
19:
568:
567:
563:
562:
561:
559:
558:
557:
538:BP subsidiaries
518:
517:
508:
506:
502:
499:
494:
491:
489:
487:
486:
477:
466:
461:
459:
456:
455:
446:
444:
439:
438:
434:
425:
423:
414:
413:
409:
402:
398:
389:
387:
379:Upstream Online
370:
369:
365:
356:
354:
346:Upstream Online
337:
336:
329:
320:
318:
310:Upstream Online
301:
300:
296:
282:
272:
266:
264:
260:
249:
244:
243:
236:
227:
226:
222:
217:
134:
110:
101:British Gas plc
85:
49:
43:
40:
37:
28:
24:
17:
12:
11:
5:
566:
564:
556:
555:
550:
545:
540:
535:
530:
520:
519:
484:
483:
476:
475:External links
473:
472:
471:
454:
453:
432:
407:
396:
363:
327:
294:
285:|journal=
234:
219:
218:
216:
213:
201:
200:
197:
194:
185:
184:
181:
172:
171:
168:
165:
162:
133:
130:
109:
106:
84:
81:
51:
50:
31:
29:
22:
15:
13:
10:
9:
6:
4:
3:
2:
565:
554:
551:
549:
546:
544:
541:
539:
536:
534:
531:
529:
526:
525:
523:
516:
513:
482:
479:
478:
474:
469:
458:
442:
436:
433:
422:on 2007-07-17
421:
417:
411:
408:
405:
400:
397:
385:
381:
380:
374:
367:
364:
352:
348:
347:
341:
334:
332:
328:
316:
312:
311:
305:
298:
295:
290:
277:
263:on 2007-06-11
259:
255:
248:
241:
239:
235:
230:
224:
221:
214:
212:
210:
206:
198:
195:
193:Shell (51.1%)
192:
191:
190:
189:
182:
180:Shell (57.5%)
179:
178:
177:
176:
169:
166:
163:
160:
159:
158:
157:
153:
151:
147:
143:
139:
131:
129:
125:
123:
122:ChevronTexaco
117:
114:
107:
105:
102:
98:
94:
90:
82:
80:
78:
74:
70:
66:
62:
58:
47:
35:
30:
21:
20:
485:
445:. Retrieved
435:
424:. Retrieved
420:the original
416:"Our Trains"
410:
399:
388:. Retrieved
377:
366:
355:. Retrieved
344:
319:. Retrieved
308:
297:
276:cite journal
265:. Retrieved
258:the original
223:
202:
187:
186:
174:
173:
155:
154:
135:
132:Shareholders
126:
118:
115:
111:
86:
65:Point Fortin
56:
54:
41:
33:
507: /
161:Shell (46%)
522:Categories
495:61°41′37″W
447:2007-09-01
426:2007-09-01
390:2007-09-01
357:2007-09-01
321:2007-09-01
267:2007-09-01
215:References
196:BP (37.8%)
183:BP (42.5%)
148:, and the
492:10°11′2″N
205:Vedomosti
44:July 2016
384:Archived
351:Archived
315:Archived
164:BP (34%)
209:Gazprom
152:(CIC).
83:History
34:updated
77:tonnes
73:trains
261:(PDF)
250:(PDF)
142:Shell
97:Amoco
59:is a
289:help
99:and
89:Suez
55:The
524::
376:.
343:.
330:^
307:.
280::
278:}}
274:{{
252:.
237:^
146:BP
144:,
124:.
95:,
67:,
450:.
429:.
393:.
360:.
324:.
291:)
287:(
270:.
46:)
42:(
36:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.